Welcome to tender impulse

 Aviation  Tenders 2017/18

<<Back
SrNo. Description Deadline Date
1 Supply of Radios and Spare Parts 04/03/2015
2 Invitation To Tender for AH64D Apache Helicopter Spares 22/07/2015
3 PURCHASE SUPPORT ASSEMBLIES FOR MH60T
HELICOPTERS
17/08/2015
4 Helicopter, blackhawk 28/09/2015
5 RFI repair of the System Electronics Unit (SEU), Torque & Turbine Gas Temperature Converter (TGT), System Interface Unit (SIU) & the Altitude Hover Hold Stabilization (AHHS) Control Panel (ACP) for the HH-60G Helicopter 21/09/2015
6 The aircraft lease purchase 26/10/2015
7 A Package of Basic Maintenance of Kawasaki BK11 7C-1 Helicopter (JA6815) including Regular Inspection 10/11/2015
8 Aircraft b-2, Bomber atb/fmf, Transducer, Motional contract for a Quantity 92 each 17/11/2015
9 State Police heliocopter systems upgrade 15/10/2015
10 Repair of instruments and aircraft avionics 10/11/2015
11 AgustaWestland AW139 helicopters avioonikakomponentide purchase, exchange, repair and maintenance. 16/11/2015
12 PILATUS type of aircraft leasing and FP6 type Cessna caravan for the benefit of paratroopers from the 11th Parachute Brigade (11th Bp). (three lots). 19/11/2015
13 Open procedure for the award of the helicopter rescue service for the provinces of Como and Sondrio 27/11/2015
14 Scheduled maintenance inspection 3000 hours / 5 years, various jobs and additional activities not planned to be carried out on helicopters CNVV.F .: AB412 VF61 - VF68 - VF69. CIG 639284241BD0F. 23/11/2015
15 AL. 45/15 ("Sale of Nine (9) A / F G 164, Eleven (11) A / F R1340 A1 and Stock Parts of 359 MAEDY".).
08/12/2015
16 Delivery twin-engine multi-purpose helicopter 21/12/2015
17 Computer system software and Hardware Maintenance and Flight information display system operator labor outsourcing tender 02/12/2015
18 Swift Current Airport (YYN) Runway Extension Design & Cost Plan 27/11/2015
19 SUPPORT AND MAINTENANCE FOR THE OPERATIONAL AIRPORT INFORMATION SYSTEM DEPLOYED AT THE NEW MUSCAT AND SALALAH AIRPORT 30/11/2015
20 CONSULTANCY SERVICES FOR THE DEVELOPMENT OF AIRPORT PAVEMENT MANAGEMENT SYSYTEM 17/11/2015
21 Review of the modus operandi of Passenger Loading Bridge (PLB) andAircraft Docking Guidance System (ADGS) Operations at Changi Airport 13/11/2015
22 LITHUANIA SE AIRPORT PASSENGER TERMINAL PALANGOS BRANCH EXCHANGE swing door sliding automatic doors WORKS CONTRACTS 16/11/2015
23 E-2D Advanced Hawkeye (AHE) Flight Management System (FMS) Safety Discrepancy Business Case Analysis - Federal Business 18/11/2015
24 Replacement of Threshold Identification Lights (TIL) at 20R Runway,Changi Airport 13/11/2015
25 Benbecula Airport LED Airfield Ground Lighting Fittings 04/12/2015
26 Fraport AG intends setting up a visitor centre born in stock of Terminal 1, 202, plus adjacent new building, ramp-side. 00/11/2015
27 Regeneration pavement track flight. Ibiza Airport. 00/00/0000
28 Implementation of services of passenger transport on scheduled flights in the subnets 11, 21, 22, 31,32, 41, 81 and 83 from the 1.8.2016 (or the subnet of 21 from the 1.1.2017). 00/12/2016
29 Service for the maintenance of runways and associated equipment of the airport of Ibiza. 00/00/0000
30 Service maintenance walkways airport Palma Mallorca. 00/00/0000
31 Supply of equipment for setting lights lamps at airports 20/11/2015
32 Markings aviation signaling agen airport. 04/12/2015
33 Delivery of materials for repairing airfield pavements 24/11/2015
34 Asphalt spreading works and other facilities in connection with the renovation and upgrading of the runway 14/12/2015
35 Design-Build Services for Airport Security Infrastructure Program
08/01/2016
36 Software Task Lithuania Air Force Aviation Base Transport And Passenger Aircraft Attack Ramp Reconstruction Design Proposals 29/11/2015
37 supply electric airplane push and pull truck at Da Nang international airport 30/11/2015
38 Kaunas Airport passenger terminal renovated design and project supervision services 12/01/2016
39 Ramp E comprises over 100,000 m≤ of paved surface and is planned to be built on an area southeast of the existing Terminal 2. - the ramp area for a total of 13 pieces. stands that can either be used for the 13 st. simultaneous Code C aircraft, or 6 pcs. simultaneous major code E aircraft, - in the field are also planned for tents intended for parking equipment. In addition to this, there are storage areas within the ramp area equipped with canopies, - the contract also includes the construction of a technical building and a number of technology cures, and ramp shelters fitted with equipment for ground handling companies' operations, - the supply of power and ventilation shall be provided at each location, however, buried fuel supply, runway lights, lighting masts and precision docking aids. - stormwater management system. 21/12/2015
40 Between Frankfurt stadium and the Regio Station Airport the S-Bahn line is warped by 3683 Gateway Gardens. The newly constructed 2-track route is about 4.2 km long. A half runs oberidisch, the other in the tunnel location (Open Frame), including underground station. The "free range" precedes in Einschnitt- as well as in an embankment with a level crossing and building a cofferdam. Inventory dismantling after commissioning. Compensatory measures, reclamation.

30/11/2015
41 Between Frankfurt stadium and the Regio Station Airport the S-Bahn line is warped by 3683 Gateway Gardens. The newly constructed 2-track route is about 4.2 km long. A half runs oberidisch, the other in the tunnel location (Open Frame), including underground station. The "free range" precedes in Einschnitt- as well as in an embankment with a level crossing and building a cofferdam. Inventory dismantling after commissioning. Compensatory measures, reclamation.

30/11/2015
42 Oslo Airport AS (OSL) a wholly-owned subsidiary of Avinor, seeks to purchase a number of electrically driven towable passenger stairs. The passenger stairs will be used within the apron area for embarking/disembarking passengers to/from the aircraft. 00/00/0000
43 Consultancy Services for Replacement of Fixed Gangways (FGWs) and Passenger Loading Bridges (PLBs) at Terminal 1 Extension Piers, Singapore Changi Airport. 28/12/2015
44 Framework agreements on IT consultancy services for the Airport Express Train 07/12/2015
45 Production and Delivery of Changi Airport FAST-Branded Merchandise 01/12/2015
46 Kaunas airport passenger terminal overhaul, Schengen and non-Schengen passengers by optimising the flow, the design and the execution of the project. 00/00/0000
47 Supply, reduced maintenance and spare parts for Mobile Lighting Units.
14/01/2016
48 The provision of labour (drivers) to transport passengers and air crew to and from aircraft. 00/00/0000
49 The tender comprises a 3D simulation application that shall be able to simulate different kinds of airport processes. The application will be a planning tool to evaluate future airport infrastructure investments. The application will also be a planning tool to improve operational processes at the airport. 00/00/0000
50 Procurement of Passenger Boarding Bridge. 09/12/2015
51 Procurement of 2 sets of Seaport all-rubber-wheeled passenger boarding bridge. 17/12/2015
52 Flight Safety Surveillance Information System maintenance and development services 11/12/2015
53 supply 4 luggage band conveyer trucks at Cam Ranh International Airport, Dong Hoi Airport, Pleiku Airport, Vinh Airport 15/12/2015
54 Flight operations services (airports, air navigation, hotels, etc. Services) European airports (2 years) 14/12/2015
55 Construction of a new passenger terminal 10/12/2015
56 Purchase of heavy duty canopy strap for passenger boarding bridge at NAIA Terminal 3 11/12/2015
57 Air traffic control tower equipment and airfield lighting control and monitoring system 17/12/2015
58 Avinor shall expand central areas at Stavanger Airport Sola (USO1). The expansion consists of expanding the departure hall and storage building which has already begun, as well as expanding the arrivals and customs area (this announcement). The area of the new building is approximately 4 500 m² divided in 3 floors of various sizes. 00/00/0000
59 Avinor shall expand central areas at Stavanger Airport Sola (USO1). The expansion consists of expanding the departure hall and storage building which has already begun, as well as expanding the arrivals and customs area (this announcement). The area of the new building is approximately 4 500 m² divided in 3 floors of various sizes. 00/00/0000
60 Lamp transformers for the lighting system must renew the Flughafen Z√ľrich AG. As a replacement, a lighting-bus system, consisting of lighting bus couplers and lighting bus actuators for the parallel circuit technology is intended. By means of this invitation to tender, a supplier is searched, which developed this lighting bus system for parallel circuit technology and in the field test, the document provides that the lighting bus system meets the required functionality. The Flughafen Z√ľrich AG will then order these components in tranches to be triggered individually. Detailed description see tender documents. 00/00/0000
61 PortGround GmbH intends the procurement of 2 piece container-pallet lifting vehicles with two platforms and the option on a third container pallet lifting vehicle which are suited to the loading and unloading widebody with air cargo and express cargo in the lower and upper range of the respective aircraft types. It is foreseen pallets and containers with a width of Max 125 "and a weight of at least 12 000 kg to load / unload. 00/00/0000
62 Manchester Airport is currently characterised by a fragmented 3-terminal operation, supported by two runways, a transport interchange, various landside road networks and significant supporting infrastructure. 06/01/2016
63 19/1/9/1/106TA(15) SUPPLY AND DELIVERY OF CONVEYOR BELT X-RAY INSPECTION UNIT INCLUDING A TWO (2) YEAR MAINTENANCE CONTRACT: COMPONENT: OPERATIONAL SUPPORT: DIVISION: PROTECTION AND SECURITY SERVICES 21/01/2016
64 One New, Passenger Boarding Ramp 20/01/2016
65 The subject matter includes the electrical services in the course of project renovation slope system 11/29 at Vienna-Schwechat airport. 00/00/0000
66 Purchase/Installation Of Communications Equipment For Romblon Airport 05/01/2016
67 Hsinchu passenger bridges and pier foundation Ya Protection Project 24/12/2015
68 Supply and installation of new boarding bridges and related works 31/12/2015
69 Of awarding design and construction management for the construction dellampliamento passenger terminal - Phase 1b 05/02/2016
70 Build Taitung, Orchid Island, Green Island airport Flight information billing system (network version) 30/12/2015
71 Installation / Construction of Conveyor Belt From Pakistan International Bulk Terminal 18/01/2016
72 Purchase/Installation Of Papi System, Relocation Of Rtil & Runway Threshold/End Lights, Installation Of Additional Rel At Runway-05 At Kalibo International Airport 05/01/2016
73 Supply and Delivery of 850 set of Rotary Head LED (Twin) downlight fittings,wattage of 2x15W- 24W similar to existing Rotary Head LED downlights(Twin- 2x17W) which are installed in Departure of Terminal 1, Singapore Changi Airport 31/12/2015
74 Conception and creation of a script, as well as the production of it containing film sequences for the staging of a large scale LED media installation media highlight for passengers in the transit area of Terminal Panel 1B at Frankfurt airport. 00/00/0000
75 Elevators and conveyors 28.92.11-00.00_ continuous for underground works) and belt conveyors 20/01/2016
76 Expert inspection of elevators, escalators, moving walks, driving equipment Paternoster shelves and passenger boarding bridges, and during the examination the examination of electric equipment com. DIN VDE 0105-0100 as proof of technical values. 00/00/0000
77 Design-Build Services for Terminal 3 West Modernization and Boarding Area F Passenger Boarding Bridge Projects 28/01/2016
78 Supply And Delivery Of Airfield Lighting Spare Parts 30/12/2015
79 Repair\Maintenance of Flight Information Display Systems (FIDS) of Davao International Airport 21/01/2016
80 Reconstruction of the observation deck of the terminal and passengers relegation zone RME "International Airport Rivne" 04/02/2016
81 Maintenance and repair compound, street,fencing security lighting and helipad/ aviation lighting system for military establishment 12/01/2016
82 A preliminary design of passenger information - USERS INTEGRATED FREIGHT TRANSPORT 01/02/2016
83 LINE ITEMS OF SPARES FOR AIRFIELD LIGHTING SYSTEM. 20/01/2016
84 Provision of Airfield/Heliport Portable Lighting Equipment 05/02/2016
85 Provision of Airfield/Heliport Portable Lighting Equipment 05/02/2016
86 TERMINAL EQUIPMENT FOR INSPECTION FOR FOREIGNERS ENTRY AND DEPARTURE INFORMATION SYSTEM, 1 SET.

18/02/2016
87 Airfield Lighting Control Systems (AFLCS) 25/01/2016
88 Airport Lighting Maintenance Training 22/01/2016
89 Airport Lighting Maintenance Training 22/01/2016
90 Purchase of spline bars for passenger boarding bridges, T1 19/01/2016
91 Replace wind cone ,segment circle,and provide runway edge lighting circuit 09/02/2016
92 Construct Runway including runway safety areas ,parallel taxi ways runway and taxi way edge lighting,signage, marking 16/02/2016
93 Purchase of Middle Tube Shock Absorber of Passenger Boarding Bridges, T1 28/01/2016
94 Supply, installation and commissioning of airport equipment service to the international airport of Oran Ahmed Ben Bella, International Module - actual airport terminal - cargo area 15/02/2016
95 Kaohsiung cum Hengchun Airport airfield lighting improved insulation case 26/01/2016
96 Maintenance and repair of motor vehicles, building and special airport equipment 01/02/2016
97 Maintenance of Airfield Ground Lightings at Brunei International Airport 01/03/2016
98 Supply and Installation of Control Unit Boards for A-VDGS bay 35 & 32 at NAIA Terminal 2 12/02/2016
99 Supply of labor and materials replacement of Auto Leveler Assembly of Passenger Boarding Bridge, T-3 03/02/2016
100 Matsu aids Taipei airport lighting rod materials and parts procurement case 04/02/2016
101 Procurement, Supply and Installation of Electrical Light Approach Cat I, along Squence Flashing Light and accessories. Krabi Airport Krabi With Electronic auction (E-bidding). 16/02/2016
102 Provide for emergency runway rehabilitation, the installation of high intensity lights and the modernisation of ground radio navigation equipment in order to enhance its operational efficiency and safety. 24/01/2017
103 Construction work for airfields, runways and manoeuvring surfaces. Construction work for airfields, runways and manoeuvring surfaces 04/03/2016
104 Airport lighting equipment maintenance (ICAO) training 10/02/2016
105 Buy devices FDIS & SMATV (Fight Data Information System & Satellite Master Antenna Television) with two components of the system that you use regularly frog., At STH 19/02/2016
106 Airfield Lighting II - REQUIREMENTS CONTRACT 01/05/2016
107 Purchase of two passenger boarding ramps for airports 16/02/2016
108 Supply airfield lighting products on an as needed basis 19/02/2016
109 The system consist of electrical material including Constant Current Regulators (CCR), lights, transformers, cables, wires, connectors, plugs and bases, etc. (see Section 6). The material shall be compatible and provide a complete airfield lighting systems when installed and connected, except for the 3 kV cables and extension cables, 600 V, from light to transformer for light. 00/00/0000
110 The subject of the contract is the supply and installation of two complete conveyors: power C 7.10.1 and 7.10.2 C pochylniany-on the basis of held by the investor. 00/00/0000
111 Installation of inset runway edge light 26/02/2016
112 Airport Lighting 23/02/2016
113 Different types of tyre, tube,liner,for jet-way passenger boarding bridge 10/03/2016
114 West Capital International Airport boarding bridge replacement procurement tenders 07/04/2016
115 Renovation and up gradation of boarding bridges at airport

02/03/2016
116 Passenger boarding ramp at the redding municipal airport 08/03/2016
117 Servicing of Aircraft Ground Control Stations 30/03/2016
118 Makung airport airfield lighting power equipment procurement case 16/03/2016
119 Design, Supply, Delivery, Installation, Testing and Commissioning of 28 Nos. of Passenger Loading Bridges (PLBs) for Terminal 1 Extension Piers, Singapore Changi Airport 14/04/2016
120 Multi year airport planning and engineering service.Airport improvements include,afield lighting and signs,Perimeter fencing and gates 15/03/2016
121 Construction of Administrative Building at Plaridel Airport 31/03/2016
122 ZAMBOANGA INTERNATIONAL AIRPORT DEVELOPMENT PROJECT 11/03/2016
123 BARCALDINE AIRPORT LIGHTING UPGRADERUNWAY, TAXIWAY, APRON AND WIND INDICATORS

11/03/2016
124 Design, Supply, Delivery, Installation, Testing and Commissioning of 28 Nos. of Passenger Loading Bridges (PLBs) for Terminal 1 Extension Piers, Singapore Changi Airport 14/04/2016
125 Hiring a civil aircraft with crew to secure special parachute training 14/03/2016
126 EC145 and EC120 AIRCRAFT MAINTENANCE WORKS 18/03/2016
127 Furnishing one new ADA Compliant passenger boarding ramp 17/03/2016
128 Bid for supply and installation luggage band conveyer system. 28/03/2016
129 New Year PU runway project 14/03/2016
130 Maguang Guo PU runway in new construction 16/03/2016
131 Supply, installation and commissioning of flight information display system 26/04/2016
132 15173 record - completion of work on Gazelle helicopters Sa342 the benefit of the industrial workshop of the aerospace Clermont-Ferrand.
05/04/2016
133 Providing a tug towing / pushing aircraft without towbar with Jamba lifting the nose, tuition services staff who use and maintain the tug and service during the warranty period.
15/04/2016
134 Flight information system functionality to expand and improve the text interface 14/03/2016
135 Rehabilitate airfield lighting system 14/04/2016
136 N taxiway surface renovation project commissioned technical services 14/03/2016
137 Songshan Airport taxiway edge lights refurbishment cum helipad lighting loop grafting case 15/03/2016
138 Taiwan Taoyuan International Airport control tower cum whole park new construction 15/03/2016
139 Radio Taipei machine taxiway center line lights materials and parts procurement case 15/03/2016
140 Airport MRT station area A7 zone imposed new construction of public works monitoring center 15/03/2016
141 Hualien airport "Terminal-wire lighting control system renovation project build-cum-upgrade" 22/03/2016
142 DESIGN, UPGRADE AND CONSTRUCTION OF AIRFIELD GROUND LIGHTING ON RUNWAY 11 APPROACH LIGHTS AT EAST LONDON AIRPORT 17/03/2016
143 Kaohsiung machine, radio and Matsu Taiwan Hualien airport airfield lighting materials and parts procurement case 18/03/2016
144 GD-61.4((P-2) (100)/CAAB/E/M-I(DEV) 2015-2016 :- Supply & installation of new boarding bridge & related works at Hazrat Shahjalal International Airport, Dhaka 30/03/2016
145 Runway and Taxiway Maintenance Work at TIA 11/04/2016
146 Antiaircraft brake taillight assembly item B 21/03/2016
147 Modernization Study of airport management information system of ONDA. 12/04/2016
148 Bagabag Airport Development Project 05/04/2016
149 Taytay Airport Development Project 05/04/2016
150 Laoag International Airport Development Project 05/04/2016
151 Purchase/Installation Of PAPI System At Masbate Airport 22/03/2016
152 PURCHASE/INSTALLATION OF AIRFIELD LIGHTING SYSTEM AT GENERAL SANTOS INTERNATIONAL AIRPORT 05/04/2016
153 UPGRADING OF RUNWAY (ASPHALT OVERLAY) AT ZAMBOANGA INTERNATIONAL AIRPORT 07/04/2016
154 The 2 private and independent Norwegian airports Sandefjord Airport Torp (ENTO) operated by Sandefjord Airport (SLH) and Moss Airport Rygge (ENRY) operated by Rygge Civil Airport (RSL), invite you to participate in the pre-qualification for the supply of air navigation services. The following services will be a part of the tendering process:
ó Aerodrome control service (TWR);
ó Communications, navigation and surveillance service (CNS).
06/04/2016
155 AIRFIELD LIGHTING SYSTEM SPARES. 28/03/2016
156 Airside Roadway Enhancement Works (LED Signage) 23/03/2016
157 The construction of Taiwan Taoyuan International Airport new control tower 23/03/2016
158 Repair and maintenance of Osman International Airport ( repair and maintenance of boundary wall from main approach road towards 11 end of runway other allied work) 11/04/2016
159 Extension of Taxiway 08 toward the south-west; extension of the Airport's southern apron and reconfiguration of Stand 16. 14/04/2016
160 Hualien airport "deprecated flight information display board case" 23/03/2016
161 Helsinki-Vantaa International Terminal T1 extension, project management contract. 04/04/2016
162 DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF RUNWAY INCURSION DETECTION SYSTEM AT SINGAPORE SELETAR AIRPORT 11/04/2016
163 Taipei international airport 105--106 annual building maintenance engineering planning and design and technical supervision services 31/03/2016
164 Renovation of passenger Terminal Building E/M Works at Shah Mokhdum Airport 07/04/2016
165 Long Range Acoustic Device to be used at Seletar Airport for WildlifeManagement 30/03/2016
166 Spares for the Maintenance of SF-260 Aircraft (Lot VI) 31/03/2016
167 Provision of Consultancy Services To Review Implementation ofSingle Communication Frequency Operations in Changi Airport 12/04/2016
168 Supply and Installation of Lighted Signage at NAIA Terminal 2 13/04/2016
169 ITQ 7115103041-SPARES FOR AIRFLELD LIGHTING SYSTEM. 04/04/2016
170 Supply and Installation of Instrumented Landing System on Track 258 02/05/2016
171 Surveillance flights FLIR helicopter. 28/04/2016
172 Design of carpark space artwork themes, painting of carpark spaces,production and installation of overhanging signages 04/04/2016
173 Hiring the inspection service in flight of aid systems for air navigation Air Force, according to the general and technical specifications laid down in the specifications of this procedure.
02/05/2016
174 Shared Passenger processing system for airport 07/04/2016
175 Renewal of stock lighting in the passenger terminal at Linz Airport and based on LED floor lamps workplace lighting solutions.
22/04/2016
176 Taoyuan Airport Smart Airport APP maintenance 28/03/2016
177 Hualien airport "Terminal-wire lighting control system renovation project build-cum-upgrade" 29/03/2016
178 San Jose Airport Federal Inspection Services Improvements 07/04/2016
179 Design, supply, delivery and installation of 23 nos. of bay indicator signboards (BIS) sign faces with inner metal frame in Terminal 1 & 2. 31/03/2016
180 Airport Operation & Management Services 14/04/2016
181 Airport Operation project. 31/03/2016
182 The Delegation of Mali ASECNA has planned for its 2016 investment budget, the acquisition and
installation of VHF equipment for Sikasso airport control tower
28/04/2016
183 The "2015/2016 Ohakea Airfield Maintenance" is a maintenance works project for the airfield pavements at RNZAF Ohakea Base. Works include but are not limited to concrete joint sealing, concrete spall repairs, slot drain repairs, rubberised bitumen bandaging, paint markings and asphalt patch repairs. 01/04/2016
184 Aircraft Spares for the Maintenance of UH-1H Helicopter Tail Numbers 806, 181, 501, 305, 504, 308, 8392, 8413 & 508 14/04/2016
185 Aircraft Spares for the Maintenance of UH-1H/D Helicopters Tail Numbers 8166, 516, 853, 8189 & 8830 14/04/2016
186 Procurement of different type motors for CIMC Passenger Boarding Bridge 21/04/2016
187 COMPLEX OF SERVICES ON TECHNICAL SUPPORT OF HARDWARE AND SOFTWARE FIDS (FLIGHT INFORMATION DISPLAY SYSTEM) AND PUBLIC ADDRESS SYSTEM IN THE AIRPORT COMPLEX "TASHKENT" AIRPORT 05/04/2016
188 SUPPLY AND ELIVER OF AIRFIELD LIGHTIG SPARE PARTS 06/04/2016
189 The purpose of this contract is the provision of a service of 5 aircraft for the prevention and defense against forest fires and prevention, surveillance and coordination during the years 2016, 2017 and 2018 (proposal 5/16-I). 06/05/2016
190 Software task lithuania air force aviation base peron "a" and taxiways (pilots g. 3, öiauliai) reconstruction project proposals it organizes 09/04/2016
191 Charleroi Airport: repair work of the hydrocarbon coating on the taxiway N4 and N5 between North / M5.
09/05/2016
192 TP-C1050302 Songshan Airport and civil maintenance contract (open contract) 07/04/2016
193 Repair and maintenance works of airport equipment (GSE) in the field of metal / steel and vehicle performance according to catalog.
31/05/2016
194 The contract is to provide services and training in a flight simulator for helicopter pilots.
22/04/2016
195 20162029 engine spare parts for aircraft C-101 (E.25).
11/05/2016
196 Reuse airport Tegel - Schumacher Quartier, planning traffic facilities and engineering structures for external development. 03/05/2016
197 Reuse airport Tegel - Schumacher Quartier, planning traffic facilities and engineering structures for internal circulation.
03/05/2016
198 Installation of: LED medium intensity runway edge light 26/04/2016
199 L/Is of spares for Airfield Lighting System 22/04/2016
200 MAINTENANCE LIGHTING INTERNATIONAL AIRPORT PUERTO ESCONDIDO 21/04/2016
201 AIRPORT SECURITY CONSULTING AND SPECIALIZED SAFETY/SECURITY SERVICES AT OíHARE AND MIDWAY INTERNATIONAL AIRPORTS 15/04/2016
202 Gregory Highway/Emerald Airport Intersection Upgrade 29/04/2016
203 MODERNIZATION PROJECT INTERNATIONAL AIRPORT 31/05/2016
204 Parts of structural elements and accessories for the aircraft CN-295 (T.21). 17/05/2016
205 Design and Construction of Airside Infrastructure at Busselton-Margaret River Regional Airport 26/04/2016
206 Airbase Operations Communication Systems NSW, SA, WA, QLD 26/04/2016
207 «UKUROVA REGIONAL AIRPORT INFRASTRUCTURE CONSTRUCTION 16/05/2016
208 Sanitary collector Junikowski on the section from the street. The lonely street. Glogowska. Construction work for pipelines, communication and power lines, highways, airfields and railways; leveling the land. Construction work for pumping. 15/06/2016
209 UPGRADING OF AIRPORT SPUR ROAD CHAINAGE 0+000 - CHAINAGE 0+095 04/05/2016
210 CONSTRUCTION OF ADMINISTRATION BUILDING AT DIPOLOG AIRPORT 21/04/2016
211 AIRPORT INFRASTRUCTURE PROCUREMENT NOTICE
«UKUROVA REGIONAL AIRPORT INFRASTRUCTURE cONSTRUCTION construction work 4734 Public Procurement Law will be awarded by open tender procedure according to Article 19.
16/05/2016
212 Aviation Messages Processing System - AMHS Data Transfer To The Se Lithuanian Airports Branches 20/04/2016
213 Airport lighting repair part 26/04/2016
214 Supply operating state of ramps and motorized security filters for various airports in the Aena network tapes. 03/05/2016
215 Delivery of passenger stairs regulated for passenger aircraft. 24/05/2016
216 Qui Nhon airport aviation engineering noise prevention and control improvement plan 27/04/2016
217 Restoration of PAPI System (Runway 02), Pavement & Fences (Runway 02/20) at Pagadian Airport, Zamboanga del Sur (2nd Posting) 05/05/2016
218 Supply & Delivery of COnveyor Slat Base Frame Assembly, T-2 (R.I.S. # 16-78-087) 22/04/2016
219 Construction of drainage, car parks and shades and rehabilitation of hangar 16/05/2016
220 Works on the reconstruction and extension of the passenger terminal at Split Airport 31/05/2016
221 Nominated Sub-Contract for Design, Supply, Delivery, Installation,Testing and Commissioning of Airfield Lighting System for Changi East Development at Singapore Changi Airport (Package Two & PackageThree) 16/05/2016
222 The Ethiopian Airports Enterprise (EAE) invites eligible bidders for the procurement of Airfield Lighting System(AGL) extension at Bahir Dar Ginbot 20 International Airport 19/05/2016
223 Installation of two passenger loading bridges 21/04/2016
224 Constriction of the extension building including but not limited to the passenger boarding bridges 05/05/2016
225 Works on the reconstruction and extension of the passenger terminal at the airport in Split. 31/05/2016
226 Regeneration 07L-25R runway pavement. Barcelona-El Prat Airport. 03/05/2016
227 Open procedure for the award, through the signing of a framework agreement, the replacement of driving tables Led at Milan Malpensa Airport (CIG n. 665039820B). 26/05/2016
228 Parts of aircraft and spacecraft: reducers for helicopters [Ukraine] 005 649 19/05/2016
229 PASSAGE IN AIR PASSENGER abroad, HIRED IN URUGUAY 19/05/2016
230 ACQUISITION oF NEW PARTS FACTORY fOR AIRCRAFT TYPE HELICOPTER MODEL BELL 212 NATIONAL SERVICE AERONAVAL 26/04/2016
231 ACQUISITION OF SPARE PARTS FACTORY IN NEW CONDITION FOR MODEL AIRCRAFT PLANE HOUSE TYPE 200-300 27/04/2016
232 The subject of the public contract is the delivery of AMHS / AFTN exchanges for LKKK node in the global aeronautical telecommunications network. Supply constitute the appropriate software meets the requirements listed in the specifications. Then duplicated / redundant hardware PBX own and his identical copies for the purpose of testing new software versions. The delivery is also client software to access the control panel (replacing SWAFTN terminals MM2000) and 8 operator positions (HWA appropriate SW) for the management, supervision and control panel configuration. Part of the course is also to ensure the fulfillment of customer service. 06/06/2016
233 Taichung Airport Overnight Apron Construction Project Design and Construction Supervision Technical Services 19/05/2016
234 Central Japan International Airport construction project commissioned to design the apron overnight cum technical supervision services 19/05/2016
235 The airport Berlin-Brandenburg GmbH (FBB) intends to renew the existing Ramp 1 and to provide temporarily the Federal Republic of Germany (BUND) available for use. In addition, the measure includes the construction of taxiway G new in the connecting area to the existing taxiway G south of Ramp 1. Moreover, it is provided, if necessary, to rehabilitate the existing taxiway G in the connection area of the Ramp 1 under the measure.
The construction project includes essentially the demolition of existing airfield pavements (Ramp 1) and the construction of planned aircraft movement areas (ramp 1 and taxiway G new in the connecting area to the existing taxiway G) in concrete and asphalt construction including the technical equipment and the necessary drainage systems.
17/05/2016
236 ICBM Airborne Launch Control System 13/05/2016
237 ITQ 7115100175-4 L/IS OF SPARES FOR SUPER PUMA HELICOPTER.
PLEASE REFER TO TERMS AND CONDITION FOR QUOTATION
ATTACHED.
29/04/2016
238 SPARES FOR SEAHAWK HELICOPTER 09/05/2016
239 Supervision over the design and execution of works and contract management pn .: - "Design and construction of the Southern flight from Warsaw S7 expressway from the junction Airport on Southern Warsaw Bypass to Grůjec - Section" A "of the node" Airport "(without the junction) to node "Lesznowola" (the junction) - the length of approx. 6.6 km. " - "Design and construction of the Southern flight from Warsaw express road S-7 from the junction Airport on Southern Warsaw Bypass to Grůjec - Section" B "of the node" Lesznowola "(without the junction) to the node" Tarczyn North "(the hub) - length section of approx. 14.8 km. " - "Design and construction of the Southern flight from Warsaw express road S-7 from the junction Airport on Southern Warsaw Bypass to Grůjec - Section" C "of the node" Tarczyn North 27/06/2016
240 Aviation Refueler Five Sets(600GPM one set, 300GPM four sets) 19/05/2016
241 Construction of a North Terminal Building 19/05/2016
242 «UKUROVA REGIONAL AIRPORT INFRASTRUCTURE CONSTRUCTION 16/05/2016
243 Acquisition of 2 refuellers tractors. 17/05/2016
244 TENDER FOR THE CONSTRUCTION OF AIRPORT RURAL FIRE SERVICES HARDSTAND AREA 17/05/2016
245 The installation of passenger boarding bridge 18/05/2016
246 Provide a common use passenger processing system and flight information display system 01/06/2016
247 London Stansted Airport Terminal Development. 29/04/2016
248 PURCHASE AND INSTALLATION OF PASSENGER BOARDING BRIDGE WITH A ROTUNDA ASSEMBLY 18/05/2016
249 REQUEST FOR PROPOSAL
FOR
Passenger Boarding Bridge Acquisition
12/05/2016
250 Framework agreement for the supply and installation panels for indoor and outdoor signage of the future terminal 1 Lyon Saint-Exupťry Airport. 06/05/2016
251 Framework agreement for the supply and installation panels for indoor and outdoor signage of the future Terminal 1 of the airport of Lyon Saint-Exupťry. 06/05/2016
252 Provision of all manpower, machinery, materials, tools, transport and accessories to design, supply and install lighted signs and other signs for Changi Airport Terminal 06/05/2016
253 Radio and Machine Taitung Taiwan Magong Lan Island airfield airport lighting materials and parts procurement case 05/05/2016
254 Gate 3 Passenger Boarding Bridge and Holding Area
03/05/2016
255 CAUAYAN AIRPORT DEVELOPMENT PROJECT 13/05/2016
256 SAN JOSE AIRPORT DEVELOPMENT PROJECT 13/05/2016
257 TAYTAY AIRPORT DEVELOPMENT PROJECT (RE-BID) 13/05/2016
258 MATI AIRPORT DEVELOPMENT PROJECT 13/05/2016
259 Taipei Main Station instructions marked response Taoyuan airport MRT line opened Update Project 03/05/2016
260 REGIONAL AIRPORT INFRASTRUCTURE CONSTRUCTION 16/05/2016
261 Services in the field of air traffic and related services 26/05/2016
262 Services in the field of air traffic and related services 26/05/2016
263 Deprecation flight information display system equipment case 09/05/2016
264 Terminal Expansion Project - Package 3A International Arrivals Carrousels and OSB 13/05/2016
265 Construction of an air traffic control tower (AC169536) / Construct Air Traffic Control Tower (AC169536) 01/06/2016
266 Replace one existing jet way passenger boarding bridges 10/05/2016
267 Muan airport runway apron joint replacement and crack repair Other construction 26/05/2016
268 Replacement, maintenance and operation of passengers boarding bridges 17/07/2016
269 SERVICE EQUIPMENT AIRPORT ELECTROMECANICO CVM 16/05/2016
270 Supply and installation of preconditioned air units for the Pier B at Brussels Airport. 00/00/0000
271 Matsuyama airport runway region settlement amount precise leveling 10/05/2016
272 Supply of LED street lights fitting at Bandaranaike International airpot 25/05/2016
273 Lanyu Airport runway repair maintenance works 20/05/2016
274 CONSTRUCTION OF TERMINAL BUILDING NEW INTERNATIONAL AIRPORT OF THE CIT 30/08/2016
275 AN/TPX42A (V) Shipboard Air Traffic Control (STC) System Radar Data
Processor
11/05/2016
276 Purchase a TOWBARLESS PUSHBACK + (towing aircraft equipment), in accordance with the requirements specification within the scope of this documentation. 00/00/0000
277 Reinforcement work and construction of roads, extension and renovation of the P1 car Beauvais Tille Airport. 31/05/2016
278 SPARES FOR AIRFIELD LIGHTING SYSTEM 24/05/2016
279 Coast dike construction project planing & design for kinmen airport.(supervision work negotiation bidding for next phase.) 14/06/2016
280 Top Anti-Aircraft Maintenance Hangar No. 074 Property Repair 24/05/2016
281 Construction of Power House, Siargao Airport 31/05/2016
282 Air Base MA3 apron lighting system repairs 20/05/2016
283 Purchase/Installation of Apron Flood Lights at Zamboanga International Airport (ZIA), Zamboanga City (2nd Posting) 01/06/2016
284 Choosing Contractors tasks: Task A: delivery, installation and commissioning of protective runway lights on taxiways L, N, S, T and de-icing station at the airport in Pyrzowice. Task B - preparation of project documentation, delivery, installation and commissioning of two vertical signs starting from the intersection of taxiway N and S of the runway at the airport in Pyrzowice. 30/05/2016
285 Performing comprehensive investor's supervision over construction works within the framework of tasks Construction of the hangar of technical services with facilities and construction spadochroniarni at the military airfield in Deblin. 10/06/2016
286 West Capital International Airport boarding bridge to replace the international tender for procurement 15/06/2016
287 Automobile Roads and motorways and other road elements roads; runways airport 14/06/2016
288 Runway Construction of Works and linking RN15 cemetery Houara Oulad Rahu Rahu CR Houara Oulad -Province of Guercif-. 08/06/2016
289 Runway construction work connecting the tarred road Laghaf (Melouane School) and Karakssou road for about 4km to the town Souihla Marrakech prefecture 06/06/2016
290 LIGHTS AND CKT CARDS FOR AIRFIELD LIGHTING
SYSTEM. PLEASE REFER TO TERMS AND CONDITION FOR
QUOTATION ATTACHED.
27/05/2016
291 Songshan Airport MRT exit 3 off rigid pavement improvement works 23/05/2016
292 West of the airport embankment Road (County Road 189 lines) 5K + 400-6K + 400 To choose the road improvement works 30/05/2016
293 Taoyuan International Airport Terminal Air Bridge deprecated first commissioned project planning and design and technical supervision services 31/05/2016
294 Flight provisioning services (including airports, air navigation services and the hotel) and aviation fuel (Jet A 1) acquisition of European airports (5 years). 00/00/0000
295 A: Proposed New Erection of a Single Storey & Part 2-Storey Airport Passenger Terminal Building at Seletar Aerospace Road 1B: Proposed New Aircraft Parking Stands with Erection of Single Storey Cargo Shed Seletar Aerospace Road 1 09/06/2016
296 Provide a common use passenger processing system and flight information display system at the international airport 01/06/2016
297 Construction of Taxiway N Tie-in and Connection Works 31/05/2016
298 Leeds Bradford Airport Ltd ó LED Supply for Airfield Ground Lighting (ĎAGLí). 17/06/2016
299 Airfield marking services Purchase 06/06/2016
300 Leeds Bradford Airport Ltd ó LED Supply for Airfield Ground Lighting (ĎAGLí). 17/06/2016
301 Construction of Air Traffic Visual Control Tower at Dublin Airport for the Irish Aviation Authority. 21/06/2016
302 The subject of the public contract is redundant data acquisition gateway ACARS-GW, which should allow to receive and send messages type DCL (Digital Clearance) defined by the standard ED-85A. These messages, the system should be able to pass in an easily processed format (eg. XML) to sponsor system (EFS). Furthermore, the data gateway ACARS-GW should allow to receive and process messages D-ATIS defined standard ED-89A. These reports should ACARS-GW had individually to respond by text messages, provided advance other Windows client (news of D-ATIS / D-VOLMET). Communication from the ACARS-GW network PreFANS SITA is determined using the protocol Matip / BATAP, communication systems contracting authority should be based on text-based, synoptic, commonly available protocols / standards (eg. XML). Part of the course is also to ensure the fulfillment of customer service.
12/07/2016
303 RUNWAY FRICTION TESTING SERVICES FOR KING MSWATI III INTERNATIONAL AIRPORT IN SIKHUPHE 10/06/2016
304 Aviation Facilities Ma3 Ramp Lighting System Repair 07/06/2016
305 PROVISION OF ALTERNATE PASSAGE TO AIRPORT FUNCTIONARIES CAR PARKING AT BBIAP ISLAMABAD 09/06/2016
306 Construction of Led Apron High Mast Lights at Port Elizabeth International Airport 23/06/2016
307 PROJECT AND CONSTRUCTION MANAGEMENT AND DESIGN SERVICES FOR THE LORD HOWE ISLAND AIRPORT TERMINAL UPGRADE 15/06/2016
308 Vilnius branch of the runway (runway) and airfield lighting system reconstruction maintenance and FIDIC Engineer services 02/06/2016
309 REQUEST FOR TENDERS FOR CONTRACTOR APPOINTMENT FOR SUPPLY AND INSTALLATION OF HIGH MAST LIGHTS AT PORT ELIZABETH INTERNATIONAL AIRPORT 21/06/2016
310 Consultant Services for Runway and Apron Rehabilitation at Red Lake Airport 17/06/2016
311 Construction and development of runway line, Finnis and guard tower Kunduz airport 18/06/2016
312 Gimhae airport boarding bridges installed manufacturing purchasing 03/06/2016
313 Construction of the first section in the Ulleung Airport 26/10/2016
314 Rehabilitate runway light project 28/06/2016
315 MARKER AND RUNWAY LIGHTS FOR AIRFIELD LIGHTING SYSTEM 15/06/2016
316 Design and Build Contractor for Nelson Air Traffic Control Tower 30/06/2016
317 Spare the runway side safety lane slope forming works 17/06/2016
318 Runway safety lighting installation works contracts 20/06/2016
319 Hydration runway landing - reconstruction of Irrigation 22/06/2016
320 Nominated Sub-Contract for Design, Supply, Delivery, Installation, Testing and Commissioning of Airfield Ground Lighting Control and Monitoring System (AGLCMS) for Singapore Changi Airport 3 Runway Operations 05/07/2016
321 Development works of the runway at Douar Feddan Lakbir and Douar Amgadi the common Boujediane 30/06/2016
322 RFQ - ADB Airfield Lighting Spare Parts 23/06/2016
323 Gwangju Airport Flight Information System (FIDS) Purchase Installation 21/06/2016
324 Supply of labor and materials for the Replacement of Defective Parts for Passenger Boarding Bridge 112 and 114 at NAIA Terminal 3 15/06/2016
325 Mus Airport Terminal Building with the integral Apron Making Facilities 14/07/2016
326 And the integral Kahramanmaras Airport Terminal Building Facilities 12/07/2016
327 Framework Agreement for Supply and Delivery of Airfield Lamps for Airfield Ground Lighting (AGL) System at the Hong Kong International Airport (PRO/T100/16/HT) 05/07/2016
328 installation and removal of signs post to Tocumen International Airport, S.A. 17/06/2016
329 Construction of new roads , taxiways, and extension of an existing runway in the vicinity of the facility 06/07/2016
330 Airfield Lighting System 23/06/2016
331 Consist of construction of a new passenger boarding bridge including access lobby from main terminal hold room 11/07/2016
332 Provision of all manpower, machinery, materials, tools, transport and accessories to design, supply and install lighted signs and other sognsfor Changi Airport Terminal 1. 22/06/2016
333 SUPPLY AND DELIVER OF AIR FIELD LIGHTING SPARE PARTS 22/06/2016
334 The scope of work includes 16 new movable Passenger Boarding bridges (PBBs), all Apron Drives, on pier east. The scope includes, but is not limited to; detailed design, construction, installation, commissioning, and all kinds of tests, training and documentation and so on. 00/00/0000
335 Flight information system FIDS Update 22/06/2016
336 Vilnius branch of the runway (runway) and airfield lighting system reconstruction maintenance and FIDIC Engineer services 30/06/2016
337 Adiyaman Airport Glide Path Infrastructure, Making of Environmental Safety and Road Lighting 18/07/2016
338 TRABZON AIRPORT TERMINAL DEPARTURE HALL BUILDING RENOVATION 18/07/2016
339 Design, fabrication, supply, installation and commissioning of passenger loading bridge no 6 and ground power unit (GPU) in addition to technical support to KEF's maintenance team if needed. 21/09/2016
340 Dunhuang Airport expansion project airfield lighting project tenders 13/07/2016
341 Dunhuang Airport expansion project re-engineering test detection tenders 14/07/2016
342 Red Bluff Municipal Airport Runway 15-33 Rehabilitation. 27/07/2016
343 Runway 34R Medium Intensity Medium Approach Lighting System. 05/07/2016
344 Three Runway System Project 16/08/2016
345 Framework Agreement for Supply and Delivery of Airfield Lamps for Airfield Ground Lighting (AGL) System at the Hong Kong International Airport 05/07/2016
346 Emergency Airfield Lighting Systems (EALS) 11/07/2016
347 Rehabilitation works of runway 09-27 at kaohsiung international airport 21/07/2016
348 The lighting consumable procurement for the terminal 1 29/07/2016
349 The first Terminal expendable lighting supplies procurement case 29/07/2016
350 Supply, Deliver, Install, Testing And Commissioning of Airfield Ground Lighting (AGL) Primary Cable And
Associated Works At KL International Airport.
18/07/2016
351 Full Discount in state and contract maintenance (parts and labor) of the lighting system installed at the airport 11/08/2016
352 Restoration of PAPI System (Runway 02), Pavement & Fences (Runway 02/20) at Pagadian Airport, Zamboanga del Sur (Negotiated Procurement Two-Failed Biddings) 18/07/2016
353 Supply and installation of the fixed signage and outdoor signs from Terminal 1 at the airport Mohammed V. 11/08/2016
354 Procurement of Airfield Lighting System (AGL) at Dire Dawa International Airport 04/08/2016
355 Merge conveyor units for baggage handling system optimization project 22/07/2016
356 NOMINATED SUB-CONTRACT FOR PAVEMENT GROOVING AT RUNWAY 3 AND ASSOCIATED RAPID EXIT TAXIWAYS (PACKAGE ONE) 25/07/2016
357 Beijing Capital International Airport and the F connection M7 Added taxiway surface secondary project tenders 25/07/2016
358 Tower Upgrade Works at Shannon Air Traffic Control Tower, Shannon Airport, Co 29/07/2016
359 The maintenance of signages at O R Tambo International Airport 04/08/2016
360 RENEWAL OF SSI SYSTEM AND ISTANBUL NEW AIRPORT PS / MODE S SSR SYSTEM WILL BE PURCHASED 08/09/2016
361 ITQ 7116100929-SPARES FOR AIRFIELD LIGHTING SYSTEM 22/07/2016
362 Flight Information Display System 26/07/2016
363 Replacing existing transformers, airfield lights 29/07/2016
364 Annual Airport Design and Construction Management Services 10/08/2016
365 Annual Airport Planning Services 10/08/2016
366 Crack Seal Airfield Pavement 10/08/2016
367 Professional Airport Planning Services Airport Master Plan 08/09/2016
368 ACQUISITION OF AERONAUTICAL LIGHTS AND PARTS FOR LIGHTING SYSTEM OPERATION AIRPORT RUNWAY MARSHAL THE SEA 01/08/2016
369 Wonju, Gangwon cover small airports and measurement equipment calibration services, test 20/07/2016
370 Muan airport expansion design for garage fire 22/07/2016
371 REPAIR AND MAINTENANCE OF THREE (3) UNITS PASSENGER BOARDING BRIDGE AT ILOILO INTERNATIONAL AIRPORT 04/08/2016
372 Taichung airport lightning warning Xitonggongcheng 25/07/2016
373 Adequacy of pavement platform in the Airport Girona-Costa Brava. 03/08/2016
374 Adaptation Phase II platform. Lanzarote airport. 03/08/2016
375 Reconstruction of light organizations - Phase 2D, light center line. 29/08/2016
376 Negotiated Procurement for two failed biddings for the Restoration of PAPI System (Runway 02), Pavement & Fences (Runway 02/20) at Pagadian Airport, Zamboanga del Sur 29/07/2016
377 Apron Light pole and Security Cameras 03/08/2016
378 PROVISION OF AIRFIELD MAINTENANCE AND TECHNICAL ASSISTANCE FOR THE NORTH REGIONS OF MALI "GAO, K 05/08/2016
379 Procurement of Airport Boarding Bridge Parts 02/08/2016
380 Delivery, installation and implementation of the operational work of the system of airport-class Advanced - Surface Movement Guidance and Control System (A-SMGCS) the level of minimum Level 2 for the Warsaw Chopin Airport 31/08/2016
381 Capital Airport Terminal 1 and 2 equipment electrical system replacement project tenders 23/08/2016
382 Taichung airport lightning warning Xitonggongcheng 01/08/2016
383 Lifting devices, skip lifts, lifts, escalators and passenger conveyors 30/08/2016
384 Emergency Resealing of Runway Pavement Skid Mark at Kalibo International Airport 02/08/2016
385 Kaohsiung cum Hengchun Airport airfield lighting improved insulation case 08/08/2016
386 SUPPLY, MANUFACTURE, INSTALLATION SIGNS AND SIGNALS STREETS OF VEHICULAR AIRPORT 04/08/2016
387 Construction of Waiting Area, Butuan Airport 11/08/2016
388 Supply and installation of metal safety signs to different airports. 09/08/2016
389 Airfield Lighting 03/09/2016
390 Taipei, Taiwan Kaohsiung machine Radio East, Taiwan and Hualien Green Nankan Airport airfield lighting materials and parts procurement case 10/08/2016
391 Bari airport. Open procedure for the procurement of works: a) Adjustment flight infrastructures and extension of runway 07/25 Rwy: Adaptation YIELD Rwy 25; b) Adaptation of Plants Visual Aids Bright. - IGC No .: 6774114FB3 - CUP No .: B91F09000080004. 19/09/2016
392 Design and Build North Runway and Associated Taxiways (NRCP2). 05/09/2016
393 Combined civil and military airport runway Strip military facilities migrate new construction case 15/08/2016
394 PROPOSED MODIFICATION OF EXISTING HEIGHT LIMIT GANTRY AT TERMINAL 3CHANGI AIRPORT SINGAPORE 15/08/2016
395 Additional Nangan airport hangar project 19/08/2016
396 For the supply of 6 lightning detection systems (ĎLDSí) comprising five (5) lightning detection systems, plus 1 spare system, for deployment at five (5) airports. Solutions for this requirement may consist of lightning detector sensors or data services for the provision of the required data. 26/09/2016
397 The passenger boarding bridges and baggage lifts 14/11/2016
398 Sale of surplus passenger access gangway system. 21/09/2016
399 Q / L2AM / GA134 / 7A340- procurement of 7 EA passenger stairs, self-propelled, for the Aircraft A310, A319 and A340 ready for flight shank. 13/09/2016
400 Purchase of supplies and materials for the Boarding Bridge 24/08/2016
401 Supply, delivery pf Power Supply for Runway Threshold Identification Light (RTIL) at Legazpi Airport 26/08/2016
402 The project consists of rehabilitating the runway, taxiway, apron, and airport lighting at the St. Michael Airport. Stabilize slopes, rehabilitate shoulders, and apply dust palliative 01/09/2016
403 Supply of Conveyor Belt. 29/08/2016
404 Pavement strengthening 03R-21L runway and associated taxiways. Gran Canaria Airport. 19/09/2016
405 This consultation is to:
- the demolition of an existing structure (pre-gateway) West terminal of the airport Paris Orly,
- the realization of a building in all trades, coming in the hall extension 1 of the Western Paris Orly Airport terminal
. - achieving the edge of the building, including the access road located along the south side of the building
the footprint of this extension represents an area of about 3600 m≤. The total building area is about 6000 sqm.
16/09/2016
406 Delivery of lighting for dome, Fernbahnhof Airport FFM 14/09/2016
407 Replace passenger boarding bridge project 09/09/2016
408 Purchase of consumable materials for Passenger Boarding Bridges at NAIA Terminal 3 30/08/2016
409 Lithuanian Air Force Aviation Base platform "A" and taxiway reconstruction design services.

17/10/2016
410 Vilnius International Airport and the airfield lighting system reconstruction contract work: the runway and side safety
lane pavement reconstruction of storm water and drainage networks reconstruction, signal light system reconstruction of SE "Aeronautical Telecommunications cables relaying and so on.

12/10/2016
411 105 annual update Taichung airport signs commissioned design and supervision of technical services 05/09/2016
412 Invitation to Quote for the Maintenance and Provision of Signage forChangi Airfreight Centre 07/09/2016
413 Repair of Passenger Boarding Bridge Canopy and Hood Assembly of Davao International Airport 19/09/2016
414 REPAIR AND MAINTENANCE OF THREE (3) UNITS PASSENGER BOARDING BRIDGE AT ILOILO INTERNATIONAL AIRPORT (RE BID) 20/09/2016
415 Engagement of Accredited Checker for the checking of foundation,substructure& superstructure of the proposed works and the affected existing building structures for the replacement of T1E fixed gangway and passenger loading bridges. 01/09/2016
416 Replacement of Fixed Gangways and Interior Finishes for Fixed Gangways and Passenger Loading Bridges at Terminal 1, Singapore Changi Airport. 22/09/2016
417 Passenger Self-Service Baggage Cart Concession 08/09/2016
418 Supply signal light system for construction runway and enlarging landing area at PhuQuoc international airport. 16/09/2016
419 Proposed Design, Manufacture, Supply, Deliver, Install, Testing And Commissioning of New One (1) Unit of Passenger Boarding Bridge (PBB) And All Associated Works At Sultan Ismail Petra Airport, Kota
Bharu, Kelantan
22/09/2016
420 Avinor AS, Oslo Airport (OSL) is planning the expansion of the Non-Schengen traffic areas, which includes a terminal and air side. The contract includes the necessary building and site work for the alteration and establishment of new apron areas as well as other infrastructure and basements and shafts for the building. The contract also includes the expansion and extension of taxiways, culverts and the expansion of an existing surface water pump station.

28/09/2016
421 Suppy and delivery of rubber bumper for Passenger Boarding Bridges at NAIA Terminal 2 07/09/2016
422 PROVISION OF AIRFIELD LIGHTING SYSTEM COMPONENTS 12/09/2016
423 16-023-08 DEVELOPMENT OF VIRAC AIRPORT 13/09/2016
424 Adequacy communications system T / A Airport Madrid-Barajas Adolfo SuŠrez compliance regulation (EU) 1079/2012 (Channeling 8,33 KHZ)

26/09/2016
425 Muan airport checkpoints apron extension work 09/09/2016
426 PROVISION OF AIRFIELD LIGHTING SYSTEM COMPONENTS 12/09/2016
427 Baggage Conveyor Belt Parts and Accessories 27/09/2016
428 Rehabilitation of the Runway, Apron and Taxiway to
flexible pavement;
12/10/2016
429 The entrusted technical service of the feasibility evaluation for the construction plan of the intelligent terminal (T4) at Taoyuan International Airport. 04/10/2016
430 Passenger Boarding Bridges Replacement Project 15/09/2016
431 Purchase of trailer passenger gangways 07/09/2016
432 Set work standards and pontoons Gangways ferryman 16/09/2016
433 GANGWAY - SUPPLY OF AN A-TYPE HEAVE COMPENSATED GANGWAY A-12 16/09/2016
434 Replacement of Fixed Gangways and Interior Finishes for Fixed Gangways and Passenger Loading Bridges at Terminal 22/09/2016
435 CONSTRUCTION AND ON-SITE INSTALLATION OF A GANGWAY FOR EVANS BAY WHARF 22/09/2016
436 Kaunas airport passenger terminal overhaul works 27/09/2016
437 The provision of air traffic services is the core business and primary statutory duties of LVNL. The Aviation Act also lays down all other tasks of LVNL.This includes inter alia the provision of communication, navigation and surveillance services, the provision of aeronautical information and provide training for air traffic services. 24/10/2016
438 Songshan Airport runway guard lights 28 Improvement 14/09/2016
439 Remove the existing gangeway 22/09/2016
440 The subject of the tender is to ensure a safe environment for air traffic on international public airports Czech Budejovice through the provision of air traffic services (ATS) for GAT flights and military flights OAT-C Instrument Flight (IFR) and flights (VFR) range :
- Providing aerodrome control service (TWR) using ATS surveillance system
08/12/2016
441 SUPPLY OF RUNWAY LIGHTINGS, BUTUAN AIRPORT 20/09/2016
442 REPAIR/REPAINTING OF RUNWAY MARKERS/MARKINGS AT BUSUANGA AIRPORT 23/09/2016
443 Construction of the underpass at the coupling section between the DC422 and éC6040, under taxiway Zadar Airport - construction part and shifting installations 21/10/2016
444 Complete supervision of construction works and the works of the transfer of installations on the construction of an underpass at the coupling section between the DC422 and éC6040, under taxiway Zadar Airport 18/10/2016
445 Beijing's new airport construction project ATC secondary radar and a single secondary radar 14/09/2016
446 Airport air traffic control radar system 19/10/2016
447 Tennis Gimpo Airport Improvement Corporation 16/09/2016
448 Ulsan airport runway identification signs induced installation work 21/09/2016
449 Supply of Runway Sweeper. 17/10/2016
450 JSC International Airport ďManasĒ, intends using the proceeds of a loan from the European Bank for Reconstruction and Development (the Bank) for a project for the partial reconstruction of terminal building in the Manas airport. 09/12/2016
451 Provide consulting servicea to conduct a hangar development 27/09/2016
452 SUPPLY OF RUNWAY LIGHTINGS, BUTUAN AIRPORT 20/09/2016
453 REPAIR/REHABILITATION OF TERMINAL BUILDING AT HILONGOS AIRPORT 21/10/2016
454 SPARES FOR AIRFIELD LIGHTING SYSTEM 23/09/2016
455 Airport Development Consulting 12/10/2016
456 Galena Airport Improvements 13/09/2016
457 GSE/T16/2016: Belt conveyor 27/09/2016
458 CONSTRUCTION OF RUNWAY TAADLOUNTE -BOUATTAS CT Aghbala province of BeniMellal 13/10/2016
459 Repair/Repainting of Runway Markers/Markings at Ormoc Airport 20/09/2016
460 Taipei international airport standby tank New Construction 22/09/2016
461 Second Terminal structural reinforcement, fire and broadcast monitoring system to improve the aviation medicine cum original central region associated with the renovation project commissioned design and supervision of technical services 27/09/2016
462 Open procedure for the adaptation and modernization of custody system hardware / software Airport; construction of the infrastructure for automation of passenger flow control from the airports of Bari and Brindisi. 27/10/2016
463 Const. & On-Site Installation of a Gangway for Evans Bay Wharf 22/09/2016
464 Information Request: Finavia Oyj, Helsinki Airport Development; Helsinki-Vantaa Airport Terminal 2 expansion and modification design competition. 14/12/2016
465 Songshan Airport runway guard lights 28 Improvement 21/09/2016
466 Delivery of equipment for the maintenance of airfield pavements.

19/10/2016
467 Runway renovation Turnkey Project 27/09/2016
468 Qualifications (RFQís) from consulting firms in providing airport planning, architectural/engineering design and construction administration services for the Grand Haven Memorial Airport. 12/10/2016
469 Proposed Design,Supply, Install,Testing And Commissioning of Simple Approach Lighting System of Runway 22 And Its Associated Works At Penang International Airport 22/09/2016
470 Taxiway extension, airfield electrical and lighting improvement 07/10/2016
471 AIRPORT OPERATIONS CENTER DESIGN SERVICES 23/09/2016
472 MIAMI-DADE COUNTY AVIATION DEPARTMENT (MDAD) GENERAL CIVIL ENGINEERING SERVICES 21/10/2016
473 Airport engineering and planning consultants to provide on-call engineering service as required for various airport project 30/09/2016
474 PROJECT OF NATIONAL HIGHWAYS AND INFRASTRUCTURE SECOND
COMPONENT AIRPORT IMPROVEMENT PROGRAM DERURRENABAQUE AIRPORT (PMAR)
26/09/2016
475 Procurement systems, runway lights, the driver Threshold / End Light Taxi Guidance Sign, PAPI, Simple Approach Light lights apron. The Loei Airport Loei


The deadline date shown is predictive deadline. Interested firms should contact tendering authority for exact deadline date.
25/09/2016
476 Airport design standards established research services 21/09/2016
477 SUPPLY & DELIVERY OF 04 TOWABLE GROUND POWER UNITS (180kVA) (BRAND NEW) 27/09/2016
478 SUPPLY & DELIVERY OF 06 COVERED BELT CONVEYORS (SELF - PROPELLED) (BRAND NEW) 27/09/2016
479 16ND0040 (Re-Ad) - National Road Lighting Program (Civil Works) Package 10, Bancasi Airport Road C0 to C123, C0 to 123, Butuan City-Cagayan de Oro City-Iligan City (Agusan-Misamis Or. Rd.) K1246+623 t 04/10/2016
480 Air Traffic Control Tower SeymourJohnson AFB, NC 19/09/2016
481 SUPPLY & DELIVERY OF 02 TOWABLE AIR CONDITIONING UNITS (BRAND NEW) 27/09/2016
482 SUPPLY & DELIVERY OF 05 JOINT CONTAINER PALLET LOADERS (BRAND NEW) 27/09/2016
483 SUPPLY & DELIVERY OF 05 SELF - PROPELLED PASSENGER STEPS (BRAND NEW) 27/09/2016
484 SUPPLY & DELIVERY OF 09 BAGGAGE TRACTORS (BRAND NEW) 27/09/2016
485 SUPPLY & DELIVERY OF 02VEHICLE MOUNTED AIR STARTER UNITS 27/09/2016
486 REPAIR TAXIWAY AT THE FRANK FEDERER MEMORIAL AIRPORT 29/09/2016
487 TO PROVIDE GENERAL AVIATION/FIXED BASE OPERATION SERVICES AND FACILITIES AT WILMINGTON INTERNATIONAL AIRPORT 15/12/2016
488 The installation luminaires protective runway system A (WIG WAG) at Chopin Airport in Warsaw. 26/10/2016
489 Qualifications for an engineering consultant firm to oversee capital improvements at the
Little Falls/Morrison County Airport
07/10/2016
490 Purchase of Resistor for Passenger Boarding Bridges at NAIA Terminal 3 23/09/2016
491 Vienna International Airport - general planning services as part of projects D-2830 Terminal 2 Plant Conservation and D-2840 baggage hall South. 06/10/2016
492 DESIGN REVIEW AND SUPERVISION OF REHABILITATION OF AIRCRAFT PAVEMENTS, AIRFIELDGROUND LIGHTING (AGL) AT MOI INTERNATIONAL AIRPORT (MIA) 06/10/2016
493 Rehabilitation of Alpha taxiway and other Airside infrastructure at George Airport. 29/09/2016
494 145 Line B (Douliu taxiway) improvement works 30/09/2016
495 The State Trading Centre, on behalf of Isavia Ltd. (the ĎPurchaserí) requests tenders for the supply and installation of Passenger Boarding Bridge (PBB) at the Keflavik International Airport:
Leif Eiriksson Terminal.
Extension of the South Terminal to North 2014.

01/11/2016
496 Spare parts are requested available for the repairs of our existing halogen runway lights. 18/10/2016
497 Consultant for airfield planning and environmental projects 22/09/2016
498 AIRPORT PLANNING AND ENGINEERING SERVICES 27/09/2016
499 Provide airport consulting service 12/10/2016
500 RFP for Independent Professional Engineering & Architectural Services

22/09/2016
501 Provide airport business planning and related management consulting service which will include development of a buiseness plan and updating the airport layout plan and master plan narraive report 03/10/2016
502 Work consist of installing waterproofing coating on four T hangars at the municipal airport 11/10/2016
503 Aircraft Hangar Door Maintenance & Repair 25/09/2016
504 X HANGAR/ Flying Cloud, Minnesota Airport 23/09/2016
505 Provide engineering service 20/10/2016
506 Purchase of trailer passenger gangways 22/09/2016
507 Design review and supervision of rehabilitation of aircraft pavement ,airfeild ground lightng at MOI international airport 11/10/2016
508 MANAGEMENT AND REHABILITATION OF RUNWAY AND RELIANT CENTRE LAOUAMRA DOUAR OULED HAMMOU SMID The MAE THE COMMON LAOUAMRA province of Larache 13/10/2016
509 Special Tactics Air Traffic Control Training Services 26/10/2016
510 To perform airport operation services to coordinate day-to-day operational service 30/09/2016
511 Procurement of Airborne Laser Scanner (ALS) data Vorarlberg. 31/10/2016
512 Provide engineering service for rehabilitation runway 26/10/2016
513 Airport engineering service 14/10/2016
514 Professional on-call airport planning engineering an architectural service for the next five year 30/09/2016
515 CONSTRUCTION AND ON-SITE INSTALLATION OF A GANGWAY FOR EVANS BAY WHARF 22/09/2016
516 To construct information counter at arrival and departure terminal 05/10/2016
517 Design, construction and operation of airport news, gift and speciality retail concession 09/12/2016
518 Songshan Airport runway guard lights 28 Improvement 26/09/2016
519 105 in Taichung gangway (GANGWAY) materials and parts 30/09/2016
520 Taoyuan airport meteorological data server adapter function extension case 27/09/2016
521 Technical assistance services on airport operation, safety and securiy management system, aerodrome engineering and airport planning 30/09/2016
522 Operation and maintenance service of Passenger Boarding Bridge 01/11/2016
523 2016 to 2018 Taoyuan International Airport concrete sections auction, removal and related ancillary works commissioned the design and management and supervision of technical services 03/10/2016
524 CAAZ/DA/02/2016: Supply and delivery of a tractor for airport 11/10/2016
525 Supply of Spares & Repairs, Calibration of Components for Aircraft and Ground Support Equipment (GSE) Refuelling Vehicles. 21/10/2016
526 Passenger terminal building and associated work 27/12/2016
527 Procure Baggage Tow Tractor 10/10/2016
528 Airport businass plan and master plan update consulting service 03/10/2016
529 Runway rehabilitation, runway extension ,taxiway construction/rehabilitation ,fencing, airfeild lighting and signage 21/10/2016
530 Refurbishment of the gate 11 passenger boarding bridge 18/10/2016
531 Construction of a new 30,000 square foot aircraft maintenance Hangar facility 25/10/2016
532 Construction management services for the airport revitalization and redevelopment project at Greater Rochester International Airport. 21/10/2016
533 Special Tactics Air Traffic Control Training Services 26/10/2016
534 Taiwan Taoyuan International Airport Pavement renovation navigation aids and facilities upgrade project plan - the scene of civil construction seventh standard (NC taxiway convergence N5, N6 junction) Engineering 07/11/2016
535 106 annual flight control tower simulation system maintenance 03/10/2016
536 Self-propelled airfield marking machine 06/10/2016
537 Quarterly Maintenance of Pontoons and Gangways at Marina Barrage. 04/10/2016
538 Hangar 955 25/10/2016
539 Ozamiz Airport Development Project 17/10/2016
540 Surigao Airport Development Project 18/10/2016
541 SUPPLY AND DELIVERY OF MATERIALS FOR LIGHTING SYSTEM AND INSTALLATION OF STREET LAMP OF ILOILO INTERNATIONAL AIRPORT 17/10/2016
542 Virac Airport Development Project (Asphalt Overlay of Runway) 17/10/2016
543 Purchase and Delivery of Push Lawn Mower at Kalibo International Airport 05/10/2016
544 Purchase, installation, commissioning and maintenance of a home airport noise monitoring system at the air base 118 Mont de Marsan 11/10/2016
545 Central Japan International Airport construction project plans Contact taxiway 2 - outside the area drainage improvement works 13/10/2016
546 S95510 / 226-MimZ / 2016, 2700 Wr. Neustadt, Kaserne Airfield, construction of a Unterkunfs-, chancery and Lyceum building, parking including associated infrastructure, general contractor services. 18/10/2016
547 DHM DIYARBAKIR AIRPORT MANAGEMENT WORK 2017-2018 PERSONELSERVI 19/10/2016
548 Air Traffic Management Bureau commissioned 20/10/2016
549 Construction, supply and fitting fixing of pontoon gangway 02/11/2016
550 Consultants to submit qualifications to provide planning, engineering and consulting services as part of the five-year Airport Capital Improvement Program (ACIP) for Santa Ynez Valley Airport 26/10/2016
551 Technical Project and Execution - Construction of aircraft parking platform and associated surface handling - Stage I.
27/10/2016
552 Construction of hangars to house the installation stills in 3 sites in the two islands of Anjouan and Moheli (Comoros) 10/10/2016
553 Provision of Consultancy Services for Design Development for intra terminal tunnels for Changi East at Singapore Changi Airport 26/10/2016
554 Gimhae International Airport marker signs installed manufacturing purchasing 05/10/2016
555 Gimhae Airport control tower elevator overhaul 05/10/2016
556 Supply and Installation of Lighting Platform and Helipad on Angel S. Adami Airport (Melilla) 06/10/2016
557 Longdongbao Airport Phase III expansion project 17/10/2016
558 Jeju International Airport Landside infrastructure expansion Electric Corporation 04/10/2016
559 Supply and Delivery of Two (2) Units-Brand New 6x6 ARFF Truck for MCIAA 19/10/2016
560 Degumming work of runways, suppression and rehabilitation of the day marking the different airports of the Kingdom 25/10/2016
561 AVIATION TECHNICAL EQUIPMENT 07/10/2016
562 CAAZ/DA/02/2016: Supply and delivery of tractor for airport 11/10/2016
563 Airside Terminal Expansion - CASC 21/10/2016
564 Corporate and Bulk Storage Hangar Project 11/10/2016
565 Renovation and upgrading the lighting of the airport Mohammed V. 11/10/2016
566 Bright Aťroportuairemarkup Construction: Lot 1: Airport Fes Sais Lot 2: Airport Tangier Ibn Battuta Lot 3: BeniMellal Airport Lot 4: Airport Laayoune Hassan 1 Lot 5: Errachidia Airport Lot 6: Airport 11/10/2016
567 Various construction contract work Palanga airport. 03/11/2016
568 Supply, installation and commissioning of the moving walkways at Terminal 2 of the airport Mohammed V. 11/10/2016
569 Supply and Installation of Lighting Platform and Helipad on Angel S. Adami Airport (Melilla) 06/10/2016
570 Lithuanian Air Force Aviation Base hangars light transport aircraft C-27J construction design services. 14/11/2016
571 Airfield Lighting Equipment & Spares 17/11/2016
572 Conveyor Belts & Spares 17/11/2016
573 Baggage Trolleys & Spares 17/11/2016
574 Airport outside 1 Airport spot management system equipment update wor 21/11/2016
575 Conveyor Belts for X-ray machines (Hand & Hold) as per sample 25/10/2016
576 105 years camps and repair hangar refurbishment works painting case 07/10/2016
577 REPAIR AND MAINTENANCE OF THREE (3) UNITS PASSENGER BOARDING BRIDGE AT ILOILO INTERNATIONAL AIRPORT (NEGO) 10/10/2016
578 Various construction works Palanga airport 03/11/2016
579 Consultancy service for review, design and implementation of terminal operating system 27/10/2016
580 Supply and installation of 8 pieces of automatic lines to check-Central Point Terminal 2, Prague / Ruzyne Airport, including the provision of services delivered by the automatic route for 10 years. The sponsor will be for a period of 4 years is entitled to order an additional 4 pieces automatic track of the number of 8 pieces of the previous sentence.

08/11/2016
581 105 in Taichung gangway (GANGWAY) materials and parts 12/10/2016
582 Construction of a 6 wide by 27 long pier a 4 wide by 30 long gangway 25/10/2016
583 Feasibility of the relocation of hangars 2 & 3 located at the republic airport 28/10/2016
584 Construction of a new nominal corporate hangar 10/11/2016
585 Future Airport-related Planning and Development Projects 31/10/2016
586 Airport Consulting Services 31/10/2016
587 Professional Design Services for the Airport Maintenance & Repair Operations (MRO) Hangar Project 02/11/2016
588 Alamogordo-White Sands Regional Airport, is requesting proposals from consulting firms
("Proposers") qualified and experienced in the field of airport engineering.
14/10/2016
589 Qimei airport runway pavement kerf Engineering 17/10/2016
590 Supply of Feasibility Consultancy Services on Construction of Floating Pontoon and Gangway at Punggol Point Jetty 19/10/2016
591 Supply of Taxiway Guidance Sign Board 09/10/2016
592 This is a maket survey for repair support of line replaceable units in support of federal aviation administration airport and air traffic surveillance systems 21/10/2016
593 443 (MH) SQN HANGER MOVE (W0103-156670/A) 14/10/2016
594 Appointment of Professional services for the Apron Stands and Bravo Taxiway Construction at King Shaka International Airport 07/11/2016
595 Reconstruction stall 1, the exchange of passenger boarding bridges for lots 4 and 6, sector b boarding bridges for lots 10 and 11.

09/11/2016
596 Maintain and repair services of power equipments and aeronautical lighting at Magong Aviation Facilities Station 07/11/2016
597 To provide on-call aviation planning service 20/10/2016
598 Aircraft ground power unit 20/10/2016
599 Fabrication and Installation of FAST Signage at Terminal 2, Check-in Row11 and 12 21/10/2016
600 Service for maintenance of the airfield and gardens Bilbao Airport. 24/10/2016
601 Enter into a contract to upgrade the MRKA at Hannover Airport at EU Standard 3 and conclusion of a maintenance contract. 17/11/2016
602 TRENTON-MERCER AIRPORT WALKWAY CANOPY 13/10/2016
603 CDG - S3 - replacement of cables telescopic gangways. 21/10/2016
604 Gangwon-air radio beacons small number of distribution facilities, electrical work and other improvements 12/10/2016
605 Supply and Delivery of Inflatable Walkway & Rescue Tube 25/10/2016
606 Conducting an impact study and technical study for the renovation of runway 07L / 25R at Brussels Airport. 07/11/2016
607 The manufacture and installation of wayfinding, directional and informational signage, across the airport site, including but not limited to a new multi-storey car park, full terminal building, car parks and various landside and airside areas. The project will be phased across 2016 and 2017, and/or when new parts of the airport development become operational. 07/11/2016
608 Airport development (terminal and air traffic control tower) master service management 03/11/2016
609 Provide professional airport planning, engineering and airport construction management service for the airport project for a five year term 31/10/2016
610 Provide airport engineering services 18/10/2016
611 Lumacurve Airfield Signs 20/10/2016
612 Procurement Airfield Lighting & Equipment from Astronics DME 20/10/2016
613 PHOENIX SKY HARBOR INTERNATIONAL AIRPORT T-3 SOUTH TRANSITION APRON RECONSTRUCTION
DESIGN SERVICES
21/10/2016
614 SUPPLY AND DELIVERY OF AIRFIELD LIGHTING SPARE PARTS 18/10/2016
615 105 years camps and repair hangar refurbishment works painting case 17/10/2016
616 Maintain and repair services of power and Lighting at Taitung Aviation Facilities Station 10/11/2016
617 185708 Recessed runway lights 07/11/2016
618 Appointement of Professional services for the Apron Stands and Bravo Taxiway Construction at King Shaka International Airport
07/11/2016
619 Kangaroo Island Airport - Airside A.2 - Runway Overlay and Extension 01/11/2016
620 CDG / OL - providing molded bases 8 "and 12" aluminum for airport beacon lights and accessories. 25/10/2016
621 Hengchun airport Terminal renovations 24/10/2016
622 Evergreen aerospace hangar on the north side on the 4th floor project 01/11/2016
623 CONSULTING SERVICES FOR THE SUB-SURFACE EXPLORATION OF THE PROPOSED CONSTRUCTION OF SIARGAO AIRPORT-CANCOHOY-ROXAS-STA. MONICA PORT 28/10/2016
624 REPAIR AND MAINTENANCE OF NEON LIGHTS (ILOILO AIRPORT SIGNAGE) OF ILOILO INTERNATIONAL AIRPORT 24/10/2016
625 EMERGENCY PROVISION, INSTALLATION AND COMMISSIONING OF VPA LIGHTING SYSTEM AT TERMINAL AREA OF LEGAZPI AIRPORT 04/11/2016
626 Supply and Delivery of Six (6) Units- Brand New Double Cab Pick-up Vehicles for Mactan-Cebu International Airport Authority 08/11/2016
627 ILS instrument landing facility upgrades 27/10/2016
628 PURCHASE OF SERVICE VEHICLE, BUTUAN AIRPORT 25/10/2016
629 Construction of new airport terminal building. 09/11/2016
630 Professional Engineering Services for a Master Drainage Plan for the Airport 01/11/2016
631 Supply, Installation and Commissioning of aeronautical information management system 07/12/2016
632 Supply, installation and apparel signboards and signaling streets of vehicular airport 19/10/2016
633 Sale and Removal of Passenger Boarding Brdige at Los Angeles International Airport 03/11/2016
634 Pre-Qualification for the Master Civil Consultancy Services for Changi East Development at Singapore Changi Airport 17/11/2016
635 Repaving the runway, Tenerife South Airport.

31/10/2016
636 Flight Data Monitoring System for Aircraft 24/10/2016
637 INSTALLATION OF LIGHTED SIGNAGES AT VARIOUS BUILDINGS OF GENERAL SANTOS AIRPORT 08/11/2016
638 Engineering and design support service for the Ketchikan International Airport 15/11/2016
639 Providing airport planning services including operation, environmental engineering 01/11/2016
640 To negotiate sole-source procurement for airfeild signs 20/10/2016
641 To negotiable sole-source procurement for airfield lighting and equipment 20/10/2016
642 Sanga-Sanga Airport Development Project - (Proposed Runway Expansion, Site Development for Runway Extension, Site Development for Stopway and Embankment of Existing Drainage) 09/11/2016
643 Siquijor Airport Development Project - (Construction of New Passenger Terminal Building, Construction of Power House and Construction of Vehicular Parking Area) 08/11/2016
644 Taipei international airport airside apron spot lights and electrical equipment, improvement works 01/11/2016
645 The Friedrichshafen GmbH (,, FFG ") Airport intends implementation variants for the realization of the project ,, New Tower solution" to identify.
By no formal market consultation process to various sustainable implementation models different to address the age-related structural deficits of the tower structure including consideration be identified and tested options for the realization of a new tower solution. Made for the replacement of the current Towers after assessment of the FFG basically 2 options:
. 1 Construction of a conventional tower building;
. 2 Construction of a Virtual Towers with camera tower and work buildings for pilots.
19/01/2017
646 Coverage expansion and improvement tetra exterior and interior Airport Madrid-Barajas Adolfo SuŠrez.

02/11/2016
647 General Aviation (GA) TaxiwayS Rehabilitation 11/11/2016
648 Appointment of Professional services for the Apron Stands and Bravo Taxiway Construction at King Shaka International Airport 07/11/2016
649 Finger E - Facades and roofing. 03/11/2016
650 Framework Agreement Projektsteuerungsleistungen former airport Berlin Tempelhof building. 14/11/2016
651 Qualifications for Future Airport-Related Planning and Development Projects 31/10/2016
652 Qimei airport runway pavement kerf Engineering 27/10/2016
653 Supply, installation, commissioning of conveyor lines and integration of existing security equipment in the baggage handling system from Agadir Al Massira airport 01/12/2016
654 105 Taichung airport signs annual update procurement case 01/11/2016
655 Taoyuan International Airport airside driving permit verification equipment procurement case 27/10/2016
656 Conveyor belts 01/11/2016
657 1051420 (Maggie typhoon typhoon hangar) renovation project 25/10/2016
658 Maggie hurricane hangar repair works 26/10/2016
659 The BOCA RATON AIRPORT AUTHORITY (the ďAuthorityĒ), is seeking a qualified aviation consultant to
provide airport consultant services to include: planning engineering, design, and airport construction
project management services for both AIP and non-federally funded projects.
10/11/2016
660 Maggie hurricane hangar repair works 01/11/2016
661 Functional support technical assistance and consulting and engineering applications and works of airport infrastructure.

28/11/2016
662 SUPPLY AND DELIVERY OF TWO (2) UNITS OF FLOOD LIGHTS WITH GENERATOR FOR TACLOBAN AIRPORT 14/11/2016
663 REPLACE AND REFURBISH PASSENGER BOARDING BRIDGES 21/11/2016
664 Runway and Taxiway Lighting Single Lamp Monitoring 27/10/2016
665 Build and upgrade public exchange Cheongju airport passenger processing system network 28/10/2016
666 JET PASSENGER BOARDING BRIDGES 14/11/2016
667 Airport engineering service for security fencing 15/11/2016
668 Runway Touchdown Zone Light 30/10/2016
669 Airfield Lighting CCR Make 30/10/2016
670 Taxiway Guidance Sign Board 30/10/2016
671 Airport Engineering Services for Hangars 15/11/2016
672 Airport Engineering Services for Runway/Taxiway Extension 15/11/2016
673 Airport Engineering Services for Runway/Taxiway & Apron Overlay/Rehabilitation 15/11/2016
674 Airport Engineering Services for Safety Area Evaluation/Corrections 15/11/2016
675 Airport engineering services for surveys 15/11/2016
676 The DeWitt Municipal Airport Commission is soliciting Statement of Qualification for Engineering and Planning Services for various services including, but not limited to the following projects:
1. Apron Expansion
2. Airfield Lighting & NAVAIDS
3. Runway/Taxiway & Apron Overlay/Rehabilitation
4. Runway/Taxiway Extension
5. Surveys
6. Property Acquisition
7. Environmental and Planning Studies
8. Safety Area Evaluation/Corrections
9. Hangars
10. Security Fencing
11. Aviation Fuel Systems
15/11/2016
677 Repair of airfield taxiway lighting circuits and components. 2. Repair of LED airfield taxiway lighting circuits and components. 3. Repair of airfield runway lighting circuits and components.4. Preventative maintenance and/or repair of airport beacon. 5. Repair of precision approach path indicator (PAPI) lighting units. 6. Repair of wind socks. 7. Repair of supplemental wind socks. 8. Repair of air traffic control tower (ATCT) consoles. 9. Repair of ATCT lighting switches. 10. Repair of ATCT wind speed indicators. 11. Repair of ATCT equipment power supplies and wiring. 12. Periodic inspection of all items mentioned above. 13. Replacement of items mentioned above, if required. 14. Troubleshooting airfield electrical circuits if they have failed. 15. Installation of new airfield electrical circuits sections to replace damaged sections 15/11/2016
678 Upgrading Of Helipad Lighting 31/10/2016
679 This project consists of providing design services for the Runway 8-26 Reconstruction project. The existing asphaltic concrete (AC) runway has deteriorated and is at the end of its useful life. Runway 8-26 is 7,608 feet long by 150 feet wide and was previously rehabilitated in 1993. The runway reconstruction area is approximately 126,800 square yards of asphalt pavement. The design work consists of removal of existing asphalt pavement, excavation, stabilizing fill, base material, utility relocation, runway pavement, AC over-runs, gravel shoulders, drainage, lighting, signage, marking and related appurtenances. 18/11/2016
680 58 Flight information Display System (FIDS) Monitors and Device Display Controllers 10/11/2016
681 Carpet replacement on passenger boarding bridges of boarding areas "A" and "G" of the international terminal 27/10/2016
682 Construction of a new 30000 SF aircraft maintenance hangar facility 01/11/2016
683 Scene marking and painting hangars renovations 31/10/2016
684 106 Annual American airports each Rapiscan X-ray inspection apparatus 22 regular maintenance services procurement case 01/12/2016
685 Lanyu Airport runway renovation project commissioned by the Planning and Design Technical supervision cum service 25/11/2016
686 Planning, Design and Construction Supervision Services of Lanyu Airport Runway Rehabilitation Project 25/11/2016
687 AIRPORT CONSULTANT SERVICES 07/11/2016
688 Construction, Completion And Commissioning Of Bandaranaike International Airport Development Project Phase Ii Stage 2 Ė Package ĎAí Ė Passenger Terminal Building And Associated Works. 27/12/2016
689 05 Airfield Lighting Equipment & Spares 18/11/2016
690 30 Conveyor Belts & Spares 18/11/2016
691 Provide professional engineering services for the design, management, coordination and preparation of contract document assocaited with the Runway 8-26 Reconstruction project. 18/11/2016
692 Taoyuan International Airport Civil engineering services maintenance services contract opening 22/11/2016
693 Procurement Technical Services of Planning, Designing, & Supervision for Architecture Engineering of Taoyuan International Airport 22/11/2016
694 Land Lease for Aircraft Hangar Development 29/11/2016
695 AIRPORT MANAGEMENT,OPERATION,MAINTANANCE,AND DEVELOPEMENT,RELIEVER AND GENERAL AVIATION AIRPORT SYSTEM 10/11/2016
696 ON-CALL AIRPORT PLANNING SERVICES 16/11/2016
697 Maggie hurricane hangar renovations 01/11/2016
698 Upgrading of Main aeronautical message handling system 28/11/2016
699 Construction Supervision Services: New Airport Terminal BuildingsandAirport Fire Station for Kiribati. 02/11/2016
700 Civil works for the installation of an ILS at the airport of Djanet." 07/11/2016
701 PROVISION OF GROUND POWER UNIT (GPU) FOR HEAVY AND MEDIUM AIRCRAFT 19/11/2016
702 Design, Fabrication and Installation of FAST Signage at Terminal 14/11/2016
703 Maintain and repair services of power and Lighting at Taitung Aviation Facilities Station 10/11/2016
704 1,051,706 renovation project (Maggie typhoon restoration hangar refurbishment project) 08/11/2016
705 Hangar and lighting system maintenance case 08/11/2016
706 Reconstruction Platform B, Palma de Mallorca Airport. 15/11/2016
707 REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL ENGINEERING DESIGN SERVICES FOR RUNWAY PAVEMENT REHABILITATION AND CENTERLINE LIGHT REPLACEMENT 05/12/2016
708 Airport engineering service for hangars 15/11/2016
709 APRON LIGHTS: DESIGN LIGHT DISTRIBUTION, SUPPLY AND INSTALL LED
LIGHTING
30/11/2016
710 Title - China Civil Aviation Air Traffic Management Bureau in Northeast China Heilongjiang Branch VHF remote station a second transmission system engineering equipment procurement and installation of public tenders 16/11/2016
711 Title - Heilongjiang Branch of air traffic air traffic control building renovation project of UPS system for equipment procurement and installation of tenders 16/11/2016
712 Title - Changzhi Airport Special Vehicles Tender Tender Notice 23/11/2016
713 Provide airport engineering services for security fencing 11/11/2016
714 REHABILITATION OF ADMINISTRATIVE BUILDING AT PINAMALAYAN AIRPORT 24/11/2016
715 Bicol International Airport Development Project (New Legazpi Airport) Package 2B Ė Construction of Passenger Terminal Building, Runway Completion and other Site Development Works (Re-Bid) Brgy. Alobo 18/11/2016
716 ďRDU Airport Building Improvements 2016 NCDOT Division of Aviation BuildingĒ 15/11/2016
717 Runway 5L/23R Replacement Program 16/12/2016
718 Optimizing the lighting system, technical equipment fire the start / runway 07/25. 28/11/2016
719 At the Frankfurt / Main traffic airport, a runway section of the runway L between the taxiways N4 to N7 is to be thoroughly renovated within the existing flight operating areas.
For this purpose, fixed and partly non-fixed surfaces must be broken off or removed and replaced by new, standardized superstructures in asphalt or concrete construction.
The supply and disposal infrastructure and transport facilities of any kind shall be adapted accordingly. The tender includes the necessary civil engineering and marking work.
The project is planned in pure night work over a period of 140 nights.
02/12/2016
720 Part 106 years barracks and hangars fire system operators dimensional case 07/11/2016
721 Radio and Machine Taipei Taiwan Makung airport airfield lighting materials and parts procurement case 08/11/2016
722 Construction SupervisionServices: New Airport Terminal Buildings and Airport Fire Station for Kiribati 13/11/2016
723 Airport signage, lighting and facility lighting 02/12/2016
724 PROVISION OF GROUND POWER UNIT (GPU) FOR HEAVY AND MEDIUM AIRCRAFT 19/11/2016
725 MAINTENANCE OF MARKING HORIZONTAL IN AIRPORTS AND AERODROMES NATIONAL 07/11/2016
726 Airfield Lighting 10/11/2016
727 T-Hangar Expansion at the Airport. 17/11/2016
728 Salisbury-Ocean City-Wicomico Regional Airport Ground Sign Improvements 22/11/2016
729 Passenger Boarding Bridges, Fixed Walkway, Cab-Mounted Gate Check Baggage Conveyors and Ancillary Equipment Ė Parts & Install 30/11/2016
730 PREVENTIVE MAINTENANCE OF THREE (3) UNITS PASSENGER BOARDING BRIDGE. 14/11/2016
731 Construction of new airport terminal building 16/11/2016
732 PROVISION OF GROUND POWER UNIT (GPU) FOR HEAVY AND MEDIUM AIRCRAFT 19/11/2016
733 Providing a machine towing / tractor for handling aircraft nilitare in Romaero SA. 05/12/2016
734 SUPPLY AND INSTALLATION OF AIRFIELD GROUND LIGHTING, PAINT MARKINGS AND ASSOCIATED SIGNAGE ON THE AERODROME IN ACCORDANCE WITH ICAO ANNEX 14, VOLUME 1 AND SA-CATS 139 STANDARDS 16/11/2016
735 Finavia is requesting tenders for an advanced visual docking guidance system for Helsinki-Vantaa airport and its support service.
A-VDGS will be installed on the gates at Helsinki-Vantaa airport's terminal extension. There is planned to be 16 new gates. Some of the gates will be equipment with dual bridges. 4 of the gates will be MARS (Multiple Apron Ramp System) gates.
25/11/2016
736 Construction passengers terminal , electromechanically house , parking lot, passenger leading cage pipe for passengers terminal at Phu Cat airport. 28/11/2016
737 105 Annual Tainan Rende District Airport Road lights line project 10/11/2016
738 Sandefjord Airport ó Renovation and upgrading of the runway ó Electrical installation works. 28/11/2016
739 Airborne Laser Scanner aerial surveys of the lower and upper Weser 2017-2018. 05/12/2016
740 The work include airport quick turn around facility construction 23/11/2016
741 Provide airport management consultant service 05/12/2016
742 Zhangjiakou Airport expansion project flight procedure design and program evaluation reports, as the tower through procurement tenders 22/11/2016
743 Taxiway Pavement Maintenance and Taxiway Echo Lighting Improvements 30/11/2016
744 Construct a new dual taxiway across the existing north runway for connecting the future third runway to the existing aircraft parking apron at Hong Kong International Airport. 29/12/2016
745 Buy low voltage cables and runway lighting Mtvst, pressure 21/11/2016
746 Rehabilitation of Wajir International Airport (Runway, Taxiways, Aprons and Access Road) 17/11/2016
747 Taipei international airport airside apron spot lights and electrical equipment, improvement works 24/11/2016
748 Kaohsiung airport runway renovation project (re-tendering) 09/12/2016
749 Rehabilitation works of runway 09-27 at Kaohsiung international airport(rebidding) 09/12/2016
750 Procure and install new passenger boarding bridges 30/11/2016
751 "Taxiway K equipped with an illuminated runway light system marks" 29/11/2016
752 Purchase of origanal equipment manufacture (oem) and orignal equipment (oe) parts for existing crouse-hinds
Airfield lighting and related equipment.
21/11/2016
753 Taoyuan International Airport outside the transit system linking financial services case 01/12/2016
754 AIRFIELD LIGHTING AND SUPPLIES 21/11/2016
755 Terminal baggage conveyors, automatic doors and rolling door Equipment Maintenance Contract 23/11/2016
756 Materials and Services for the Installation of Runway Lights at Basa Air Base 02/12/2016
757 Materials and Services for the Improvement of Taxiway at Basa Air Base 02/12/2016
758 Provide professional engineering and consulting services as required by the Airport Board to assist in the installation of aviation fuel tank and dispensary systems 14/12/2016
759 Supply and Delivery of Ground Care Products for LAX and VAn Nuys Airports 08/12/2016
760 Airport Management Consultant Services at the Greater Rochester International Airport 05/12/2016
761 Finavia Oyj Oulu airport paving contract in 2017. 28/11/2016
762 Taoyuan International Airport Park and vicinity specific area plan zone expropriation engineering pilot project and technical services 22/11/2016
763 Construction of new airport terminal building 16/11/2016
764 Renovation and upgrade of the lighting of the Mohammed V airport 22/11/2016
765 SUPPLY, INSTALLATION AND APPAREL signboards and signaling STREETS OF VEHICULAR 15/11/2016
766 N taxiway surface renovation project 07/12/2016
767 Provide airport engineering service for security fencing 08/12/2016
768 Provision of passenger baggage trolleys for different airports of the Kingdom. 06/12/2016
769 Dillingham Airport Runway Shift Design Services 29/11/2016
770 Airport Engineering Services for Safety Area Evaluation/Corrections 08/12/2016
771 Airport Engineering Services for Apron Expansion 08/12/2016
772 Airport Engineering Services for Airfield Lighting & NAVAIDS 08/12/2016
773 2. Airfield Lighting & NAVAIDS 08/12/2016
774 Runway/Taxiway & Apron Overlay/Rehabilitation 08/12/2016
775 Songshan Airport runway 28 end of the main floor and E stand preventive repair shop planing works 21/11/2016
776 Taiwan Taoyuan International Airport Pavement Rehabilitation and Navigation Facilities Upgrading Project-Airfield Civil Works Tender Package 7 Taxiway NC Junction with N5?N6 Rehabilitation Project 23/11/2016
777 Passenger boarding bridge maintenance management services 16/12/2016
778 The project includes replacement of existing passenger boarding bridges and improvements to associated infrastructure within Boarding Area A to increase flexibility of aircraft parking, including apron improvements, improvements to the hydrant fueling system, new fixed bridges, new door penetrations, and any improvements necessary to building systems and other infrastructure. 09/01/2017
779 The Danish Defense Acquisition and Logistics Organization (DALO) intends to conclude a framework agreement for the purchase of 3 Airborne Systems Maritime Craft Aerial Delivery Systems (MCADS) and spare parts incl. documentation, training and equipment for the training of Heavy Drop.
MCADS is a platform by means of a parachute system allows dropping a 11m Rigid-hulled Inflatable Boat (RHIB) from the air to water globally, primarily from the Danish C-130J Hercules alternatively from foreign transport aircraft operated by the Danish Defense's strategic partners.
MCADS shall be considered as a system that includes:
ó MCADS platform
ó Parachute Release System
ó Cargo parachutes and lashing
ó Training of technical and operational personnel
ó Logistics.
20/12/2017
780 Airfield Runway Photometric Testing 29/11/2016
781 Kanas Airport New instrument landing system and airfield lighting systems engineering new multi-purpose support vehicle re-flight zone tenders 09/12/2016
782 Taichung Airport W2 taxiway into the AIDC plant at additional prohibited from entering the red lights case 22/11/2016
783 Manchester Airport Transformation Programme ó PP22 Aircraft Passenger Boarding Bridges to Pier 1. 30/03/2017
784 CONSTRUCTION AND REHABILITATION OF AIRPORT RUNWAYS, APRONS AND RELATED INFRASTRUCTURE FOR VANUATU AIRPORTS 19/12/2016
785 Renovation of terminal building at Baridal Airport. 21/11/2016
786 Installation of LED light fitting in place of Ordinary light fitting of PTB at Osmani International Airport 21/11/2016
787 Providing & Installation of Taxiway light. 28/11/2016
788 Installation of Obstruction light of Runway 17 ends at Barisal Airport 28/11/2016
789 Taxiway K equipped with an illuminated runway light system marks 29/11/2016
790 Procurement of Tire, Tube, Liner for Jetway Boarding Bridges at Hazrat Shahjalal lnternati Dhaka. 21/11/2016
791 Taichung International Airport Branch Renovation 23/11/2016
792 106 annual runways, taxiways, aprons and other facilities maintenance, repair and marking paint project 25/11/2016
793 IMPROVEMENT OF PASSENGER TERMINAL BUILDING AT TACLOBAN AIRPORT 13/12/2016
794 Supply and Delivery of Six (6) Units- Brand New Double Cab Pick-up Vehicles for Mactan-Cebu International Airport Authority 07/12/2016
795 DEVELOPMENT OF CALBAYOG AIRPORT (Airport Shore and Slope Protection) 13/12/2016
796 National Airspace Management System (NAIMS) Spare parts purchase 21/11/2016
797 SUPPLY AND DELIVERY OF AIRPORT PASSENGER BAGGAGE TROLLEYS 05/12/2016
798 NAVIGATIONAL AIRCRAFT LIGHT 30/11/2016
799 Construction Mastic runway, landing area at Chu Lai Airport 28/11/2016
800 106 annual Songshan and Taoyuan airport meteorological equipment maintenance outsourcing service case 20/12/2016
801 Makung airport air bridge operation, maintenance and repair services procurement (106 years) 05/12/2016
802 Supply of Double Berthing Fenders and Gangways 12/12/2016
803 The Airport Authority Hong Kong (the ďAuthorityĒ) is planning to modify the existing Automated People Mover (APM) system for the expansion of the existing Two Runway System at Hong Kong International Airport into a Three Runway System. 17/02/2017
804 Procurement for the installation of airport lighting, etc. on the F17 Ronneby Airport. 09/01/2017
805 The Airport Authority Hong Kong (the ďAuthorityĒ) is undertaking to expand Hong Kong International Airport from a two-runway system into a three-runway system (3RS). This is a massive and complex project comprising reclamation of 650 hectare of land, construction of a third runway and a new passenger concourse (TRC), expansion of the existing Terminal 2 (T2), provision of new automated people mover and high speed baggage handling systems connecting T2 and TRC and other associated airport support infrastructure. A general layout plan of the 3RS is attached for information. 22/12/2016
806 The Authority hereby invites tenders from interested organizations with proven experience and capability for the Design, Supply and Installation of Light Detection and Ranging System. Details of the invitation are spelled out in the Tender Document. 13/12/2016
807 Kanas Airport New instrument landing system and airfield lighting systems engineering new multi-purpose support vehicle re-flight zone tenders 09/12/2016
808 LinyiShubuling Airport expansion project PPP projects 09/12/2016
809 Jeju 4/4 minutes Equipment (security, etc.) Purchase 25/11/2016
810 ACQUISITION OF EQUIPMENT FOR EMERGENCY OPERATIONS CENTER INTERNATIONAL AIRPORT AURORA 22/11/2016
811 Taipei international airport construction services 106 Annual Maintenance Contract 05/12/2016
812 Maintenance and Repair of Aircraft Hangar Doors 22/12/2016
813 62LIGHT, LANDING,AIRCR
Repair Aircraft Landing Light
20/01/2017
814 ITB SOUTHEAST APRON PHASE
IV (PAVING AND LIGHTING)
14/12/2016
815 Request for Qualification - Pavement Inspection & Condition Assessment of Airport Apron 06/12/2016
816 1. The contract is for delivery of high altitude rescue equipment including:
1) Part I - altitude compensation suits WUK-90 representing individual equipment crew on airplanes supersonic MiG-29 or equivalent.
The term of the contract:
- in 2017. To 31.10. 2017. - 39 pcs.
- in 2018. to 31.10.2018 r. - 39 pcs.
- in 2019. to 10.31.2019 r. - 21 pcs.
- in 2020. to 31.10.2020 r. - 21 kpl.
20/12/2016
817 Kalamazoo/Battle Creek International Airport Rehabilitate General Aviation Apron and Repair Commercial Apron 16/12/2016
818 Fencing Kaohsiung airport instrument landing system (ILS) 27 end of the road and the new location of the new construction 06/12/2016
819 Three consolidated projects to renovate various hangars to support the
new C17 Beddown Mission.
06/12/2016
820 Supply Delivery, Installation, Replacement And Upgrading Of Runway Lights Et 28/12/2016
821 Pcs 608 rooms and hangar roof renovations 28/11/2016
822 16-040-11 PURCHASE/INSTALLATION OF DVOR/DME FOR SAN JOSE AIRPORT 15/12/2016
823 Design and extend of Bahrain International Airport (building contractors) 28/12/2016
824 DESIGN LIGHT DISTRIBUTION, SUPPLY AND INSTALL LED LIGHTING FOR APRON AREA 30/11/2016
825 Procurement of airfield ground lightning upgrading new airfield ground lightning installation 29/12/2016
826 CONSTRUCT AIRFIELD LIGHTING VAULT DES MOINES INTERNATIONAL AIRPORT 20/12/2016
827 PROVIDE PROFESSIONAL SURVEYING SERVICE TO COMPLE AN AS-BUILT AERONAUTICAL SURVEY IN SUPPORT AF AN AGIS UPDATE
AND IN SUPPORT OF AN AIRPORT LAYOUT PLAN
29/11/2016
828 The vehicle for izgurivanja aircraft.

14/12/2016
829 General contractor general renovation runway 15/33. 22/12/2016
830 Airfield Lighting 10/01/2017
831 106 years hangar and lighting system maintenance products Buyer 06/12/2016
832 Engineering design, delivery and installation of 48 sliding gates for aircraft hangars. 16/01/2017
833 Hangars with accompanying infrastructure; Hangars.
Ground works, concrete works and internal works, including technical disciplines for 12 hangars at ōrland Fighter Aircraft Base. Gross area: approx. 12 000 m≤.
16/01/2017
834 Hangars with accompanying infrastructure; infrastructure and outdoor works.The construction of approx. 106 000 m≤ roads, places and taxiways. The establishment of Water and sewage systems and other infrastructure, the construction of approx. 76 000 m≤ green areas, the casting of approx. 8 200 m≤ concrete sheets, the construction of approx. 1 200 lm mounds, etc. 16/01/2017
835 SOLAR WIRELESS LED RUNWAY GUARD LIGHTS 12/12/2016
836 CONSTRUCT AIRFIELD LIGHTING VAULT 20/12/2016
837 Professional on-demand engineering and planning consulting services at county international airport - field (ryy) for the next five (5) years. 22/12/2016
838 106 years of lightning detection system maintenance and access to information 05/12/2016
839 Upgradation of main aeronautical message handling system 08/12/2016
840 Purchase of heavy duty rubber bumper of Boarding Bridges at T-1 06/12/2016
841 Replacement of AC units installed in passenger boarding bridiges 12/12/2016
842 Seven US, Wangan Airport aids to navigation lighting and communications meteorological equipment maintenance services case 06/12/2016
843 The manufacture and installation of wayfinding, directional and informational signage, across the airport site, including but not limited to a new multi-storey car park, full terminal building, car parks and various landside and airside areas 04/01/2017
844 The deadline date shown is predictive deadline. Interested firms should contact tendering authority for exact deadline date.

Procurement System apron lighting and street lighting at Buriram Airport
10/12/2016
845 North Wharf Gangway Renovation Work 12/12/2016
846 Lighting equipment replacement materials procurement 13/12/2016
847 CONSTRUCT AIRFIELD LIGHTING VAULT 20/12/2016
848 Replacement of Conveyor Belts and Improvement of Shutters at JNIA 23/12/2016
849 Invitation to Quote for conceptualization and fabrication of signs atArrival Baggage Claim Hall 09/12/2016
850 Design and construction of the terminal cores and APM interface , air terminal renovation, demolition and new construction 12/01/2017
851 R√≠kiskaup (the ‚ÄėState Trading Centre‚Äô) on behalf of the Purchaser, requests tenders for the supply and delivery of: New Approach Lighting lines at runway ends 01 and 29 at Keflavik International Airport in Iceland: Approach Lighting Masts and Poles. 05/01/2017
852 Replacement of Passenger Boarding Bridges (PBB) Control System of Davao International Airport 21/12/2016
853 MAINTENANCE OF BAGGAGE CONVEYORS PSIA319,030 05/12/2016
854 Third Runway System Project 29/12/2016
855 Supply worksInstallation, installation and commissioning of aLighting remote control systemOutside Tunis-Carthage airport 14/12/2016
856 Gimhae international airport 36L instrument landing facilities (ILS) Purchase and installation 14/12/2016
857 Information Request: Finavia Oyj, Helsinki-Vantaa Airport terminal and an award exterior signage. 05/03/2017
858 Design and build of a building`s expansion at Bahrain International Airport (Grade B and above MOW approved building contractors 29/12/2016
859 Supply operating state of an ILS / DME cat. III in Asturias Airport, runway 29. 19/12/2016
860 Process redesign of the international departure terminal Aéoport Paris Orly Sud - structural works contract - envelope - electromechanical equipment 19/12/2016
861 Work includes construct the airport flex hangar 05/01/2017
862 Supply and delivery of associated equipment and parts for airport power supply system and accessories 29/12/2016
863 Taichung Chingchuankang base hangar and other military facilities and construction projects 21/12/2016
864 Hangar AV System 12/01/2017
865 Existing Automated People Mover (APM) system for the expansion of the existing Two Runway System 17/02/2017
866 Alteration and modification on existing endless baggage reclaim belt installed at international arrival lounge of JIAP 20/12/2016
867 Airline Automatic Guidance System 19/12/2016
868 Repair of Passenger Boarding Bridge Canopy and Hood Assembly of Davao International Airport 27/12/2016
869 REHABILITATION OF CIRCUIT-1 OF RUNWAY EDGE LIGHTS (REL), RUNWAY THRESHOLD LIGHTS (RTL), TAXIWAY EDGE LIGHTS (TEL) & LED APRON FLOOD LIGHTS AT LAOAG INTERNATIONAL AIRPORT 27/12/2016
870 63Amber Airfield Edge Lights 12/12/2016
871 Airfield and PAPI Lighting System Replacement 16/12/2016
872 ATRP and ATA terminal building improvements according to functional design. Seville Airport. 27/12/2016
873 AIRPORT LOADING BRIDGE AND BAGGAGE CONVEYOR SYSTEM ANNUAL MAINTENANCE 14/12/2016
874 Installation of Vehicular Parking Area Lighting in DumagueteAiport 14/12/2016
875 Taiwan Taoyuan International Airport Pavement Reconstruction and Navigation Facility Upgrade Project - Scene 7th Floor of Civil Construction (N5, N6 of NC Taxiway) 23/12/2016
876 106 annual airport runway debris removal and run (slip) Road marking project (open contract) 14/12/2016
877 Taiwan Taoyuan International Airport Pavement Rehabilitation and Navigation Facilities Upgrading Project-Airfield Civil Works Tender Package 7 Taxiway NC Junction with N5„ÄĀN6 Rehabilitation Project 23/12/2016
878 Gimhae international airport 36L instrument landing facilities (ILS) Purchase and installation 14/12/2016
879 Procurement of Instrument Landing System (ILS) 01/02/2017
880 Airport Pavement Demolition at LAX . See additional specifications, instructions and provisions in the RFB. 29/12/2016
881 Hangzhou Xiaoshan International Airport, airfield lighting high and low voltage power distribution reconstruction project 12/12/2016
882 Construction Landscape Of Front Ground And Hamedan Airport Infrastructure 21/12/2016
883 Airport Engineering, Planning and Consultant Services for Airport Projects 30/12/2016
884 Kaohsiung Airport Runway Reconstruction Project (Re-tendering) 16/12/2016
885 Operation and maintenance of air bridge in Taichung Airport 22/12/2016
886 Rehabilitation works of runway 09-27 at Kaohsiung international airport(rebidding) 16/12/2016
887 Cruise Ship Gangway: Research from and adjustments applicable compliance guidelines. 10/01/2017
888 Provision of deicers. 16/01/2017
889 Instrumented Aerodynamic Interface Plane (AIP), a MassFlow Measurement/Throttling Systems, and Ejector Systems 24/12/2016
890 Preventive maintenance for the airport owned passenger loading bridges 20/12/2016
891 Waterproofing Above PLB Fixed Gangway at Changi Airport,Terminal 1 28/12/2016
892 PROVISION OF SKILLED PERSONNEL FOR GROUND HANDLING SERVICES 30/12/2016
893 Ground handling service 27/12/2016
894 1 set of Seaport all-rubber-wheeled passenger boarding bridge 20/12/2016
895 Operations and Maintenance of Baggage Handling System and Passenger Boarding Bridges and Ancillary Equipment 21/12/2016
896 Air Traffic Control Tower 28/12/2016
897 Purchase of High Pressure Hydraulic Hose for Passenger Boarding Bridge at NAIA Terminal 16/12/2016
898 Supply and delivery of passenger boarding bridge tires at NAIA Terminal 2 16/12/2016
899 Request for Information (RFI) for a Long Endurance Group 2 Unmanned Aircraft Systems (UAS) 22/12/2016
900 Acquisition of Docks Aircraft 15/01/2017
901 Construct the airport flex hanger 05/01/2017
902 105 years of airport observation system and other 7 items of equipment maintenance 20/12/2016
903 Call for application to participate - rental of a mobile elevating gangway for cruise ships. 17/01/2017
904 Hangar AV System 12/01/2017
905 Nano Unmanned Aerial Systems. 19/01/2017
906 Project management mission on the replacement of existing airplanes 6 boarding bridges in Terminal 1, creating two pre-boarding bridges and footbridges were in position 8, construction of an extension of about 400m 2 to the east of Terminal 1 , level 1. 09/01/2017
907 design-build contract for the construction of stops and their beds Runway media also including their set-backs. 13/01/2017
908 Design, construction and operation of Kerbala International Airport 31/12/2016
909 REPLACEMENT OF DAMAGED EXPANSION JOINT AT AIRSIDE VEHICULAR BRIDGE,SINGAPORE CHANGI AIRPORT 29/12/2016
910 Realization of civil works for road and aviation infrastructure Airport Cote dAzur. 09/01/2017
911 Services of design and construction management for the extension to the North Apron. 27/01/2017
912 36L Gimhae International Airport instrument landing facilities (ILS) Purchase and installation 22/12/2016
913 Golden Gate Airport to help navigation power room high and low voltage distribution equipment and navigation aid equipment procurement case 27/12/2016
914 1 set of Seaport all-rubber-wheeled passenger boarding bridge 29/12/2016
915 Avinor shall during spring 2017, execute new asphalt works for the runway 11/29 at Stavanger Airport. The contract includes electrical works ‚ÄĒ disassembly and assembly of runway lights, etc., required for the execution of the new asphalting work. 04/01/2017
916 Supply, installation, testing and delivery and maintenance provided by the Brussels Airport s Docking Guidance System (DGS). 20/01/2017
917 This consultation concerns the acquisition of a sweeper of 8 10 m 3 equipped with a high-pressure cleaning system for Liege Airport. 19/01/2017
918 Airport Loading Bridge & Baggage System Maintenance 05/01/2017
919 Establishment of air traffic areas BER North. 16/01/2017
920 Airfield Lighting Supplies 06/01/2017
921 Mareeba Airport Upgrade . Construction of Airside Infrastructure. 31/01/2017
922 Emergency work on the airport platform of Martinique Aime Cesaire International Airport. 16/01/2017
923 WIDENING OF MUNICIPAL AIRPORT 16/01/2017
924 Overhaul of international departure process at Paris Orly airport terminal flooring Southeast market (SOL). 16/01/2017
925 Procurement of lighting, signage and miscelleneous electrical equipment for runway rehabilitation project 16/01/2017
926 Supply, delivery and installation of deprature, arrival shading light, runway periphery street light etc 27/12/2016
927 Architectural and engineering services projects at Greenbrier Valley Airport (KLWB) over the next five years 30/01/2017
928 Supply and Delivery of Parts and Accessories for Airfield Lighting System (AFLS) for Area 11 28/12/2016
929 Supply and delivery of parts and accessories for Airfield Lighting System at New Bacolod Silay Airport 27/12/2016
930 Daegu airport extension and other construction 04/01/2017
931 Procurement for the installation of the taxi light, flat edge lights and signs on the F21 Kallax. 24/02/2017
932 Construction hangar apron SF1. 23/01/2017
933 63Amber Airfield Edge Lights 10/01/2017
934 Taiwan Taoyuan International Airport Pavement Rehabilitation and Navigation Facilities Upgrading Project-Airfield Civil Works Tender Package 7 Taxiway NC Junction with N5„ÄĀN6 Rehabilitation Project 09/01/2017
935 Rapid Exit Taxiways at Runway 06/24 20/01/2017
936 Replacement of three passenger boarding bridges 24/01/2017
937 Purchase of five (5) trailed conveyor belts for airports 16/01/2017
938 REPAIR AND MAINTENANCE OF PTB GANGWAY AT ILOILO INTERNATIONAL AIRPORT 09/01/2017
939 Military and Civil Aviation Joint Airport Runway Area Military Facilities Migration Project 11/01/2017
940 Beaconing taxiway. Adolfo Suarez Airport Madrid / Barajas. 16/01/2017
941 WORKS OF REBUILDING AT TERMINAL II AT THE INTERNATIONAL AIRPORT OF TUNIS CARTHAGE 27/01/2017
942 Providing and installation of conveyor belt for passenger terminal building 26/01/2017
943 Aircraft warning light 17/01/2017
944 Supply, delivery and replacement of runway threshold identification lights 16/01/2017
945 Airport hotels in Annecy - Phases 2 and 3 achieving taxiways, access roads and aircraft parking. 02/02/2017
946 This request for information is intended to collect information on the market, moving walkways ( "Horizontal Travellator", "horizontal moving walkway", "horizontal sliding walkway") suppliers and moving walkways delivery times, prices and reference projects. 03/04/2017
947 AIR FIELD LIGHTING SYSTEM (AFLS) & NAVAIDs AT NAS ORMARA 09/02/2017
948 FIS/CUSTOMS BAGGAGE BELT REPLACEMENT 19/01/2017
949 The Ethiopian Airports Enterprise (EAE) invites eligible bidders for the procurement of supply, installation commissioning of solar airfield lightning system at JigjigaWilwal Airport 16/02/2017
950 Creation and flight test service for multi-copter flight control system 04/01/2017
951 Airport Engineering Services 27/01/2017
952 Airfield Lighting Supplies 06/01/2017
953 Professional Airport Engineering 23/01/2017
954 Reinstatement of Lightning Protection Systems at Airport Maintenance Centre 13/01/2017
955 Taoyuan International Airport Auxiliary Navigation Lighting System Maintenance Opening Contract 07/02/2017
956 International Airport baggage trolleys advertising labor procurement case 16/01/2017
957 Supply operational status of ILS / DME CAT I at Tenerife Airport North, track 12. 24/01/2017
958 Grants pass Airport west hangar access taxilanes 31/01/2017
959 Strnghtening of runway, taxiway apron and other associated work 06/02/2017
960 REQUEST FOR QUALIFICATIONS PROFESSIONAL AIRPORT ENGINEERING AND PLANNING SERVICES FOR ROCK HILL/YORK COUNTY AIRPORT I. INVITATION 25/01/2017
961 Taoyuan International Airport electric vehicle import commissioned by the professional advisory services case 23/01/2017
962 Taiwan Taoyuan International Airport Pavement Rehabilitation and Navigation Facilities Upgrading Project-Airfield Civil Works Tender Package 7 Taxiway NC Junction with N5„ÄĀN6 Rehabilitation Project 17/01/2017
963 Maintenance contract and related work for his majesty the sultans flight hangar 16/01/2017
964 Runway Reconstruction and Rehabilitation Engineering Services 30/01/2017
965 RUNWAY REHABILITATION 31/01/2017
966 Supply, installation, testing and commissioning to complete the installation of a medium intensity runway lighting system, PAPI’s and Field Electrical Center (FEC) building at the Gods River Airport. 24/01/2017
967 Airport Corporation of Vietnam Bid for package 4: repairing runway at Can Tho international airport 2016. 23/01/2017
968 Grants Pass Airport West Hangar Access Taxilanes - Phase I 31/01/2017
969 Taxiway A Rehabilitation and/or Reconstruction Runway 15/33 Extension and Road Relocation 15/02/2017
970 Improvement of the Second Terminal Building of Taipei International Airport 24/01/2017
971 Airport MTR A1 station autonomous management area security system engineering case 23/01/2017
972 Airside Land Development at Larnaka Airport. 28/02/2017
973 REHABILITATION OF AIRSIDE PAVEMENTS AND AIRFIELD GROUND LIGHTING (AGL) SYSTEM AT MOI INTERNATIONAL AIRPORT, MOMBASA, KENYA 14/03/2017
974 Airport Master Plan - Anderson Airfield 15/02/2017
975 Requests for Qualifications - As-needed Engineering Services - Quillayute Airport (UIL) 30/01/2017
976 Ketchikan-Revilla &Gravina Airport Shuttle Ferry Berths 02/02/2017
977 Professional Airport Engineering At David Jay Perry Airport 27/01/2017
978 Taoyuan International Airport Airfield Ground Lighting Facility Maintenance Management and Commissioned Design Supervision Technical Service 15/02/2017
979 Professional, Engineering, Planning and Consulting Services for Development of Project 2014-21 Airport Master Plan Update 23/02/2017
980 International Airport Improvement Project ‚Äď Environmental Remediation 30/01/2017
981 Purchase of sheridan airport vehicle and runway broom 08/02/2017
982 Provide work order engineering service for county international airport 01/02/2017
983 Installing, operating and maintaining 4 LEDs 27/01/2017
984 Flight Management Function (FMF) Software Application 27/01/2017
985 Airport consultants for projects : terminal apron expansion, rehabilitation, and reconstruction; taxiway a and c rehabilitation and/or reconstruction; south parking apron rehabilitation and/or reconstruction; land acquisition assistance; west blackhawk trail road extension; runway 15/33 extension and road relocation. 15/02/2017
986 Inspect and Certify the Lifeline Systems Installed on 65 nos of Passenger Loading Bridges (PLB) and 42 nos of Fixed Gangways (FGW) at Changi Airport 23/01/2017
987 Prefabricated gangway 27/01/2017
988 AIR FIELD LIGHTING SYSTEM (AFLS) & NAVAIDs AT NAS ORMARA 27/02/2017
989 Construction of 27 nos. watch tower on airside at CAA Skardu Airport 30/01/2017
990 Air Traffic Control Tower 14/02/2017
991 Runway Development Works ABRA Territorial Municipality of Ain Leuh "Province of Ifrane". 27/01/2017
992 Providing major upgrades to the infrastructure of internationl airports in participating countries including airfield ground lighting , rescue fire vehicle 30/01/2017
993 Taoyuan International Airport airside facilities comprehensive strengthening project plan - site commissioned by the civil engineering design supervision technical services 20/02/2017
994 "Advancement of the Second Airport Road and Airport Terminal Improvement" and the "Planning and Feasibility Assessment of the New Airside Ramp (including Maintenance Shelter) and Drainage Improvement" 09/02/2017
995 aiwanTaoyuan International Airport Airside Facilities Comprehensive Strengthening Project-Airfield Civil Work Plan, Design, Construction Supervision Services Contract 20/02/2017
996 Airport Corporation of Vietnam Bid for package 04: supply and installation ILS equipment at Chu Lai Airport. 20/02/2017
997 Professional Airport Engineering At David Jay Perry Airport 27/01/2017
998 SUPPLY AND DELIVER OF AIRFIELD LIGHTING SPARE PARTS 31/01/2017
999 Supply, installation, testing and commissioning of way finding signage system 06/03/2017
1000 Apron, Taxiway and Apron Facilities for Taiwan Taoyuan International Airport Terminal 3 Area 24/04/2017
1001 Replacement of Arrival Baggage Conveyor at NAIA Terminal 2 17/02/2017
1002 Design and construction of the reconfiguration and expansion of the passenger terminal and the lengthening of runway 22/03/2017
1003 Infrastructure works related to Maintenance Repair & Overhaul (MRO) Hangar at Bahrain International Airport 22/02/2017
1004 Construction of Maintenance Repair & Overhaul (MRO) Hangar at Bahrain International Airport, Kingdom of Bahrain - Prequalification 22/02/2017
1005 Installation of Lights at Changi Airport 06/02/2017
1006 Replace Electrical Distribution Circuit 1 & Airfield Lighting at Sheppard AFB 21/03/2017
1007 Engineering Services for Airport Planning and Design 17/02/2017
1008 Construction of Airport Improvements At Bryan Coulter Field 28/02/2017
1009 RFI for Shannon Airport Aircraft Hangar and Taxiway Project 24/02/2017
1010 Professional Services for Santa Barbara Airport Taxiway H Extension Project 17/02/2017
1011 Procurement for the award of contracts by the open procedure for the supply of the electric winch, no. 430-1966 / 2015. 28/02/2017
1012 The buildings to be constructed is a 2-storey building with function maintenance hangar in massive construction with a flat roof and 2 steel halls (two-sided open) which serve as a shelter for vehicles. The works are carried out on the airfield in Fassberg 29328. 27/04/2017
1013 Hangar Door Maintenance 03/03/2017
1014 Construction & Installation Of Floating Gangway & 1 No Spud Of Biwta Floating Dock Under Mme Department O Biwta 13/02/2017
1015 Aeroports de Paris CDG - Rehabilitation of Terminal 2B and Liaison BD - Lot HVAC: HVAC, plumbing and smoke. 24/02/2017
1016 Aeroports de Paris CDG - Rehabilitation of Terminal 2B and Liaison BD - Lot SBB: high voltage, low voltage, low current. 24/02/2017
1017 MMHS Crescent Plate Baggage Conveyor System 28/02/2017
1018 Monitoring and Evaluation of the Earth and Sea Observation System (EASOS) programme funded by the UK Space Agency International Partnership programme. 27/02/2017
1019 Preparaion of airport master plan and detail design of first phase development of second international airport 01/03/2017
1020 Screed runway. Fuerteventura Airport. 14/02/2017
1021 Iobby rehabilitation B Orly Sud - Paris Orly Airport South Terminal. 17/02/2017
1022 Commissioning of display of signs inside Narita International Airport 14/03/2017
1023 AltaLISLiDAR 07/02/2017
1024 Purchase of Closure Bellows for Boarding Bridges at NAIA Terminal 1 09/02/2017
1025 market design / implementation for the establishment of an arresting bed system at the runway threshold 30 of the Roland Garros Reunion airport. 06/03/2017
1026 Repair Aircraft Parking Apron Lighting 20/02/2017
1027 The existing enclosure around the southern tip of the runway 18 West must be at a length of Approx. 6 200 m can be renewed 01/03/2017
1028 Municipality of Fernando de la Mora 16/02/2017
1029 Chongqing Jiangbei International Airport East Terminal Area and the third runway construction equipment security equipment (liquid detectors and explosion-proof cans, etc.) procurement tender notice 08/03/2017
1030 Improvement of the Second Terminal Building of Taipei International Airport 14/02/2017
1031 SUPPLY AND DELIVERY OF STREETLIGHT LUMINAIRES, LAMPS, POLES AND ACCESSORIES AS WELL AS AIRPORT RUNWAY, AND GENERAL AREA LIGHTING 24/02/2017
1032 DESIGN, SUPPLY, DELIVERY AND INSTALLATION OF A SUITABLE AIRPORT RUNWAY LIGHTING SYSTEM FOR CONDOBOLIN AERODROME 07/03/2017
1033 Advance Planning Plan for the Second Apron Pavement Reconstruction Project at Matsuyama Airport Commissioned Technical Service Case 23/02/2017
1034 Main Runway Expansion Joint Repair Project 13/02/2017
1035 Taoyuan International Airport Auxiliary Navigation Lighting System Maintenance Opening Contract 13/02/2017
1036 Supply and distribution office renovation project and the Chengdu Shuangliu Airport 02L runway II instrument landing system update engineering process installation engineering and ancillary equipment procurement 07/03/2017
1037 Replacing lighting control. 28/04/2017
1038 ATRP and ATDOCV of projects and works at several airports, phase II. 21/02/2017
1039 17NSN: 170 015024630 NOM: TOW TRACTOR,AIRCRAF QTY: 21 EACH 09/03/2017
1040 Aircraft towbar less pushback toe tractor 16/02/2017
1041 Electric Stand Up Tow Tractor 22/02/2017
1042 Hangar Door Maintenance 03/03/2017
1043 Preventive and amintenance boarding bridges 22/02/2017
1044 Airport Lighting 21/02/2017
1045 EMERGENCY AIRPORT LIGHT PACKAGE 22/02/2017
1046 PAPI- AIRFIELD LIGHTING 23/02/2017
1047 Acquisition of 2 vehicles De-icer and an open multi-year contract for technical assistance. 09/05/2017
1048 Taipei, Kaohsiung and Taitung, Kinmen and Matsu radio station Matsu airport lighting materials and parts procurement 21/02/2017
1049 he purchase of navigation and landing ranging beacon ILS DME for airport Samarkand NAC "Uzbekistan Airways". 15/03/2017
1050 Airport Engineering Services 21/02/2017
1051 Installation of an 80 ft long ADA aluminum gangway 24/02/2017
1052 Supply, delivery, installation and commissioning of digital signage 29/03/2017
1053 Relocate ILS Runway 10, Replace REIL Runway 10, Relocate PAPI P&C Runway 10, Cyril E. King Airport, Saint Thomas, Virgin Islands 10/03/2017
1054 Call for applications: Liège Airport - complete project author assignment for the extension of the secondary runway and for the creation of new taxiways in order to increase the capacity of the main runway. 13/03/2017
1055 Development and Taxi Way Apron (Auction Not Binding) 14/02/2017
1056 Airport Road Corridor Widening & Rehabilitation Project -Leduc County 02/03/2017
1057 Renovation of Apron 3 North and taxiway INN9 at Brussels Airport. 13/03/2017
1058 Delivery of the system of electronic flight progress strips for TWR FIR EPWW. 30/03/2017
1059 Taoyuan International Airport Auxiliary Navigation Lighting System Maintenance Opening Contract 22/02/2017
1060 Construction of Maintenance Repair & Overhaul (MRO) Hangar at Bahrain International Airport, Kingdom of Bahrain 23/02/2017
1061 Infrastructure works related to Maintenance Repair & Overhaul (MRO) Hangar at Bahrain International Airport 22/02/2017
1062 Supply and deliver new electrical lightings and accessories, civil aviation dept. 22/02/2017
1063 Acquisition of the Helsinki-Vantaa airport terminals signage 2017-2021. 23/03/2017
1064 Market Survey/Request for Information Capability Assessment for Purchase & Installation of a Simulator/System Development Kit in support of Advanced Unmanned Aircraft System Research Simulator 28/02/2017
1065 (APAPI) material procurement case 20/02/2017
1066 SO - Airport Engineering - Inuit (EF997-172653/A) 15/03/2017
1067 Supply of bituminous concrete and emulsion for the renovation of the Cuers aerospace runway. 21/03/2017
1068 Spare Parts For Hawk Aircraft 19/03/2017
1069 Tire purchase for F-16 aircraft 27/03/2017
1070 Airfield lighting adb 17/02/2017
1071 Purchase and Installation of Conveyor Belt, Butuan Airport 06/03/2017
1072 Aviano AB Flight Simulator Electronic Security System 20/02/2017
1073 Replacement of Runway 24R VASI with a PAPI and Installation of Runway 24L DME at Dayton International Airport, Dayton, Ohio 03/03/2017
1074 Taiwan Taoyuan International Airport Joint Transit System Construction Project "Track and Bridge Monitoring Operation" commissioned technical service case 21/03/2017
1075 Request for Qualifications - Professional Airport Engineering Services Runway 11/29 Replacement Project 15/03/2017
1076 Re-construction of apron at Hazrat Shahjalal International Airport S.H-Re-construction of pavement at baggage make-up area at PTB-2 in/c other associated works 16/03/2017
1077 Replacement of Mechanical and Electrical Components of Canopy & Curtain for Jetway Passenger Boarding bridge i/c related works at HSIA. 14/03/2017
1078 Development & renovation of lighting system for Terminal 1 & 2 at HSIA S.H Providing & Installation of LED Panel light at Arrival Baggage Belt No. 5 6 7 & 8 area & Arrival Concourse Hall at TB-2 at HazratShahjalaI International Airport Dhaka. 13/03/2017
1079 South extension of Line 14 of Olympiads in Orly Airport - buyer mission. 10/03/2017
1080 Hangar Door Maintenance 03/03/2017
1081 The main objective of the contract is to complete the renovation of runway 23R-05L. This includes: * from the point of view of civil engineering, the rehabilitation of: - the covering of runway 23R-05L and its two runway thresholds; - the lining of the access ramp C4. 27/03/2017
1082 South extension line 14 to Orly Airport - auscultation over the area of the future of White House Station Paris XIII. 17/03/2017
1083 Installation of an 80 ft long aluminum gangway 24/02/2017
1084 Acquisition and Supply of Airfield Guidance Signs for the Israel Airport Authority 03/06/2017
1085 Public tender for planning permission, construction, management and operation of logistics center at Ben Gurion Airport 17/05/2017
1086 Procurement repair outbound baggage conveyor belt. The deadline date shown is predictive deadline. Interested firms should contact tendering authority for exact deadline date 03/03/2017
1087 Employment repair the driving surface (TAXIWAY) C between the C4 and C6 driver at Suvarnabhumi Airport. 28/02/2017
1088 Federal inspection service with processing equipment baggage belt, baggage scanning and a Passenger Boarding Bridge connector from existing Gate 1 22/03/2017
1089 Rehab Passenger Boarding Bridge 08/03/2017
1090 The performance, design, fabrication, installation, and test requirements for a Crescent Plate Baggage Conveyor System for Buildings 2028 and 2037 at Hickam Air Force Base 28/02/2017
1091 ADS-B Project Bidding for ADS-B Ground Station Equipment Bidding for Civil Aviation Broadcasting in West China 27/02/2017
1092 Long term rental for the duration of 60 months of n. 18 motorized driven stairs for boarding and disembarking from aircraft passengers inside the airport of Naples Capodichino. The characteristics of the car, the technical specifications of the subject of rental items, duration, etc 13/03/2017
1093 Nausori runway extension and upgrade- engineering services 30/03/2017
1094 Acquisition and installation of an ILS / DME system for the airport of Grosseto. 18/04/2017
1095 Pre-qualification for Building and Civil Engineering Works at the Hong Kong International Airport 15/03/2017
1096 Airfare mobile belt conveyor-elevator for loading-unloading of baggage and cargo 20/03/2017
1097 15NSN 7RH 1560 015053989 V2, P/N 901015242104, FAIRING,AIRCRAFT. The item is used on or supports the V22. 15/03/2017
1098 59SOURCES SOUGHT NOTICE FOR V22 MADE NEW INTERFACE UNIT AND MONITOR SENSOR IN REFERENCE N0038317RF151 14/03/2017
1099 Taiwan Taoyuan International Airport, the third terminal area Ping Ping, taxiway and Ping Ping facilities 31/03/2017
1100 Apron, Taxiway and Apron Facilities for Taiwan Taoyuan International Airport Terminal 3 Area 31/03/2017
1101 Supply and installation of Aircraft Loading Walkways for Pier B of Brussels Airport 05/04/2017
1102 Airport Surface Movement Radar Equipment. 18/04/2017
1103 J HANGAR DOOR ELECTRICAL TRACK REPAIR 03/03/2017
1104 To provide the Maintenance Management of ground support equipment at the Muscat International Airport 15/03/2017
1105 This includes a fixed wharf structure and a floating pontoon with an access gangway. 31/03/2017
1106 Runway 12-30 rehabilitation 15/03/2017
1107 Airport runway lights 11-29, Vidsel Airport 2017. 28/03/2017
1108 Screed pavement runway 12-30. Bilbao airport. 17/03/2017
1109 Work include replacement of passenger boarding bridges 23/03/2017
1110 Provision of trolley management service to Abu Dhabi Airports Co. 09/03/2017
1111 INBOUND BAGGAGE CONVEYOR REFURBISHMENT 15/03/2017
1112 Planning, Design, and Construction Administration Services for Juneau International Airport Gate 2 Passenger Boarding Bridge 24/03/2017
1113 Supply and Delivery of Timer Board of Runway Threshold Identification Lights (RTIL) at Dumaguete&Kalibo Airport 10/03/2017
1114 The procurement of approach light for TaitungFengnian Airport 22 runway and Hualian Airport 03 runway 06/04/2017
1115 SUPPLY, DELIVERY, INSTALLATION AND CONFIGURATION OF ONE (1) UNIT BRAND NEW UNMANNED AERIAL VEHICLE (UAV) FOR THE LAND MANAGEMENT BUREAU 27/03/2017
1116 Taitung Airport 22 runway and Hualien Airport 03 runway approach lamp purchase case 06/04/2017
1117 Emergency Runway Light Package 21/03/2017
1118 Repair Aircraft Parking Apron Lighting 11/04/2017
1119 Procurement of Major Spare Parts Passenger Boarding bridges at HSIA. 14/03/2017
1120 Maintenance of Passenger Loading bridges State wide 06/04/2017
1121 Supplying of different Size I-beam and Electrode for repairing of different Gangways and flaps in different Pontoon under Ferry sub-division Barisal during the year 2016-2017. 29/03/2017
1122 Design, Manufacture, Installation & Commissioning Of New Gangway(s) for Overseas Passenger Terminal 21/04/2017
1123 interiors and seaplane base signs. 10/06/2017
1124 QiannanLuobo Airport expansion project 29/03/2017
1125 Purchase / installation of Conveyor Belt quantity 16 for use by Pakistan Army 24/03/2017
1126 Aeroports de Paris supplies and set markup services regulators. 30/03/2017
1127 Framework Agreement for the acquisition of parts of connecting elements for aircraft EA. 19/04/2017
1128 F / A-18 Hornet fighter purchase stock of spare parts for the landing gear system 18/04/2017
1129 Xinjiang Tacheng Airport expansion project instrument landing system / rangefinder equipment (recruiting) international tender notice 30/03/2017
1130 Pohang Airport LED lighting replacement and electrical work 17/03/2017
1131 The work to be performed under this project includes manufacturing and delivering prefabricated fixed pier, floating docks, gangways 11/04/2017
1132 In general the project consist of a floating transient dock system. The dock include aluminum access gamgways 21/03/2017
1133 Expansion and renovation of Runway Air Base 123-Bricy Orleans - Phase 4. 15/06/2017
1134 Manufacture and installation of 185 exterior signs at the International Airport parking garage and surface parking lot. 03/04/2017
1135 The rehabilitation of airside pavements and airfield ground lighting system at MOI international Airport 04/04/2017
1136 Airport Runway 13/31 Reconstruction - Phase 2 04/04/2017
1137 Charles de Gaulle Airport Paris - Orly-Le Bourget - Providing lighting of LED lights and parts accessories. 05/04/2017
1138 Delivery of electric baggage tractor (2 units) for the needs of JSC International Airport of Sochi. 20/03/2017
1139 Construction of Airport Surface Surveillance Capabilities (ASSC) System, Portland International Airport 13/10/2017
1140 Operation and Maintenance of Arctic Bay Airport 07/04/2017
1141 Furnish floats and a gangway for the replacement of the City pier Transient Moorage 29/03/2017
1142 Taichung Qingquan Gang base hangar and other military facilities to build the project 12/04/2017
1143 Conductive Conveyor Belting 29/03/2017
1144 F-15 Spares (6 Line Items) 04/04/2017
1145 A high air pressure compressors submarine hangar 30/03/2017
1146 Hangar for aircraft 44210000-5 - Structures and parts for aircraft Hangar - 1 piece 10/04/2017
1147 Develop a comprehensive estimate of the design construction of a new runway at the International Airport them. John Paul II Balice Sp. z oo 20/04/2017
1148 TO REPAIR, FLATTEN, TEST AND COMMISSION 10 UNIT GANGWAY PLATE FOR ETS 91 CLASS AT ETS DEPOT BATU GAJAH, PERAK 30/03/2017
1149 Request for Information (RFI) for RQ7Bv2 (SHADOW) Tactical Unmanned Aircraft System (TUAS) for a Block III Propulsion System and Logistics Sustainment Operations Support 17/04/2017
1150 Repair Hangar Door, B#849, Osan AB 18/04/2017
1151 Airfield Alpnach, rehabilitation and maintenance airfield pavements, Prio. 1 02/05/2017
1152 Master Professional Services contract will provide airport planning, engineering, construction management, environmental and airport management support services 21/04/2017
1153 Toledo Executive Airport Rehabilitate Airfield Pavements 11/04/2017
1154 Apron, Taxiway and Apron Facilities for Taiwan Taoyuan International Airport Terminal 3 Area 31/03/2017
1155 YP256 EA18G Maintenance Hangar, Naval Air Station Whidbey Island, WA 07/04/2017
1156 Airfield Pavement Upgrades, CFB Goose Bay, NL 19/04/2017
1157 Upgrade Aviation Ground Lighting at Building 210 12/04/2017
1158 Flight Management Function Software Application 06/04/2017
1159 County airport runway 6/24 safety area improvements 21/04/2017
1160 Construction of the future corporate/maintenance hangar, construct stub taxiway/taxilane and helipad. 18/04/2017
1161 To purchase and construct approx 210 of aluminium gangway 17/04/2017
1162 The Bulimba Navy Barracks wharf facility consists of two main components. This includes a fixed wharf structure and a floating pontoon with an access gangway 07/04/2017
1163 RUNWAY LIGHTING 07/04/2017
1164 Construction of airport roadway, runway and taxiway. 21/04/2017
1165 Purchase and installation of an Municipal Airport Entrance Sign. 19/04/2017
1166 Apron signs and latitude and longitude signs replacement works 10/04/2017
1167 Seymour Johnson KC46A Hangar 18/05/2017
1168 Air Traffic Control Equipment, Improved Power Supply, and Airfield Lighting and Cabling 16/05/2017
1169 Supply and installation of a metallic ladder and gangway. 06/04/2017
1170 N taxiway road construction 11/04/2017
1171 Provide airport marking/ striping 04/04/2017
1172 The assignment covers purchase of airplane stairs delivered to Swedavia airports. 20/04/2017
1173 To design, fabricate and install an entrance/exit sign at the airport. 20/04/2017
1174 Construction at Marshfield Municipal Airport 20/04/2017
1175 Stornoway Airport Taxiway Refurbishment 02/05/2017
1176 The procurement of approach light for Taitung Fengnian Airport 22 runway and Hualian Airport 03 runway 13/04/2017
1177 Taitung Airport 22 runway and Hualien Airport 03 runway approach lamp purchase case 13/04/2017
1178 Improve Runway and Support Infrastructure 14/04/2017
1179 Work on the development of runways in the commune of SIDI EL AIDI in two lots 10/05/2017
1180 Prevention ready to install utility system, lighting system and three sanitary system at Suvamabhumi Airport 30/06/2017
1181 Construction of the following runways: -Track connecting RP 2119 to ouledAbbou from a distance of 500 ml. -Link linking OuledHmama to El Hadra from a distance of 500ml to CT OuledCharki / El Kelaa Province of 25/04/2017
1182 Hangar Door Replacement Project 17/04/2017
1183 Auscultation of the civil aeronautical pavements of the airport of Niamey 15/05/2017
1184 Construction of general aviation hangar 03/05/2017
1185 APPOINTMENT OF SERVICE PROVIDER TO SUPPLY AND INSTALL THE AUTOMATED WEATHER OBSERVATION (AWOS) / INSTRUMENT LANDING SYSTEM (ILS) ROUTER UPGRADE AT KING SHAKA INTERNATIOAL AIRPORT (KSIA) 12/05/2017
1186 Greenfield Municipal Airport Rehabilitate Runway Lighting & Rotating Beacon 13/04/2017
1187 Middletown Airport Taxiway and Apron Improvements 04/04/2017
1188 Supply, installation, commissioning and maintenance of digital signage equipment at ireland west airport knock 18/04/2017
1189 Updated conveyor baggage and the introduction of automated sorting system of internal airports (second stage) 01/05/2017
1190 Yeosu Airport Lighting Control System Improvement 17/04/2017
1191 UPGRADING OF AIRFIELD LIGHTING SYSTEM & RUNWAY THRESHOLD IDENTIFICATION LIGHTS AT GENERAL SANTOS INTERNATIONAL AIRPORT 25/04/2017
1192 Hangar Door Maintenance 14/04/2017
1193 Repair and Service Hangar Doors 14/04/2017
1194 SUPPLY AND DELIVERY OF FOUR (4) UNITS OF MOTORIZED PASSENGER STAIRS 12/04/2017
1195 Repair works of the runway - EOTT 13/04/2017
1196 Green Island Airport runway extension project management services 09/05/2017
1197 Installation of L-810 airport obstruction lights. 26/04/2017
1198 Supervision of reconstruction of the runway, apron and taxiway 08/04/2017
1199 Development & renovation of lighting system for Terminal 1 & 2 at HSIA S.H Providing & Installation of LED Panel light at Arrival Baggage Belt No. 5 6 7 & 8 area & Arrival Concourse Hall at TB-2 at HazratShahjalaI International Airport 22/05/2017
1200 Construction and Completion of Terminal Building at Bumthang Domestic Airport 03/05/2017
1201 Airfield pavement construction work. Provision of Runway refurbishment to Pavement Classification no.30 and Engineered Material Arresting System whilst maintaining support systems and access to comply with military aeronautical authority regulations at RAF Northolt. 15/05/2017
1202 Concourse C Passenger Boarding Bridge C-11 03/05/2017
1203 JBE041 Add/Alter Hangar JBER, Alaska 20/04/2017
1204 Passenger trolleys management for new muscat international airport 07/05/2017
1205 Framework agreement for repairs, rehabilitation and upgrade of runways, taxiways, aprons and service roads 16/04/2017
1206 Framework agreement for marking and remarking of runways, taxiwaysm apron and service roads 16/04/2017
1207 B-002,102 renovation Tunnel Runway 18 West, EU-P 0376-17BL overall measure. 09/05/2017
1208 PASSENGER BOARDING BRIDGE (PBB) 09/05/2017
1209 Design/ buid service for construction of aviation terminal building 03/05/2017
1210 Aircraft tractors 31/05/2017
1211 Repair of concrete pavements military airport in Swidwin. 19/04/2017
1212 Provision of Cage Trolleys for Terminal 4 Baggage Handling system 21/04/2017
1213 Street lighting work on the RD203, serving the Beauvais-Tille airport. 09/05/2017
1214 Construction and installation work on the project: "Reconstruction (restoration) of airfield pavements at the airport" 21/04/2017
1215 Replacement and Upgrading of Nine (9) Units Passenger Boarding Bridges including Layout of New Power Feeder Line Cable at NAIA Terminal 1 05/05/2017
1216 Passenger Boarding Ramps for Rural Airports 03/05/2017
1217 Project management for the partial renewal taxiways "echo - fox - alpha / 2 congratulations and Charly". 22/05/2017
1218 Aircraft mini push back tow tractor 04/05/2017
1219 VAMC - Insulation object aviation hangar. 09/05/2017
1220 N taxiway road construction 25/04/2017
1221 The procurement of approach light for Taitung Fengnian Airport 22 runway and Hualian Airport 03 runway 24/04/2017
1222 Seymour Johnson KC46A Hangar 18/05/2017
1223 AIR FIELD LIGHTING SYSTEM (AFLS) & NAVAIDs AT NAS ORMARA 20/04/2017
1224 AIRPORT ROAD AND FURY PLACE RECONSTRUCTION 04/05/2017
1225 Haikou Meilan Airport expansion project instrument landing system and range finder procurement projects 04/05/2017
1226 Apron signs and latitude and longitude signs replacement works 20/04/2017
1227 AIRCRAFT GENERAL SUPPLY 27/04/2017
1228 This project is for the replacement of Runway 12 MediumIntensity Approach Lighting System with Runway Alignment Indicator Lights (MALSR) System at Huron Regional Airport in Huron 02/05/2017
1229 Acquisition hose for refueling aircraft 28/04/2017
1230 Hengchun air station runway marking line paint 26/04/2017
1231 ACQUISITION OF REFORTION FOR THE MAINTENANCE OF AIRCRAFT C-182s 16/05/2017
1232 Supply of materials and spare parts for maintenance of airfield ground lighting (AGL) equipment, fittings and 45 w halogen taxiway lamps 09/05/2017
1233 Purchase of special vehicles - aircraft tractor. The deadline date shown is predictive deadline. Interested firms should contact tendering authority for exact deadline date. 26/05/2017
1234 Taipei, such as the unit of the airport lighting equipment procurement case 26/04/2017
1235 Spares for the Maintenance of Electrical System of SF-260TP Aircraft Nrs. 706, 708, 704 and 701 21/04/2017
1236 Tactical Unmanned Aerial Vehicle (TUAV) Facility 24/04/2017
1237 Project management market to repair the runway of the airport Biarritz - Basque country. 05/05/2017
1238 PURCHASE OF SPARES FOR AN-32B AIRCRAFT 21/04/2017
1239 PURCHASE OF VEHICLE MOUNTED GROUND POWER UNIT 15/05/2017
1240 EGLIN AFB, AEROSPACE GROUND EQUIPMENT SUPPORT 28/04/2017
1241 EIE384 F35 Aerospace Ground Equipment (AGE) Facility Fillstand 18/05/2017
1242 REMOVAL OF RUBBER DEPOSIT AT RUNWAY 02R/20L AND REPAINTING OF AFFECTED PAVEMENT MARKINGS 10/05/2017
1243 Installation of L-810 airport obstruction lights, installation of metered electrical service 26/04/2017
1244 17-014-04 PURCHASE/INSTALLATION OF PAPI SYSTEM & AERODROME BEACON AT CAUAYAN AIRPORT 25/04/2017
1245 SUPPLY AND DELIVERY OF FOUR (4) UNITS OF MOTORIZED PASSENGER STAIRS (REBID) 10/05/2017
1246 Purchase and installation of necessary GARMIN manufactured avionics equipment for the implementation of ADS-B in/out in 21 of our flight training aircraft 01/05/2017
1247 Supply and deliveryof parts and accessories for Airfield Lighting System at Tacloban AIrport 26/04/2017
1248 Aircraft maintenance and repair 09/05/2017
1249 UPGRADING OF AIRFIELD LIGHTING SYSTEM & RUNWAY THRESHOLD IDENTIFICATION LIGHTS AT GENERAL SANTOS INTERNATIONAL AIRPORT 25/04/2017
1250 Acquisition of Ground Handling Generator (GPU) generators for metz nancy lorraine airport (epmnl - lorraine airport) 09/05/2017
1251 Component OEM Repair of HC144 Aircraft A/C Generators 25/04/2017
1252 DJI Matrice 600 Pro multirotor unmanned aerial vehicles (UAVs) and associated accessories 28/04/2017
1253 SUPPLY OF AH64D APACHE SPARES 28/04/2017
1254 F16 AIRCRAFT SPARES - 4 LINE ITEMS 04/05/2017
1255 Maintenance Hangar Repairs USCG Air Station Detroit Mount Clemens, MI 27/04/2017
1256 Provide all labor, materials, and equipment necessary to Relocate PAPI PCU outside the RSA for Runway 28 at Henry E. Rohlsen Airport, Christiansted, St. Croix, Virgin Islands 24/04/2017
1257 REGION 1 EXCLUSIVE USE LIGHT FIXED WING ATGS AIRCRAFT 28/04/2017
1258 Refurbishment of 2 stearns airport equipment transitread steel plate inbound baggage conveyors 21/04/2017
1259 TCM factory rebuilt aircraft engine. Rebuilt engine should include magnetos, fuel control and fuel pump 26/04/2017
1260 Portland International Airport hangar 7909 rehabilitation 09/05/2017
1261 Replace PAPI, kalaupapa airport 18/05/2017
1262 DUBBO REGIONAL AIRPORT AERONAUTICAL GROUND LIGHTING (AGL) UPGRADE 02/05/2017
1263 Provide engineering, architectural, and planning services for the Princeton Municipal Airport 26/05/2017
1264 Gimpo Airport generators consumable parts replacement and repair 24/04/2017
1265 Airport Runway Deicer Potassium Acetate 25/05/2017
1266 Single procurement of an electric conveyor belt with an extensions arm for Svalbard Airport. 12/05/2017
1267 Swedavia Framework PCA unit. 08/03/2018
1268 Information Request: Finavia Oyj, Helsinki-Vantaa Airport terminal and an award exterior signage. 03/12/2017
1269 Design and construct an aerospace ground equipment facility 18/05/2017
1270 Reconstruction of Taxiway A as well as widening of connector Taxiway E1 22/05/2017
1271 HO20170076 :- Supply, Installation, Testing and Commissioning of Aircraft Warning Light for Modernization 10/05/2017
1272 AKRON FULTON AIRPORT OBSTRUCTION REMOVAL AND LIGHTING INSTALLATION 02/05/2017
1273 Tender Development & Construction Supervision Services, Faleolo International Airport, Samoa 04/05/2017
1274 PASSENGER AMENTIES SERVICES 24/05/2017
1275 Airfield Maintenance 31/05/2017
1276 Generator 19/05/2017
1277 Contract for original equipment manufacturer and remaunufactured parts for fixed wing and rotary style aircrafts 05/05/2017
1278 Modernization of the navigation lights 01/06/2017
1279 Airport development evaluation services 12/05/2017
1280 GRANDE PRAIRIE AIRPORT REQUEST FOR RUNWAY 07/25 EVALUATION 15/05/2017
1281 Aviation education facility and regional airport maintenance hangar 27/04/2017
1282 Supply and Delivery Aircraft Passenger Boarding / Disembarking Gangways 01/06/2017
1283 ESENBOA AIRPORT STATE AIRCRAFT HANGAR INTRODUCTION CONTROL POINTS G3 AND KALASNIKOF TYPE LONG TERM STANDARDS 02/05/2017
1284 Construction and installation work on the project: "Reconstruction of the airport complex" Sokol " 28/04/2017
1285 Taxyway and appron development 27/04/2017
1286 Const main runway 15/05/2017
1287 Review of FS South Banten Airport Development 28/04/2017
1288 Clearing work for standard runway strip fulfillment 27/04/2017
1289 Kumamoto Airport Domestic separate building new construction design 11/05/2017
1290 To supply lumacurve airfield signs. 02/05/2017
1291 Portable Runway and Taxiway Edge Light systems 08/05/2017
1292 Runway and taxiway lighting and signage at county airport. 09/05/2017
1293 Install New Runway 17-35 Vertical Guidance System. 01/05/2017
1294 Design of LED Medium Intensity Taxiway Lights 11/05/2017
1295 Replace Guidance Sign and Taxiway Lights at Sullivan County International Airport 12/05/2017
1296 Taipei, such as the unit of the airport lighting equipment procurement case 02/05/2017
1297 Procurement of aircraft spare parts 27/04/2017
1298 Maintenance of tow tractor 15/05/2017
1299 Procurement ILS-91G type ILS device 1 equation 14/06/2017
1300 Airport Development Evaluation Services 12/05/2017
1301 Airfeild pavement reconstruction and replacement 30/05/2017
1302 Reconstruction of Taxiway 22/05/2017
1303 TO SUPPLY AND INSTALLATION OF AIRFIELD GROUND LED LIGHTS AT KING SHAKA INTERNATIONAL AIRPORT 22/05/2017
1304 Mineta San Jose International Airport - Lighting System Upgrade for CAT II App. 04/05/2017
1305 RECONSTRUCTION OF TAXIWAY AND APRON AT MANDA AIRSTRIP - LAMU 08/05/2017
1306 AIR FIELD LIGHTING SYSTEM (AFLS) & NAVAIDs AT NAS ORMARA 04/05/2017
1307 AERIAL REFUEL CONTR 22/05/2017
1308 Supply and Delivery of Ground Services Equipment and Provision of Ground Services Equipment Management Services for the Hong Kong International Airport 15/05/2017
1309 Generator purchase case 08/05/2017
1310 SystemsFlight Test Aircraft Maintenance Redstone Test Center Aviation Flight Test Directorate 25/05/2017
1311 SUPPLY OF AH64D APACHE SPARES 04/05/2017
1312 F16 AIRCRAFT SPARES - 3 LINE ITEMS 15/05/2017
1313 F16 AIRCRAFT SPARES - 5 LINE ITEMS 09/05/2017
1314 15FAIRING, AIRCRAFT 03/05/2017
1315 AGL(air field lighting system) complete supply, installation and commissioning work at dire dawa international airports 18/05/2017
1316 Repair Taxiway at Wright-Patterson AFB 05/05/2017
1317 Ground support equipment maintenance and fueling services 24/05/2017
1318 2 EA of existing runway end identification light system 02/05/2017
1319 PLATE, STRUCTURAL for the B1B aircraft (56F) 09/06/2017
1320 One (1) Unit Crane for FA-50PH Aircraft 23/05/2017
1321 Spares for the Maintenance of AW109-AH Aircraft Nrs. 815, 816 and 819 23/05/2017
1322 Spares for the Maintenance of Engine and Fuel Systems of AW109-AH Aircraft 23/05/2017
1323 Procurement of 3 ea Cover, PSN Light with PN: AN3042-3 for use of C-130 aircraft with tail nr 3633 02/05/2017
1324 Procurement of 5 ea Data Bus Coupler with PN: DBP50010XS and 1 other L/I for use of C-130 aircraft with tail number 5040 02/05/2017
1325 Bought a mobile power generator aircraft and aircraft GPU converter 03/05/2017
1326 SUPPLY OF AH64D APACHE SPARES 05/05/2017
1327 Spares for Airfield Maintenance System 11/05/2017
1328 Purchase spares in support of the UH1N Helicopter Programs 26/05/2017
1329 Supply and delivery of helicopter landing lights to the South African Police Service 04/05/2017
1330 Construction and Repair of a Fuel System, Apron, Taxiway, Ramp, and Lighting at the Pittsburgh Air Reserve Station, PA 13/06/2017
1331 APPOINTMENT OF SERVICE PROVIDER TO SUPPLY AND INSTALL THE AUTOMATED WEATHER OBSERVATION (AWOS) / INSTRUMENT LANDING SYSTEM (ILS) ROUTER UPGRADE AT KING SHAKA INTERNATIOAL AIRPORT (KSIA) 12/05/2017
1332 Procurement of Sissors Lift of Passenger Boarding bridge at HSIA. 11/05/2017
1333 62LIGHT, COCKPIT,AIRCR 10/05/2017
1334 Light Duty Tow Tractor purchase 12/05/2017
1335 Runway Extension (100 mx 30 m) with hotmix including Marking 02/05/2017
1336 Project consist of reconstruction of runway 17/05/2017
1337 KP / PERO-3 / C / 042/2017 / OE: Supply and Service Parts Maintenance Ground Support Equipment (GSE), Aviation Ground Support Equipment (GSE) and Special Vehicles for the Royal Malaysian Navy 25/05/2017
1338 AIRPORT WAYFINDING/SIGNAGE DESIGN SERVICES 26/05/2017
1339 MH65 SPARE PARTS 08/05/2017
1340 Aircraft Spare Parts 02/05/2017
1341 SERVICE AND MAINTENANCE OF TURBOCOMANDER AIRCRAFT. 08/05/2017
1342 Services to Include Alongside Aircraft Refueling 19/05/2017
1343 Combined Operations Building Expansion Preliminary Design at Kelowna International Airport (YLW) 23/05/2017
1344 Assignment Aircraft Refueling 10/05/2017
1345 Airport Fuel System Rebid 09/05/2017
1346 ACQUISITION OF A NEW LANDING SYSTEM BY INSTRUMENTS ILS CATEGORY III 06/05/2017
1347 N taxiway road construction 10/05/2017
1348 JAH1 Helicopter Generator Repair 12/05/2017
1349 Repair Taxiway/Runway Alpha Overlay 12/05/2017
1350 Provision of ground handling at the airport in Lleida-Alguaire, including, among others, services ground administration and supervision, passenger, baggage handling, assistance operations ramp handling aircraft cleaning, service thaw assistance to passengers with reduced mobility, etc, 19/06/2017
1351 Technical Supervision of Runway Extension Run from 1400m x 30m to 1600m x 30m, Taxiway and Apron Widening including Marking 04/05/2017
1352 Resurfacing of runways, taxiways and aprons with hotmix including marking (AUCTION RE) 05/05/2017
1353 Upgrade of standby generators control system 31/05/2017
1354 Purchase of materials for maintenance and repair of airport runways 16/06/2017
1355 Procurement of aircraft spare parts 05/05/2017
1356 3 SETS- BEACON LIGHT AND SIREN 05/05/2017
1357 Airfield and PAPI Lighting System Replacement 22/05/2017
1358 SPARES FOR SEAHAWK HELICOPTER 16/05/2017
1359 Improve Runway and Support Infrastructure 07/06/2017
1360 2915Õĺ Manifold,FuelÕĺ Aircraft, T38ÕĺWSIC: T 18/05/2017
1361 Jet A fueling System 16/05/2017
1362 Replace Guidance Signs and Taxiway Lights at Sullivan County Inernational Airport 12/05/2017
1363 Construct new airport aircraft fueling system, including two (2) above-ground fuel storage tanks (one 10,000 gallon tank for AvGas and one 12,000 gallon tank for Jet Fuel). Project includes fueling dispensers/cabinets and remote fill cabinets for both types of fuel 09/05/2017
1364 Check out the purchase price of elevator parts, escalators, conveyor belts. And bridge 11/05/2017
1365 Procurement of Aviation Ground Support Equipment 29/05/2017
1366 Technology for the production and installation of lighting and arrivals takeoff runway. 08/06/2017
1367 Runway and taxiway pavement markings, adjustment of existing taxiway centerline lighting 01/06/2017
1368 Work on the addition of a precision approach path indicator (PAPI) on the runway at Salluit Airport 17/05/2017
1369 Purchase of items for the aircraft CC115 Buffalo 13/06/2017
1370 Supply and Delivery of Spare Parts for the Aircraft Ready Available Spares (ARAS) of PN Islanders NV310, NV311, NV312, NV314 and NV320 24/05/2017
1371 CLOSING FLAPS AND FLOATATION GEAR FOR SUPER PUMA HELICOPTER 23/05/2017
1372 Spares for Super Puma Helicopter 16/05/2017
1373 Request for Information (RFI) for United States Navy Aircraft Armament Equipment (AAE) Repair and Upgrade Services 18/05/2017
1374 AIRSTRIP LIGHTING MAINTENANCE SUPPLIES 16/05/2017
1375 Construction of runways (3rd tranche) in laghnadra commune 25/05/2017
1376 Pilatus Aircraft Maintenance Contract for the Ontario Provincial Police. 01/06/2017
1377 Preventive and corrective-scheduled helicopters, Fleet Air Media Service of the National Police, with its components and ancillary equipment maintenance. Years 2017-2018. 13/06/2017
1378 Tender for maintenance of HAFA aircraft 24/05/2017
1379 Lake Tahoe Airport General Aviation Apron Reconstruction - Phase 4 24/05/2017
1380 RNZAF Aircraft Maintenance, Repair and Overhaul (MRO) Market Engagement Event 1 & 2 June 2017 12/05/2017
1381 Yeosu Airport LED lighting replacement work 10/05/2017
1382 NAS Lann-Bihoue - BAN Lanvéoc Poulmic - replacement sidelights markup: supply (innovation contract). 04/05/2018
1383 R & M of Acft&Acft Ground Equipment 08/05/2017
1384 Aircraft Spare Parts 09/05/2017
1385 Taoyuan Airport MRT A10 Zone Expropriation Public Construction 06/06/2017
1386 Paving of the runway at DouarHatata at the OuledGhanem Province El Jadida 26/05/2017
1387 Replacement and Installation of Runway 13/Runway 31 NAVAIDS at Bismarck Municipal Airport, Bismarck, North Dakota 23/05/2017
1388 WINDOW PANEL, AIRCRAFT 12/06/2017
1389 Contract for the execution of civil works and installations for the activities of engineering services aimed at upgrading of the 13/31 runway Airport of Brindisi, complete the final design to be presented during the tender and execution if awarded . 31/07/2017
1390 Taxiway B OFA for unrestricted taxi by group V aircraft 02/06/2017
1391 Leeds Bradford Airport (the Airport) is seeking to appoint a contractor to provide fuel farm management and into-plane fuelling services. 05/06/2017
1392 Assistance project ownership for the structural strengthening of runway 12/30 and fox strap. 12/06/2017
1393 Ground handling equipment. 17/05/2017
1394 Airfield Lighting System Electrical Repair and Maintenance at BWI & MTN 30/05/2017
1395 SEALED bids for Aircraft Switchback Boarding Ramp 22/05/2017
1396 REPLACE AIRFIELD LIGHTS WITH LEDS AREA F AVIANO AB, ITALY 08/05/2017
1397 Constructing a dixed pier, gangway, and floating dock 30/05/2017
1398 DAYTON INTERNATIONAL AIRPORT TERMINAL APRON RECONSTRUCTION-PHASE 2 18/05/2017
1399 Spare parts for Cessna Aircraft 14/05/2017
1400 Snow and Ice Removal Services 02/06/2017
1401 TRAILING EDGE,AIRCRAFT 18/05/2017
1402 15--DOOR,AIRCRAFT 20/06/2017
1403 J--SMALL BOAT DOCKS ALUMINUM GANGWAY REPAIR 24/05/2017
1404 F-15 SPARES 19/05/2017
1405 AIRCRAFT GENERAL SUPPLY 19/05/2017
1406 Replace Five (5) Airport Apron Floodlights 01/06/2017
1407 Framework agreement, system for aircraft GPU (Ground Power Units). 26/05/2017
1408 Taxiway Alpha Reconstruction 18/05/2017
1409 Structural remodeling of footbridges and supply with installation of equipment to handle aircraft. Palma de Mallorca airport. 22/05/2017
1410 Fresno Yosemite International Airport taxiway C reconstruction 16/05/2017
1411 Removal and replacement of one passenger boarding bridge at gate B9 icluding new pre-conditioned air and ground power units at the impacted bridge 25/05/2017
1412 Company experiance in aviation lighting and electrical configuration 08/06/2017
1413 Mkuze airport runway, taxiway and apron upgrade 10/05/2017
1414 ACQUISITION OF SPARE PARTS FOR GENERATOR 16/05/2017
1415 Spare parts and supplies for bars towing aircraft model HYDRO be providing SOS AIHCB 06/06/2017
1416 Design - Taxiway Bravo, Main Apron Aircraft Parking Area Rehabilitation and Airside Guidance Sign Upgrades 01/06/2017
1417 Supply of (a) meters to measure filling of lorries (b) electric forklifts of 3 tons capacity, also (c) aircrafts fuelling equipment. 28/05/2017
1418 Supervision Installation of General Street Lighting Light Ornament LED Jalan Lambaro - International Airport SIM Kab. Aceh Besar 12/05/2017
1419 The boarding bridge spare parts procurement for Kunming Changshui International Airport 27/05/2017
1420 53--BOLT,SHEAR,AIRCRAFT 16/05/2017
1421 SPIDER AIRCRAFT, UNI; NSN 1680-01-584-6964; PN 449-040-080-101 23/05/2017
1422 CONTINUATION OF ASPHALT OVERLAY OF TAXIWAY AND UPGRADING OF RUNWAY AND TAXIWAY SHOULDERS AT PLARIDEL AIRPORT 30/05/2017
1423 WSDC Z9N, F-18 AIRCRAFT; 1620-01-601-7503, DRAG LINK, LANDING G 11/05/2017
1424 Construction of Cargo Terminal Building (Non-binding Auction) 16/05/2017
1425 Design, Supply & Installation of Standby Power Generators for Tokua and Nadzab Airports in Papua New Guinea. 19/06/2017
1426 Spares for Seahawk Helicopter 22/05/2017
1427 Rehabilitation at Tzaneen Airfield Runway 19/05/2017
1428 SWPP implementation, maintenance and monitoring , marking and lighting of cosed airport facilities 24/05/2017
1429 Laguardia Airport - Emergency Generaors at variuos Locations. 18/05/2017
1430 Construction of international and domestic cargo terminal at Islamabad airprot 22/05/2017
1431 106 ~ 109 years Taoyuan International Airport to help navigation light system maintenance contract 09/06/2017
1432 AIRCRAFT COMPONENTS AND ACCESSORIES 15/05/2017
1433 Improve Runway and Support Infrastructure 07/06/2017
1434 Procurement of Repair of Baggage Conveyor at Laguindingan Airport 17/05/2017
1435 Remanufactured Aircraft Engine 23/05/2017
1436 Supervision of Passenger Terminal Building Construction 15/05/2017
1437 Updated conveyor baggage and the introduction of automated sorting system of internal airports 24/05/2017
1438 TOWBAR, AIRCRAFT (W0001-175194/A) 14/06/2017
1439 Upgrading of Taxiway Information Signage at General Aviation Areas 02/06/2017
1440 ONE (1) LOT- SUPPLY AND LABOR FOR THE MAINTENANCE WORKS OF THE TWO 92) DUAL INSTRUMENT LANDING SYSTEM (ILS) CAT II AND TWO DUAL DISTANCE MEASURING EQUIPMENT (DME) FOR 4/22 AND ASSOCIATED EQUIPMENT 15/05/2017
1441 FILTER BODY AND FILTER ELEMENT FOR F16 AIRCRAFT 23/05/2017
1442 F16 AIRCRAFT SPARES - 5 ITEMS 24/05/2017
1443 Design/bid/Build, FY17 Renovate/repair Aircraft Maintenance Unit, Facility 5251 located at Davis-Monthan AFB, Pima County, AZ 25/05/2017
1444 Development of an Airborne Low Cost, Size, Weight, and Power (C-SWaP) Surveillance System for Detecting and Tracking Non-Cooperative Aircraft Supporting Unmanned Aircraft Systems (UAS) Detect and Avoid (DAA) 22/05/2017
1445 ELECTRICAL CONTROL PANEL / 40A, UH-60A BLACK HAWK HELICOPTER 26/06/2017
1446 Spare Parts for LC-130 12/06/2017
1447 Aviation fuel (turbine) Acquisition of European airports (5 years). 14/06/2017
1448 Service and repair of lighting system maneuvering area airports 05/06/2017
1449 Request for Expression of Interest in Leasing Aviation Hanger 31/05/2017
1450 Qualifications For Airport Engineering Services 01/06/2017
1451 UH-60M helicopter parts 1st request for 2017. 12/06/2017
1452 F16 AIRCRAFT SPARES - 4 LINE ITEMS 26/05/2017
1453 Purchase of Conveyor Belt, Butuan Airport 31/05/2017
1454 Procurement of aircraft spare parts 16/05/2017
1455 16--LANDING LIGHT, RETR 26/06/2017
1456 16--ILS GNSS GLS MULTI 26/05/2017
1457 16--SSN AIRCRAFT COMPONENTS AND ACCESSORIES 27/05/2017
1458 Small Tactical Unmanned Aircraft System The deadline date shown is predictive deadline. Interested firms should contact tendering authority for exact deadline date. 22/05/2017
1459 Spare parts for helicopters Mi-26T 21/05/2017
1460 AHQ/15/FS/ANT/1010 RE IV: PURCHASE OF SPARES FOR AN-32B AIRCRAFT 22/05/2017
1461 WET LEASE (ACMI) OF ONE A319/A320/A321 AIRCRAFT 30/05/2017
1462 ACQUISITION OF SPARE PARTS FOR GENERATOR (AEROESPACIO POSADAS MONITORING AND CONTROL STATION) 16/05/2017
1463 Design of a FAA L-881 LED PAPI system 08/06/2017
1464 GENERATOR TO BE USED AT THE COIBA AIRPORT STATION 17/05/2017
1465 Ground Power Unit (GPU) 16/05/2017
1466 The assignment covers purchase of airplane stairs delivered to Swedavia airports. 29/05/2017
1467 Rehabilitation of FSS Building and Other Works at Zamboanga International Airport. 05/06/2017
1468 Aircraft Spare Parts 16/05/2017
1469 MOUNT,MACHINE GUN MQ-9 (PREDATOR B) UNMANNED AIRCRAFT SYSTEM ENGINEERING, MANUFACTURING AND TECHNICAL SUPPORT 26/05/2017
1470 The Construction of the Passenger Boarding Bridge Improvements at Albany International Airport. 25/05/2017
1471 C130 AIRCRAFT SPARES 26/05/2017
1472 SUPPORT EQUIPMENT FOR SEAHAWK HELICOPTER 24/05/2017
1473 ITB - Runway 4-22 and Other Pavement Rehabilitation 09/06/2017
1474 Passenger boarding ramp 24/05/2017
1475 ITB - Airfield Pavement Reconstruction and Replacement (Taxiway N Reconstruction, Airfield Slab Replacement, Airside F Joint and Slab Replacement & Taxiway W Reconstruction) 02/06/2017
1476 RFI - Peter O. Knight - Hangar Development 31/05/2017
1477 ITB - General Aviation Hangar Rehabilitation 14/06/2017
1478 Hartzell field runway 8-26 PAPI installation electronic 24/05/2017
1479 RFP - Airport Engineering and Planning Services 31/05/2017
1480 17--Aircraft Tow Tractor 13/06/2017
1481 ACQUISITION OF REFACC. FOR AIRCRAFT MAINTENANCE C-182s 25/05/2017
1482 Aircraft tractor 07/06/2017
1483 Taoyuan International Airport, the first air bridge empty bridge replacement works 13/06/2017
1484 AIRCRAFT COMPONENTS AND ACCESSORIES 19/05/2017
1485 Lease of 2,500sq.ft.airport hangar storage unit 30/05/2017
1486 Service provision to third parties storage and distribution of aviation fuel at the airport of Zaragoza. 30/06/2017
1487 Procurement of aircraft spare parts 18/05/2017
1488 Supply and Delivery of Luggage and Caged Trolleys 22/05/2017
1489 Maintenance and Provision of Signs at Singapore Changi Airport. 23/05/2017
1490 SUPPLY AND DELIVERY OF AIRFIELD LIGHTING SPARE PARTS 23/05/2017
1491 Upgrading of Taxiway Information Signage at General Aviation Areas 02/06/2017
1492 Initial Price on aircraft maintenance 21/06/2017
1493 Repairing runway at Phu Quoc International Airport 26/05/2017
1494 Supply and installation of conveyor belts at NAIA Terminal 2 19/05/2017
1495 FOR THE SUPPLY AND DELIVERY OF ONE HUNDRED FIFTY (150) UNITS OF AIRPORT PASSENGER LUGGAGE TROLLEYS 06/06/2017
1496 Supply and Delivery of Spare Parts for the Scheduled Maintenance Inspection (SMI) and Aircraft Ready Available Spares (ARAS) of AW109E Helicopter NH431 and NH432 07/06/2017
1497 16--Procurement of 7R Spares used in support of the P-8. 27/05/2017
1498 Common Aircraft Armament Test Set (CAATS) Systems and Pure Air Generator System (PAGS) Adapter Set (PAS) units 16/06/2017
1499 MH65- SPARE PARTS 19/05/2017
1500 USN C-40A Aircraft Procurement 01/06/2017
1501 Airfield Lighting Tower Recapitalization, Phase 2, 12 Wing Shearwater, NS 06/06/2017
1502 Building Modifications at Municipal Airport 30/05/2017
1503 Replace Five (5) Airport Apron Floodlights 01/06/2017
1504 The provision of aircraft maintenance services 14/06/2017
1505 Supply of consumables for the aircraft maintenance effort 15/06/2017
1506 Gangway Bridge & other repair at Bishnandi Ferry Ghat under the RHD Ferry Maintenance Sub-Division Kanchpur Dhaka during the financial year 2016-2017. 28/05/2017
1507 REMOVAL OF RUBBER DEPOSIT AT RUNWAY 02R/20L AND RE-PAINTING OF AFFECTED PAVEMENT MARKINGS 07/06/2017
1508 16--Aircraft Components and Accessories 02/06/2017
1509 Ground Power Unit - Aviation 06/09/2017
1510 F-15 Spares (3 Line Items) 31/05/2017
1511 Spares for Seahawk Helicopter 31/05/2017
1512 Aircraft Towbarless Tow Tug for SEG 24/05/2017
1513 Project management mission to strengthen the runway and taxiways of the airport and Ajaccio 19/06/2017
1514 This project is to remove existing ramp and deck and install new ADA Ramp and deck at the Palo Alto Airport Terminal 31/05/2017
1515 The FAA Western Service Area has a requirement for work associated with the installation of a Medium intensity Approach Lighting System (MALS) to serve runway 27 at the San Diego International Airport in San Diego 26/05/2017
1516 Supply and installation of airport entrance lights with solar cel 22/05/2017
1517 Announcement of bid to buy and install lighting system for AOB building and AIMS building at Suvarnabhumi Airport 09/06/2017
1518 Procide engineering service for airfield development project 08/06/2017
1519 Bulk hangar construction and the runway 5-23 signage & PAPI rehabilitation 15/06/2017
1520 CONSTRUCTION INFRASTRUCTURE AND SUPERSTRUCTURE DUBROVNIK AIRPORT 01/06/2017
1521 AHQ-17-LP-V&A-1149: PURCHASE OF SPARES FOR REPAIRING AND TESTING OF GROUNDING SYSTEM 25/05/2017
1522 AHQ/17/FS/M17/1008: PURCHASE OF SPARES FOR MI 171E HELICOPTERS 30/05/2017
1523 MKUZE airport runway, taxiway and apron upgrade 02/06/2017
1524 NEW EMERGENCY GENERATOR, KONA INTERNATIONAL AIRPORT 15/06/2017
1525 Furnish and Deliver One (1) Airfield Runway Sweeper Vehicle to Molokai Airport 15/06/2017
1526 Hangar 110 Renovation - Phase 5, Kalaeloa Airport, Island of Oahu 15/06/2017
1527 Aircraft Maintenance Systems 30/05/2017
1528 Two main dash 8, 300 series aircraft wheels for the MTMDET 31/05/2017
1529 REPLACE AIRFIELD LIGHTS WITH LEDS AREA F AVIANO AB, ITALY The deadline date shown is predictive deadline. Interested firms should contact tendering authority for exact deadline date. 29/05/2017
1530 SUPPLY AND INSTALLATION OF EQUIPMENT AIRCRAFT (PCA) IN TERMINAL CONTACT POSITIONS T2.- AIRPORT BARCELONA-EL PRAT 05/06/2017
1531 SUPPLY OF AERONAUTICAL LIGHTS OF SURFACE AND VERTICAL SIGNALING OF CAMPODE LED TECHNOLOGY FLIGHTS. AIRPORT AS MADRID BARAJAS 05/06/2017
1532 Supply and Installation Turnkey Lighting Platform Aircraft Angel S. Adami Airport (Melilla) 08/06/2017
1533 1560-012640436, PLATE, STRUCTURAL, AIRCRAFT 26/05/2017
1534 Depot Level Diagnostic and Repair Capability for PATRIOT Advance Capability - 3 (PAC-3) Ground Support Equipment (GSE) Secondary Items 19/06/2017
1535 REPAIR OF MH65 SPARE PARTS 26/05/2017
1536 The Federal Aviation Administration (FAA) Western Service Area has a requirement for work associated with the installation of a government furnished instrument landing system shelter at the Ukiah Municipal Airport, Runway 15 26/05/2017
1537 Spare for Seahawk Helicopter 30/05/2017
1538 Spares for Seahawk Helicopter 02/06/2017
1539 SPARES FOR SEAHAWK HELICOPTER 09/06/2017
1540 Aircraft Maintenance Systems - ACAN 30/05/2017
1541 Provision of aeronautical ground lights and vertical signaling airfield LED technology. Adolfo Su√°rez airport Madrid / Barajas. 05/06/2017
1542 Folding of main parachutes EPC and back TAP 696-26 F2. 04/07/2017
1543 2 Nrs of 1500 kva diesel rotatory uninterruptable power supply containerized generators 30/05/2017
1544 Department of public safety hangar 24/05/2017
1545 Replace passenger boarding bridge 16/06/2017
1546 Installation of glass-fiber reinforced gangways and railings 14/06/2017
1547 Maintenance of the automated system of centralized refueling aircraft 26/05/2017
1548 The establishment of the accounting system of unmanned vehicles in terms of unmanned aircraft 08/06/2017
1549 Provision of Remote Piloted Aircraft Services 30/05/2017
1550 OVERHAUL WORK 1 (ONE) ASSY ENGINE FOR MAINTENANCE AIRCRAFT HELICOPTER BO-105 OFFICE BASARNAS CENTER 26/05/2017
1551 20172036 spare propeller CN235 (T.19) and CN-295 (T.21). 27/06/2017
1552 Ground Control Station Uninterruptible Power Supply (GCS UPS) 06/06/2017
1553 Supply and installation of air-conditioning aircraft (PCA) in positions contact terminal T2. Airport Barcelona - El Prat. 05/06/2017
1554 1515, centering socket, hu for SH-60 helicopter 24/05/2017
1555 HOLDER ASSEMBLY, ELE, 40A/ BLACKHAWK HELICOPTER, NSN: 5977-01-106-2173, PR: 0067948961 21/06/2017
1556 SUPPLY AND INSTALLATION OF POWER DISTRIBUTION UNIT AT CHANGI AIRPORT TERMINAL 2 02/06/2017
1557 Provision of an aircraft tow truck at HKIA North, Kabul AFG 08/06/2017
1558 Supply of a passenger staircase for access to airplanes with canopy, Towbar 19/06/2017
1559 Ground-handling services (luggage, aircraft cleaning, runway markings) on behalf of the Deauville Normandy airport 19/06/2017
1560 Purchase of Spare Parts for Passenger Boarding Bridge Nos. 109-120 at NAIA Terminal 3 16/06/2017
1561 REPAIR/REPAINTING OF RUNWAY MARKERS/MARKINGS AT NEW BACOLOD SILAY AIRPORT 16/06/2017
1562 15--DOOR,AIRCRAFT 20/06/2017
1563 Procurement of Repair of Passenger Boarding Bridge at PTB 30/05/2017
1564 Supply and commissioning of 50 nos. brand new heavy duty baggage trolleys 20/06/2017
1565 Self-propelled passenger stairs 5 pcs 12/06/2017
1566 Lynchburg Regional Airport - Rehabilitate Taxiway Lighting / Rehabilitate Airfield Electrical Vault 22/06/2017
1567 Supply collapsible hangar for storage of ground support of flights and aircraft maintenance within the framework of the state defense order 29/05/2017
1568 Delivery of passenger stairs to the regulated passenger aircraft. 29/06/2017
1569 RECONSTRUCTION OF AIRPORT TERMINAL ROAD & AMELIA EARHART BOULEVARD 08/06/2017
1570 Replace five (5) Airport Floodlights 01/06/2017
1571 FABRICATION, SUPPLY AND INSTALLATION OF TRAFFIC SIGNAGE, APRON PAVEMENTMARKINGS AND ALL ASSOCIATED AIRSIDE ROAD WORKS AT SINGAPORE CHANGIAIRPORT 31/05/2017
1572 Acquisition of Aircraft Spare Parts 02/06/2017
1573 Furnish and delivery of one riding mover and one mid size compact riding sweeper to Waimea-Kohala Airport 09/06/2017
1574 Furnishing and delivery of one airfield runway sweeper vehicle 22/06/2017
1575 Rehabilitate Taxiway Lighting 22/06/2017
1576 Runway 14-32 Rehabilitation - Valkaria Airport 16/06/2017
1577 Addition of two new passenger loading bridges 06/07/2017
1578 Instrument Landing System Replacement- Ft. Lauderdale-Hollywood International Airport 19/06/2017
1579 REPLACE AIRFIELD LIGHTS WITH LEDS AREA F AVIANO AB, ITALY The deadline date shown is predictive deadline. Interested firms should contact tendering authority for exact deadline date. 04/06/2017
1580 Z--Repair Runway Pavement and Lighting at Truax Airfield NAS Corpus Christi and Taxiway repairs at NALF Cabaniss, Corpus Christi, TX. 13/06/2017
1581 Purchase of Ten (10) Units Passenger Boarding Bridge Tire H40X 14.5-19 14/06/2017
1582 15--TANK,FUEL,AIRCRAFT 10/07/2017
1583 Supervision of Fatmawati Airport Office Building Construction 29/05/2017
1584 Aircraft Spare Parts 29/05/2017
1585 Procurement of aircraft spare parts 29/05/2017
1586 Electromagnetic Tow Behind Sweeper 07/06/2017
1587 Airport Papi and Reil replacement project 22/06/2017
1588 Development & renovation of lighting system for Terminal 1 & 2 at HSIA S.H Providing & Installation of LED Panel light at Arrival Baggage Belt No. 5 6 7 & 8 area & Arrival Concourse Hall at TB-2 at Hazrat ShahjalaI International Airport Dhaka. 06/06/2017
1589 Maintenance and Repair of ZP-ETW and ZP-TNK Aircraft of ANDE 06/06/2017
1590 Airport Ground Services Provision 15/06/2017
1591 New 14-unit T-hangar At the Avon Park Executive Airport 20/06/2017
1592 Construction services related to Runway 4-22 Rehabilitation. 20/06/2017
1593 Hangzhou Xiaoshan International Airport Baggage Tractor Procurement Tender Notice 13/06/2017
1594 Hangzhou Xiaoshan International Airport Belt Conveyor Procurement Project Tender Notice 13/06/2017
1595 LIGHT,LANDING,AIRCRAFT 05/06/2017
1596 INSTALLATION OF NEW LIGHTING IN PLATFORMS. BILBAO AIRPORT 14/06/2017
1597 Airport Ground Services Provision 15/06/2017
1598 Supply signal ‚Äď lighting system for the project of enlarging Northern landing area on runway parallel section from NS to E6- Tan Son Nhat international airport 15/06/2017
1599 Construction of 15th SW Hangar at Lumbia Airport 16/06/2017
1600 Supply, delivery & installation of conveyor belt for Arrival and Departure Conveyor at NAIA Terminal 1 30/05/2017
1601 Helicopters, aeroplanes, spacecraft and other powered aircraft. Helicopters and aeroplanes. Helicopters. Parts for aircraft, spacecraft and helicopters. Parts for helicopters. Repair and maintenance services of helicopters. Military aircraft. Repair, maintenance and associated services related to aircraft and other equipment. Repair and maintenance services of aircraft. Aircraft maintenance services 25/06/2017
1602 Object of the contract will be used, if necessary, finding information on the enemy, or for collecting other information. Data will be transmitted in real time to the operator terminal UAVs 18/07/2017
1603 Runway light, taxiway light 22/06/2017
1604 52U17 base maintenance of aircraft in an authorized service 23/06/2017
1605 Construction of KMIII International Airport. 09/06/2017
1606 Professional engineering services - Maintenance gangway at St-Laurent IO pier 12/06/2017
1607 Airfield Lighting Control System & Constant Current Regulator Replacement 14/06/2017
1608 Design-Build project for constrution of a P602, Aircraft Maintenance Facility and Apron. 07/06/2017
1609 SPARES FOR AIRFIELD LIGHTING SYSTEM 09/06/2017
1610 SPARES FOR AIRFIELD ARRESTING SYSTEM 08/06/2017
1611 ACQUISITION OF AERONAUTICAL ELECTRICAL MATERIALS, APPROXIMATION SYSTEM AND PAPI SYSTEM, TO BE DISTRIBUTED AT THE DIFFERENT AIRPORTS AT NATIONAL LEVEL 20/06/2017
1612 RPR Airfield Approach & ID Lighting, Runway 20 QUUG 15-1009 09/06/2017
1613 Work consists of installation of Medium intensity Runway Lights, runway guidance signage on the runway. 16/06/2017
1614 Runway 17/35 Marking Rehabilitation 07/06/2017
1615 106 year taxiway side light system maintenance project 09/06/2017
1616 Buy lighting system warning aircraft for the Ministrys building under construction 03/07/2017
1617 Passenger boarding bridges for aircraft 12/06/2017
1618 Procurement of aircraft spare parts 05/06/2017
1619 AIRCRAFT DOOR (UH-60A/L HELICOPTER) 14/06/2017
1620 Rehabilitate Runway Lights. 09/06/2017
1621 LIGHT, INSET, BIDIRECTIONAL FOR AIRFIELD LIGHTING SYSTEM 20/06/2017
1622 Perform specialzed airfield lighting and electrical repairs 06/06/2017
1623 Construction and installation work on the project "Reconstruction and modernization of the international airport Kurumoch, Samara 20/06/2017
1624 Spares for the Maintenance of Avionics System of OV-10 Aircraft Nrs. 136, 139, 145, and 636 22/06/2017
1625 Aircraft Consumables 06/06/2017
1626 Aircraft Spare Parts 06/06/2017
1627 Procurement of aircraft instrument 05/06/2017
1628 HIGH INTENSITY SIGNAGE 05/06/2017
1629 Contract for maintenance of telescopic gangways of various airports. 21/06/2017
1630 SB UPGRADE OF AC GENERATOR FOR MA-60 AIRCRAFT 20/06/2017
1631 Tire, Pneumatic, Aircraft 19/06/2017
1632 WSDC 26F, F-16 AIRCRAFT; 1560-01-623-9542, BULKHEAD, AIRCRAFT 13/06/2017
1633 Scheduling, steering and coordination mission for the construction of a new terminal at Rabat Salé Airport 03/07/2017
1634 Lighting at the county airport. 16/06/2017
1635 The overhaul of wheels and brakes of the aircraft Tu-204-300 / Tu-214. 07/06/2017
1636 Improve Runway and Support Infrastructure 13/06/2017
1637 RK movement area and RESA (including related facilities)" - Targu Mures Transylvania Airport. 13/07/2017
1638 Supervision of Taxiway Works 06/06/2017
1639 Projects may include but not limited to the planning and/or design of the following: airfield lighting improvement , aircraft hangars 15/06/2017
1640 Finger Lakes Regional Airport, Apron Reconstruction 14/06/2017
1641 Purchase Equipment For Lighting Of International Payam Airport Band (repair And Maintenance Purchase Of Lighting Device Band,Taxiway And Etc ) 17/06/2017
1642 Xinjiang Tacheng Airport renovation and expansion project instrument landing system international tender notice 21/06/2017
1643 Services overflight lighting system 12/06/2017
1644 GENERAL AIRCRAFT MAINTENANCE 05/07/2017
1645 Work include approx 200 LF of 2 PVC condult in trench 2 LS aviation fuelling system 19/06/2017
1646 Handcuffs and Full Restraint Systems 23/06/2017
1647 Supply 04 dumb luggage conveyer belts 12/06/2017
1648 SUPPLY, DELIVERY, INSTALL AND REPLACE 400 NOS. OF T8 AND T5 EXIT LIGHTSTO LED EXIT LIGHT FITTINGS IN TERMINAL 1, SINGAPORE CHANGI AIRPORT. 19/06/2017
1649 Rehabilitation of Secondary Runway and Apron at Malindi Airport 21/06/2017
1650 ONE YEAR TERM CONTRACT FOR MAINTENANCE AND REPAIR OF COMPOUND, STREET FENCING SECURITY LIGHTING SYSTEM. AVIATION LIGHTING SYSTEM, FIRE PROTECTION SYSTEM & HANGER ESTABLISHMENT WITHIN PENGKALAN TENTERA UDARA DIRAJA BRUNEI 04/07/2017
1651 Terminal construction 20/06/2017
1652 Spare parts for AW109E helicopter 11/06/2017
1653 CONSTRUCTION OF AIRPORT SEAWALL (CONTINUATION) 30/06/2017
1654 External Aircraft Fuel Tank Storage System (EAFTSS) Conveyor 27/06/2017
1655 DRAFT Specification for Light Emitting Diode (LED) Runway End Identifier Lighting (REIL) System. 15/06/2017
1656 F16 AIRCRAFT SPARES - 5 LINE ITEMS 22/06/2017
1657 Repair Runway Pavement and Lighting at Truax Airfield NAS Corpus Christi and Taxiway repairs at NALF Cabaniss, Corpus Christi, TX. 13/06/2017
1658 47MX Ground Power Units 16/06/2017
1659 Insulating, for sequential supply airfield lights 15/06/2017
1660 REHABILITATION OF SIGN OF AIRPORT AND ASTA FLAG, DESHIERBE AND CAN ARERO 22/06/2017
1661 Provision of contract for the supply and installation of new ILS system for runway 29 at Bornholm Airport. 14/07/2017
1662 106 year taxiway side light system maintenance project 21/06/2017
1663 DOOR,AIRCRAFT 13/06/2017
1664 MH-53 AND MH-60 HELICOPTER GROUND SUPPORT EQUIPMENT 14/06/2017
1665 Airfield and Papi Lighting System Replacement 13/07/2017
1666 Implementation of aviation works for flight inspections of ground facilities and lighting equipment APK Norilsk 21/06/2017
1667 Supply of airfield tractor BelAZ-74212 for the needs of the Kazan aircraft plant them. S. P 16/06/2017
1668 Request for price quotations for the right to enter into an Agreement for the supply of airfield tractor BelAZ-74212 for the needs of the Kazan aircraft plant them. S. P. Gorbunova branch of PJSC Tupolev. 16/06/2017
1669 AIRCRAFT GENERAL SPARES 22/06/2017
1670 Supply of aviation fuel for an aircraft 22/06/2017
1671 The objective of the procurement is to meet the requirements for depot maintenance of P3 Orion surveillance aircraft, which are operated by the Royal Norwegian AirForce. 10/07/2017
1672 1560-014176910, SPAR,AIRCRAFT 16/06/2017
1673 Relocation of existing float, removal and storage of the existing gangway and removal and disposal of the two existing steel piles for construction of an interim marina 20/06/2017
1674 Proposed Supply, Fabricate and Install One Unit to Existing RC Gangway Pontoon Wharf at Daro, Mukah Division 12/07/2017
1675 Provision of periodic and seasonal maintenance services for the aircraft 15/06/2017
1676 Provision of aircraft maintenance services 14/07/2017
1677 Delivery of ground bench equipment for testing of IL-96-300 aircraft systems 03/07/2017
1678 Procurement of aircraft spare parts 14/06/2017
1679 Technology for the production and installation of lighting and arrivals takeoff runway. 23/06/2017
1680 AIRFIELD LIGHTING AND VAULT UPGRADES 28/06/2017
1681 Airfield Street Sweeper 23/06/2017
1682 Increasing between the repairing resource TTSN box of air units KSA-2 plane MiG-29. 26/06/2017
1683 Construction Instrument Landing System (ILS) at Buon Ma Thuot airport 04/07/2017
1684 Supply 19 tractors of 2,5 tons. 04/07/2017
1685 Supply uniform, signs for Central Airport Authority 26/06/2017
1686 Common Aircraft Armament Test Set (CAATS) Systems and Pure Air Generator System (PAGS) Adapter Set (PAS) units 23/06/2017
1687 DRAFT Specification for Light Emitting Diode (LED) Runway End Identifier Lighting (REIL) System. 30/06/2017
1688 Instrument Landing System Replacement- Ft. Lauderdale-Hollywood International Airport 19/06/2017
1689 Removal and replacement of lighted airfield guidance signs 06/07/2017
1690 Buy and install LED under the 2nd floor of the terminal at Suvarnabhumi Airport. 30/06/2017
1691 Install New LED Lighting For Runway 17-35 06/07/2017
1692 Wheel holding tractor for corporate aircraft 04/07/2017
1693 AIRCRAFT TOOLS AND EQUIPMENT 21/06/2017
1694 Taxiway Alpha North Reconstruction 10/07/2017
1695 Air traffic services and MET. 09/07/2017
1696 Delivery (purchase) of 9 intercity low-floor buses. 12/07/2017
1697 17-024-06 SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF BAGGAGE CONVEYOR AT VARIOUS AIRPORTS 06/07/2017
1698 Supply and Delivery of Four (4) Units of Motorized Passenger Stairs 22/06/2017
1699 Purchase of 5KVA Portable Generator Set 19/06/2017
1700 Scheduling, steering and coordination mission for the construction of a new terminal at Rabat Salé Airport 03/07/2017
1701 Ground Support Software for Aviation 26/06/2017
1702 GROUND POWER UNIT 4 OUTPUTS 07/07/2017
1703 Procurement and installation of TGS and apron light 19/06/2017
1704 Request for Information Only - Driving Simulators Training Aids 05/07/2017
1705 Spares for Airfield Lighting System 27/06/2017
1706 Purchase of two generators for the airports of Saint Louis (lot 1) and Tambacounda (lot 2) 29/06/2017
1707 SUPPLY AND DELIVERY OF AIRFIELD LIGHTING SPARE PARTS 22/06/2017
1708 Construction of new hangar and office space 07/07/2017
1709 Into-Plane Aviation Fuel 30/06/2017
1710 Spare parts for aircraft DA-40NG and Cessna 172S, L-410UVP-E20 29/06/2017
1711 Fuel for jet engines of aircraft with subsonic flight speed of TS-1 03/07/2017
1712 Purchase installation of Gimpo Airport emergency generator 22/06/2017
1713 RESEALING OF RUNWAY CRACKS AND JOINTS 27/06/2017
1714 CONSTRUCTION OF A BRIDGE - GANGWAY - IN THE COMMUNAL OF TALAMBOTE 10/07/2017
1715 1560-014176910, SPARE AIRCRAFT 02/08/2017
1716 Development & renovation of lighting system for Terminal 1 & 2 at HSIA S.H Providing & Installation of LED Panel light at Arrival Baggage Belt No. 5 6 7 & 8 area & Arrival Concourse Hall at TB-2 at HSIA. 03/07/2017
1717 Procurement and Installation of A-PAPI and RTIL Including Genset 15 KVa 24/06/2017
1718 Conveying of tumbled conveyors will be tendered 04/07/2017
1719 Airfield Lighting, Electrical Improvements and Apron Pavement Reconstruction 29/06/2017
1720 Josephine County Board of Commissioners 22/06/2017
1721 Install Solar Powered Aircraft Lighting Systems 07/07/2017
1722 Charlotte-Monroe Executive Airport Corporate Aircraft Hangar 29/06/2017
1723 REPLACE AIRFIELD LIGHTS WITH LEDS AREA F AVIANO AB, ITALY 20/06/2017
1724 Tender For Design and Supply Of Customised Trolleys To Keep AndTransport Aircraft Grounding Cables And Aircraft Chocks 05/07/2017
1725 1740-12-383-7234, TRACTOR, WHEELED, AIRCRAFT TOWING, PN STT50, QTY 1 EACH, CAGE C2489 03/07/2017
1726 Routine Maintenance Lighting and Installation Facilities Terminal 1 and Terminal 2 Juanda Airport Surabaya 29/06/2017
1727 Install Solar Powered Aircraft Lighting Systems at Grand Lake TL228 07/07/2017
1728 MAINTENANCE AND REPAIR OF COMPOUND, STREET, FENCING SECURITY LIGHTING SYSTEM, AVIATION LIGHTING SYSTEM, FIRE PROTECTION SYSTEM & HANGAR DOOR EQUIPMENT, FIRE SERVICE INSTALLATION FOR MILITARY ESTABLISHMENT WITHIN PENGKALAN TENTERA UDARA DIRAJA BRUNEI 30/06/2017
1729 Provide design services for the Portland International Airport ConcourcesC, D and E Passenger Boarding Bridge 28/06/2017
1730 Runway Sweeper to Deliver to Natasquan Airport in Quebec Canada - Transport Canada (T3033-170004/A) 26/07/2017
1731 Implementation of cadastral work on the production of technical plans for cadastral registration of the facilities of the facility "Construction of the runway P. Palana, Kamchatka Territory 27/06/2017
1732 REPAIR/REPAINTING OF RUNWAY MARKERS AND MARKINGS AT NAGA AIRPORT 27/06/2017
1733 Supply operational status of ILS / DME CATIII at Vigo airport, runway 19. 04/07/2017
1734 Refueling domestic airports. 30/09/2017
1735 106 year taxiway side light system maintenance project 29/06/2017
1736 Tender For Design and Supply Of Customised Trolleys To Keep AndTransport Aircraft Grounding Cables And Aircraft Chocks 05/07/2017
1737 SUPPORTING EQUIPMENT FOR F16 AIRCRAFT - 2 LINE ITEMS 03/07/2017
1738 FC-9746, Fuel Storage Facility and Fueling Facility Operation and Ground Support Fueling Management 09/08/2017
1739 Qingdao new airport navigation lights and aircraft navigation equipment procurement projects(1) 13/07/2017
1740 WSDC VUN, F-18 AIRCRAFT; 1680-01-114-8524, NOZZLE, FLIGHT REFUEL 03/08/2017
1741 Common Aircraft Armament Test Set (CAATS) Systems and Pure Air Generator System (PAGS) Adapter Set (PAS) units 23/06/2017
1742 Rehabilitation runway and runway lighting 06/07/2017
1743 Airport papi and rail replacement project 27/06/2017
1744 Re-painting of all airport runway marking and taxiways at 10 municipal airports 12/07/2017
1745 Re-painting of all airport runway marking and taxiways at 10 municipal airports 12/07/2017
1746 Instrument landing system 13/07/2017
1747 South Airport on the 13th floor of the public staircase maintenance works 06/07/2017
1748 Supply and Installation of Programmable Logic Controller of 386,700.00 Passenger Boarding Bridge 107 L-1 at NAIA T-3 27/06/2017
1749 106 year Taichung No.3 generator overhaul project 30/06/2017
1750 NSN 4720014559951, HOSE KIT, FUEL, WEAPON SYSTEM 04F, AIRCRAFT, STRATOFORTRESS B-52 25/06/2017
1751 Repair Roof-F141 Maintenance Hangar 25/07/2017
1752 LIGHT. LANDING. AIRCRAFT 25/06/2017
1753 REPAIR OF PASSENGER BOARDING BRIDGE AT NEW BACOLOD-SILAY AIRPORT 20/07/2017
1754 Install Solar Powered Aircraft Lighting Systems at Grand Lake TL228 07/07/2017
1755 Equipment procurement airport: Lot 1. Storage tape - 1 pcs .; Lot 2: Luggage trolley - 8 pcs .; lot 3: tractor trolley luggage - 4 pcs .; Lot 4 - ladder for boarding / disembarking passengers - 1 piece .; lot 5 - Defrost - 1 pc. 27/07/2017
1756 Procurement and Installation of Precision Approach Lighting System (Pals) Runway 09 05/07/2017
1757 Electric to tractor with trailor 05/07/2017
1758 Tender Document For The Procurement Of Aircraft Towing Tractor (NEW) Qty 05 Ea. 31/07/2017
1759 Unpin and temporarily remove the existing gangway 29/06/2017
1760 Tender Document For The Procurement Of Baggage Belter (NEW) Qty 08 Ea. 31/07/2017
1761 Tender Document For The Procurement Of Ground Power Unit 180 KVA (NEW) Qty 12 Ea. 31/07/2017
1762 TO SUPPLY, INSTALL, TESTING AND COMMISSIONING FOUR (4) UNITS OF VESTIBULES (GANGWAY) SYSTEM FOR TWO (2) SETS OF EMU 83 CLASS 18/07/2017
1763 AIRFIELD LIGHTING SYSTEM ‚Äď INSTALLATION 13/07/2017
1764 Runway Sweeper for Kuujjuaq Airport - Transport Canada (T3033-170003/A) 03/08/2017
1765 SATE new lighting with LED technology. Adolfo Su√°rez Madrid Barajas Airport. 12/07/2017
1766 The construction of a new air traffic control tower 08/07/2017
1767 Guangzhou Baiyun International Airport cargo tractor procurement project 19/07/2017
1768 Airport Runway Sweeper 07/07/2017
1769 REPAIR OF PASSENGER BOARDING BRIDGE AT NEW BACOLOD-SILAY AIRPORT 20/07/2017
1770 K-186695 Boarding ramps at Avinor airports. 12/07/2017
1771 *UPDATED* ITB-Airfield Signs 06/07/2017
1772 Dynamic Message Signs Maintenance and Repair Services Orlando International Airport 26/07/2017
1773 Schedule II - runway 13-31 medium intensity lighting system and precision approach path indicators 13/07/2017
1774 Passenger Jet Bridge Program 13/07/2017
1775 ILS 19/07/2017
1776 2017-31 RFQ Airport Runway Sweeper 07/07/2017
1777 Hangzhou Xiaoshan International Airport navigation lights and high pole lights, accessories procurement tender notice 18/07/2017
1778 Acquisition airport equipment: Lot 1. Tape Storage - 1 pc .; Lot 2: Storage Trolley - 8 pcs .; Lot 3: Tractor trolley luggage - 4 pcs .; Lot 4 - ladder for boarding / disembarking passengers - 1 piece .; Lot 5 - Defrost - 1 pc. 27/07/2017
1779 Airfield Lighting Project at PS International Airport 19/07/2017
1780 171-07496-00 - Airside Lighting and Security Upgrades 05/07/2017
1781 Kaohsiung Airport runway construction project (the second re-tender) 03/08/2017
1782 LIGHT, LANDING, AIRCRAFT 14/07/2017
1783 Provision of passenger and cargo handling services in Democratic Republic of Congo and Uganda 20/07/2017
1784 Supply and Installation of 150kVA Emergency Generator at Wajir Inter¬national Airport 17/07/2017
1785 Bergen ‚ÄĒ Reconstruction of the existing terminal 21/08/2017
1786 This contract concerns the supply of motorized stairs for the Charleroi airport. This contract was awarded in the form of the framework agreement for a period of 4 years. The presumed quantities will be specified in the specifications. 07/08/2017
1787 Technology for the production and installation of lighting and takeoff runway arrivals Raybond. 14/08/2017
1788 Ossora airport construction, Kamchatka edge 18/07/2017
1789 A set of instrument landing system simulation machine 19/07/2017
1790 MAINTENANCE AND REPLACEMENT OF SYSTEM REILP, PAPI, ILS 07/07/2017
1791 (SBMA-BAC-GOODS-ITB-03-17(2) ) FOR THE SUPPLY AND DELIVERY OF ONE HUNDRED FIFTY (150) UNITS OF AIRPORT PASSENGER LUGGAGE TROLLEYS (2nd BIDDING) 25/07/2017
1792 Purchase of Spare Parts for Runway 06/24 Instrument Landing System (ILS) 20/07/2017
1793 Supply and delivery of 2x aircraft tow tractor 17/07/2017
1794 Hangzhou Xiaoshan International Airport T2 Terminal lighting project tender notice 20/07/2017
1795 The object of this tender is to choose the most advantageous tender for the contracting of Replacement services and installation of automated conveyor belts 11/07/2017
1796 Maintenance of diesel generators / maintenance of diesel generators 12/07/2017
1797 Leasing for land for on-airfield Ground Support Equipment 19/07/2017
1798 Western Airport Group Ningxia Airport Co., Ltd. 2017 aircraft tractor purchase project 21/07/2017
1799 REPAIR/REPAINTING OF RUNWAY MARKERS/MARKINGS AT LAOAG INTERNATIONAL AIRPORT 25/07/2017
1800 Construction infrastructure and superstructure dubrovnik airport 05/07/2017
1801 Aviation fuel oxidation stability heating tube automatic deposition evaluation evaluation instrument 18/07/2017
1802 Runway 13/31 Repairs MSAB Jordan 07/08/2017
1803 Maintenance of Tu-154 aircraft, in terms of monitoring and analysis of the technical condition of aircraft and their components 07/07/2017
1804 Hangzhou Xiaoshan International Airport T2 Terminal lighting project tender notice 20/07/2017
1805 Ground Power Unit (GPU) 25/07/2017
1806 BAB 14, 121,967-124,500, RF Dresden, vehicle restraint system (S-223-2017-00014) 01/08/2017
1807 Emergency Rehabilitation of Passenger Terminal Building, Surigao Airport 24/07/2017
1808 Installation of General Street Lighting Lamp LED Ornament Kwh Meter IV JalanLambaro - International Airport SIM Kab. Aceh Besar (Otsus Aceh) 07/07/2017
1809 Qingdao new airport navigation lights and aircraft navigation equipment procurement projects(1) 31/07/2017
1810 Qingdao new airport flight area diesel engine generator purchase 18/07/2017
1811 The structure in Mullaghanish requires Aircraft Warning Lights (AWL) system, this tender is for the supply only. 19/07/2017
1812 Lantau Airport runway construction project commissioned by the project management technical services 08/08/2017
1813 CONSULTANCY SERVICES FOR THE DETAILED ENGINEERING DESIGN OF THE HORIZONTAL INFRASTRUCTURE PROJECT OF THE CLARK INTERNATIONAL AIRPORT NEW TERMINAL BUILDING PROJECT (FORMERLY CLARK AIRPORT LOW COST TERM 17/07/2017
1814 Improvement/ development of airfield lighting system 10/07/2017
1815 Rehabilitation runway and runway lighting 10/07/2017
1816 Development and renovation of lighting system for terminal 17/07/2017
1817 Supply generator 650KVA 14/07/2017
1818 Mobile Helicopter Refuelling Equipment. 02/10/2017
1819 Purchase of generator at Gimpo Airport sewage treatment facility 12/07/2017
1820 Earthwork, drainage structures, aggregate base, asphalt surfacing, airfield lighting modifications and pavement markings for a 16,000 square foot aircraft apron expansion 04/08/2017
1821 Towable Passenger Stairs 20/07/2017
1822 Terminal 2 Passenger Boarding Bridge and Baggage Handling System Maintenance 14/07/2017
1823 Buy lighting warning aircraft for the Ministrys building system under construction 26/07/2017
1824 Oxygen generators for aircraft 27/07/2017
1825 South Airport on the 13th floor of the public staircase maintenance works 24/07/2017
1826 Supply and installation luggage belt system at passengers terminal ‚Äď Phu Cat Airport 27/07/2017
1827 Supply of spares for baggage conveyor belt system 15/08/2017
1828 Purchase spare parts (differential pressure gauge and other two kinds) of Gimhae Airport refueling facility 18/07/2017
1829 Request for Tender - Airport Fuel Keylock 2017 27/07/2017
1830 RUNWAY SHOULDER CONSTRUCTION, DAWSON CITY AIRPORT, YUKON 2017-2018 31/07/2017
1831 140 KVA Aircraft Ground Power Unit 09/08/2017
1832 Airfield and Papi Lighting System Replacement 20/07/2017
1833 The FAA Western Service Area has a requirement for work associated with the installation of two Government Furnished Instrument Landing System shelters at the Modesto Municipal Airport, Runway 28R 18/07/2017
1834 Construction of a reserve generator UdonThani Airport Control Center at UdonThani Airport Control Center UdonThani Province 12/08/2017
1835 Gimhae Airport refueling facility 17/07/2017
1836 Conveyor belt adjustment (conveyor belt system) and other 10 commissioned renovation 09/08/2017
1837 Improvement/ installation of security lights at different CAA airport 28/07/2017
1838 Supply spare parts and consumables to the lighting equipment for the needs of Emelyanovo Airport 18/07/2017
1839 Installation of SPD and lightning laying facility at Yangyang Airport 20/07/2017
1840 Extendable conveyor system for loading of aircraft. 31/07/2017
1841 Light Bulbs & Ballasts and Airport Lighting 01/08/2017
1842 PROCUREMENT OF AIRCRAFT REFUELLER 21/08/2017
1843 Transportation of Aircraft Refueller from Karachi Airport to Lahore Airport 02/08/2017
1844 Delivery of telescoping and not telescopic conveyor belts with an electric drive for loading and unloading of aircraft. 31/07/2017
1845 Runway Sweeper to Deliver to Sept-Iles Airport in Quebec, Canada - Transport Canada 02/08/2017
1846 Construction of a C-17 Two Bay Corrosion / Fuel Cell Hangar at the Pittsburgh Air Reserve Station, PA 25/07/2017
1847 Aviation fuel supply service at Lleida-Alguaire airport. 05/09/2017
1848 The contract is for an operator to provide a pay for passenger trolley service at LLA for a period of 3 years plus a possible 1 Year extension. 25/08/2017
1849 SUPPLY AND INSTALLATION OF THRESHOLD IDENTIFICATION LIGHTS (REIL) FOR ENRIQUE MALEK AIRPORT 24/07/2017
1850 Implementation of works on the installation of metal gangways pontoon bridge in the neighborhoodZaton Barnaul 26/07/2017
1851 Work include replacement of existing moorage floats, fixed access pier and gangway 03/08/2017
1852 Aviation lighting work according to Jeju airport apron packing repair b 17/08/2017
1853 BER passenger boarding bridges 10/08/2017
1854 Flagstaff Regional Airport Runway Light Replacement 14/08/2017
1855 Aircraft Spares for R/M of Aircraft and Aircraft Ground Equipment 16/08/2017
1856 Aircraft Fuel Tank 29/09/2017
1857 Ground Power Unit 11/08/2017
1858 Providing & Installation of Aerodrome Beacon light at Osmani International Airport Sylhet- Procurement of obstruction light fitting & Beacon lighting fitting spare at Osmani International Airport Sylhet. 08/08/2017
1859 Operation and maintenance of baggage handling system and passenger boardng bridges 17/08/2017
1860 Ground Power Unit 28/07/2017
1861 Passenger boarding bridge. 10/08/2017
1862 Aircraft Maintenance Support Services 03/08/2017
1863 Ground Power Unit 11/08/2017
1864 Y--FY18 MCON P-601, AIRCRAFT MAINTENANCE HANGAR 2, JOINT REGION MARIANAS, ANDERSEN AFB, GUAM 08/08/2017
1865 Pierre Regional Airport Passenger Boarding Bridge 10/08/2017
1866 Aircraft tractor purchase 16/08/2017
1867 ACQUISITION OF AERONAUTICAL LIGHTS AND SPARE PARTS FOR THE OPERATION OF THE LIGHTING SYSTEM OF MARISCAL LA MAR AIRPORT 31/07/2017
1868 Qinghai Airport Co., Ltd. 2017 annual runway sweepers purchase project tender notice 16/08/2017
1869 - Maintenance of airfield lighting [1 PACKAGE x 1 TIMES] 31/07/2017
1870 EGLIN AFB, AEROSPACE GROUND EQUIPMENT SUPPORT 07/08/2017
1871 SOIL INVESTIGATION WORKS FOR PHASE 4 FIXED GANGWAY AND PASSENGERLOADING BRIDGE REPLACEMENT AT CHANGI AIRPORT SINGAPORE 04/08/2017
1872 Delivery of airport wide-range sweeper racks. 05/09/2017
1873 Supply aviation signal ‚Äď light 17/08/2017
1874 R & M of Acft & Acft Ground Equipment 02/08/2017
1875 Baggage Conveyer/ Belt Loader 08/08/2017
1876 RPR Airfield Approach & ID Lighting, Runway 20 QUUG 15-1009 28/08/2017
1877 Decorah Municipal Airport 2017 Hangar Development 15/08/2017
1878 Kaohsiung Airport runway construction project (the second re-tender) 04/08/2017
1879 Supply band conveyer, ball ‚Äď bearing, reel of luggage belt at International Terminal - Tan Son Nhat International Airport. 07/08/2017
1880 Aircraft Ground Power Unit 17/08/2017
1881 Y--P198 and P203 F35 AIRCRAFT MAINTENANCE HANGAR AND FLIGHTLINE APRON EXPANSION AT MARINE CORPS AIR STATION MIRAMAR, SAN DIEGO, CALIFORNIA 12/08/2017
1882 Project consist of construction modification to the JNU airport terminal building and installation pf passenger boarding bridge euipment and miscelleneous related work 22/08/2017
1883 Yanan airport relocation project equipment procurement instrument landing system 23/08/2017
1884 TOPOGRAPHICAL SURVEYING WORKS FOR FIXED GANGWAY & PASSENGERLOADING BRIDGE REPLACEMENT PROJECT AT CHANGI AIRPORT SINGAPORE 11/08/2017
1885 KAA/ES/ISIOLO: Supply and installation of Apron Floodlights and Street Lighting for Isiolo Airport 15/08/2017
1886 Procurement of eleven (11) self-propelled passenger stairs 15/09/2017
1887 Medevac Aircraft Maintenance Hangar, Yakima Training Center, WA 18/09/2017
1888 Taxiway and Apron Reconstruction 13/08/2017
1889 SUPPLY, DELIVER, INSTALL AND REPLACE OF EXISTING LED SIGNAGE SINGAPORE CHANGI AIRPORT, TERMINAL 1 04/09/2017
1890 REQUEST FOR TENDER FOR THE PROVISION OF JET FUELLING RETICULATION MECHANICAL ENGINEERING PROFESSIONAL SERVICES FOR MIDFIELD CARGO FOR A PERIOD OF EIGHT (8) YEARS AT OR TAMBO INTERNATIONAL AIRPORT 15/09/2017
1891 Construction of Panggema Airport 16/08/2017
1892 Kaohsiung Airport runway construction project (the second re-tender) 15/08/2017
1893 Ground Power Unit - Frequency Converters 20/08/2017
1894 Aircraft Maintenance Support Services 14/08/2017
1895 Fort Dodge Regional Airport Hangar ‚ÄúA‚ÄĚ Development Program ‚Äď Phase 1 25/08/2017
1896 Buy carpet Belt conveyor belt 2nd Floor Passenger Terminal and Customer Service Room Customer service D-Terminal 2 at Suvarnabhumi Airport 31/08/2017
1897 Integrated purchase of aviation security equipment spare parts (B) 16/08/2017
1898 Construction of a runway at the Douar TITZIL, the Commune of Guigou Reporting to the Province of Boulemane 07/09/2017
1899 R & M of Acft & Acft Ground Equipment 09/08/2017
1900 Ground Power Unit (GPU) 16/08/2017
1901 The second airway entry baggage turntable and other LED projects 22/08/2017
1902 Aircraft Ground Handling Support 16/08/2017
1903 Supply dolly and trolley for Vietnam Airport Corp. 29/08/2017
1904 The request for Proposal for the Supply of Avgas and Jet Fuel at Pilanesberg International Airport in the North West Province of South Africa for a period of ten (10) years 18/08/2017
1905 SOIL INVESTIGATION WORKS FOR FIXED GANGWAY REPLACEMENT AT TERMINAL 1 & 2, SINGAPORE CHANGI AIRPORT 25/08/2017
1906 CONSTRUCTION OF A GANGWAY ABOVE THE CHERAN BETWEEN THE COMMONS OF RUMILLY AND BOUSSY 02/10/2017
1907 Construction of helicopter hangar 25/08/2017
1908 Yanan airport relocation project equipment procurement instrument landing system 31/08/2017
1909 Ground Support Equipment. The deadline date shown is predictive deadline. Interested firms should contact tendering authority for exact deadline date. 20/08/2017
1910 Rental of positive elevators or nacelles and nacelles or gangways. 15/09/2017
1911 Aircraft Ground Handling Support 16/08/2017
1912 Walk-Behind Baggage Conveyer/ Belt Loader 15/08/2017
1913 Luoyang Airport 26 runway instrument landing system update engineering design 07/09/2017
1914 Supply, delivery, testing and commissioning on a turnkey basis of equipment forty (40) units baggage trolleys 18/08/2017
1915 Supply, delivery, testing and commissioning on a turnkey basis of equipment seventy (70) units mail trolleys 18/08/2017
1916 Reconstruction of Runway and Taxiway Marking at Chicoutimi 24/08/2017
1917 Supply of new trolleys at several airports. 17/08/2017
1918 Install and operate baggage carts and cart dispensers 31/08/2017
1919 Air Force Maintenance and Aircraft Maintenance Service for Air Force Aircraft ICH47F Helicopter Turbochargers 21/09/2017
1920 J--GENERATOR,AIRCRAFT,, IN REPAIR/MODIFICATION OF 11/09/2017
1921 Truck tractors / luggage tractor purchases 28/08/2017
1922 BAGGAGE BELT MAINTENANCE, SERVICE AND REPAIR BRADLEY INTERNATIONAL AIRPORT 29/08/2017
1923 Xiamen new airport air traffic control project feasibility study report preparation project 29/08/2017
1924 Supply, Installation and Commission of Lightning Warning Alert System 25/08/2017
1925 Replacement and Maintenance of Signage at OR Tambo International Airport 05/09/2017
1926 Brush Sets for Runway Sweepers 24/08/2017
1927 Install Runway 34 PAPI 31/08/2017
1928 Baggage Belt Maintenance, Service and Repair - Bradley International Airport 29/08/2017
1929 Cleaning service and management of trolleys at the Vigo airport. 08/09/2017
1930 Announced the Belt for Conveyor auction for use with luggage conveyor systems. Suvarnabhumi Airport 01/09/2017
1931 Buy carpet Belt conveyor belt 2nd Floor Passenger Terminal and Customer Service Room Customer service D-Terminal 2 at Suvarnabhumi Airport 31/08/2017
1932 BOX HANDLING CONVEYOR SYSTEM 25/08/2017
1933 22000L Aircraft Refueller (W6399-180406/A) 25/09/2017
1934 RPR Airfield Approach & ID Lighting, Runway 20 QUUG 15-1009 28/08/2017
1935 AERIAL REFUEL MANIFOLD / 05F, C/KC-135 STRATOLIFTER AIRCRAFT 02/09/2017
1936 Check the work of conveyor belt conveyor in Chumphon Airport, Chumphon District, Chumphon Province 1 System 30/08/2017
1937 Taxi Guidance Sign Taxi Guidance Sign Update CCR electric control system, airport control PLC, Khon Kaen Airport 22/08/2017
1938 Automatic pallet 23/08/2017
1939 Manufacture and supply of a trolley for transporting the rudder of the IL-76TD (MD) 25/08/2017
1940 Framework Procurement for Supply, Delivery, Installation and Commissioning of LED Luminaire in Changi Airport Terminal 1,2,3,4 and Cargo Airfreight Centre 11/09/2017
1941 GANGWAY TOWER 14/09/2017
1942 RRC FOR MAINTENANCE OF GANGWAYS FOR A PERIOD OF TWO YEARS 29/08/2017
1943 Procurement of Wheel Tractor and Rotary Mower (Dabo Airport and Natuna Ranai Airport) 18/08/2017
1944 Mobile Helicopter Refuelling Equipment. 02/10/2017
1945 Construction of two reinforced concrete pillars for the rolling of mobile passenger gangways on a Cap Janet terminal 20/09/2017
1946 Procurement and Installation of Airport Power Supply System 21/08/2017
1947 One (1) New and Unused Enclosed Cab Diesel Powered Air Sweeper 06/09/2017
1948 Option Final Bid - P-8 Ground Support Equipment 31/08/2017
1949 UPDATED Langlade Country Airport fule System Point-of-Sale Retrofit 07/09/2017
1950 Ground Power Unit - Aviation 06/09/2017
1951 Supply 02 luggage and cargo belts 28/08/2017
1952 Maintenance of baggage handling system installed at Fez airport (Terminal 2) 18/09/2017
1953 RPR Airfield Approach & ID Lighting, Runway 20 QUUG 15-1009 31/08/2017
1954 Maintenance maintenance of the Department of Hangzhou Xiaoshan International AirportGoldhofer AST-2R 210 rodless aircraft tractor TDM display 07/09/2017
1955 RENTAL OF GROUND HANDLING EQUIPMENT - PAPA AIR BASE 07/09/2017
1956 Daegu Airport LED lighting replacement work 24/08/2017
1957 HYDRAULIC PALLET TROLLY; MAX LOAD CAPACITY 500KGS;FORK TYPE 24/08/2017
1958 RPR Airfield Approach & ID Lighting, Runway 20 QUUG 15-1009 31/08/2017
1959 Provision of Ground handling Services. 22/09/2017
1960 Spare Parts and Runway Lighting Requirements 05/09/2017
1961 Ohakea Airfield Lighting & Movement Area Guidance Signs (MAGS) Project 19/09/2017
1962 Medevac Aircraft Maintenance Hangar, Yakima Training Center, WA 18/09/2017
1963 Development of comprehensive, multi-dimensional design documentation with security analysis for the development and reconstruction of airport infrastructure. 03/10/2017
1964 Procurement Spare Parts for private companies maintenance and maintenance of spare generators at Suvarnabhumi Airport. 14/09/2017
1965 Buy and install lighting system at AOB building and AIMS building at Suvarnabhumi Airport. 14/09/2017
1966 Provision of lighting for various airport platforms 04/10/2017
1967 Lighting work of various airports in the Kingdom 18/09/2017
1968 Upgrading of Lighting, Large Area Lighting and Tan Tan Airport Replacement 18/09/2017
1969 Maintenance of the lighting system installed at Mohammed V Airport 18/09/2017
1970 Medium price for repairing conveyor belt inbound at Loei Airport, Tambon Naan, Amphoe Mueang Loei, Loei 1 System by the agreed price method. 31/08/2017
1971 Baiyun International Airport new LED electronic induction screen tender 24/08/2017
1972 Large helicopter (KA-32) landing gear 12/10/2017
1973 Delivery of fuel for jet engines TS-1 (RT) by refueling the Customer,s aircraft at the airport in Saratov 28/08/2017
1974 Construction work and completion of runways under the commune Ghiata Al Gharbia province of TAZA 13/09/2017
1975 Walk Behind Conveyer Belt Loader 30/08/2017
1976 Y--P198 and P203 F35 AIRCRAFT MAINTENANCE HANGAR AND FLIGHTLINE APRON EXPANSION AT MARINE CORPS AIR STATION MIRAMAR, SAN DIEGO, CALIFORNIA 01/09/2017
1977 Flight Planning and Ground Handling Services 05/09/2017
1978 AIRCRAFT GROUND POWER UNIT 17/09/2017
1979 Supply and Installation of Passengers boarding passengers at the airport. 22/09/2017
1980 South Airport on the 13th floor of the public staircase maintenance improvement project 07/09/2017
1981 Purchase of lightweight trolley (trolley) 04/09/2017
1982 Taxiway and Apron Reconstruction 01/09/2017
1983 Purchase of lighting products for the facility: "Center for Air Traffic Control" on the grounds of Smolevichi region " 08/09/2017
1984 Supply dolly trolley. 07/09/2017
1985 Installation of Airfield Lighting system at PAF Base Faisal 575 25/09/2017
1986 WORKS OF CONSTRUCTION OF A BRIDGE - GANGWAY - IN THE COMMUNAL OF TALAMBOTE 18/09/2017
1987 Request for Information ‚ÄėTemporary Storage of Personal Baggage ‚ÄĒ Schiphol‚Äô. 25/08/2018
1988 Trolley for removing and transporting the air intake of the engine CFM56-7B 14/09/2017
1989 Oxygen Generators for Aircraft 14/09/2017
1990 Purchase of self-propelled electrical belt conveyor 15/09/2017
1991 UAV Engines & Generators 30/08/2017
1992 Supplying Power Generator for The Airport Water Well ‚Äď Al Shouka 05/09/2017
1993 REHABILITATION OF RUNWAY / TAXIWAY / APRON 09/09/2017
1994 SAFETY FACILITIES BODYWORK, GANGWAY AND SCALE 11/09/2017
1995 PURCHASE OF ONE (1) NEW 2017 AERO SPECIALTY JETGO 600MTI-RJ GROUND POWER UNIT FOR THE LEE’S SUMMIT MUNICIPAL AIRPORT 30/08/2017
1996 Airfield Street Sweeper 01/09/2017
1997 Airport Construction Contracts 30/08/2017
1998 MULTI-DISCIPLINARY CONSULTANCY SERVICES FOR REPLACEMENT OF FIXED GANGWAYS AND PASSENGER LOADING BRIDGES AT SINGAPORE CHANGI AIRPORT 15/09/2017
1999 PASSENGER TROLLEYS MANAGEMENT FOR NEW MUSCAT INTL AIRPORT 28/09/2017
2000 39--50 Wanzl Model Travel 400/4 Luggage Carts and 5 Wanzl Model Porter Trolley 2000 in support of the Navy AMC Air Terminal, Norfolk, VA. 31/08/2017
2001 Ground Power Unit 06/09/2017
2002 Medevac Aircraft Maintenance Hangar, Yakima Training Center, WA 18/09/2017
2003 Airport relocation project equipment procurement instrument landing system(2) 13/09/2017
2004 Remodeling Picasso terminal building at Malaga-Costa del Sol airport. 19/09/2017
2005 Mobile Ground Power Unit 13/09/2017
2006 Aviation light maintenance and inspection equipment for Kobe Airport. 29/09/2017
2007 Provision of Warning Signage around Seletar Airport 06/09/2017
2008 SUPPORTING EQUIPMENT FOR F16 AIRCRAFT 12/09/2017
2009 Loading Ramps for Airfield Operations 12/09/2017
2010 Construction Management Services for Extend Runway 3/21, Lanai Airport 25/09/2017
2011 Buy and install lighting system at AOB building and AIMS building at Suvarnabhumi Airport. 14/09/2017
2012 Supply of passenger luggage trolleys for different airports in the Kingdom 27/09/2017
2013 Fuel Supply Framework Agreement Jet A1 airports Arad and Craiova. 29/09/2017
2014 - autonomous power supply for aircraft 90-100 kVA-9 pieces; - autonomous power source for 120 kVA-9 aircraft; - electric generator with illumination tower -10 pcs; - Aircraft and aviation engine-1 cpl engine washing equipment; - mobile trailer heater - 4 cpl. 02/10/2017
2015 Cheongju International Airport Domestic Terminal expansion construction project management services 22/09/2017
2016 East Airfield Lighting Control Vault 30/10/2017
2017 Airfield Lighting and NAVAIDS 26/09/2017
2018 Baggage conveyor belt procurement project 27/09/2017
2019 Service management and maintenance of trolleys at Tenerife South Airport. 21/09/2017
2020 Development and delivery of an Air Traffic Complexity Assessment Tool (tCAT) for Traffic Complexity Assessment and Management. 20/10/2017
2021 Baggage tractors 13/10/2017
2022 Procurement of two (02) Aircraft Nose gear Towbar tractor Category 12/10/2017
2023 SUPPLY AND DELIVERY OF SPARE PARTS OF CCR FOR AIRFIELD LIGHTING SYSTEM (AFLS) AT nEW BACOLOD-SILAY AIRPORT 28/09/2017
2024 Flight Simulator Maintenance Services 14/09/2017
2025 Maintenance Servicing Minor Repairing of Boarding Bridge Conveyor Belt systemWeighing scale Lift Escalators etc. i/c. other alied works at SAIA Ctg 18/09/2017
2026 R & M of Acft & Acft Ground Equipment 08/09/2017
2027 Replacement of Ceiling and Lighting System at Departure Transit East Skytrain Station in Terminal 1 12/09/2017
2028 Auction in electronic form for the right to conclude a contract for the supply of mobile gangways with a platform for the needs of the PGM GBU "Highways" among small businesses and socially-oriented non-profit organizations 18/09/2017
2029 Development of the Construction Design and Authors Supervision for the Installation of the Apron Taxiway Centreline Lights and Integration into the Existing Aerodrome Lighting Control System 22/09/2017
2030 Ground Power Unit 06/09/2017
2031 UAV Engines & Generators 08/09/2017
2032 Purchase of trolley holders 11/09/2017
2033 GROUND HANDLING & AIR NAVIGATION SERVICES FOR THE UNITED NATIONS MISSION IN COLOMBIA 18/09/2017
2034 Baggage trolleys at the Bandaranaike International Airport 27/09/2017
2035 Supply of Mobile Passenger Boarding Bridge for Aircraft 19/09/2017
2036 REPAIRS AND MAINTENANCE OF GANGWAY ROOFDECK 12/09/2017
2037 Upgrading of Baggage Conveyor Nos. 4 & 5 into 4-Unit Carousels at NAIA Terminal 2 28/09/2017
2038 No. 17-2017 Selection of the supplier of the ILS landing instrument system with DME 18/09/2017
2039 59--Ground Power Units 13/09/2017
2040 Aircraft Wrap-Around Maintenance Staging (WAMS). 30/09/2017
2041 Supply of fuel for the aircraft that form the fleet of the Air Media Service of the General Directorate of Police. 20/10/2017
2042 Aircraft Refueller 17/10/2017
2043 Procurement Spare Parts for private companies maintenance and maintenance of spare generators at Suvarnabhumi Airport. 14/09/2017
2044 Buy and install lighting system at AOB building and AIMS building at Suvarnabhumi Airport. 14/09/2017
2045 Supply and Delivery of Airfield Lights at Seletar Airport 14/09/2017
2046 Conveyor Belt Loaders Ground Power Unit Passenger Stairs 17/10/2017
2047 SUPPLY AND DELIVERY OF SPARE PARTS OF CCR FOR AIRFIELD LIGHTING SYSTEM (AFLS) AT nEW BACOLOD-SILAY AIRPORT 28/09/2017
2048 Procurement of 07 Conveyor Belt Loaders 24/10/2017
2049 Mobile Ground Power Unit 15/09/2017
2050 Repair Aircraft Maintenance Unit (AMU), Facility 5251 at Davis-Monthan Air Force Base, AZ 12/09/2017
2051 Medium Approach Lighting System w/ Runway Alignment Indicator Lights (MALSR) for Runway 35 19/10/2017
2052 Demolition of the existing fixed timber piers and mooring piles and installation of the proposed floating dock system and gangways 29/09/2017
2053 Request For Proposal for Ground Handling Services at JFK 1 02/10/2017
2054 ED122139_66480 - Site Preparation‚ÄďReplace Airfield Lighting Power Centre (ALPC) & Controls 26/09/2017
2055 Supply, Installation and Commission of Canopy Type Generator 27/09/2017
2056 AIRPORT ABOVE GROUND FUEL STORAGE SYSTEM 22/09/2017
2057 PURCHASE OF NEW OR DEMOLITION, REFURBISHMENT, AND/OR RELOCATION OF PASSENGER BOARDING BRIDGES 12/10/2017
2058 Construction of the international airport terminal 20/09/2017
2059 Repair & Painting work for Pontoon No. PI-041/1986 Gangway & other repair at Panthashala Ferry Ghat under the RHD Ferry Maintenance Sub-Division Kanchpur Dhaka during the financial year 2017-2018. 25/09/2017
2060 Repairing and Painting of Pontoon Gangway-bridge PI-224/2005 at Joukura Ferryghat under Ferry Sub-Division Faridpur during the FY 2017-2018. 28/09/2017
2061 Road Improvement to Jalan Mergosari - Gangway Lane 14/09/2017
2062 8500358 Fixed Ground Support Equipment Professional Services 23/10/2017
2063 Airport Road and Taxiway Extension 26/09/2017
2064 16--Aircraft Components and Accessories V22 MMR 12/10/2017
2065 Instrument Landing System (ILS). 19/10/2017
2066 SUPPLY AND DELIVERY OF PARTS AND ACCESSORIES FOR THE AIRFIELD LIGHTING SYSTEM (AFLS) AT ILOILO INTERNATIONAL AIRPORT 26/09/2017
2067 Apron Lighting Upgrade - Region of Waterloo International Airport 04/10/2017
2068 Procure Aircraft Generators 28/09/2017
2069 PAPI/PLC/Runway Lighting Control System 31/10/2017
2070 Development of Runway lighting systemE/M works- Providing and Installation of Runway Threshold Taxiway & Apron lighting system in/c other related works at Barisal Airport 12/10/2017
2071 Construction and installation works at the facilities of ZAO Gazpromneft-Aero Novosibirsk under the project: "Technical re-equipment of the NFS and PAZ system of the centralized system for refueling aircraft 23584736.42 5220.1275" 22/09/2017
2072 Supply & Commissioning of ‚ÄėAircraft Tow Tractor(s) 23/10/2017
2073 PURCHASE OF GENERATOR 27/09/2017
2074 Purchase and supply of trolley 17/10/2017
2075 Static Display Aircraft Signs 26/09/2017
2076 Removal of an existing timber fixed dock and piles, ocnstruction of a timber fixed dock ramp and landing, a 30x5 aluminum gangway 03/10/2017
2077 Provision of Trolley Operations for a Period of three (3) years at O R Tambo International Airport 13/10/2017
2078 Bag conveyor system Container conveyor technology VE1002. 13/10/2017
2079 Xianyang Hangjia station aircraft fuel truck intelligent business management system technology projects 13/10/2017
2080 Aerospace Ground Equipment (AGE) HandiFueler Service Cart 23/09/2017
2081 Provide engineering and design services, including construction administration, to: 1. Replace Medium Intensity Runway Lights; 2. Install Precision Approach Path Indicator-2 lights on Runway 16-34; 3. Rehabilitate apron; 4. Rotomill and overlay turnarounds and cross taxiways; 5. Rotomill and overlay Runway 16-34; and 6. Mark Runway16-34 24/10/2017
2082 Procurement of Supply and Installation of PLC and HMI of Passenger Boarding Bridge 25/09/2017
2083 1680, cell, fuel, aircraft for the UH-1 helicopter 20/09/2017
2084 Construction of a runway at Douar TITZIL 16/10/2017
2085 Provission of passenger luggage trolleys model travel 400 for por Elizabeth International Airport 11/10/2017
2086 Shenyang Taoxian Airport runway sweeping vehicle purchase project tender notice 18/10/2017
2087 Hangzhou Xiaoshan International Airport flight zone signs signs procurement project tender notice 09/10/2017
2088 Aviation fuel thiol tester and other two procurement 27/09/2017
2089 Five aircraft bridge overhauls. 25/10/2017
2090 The aviation jet a1 fuel supply 20/10/2017
2091 Static Display Aircraft Signs 26/09/2017
2092 The Supply and Installation of the Aerodrome Ground Lighting and Associated Signage at OR Tambo International Airport 23/10/2017
2093 Procurement of eleven (11) self-propelled passenger stairs 29/09/2017
2094 Cleaning service and management of trolleys in the airport of A Coru√Īa. 06/10/2017
2095 THE SUPPLY AND INSTALLATION OF THE EARODROME GROUND LIGHTING AND ASSOCIATED SIGNGE AT O R TAMBO INTERNATIONAL AIRPORT 23/10/2017
2096 Design, Supply, Installation, Testing and Commissioning for 28 numbers of Passenger Loading Bridges at Singapore Changi Airport 30/10/2017
2097 High-pole lampfor and apron lighting monitoring system 16/10/2017
2098 The demolition, study and construction of metal gangways including ramps access on the Casablanca - Berrechid motorway 11/10/2017
2099 Airfield lighting equipment and spares Baggage trolleys and spares Conveyor belt and spares Electrical mv transformer and switchgear Security equipment(CCTV camera, explosive and metal dector) 28/10/2017
2100 The Installation, Removal and Alteration of the Road Markings and Signage on the Aerodrome at OR Tambo International Airport 31/10/2017
2101 Proposed Supply, Fabricate and Install One UnitnGangway to Existing R.C. Pontoon Wharf at Balingian, Mukah Division 18/10/2017
2102 Request for Proposals for the Provision of Trolley Operations for a Period of three (3) years at O R Tambo International 13/10/2017
2103 Replacement of Jetway Passenger Boarding bridge and related works at Hazrat Shahjalal International Airport S H- Replacement of old Passenger Boarding Bridges No. 1 2 & 6. 12/10/2017
2104 Procurement of different type major spare parts for CIMC Passenger Boarding Bridges at HSIA. SH- Renovation of Canopy hood and related mechanical structure in/c allied works for CIMC Passenger Boarding Bridges 12/10/2017
2105 Replacement Gangway and Park Estromatolitos, Porvenir 06/10/2017
2106 BULK AVIATION FUEL (E60HL-170052/C) 05/10/2017
2107 Overhead Door, Baggage Belt and Baggage Carousel Maintenance and Services at Albany International Airport. 12/10/2017
2108 Emergency Supply of Lighting Parts for Airport Terminals from 107 to 108 17/10/2017
2109 Replacement of Kaohsiung Airport 09/27 runway lighting purchase case 30/10/2017
2110 59--Airfield Lighting Supplies 28/09/2017
2111 BELT AIRCRAFT SAFETY 02/10/2017
2112 Depot Capability Establishment for Repair Capability of Air to Air Refuel System Components 12/10/2017
2113 Carrying Ferry and Pontoon 1 Utility Type-2 improved 026/1997 2 Pontoon No.PI-001/1988 with Gangway and 3 Pontoon No.PI-002/1988 with gangway from Nangalbadh Ferryghat of Magura Road Division to Deudhukun Ferryghat of Netrokona Road Division during the year 2017-2018 10/10/2017
2114 Gangway preventive maintenance program technicians service 04/10/2017
2115 16--GENERATOR,AIRCRAFT 13/11/2017
2116 Replacement of existing growlights at Changi Airport Terminal 3 Greenwall 19/10/2017
2117 Aircraft maintenance services. 01/11/2017
2118 Operational maintenance of the ILS 381 (Instrument Landing System) of the 3 armies and their associated dynamic lightning protection 16/10/2017
2119 Airfield Aviation Fuel Trailer 06/11/2017
2120 Shenyang Taoxian Airport runway sweeping vehicle purchase project tender notice 18/10/2017
2121 R & M of Acft & Acft Ground Equipment 03/10/2017
2122 AUDIT OF THE PASSENGER LOADING BRIDGE (PLB) & AIRCRAFTS DOCKING GUIDANCE SYSTEM (ADGS) 11/10/2017
2123 Replacement of existing growlights at Changi Airport Terminal 3 Greenwall 19/10/2017
2124 MAINTENANCE AND PROVISION OF SIGNAGE FOR CHANGI AIRFREIGHT CENTRE 09/10/2017
2125 Construction of Taxi Way and Apron Hangar (Auction) 04/10/2017
2126 Construction of Taxi Way and Apron Hangar 06/10/2017
2127 Taxiway Lighting Equipment 04/10/2017
2128 SUPPLY, INSTALLATION & COMMISSIONING OF PERIMETER CCTV SYSTEM AT BANDARANAIKE INTERNATIONAL AIRPORT, KATUNAYAKE 11/10/2017
2129 Supply of Aviation Fuel Je A-1 I 20 20 9 - Type 17/10/2017
2130 Construction and installation work on the project: "Reconstruction and modernization of Kurumoch International Airport, Samara" 19/10/2017
2131 UH-60M Black Hawk Helicopter Auxiliary Power Unit Generator 1 item 1 new product purchase 12/10/2017
2132 Procure Aircraft Generators 03/11/2017
2133 Contract for the supply and installation of a mobile footbridge in the outer port of Ciutadella, Menorca. 08/11/2017
2134 Request for Bids (RFB) for the Supply and Installation of chute strip curtains, friction belts and bumpers in the baggage hall at Cape Town International Airport 23/10/2017
2135 Delivery of airport equipment: Lot1 Passenger bus-1 piece, Lot2 Self-propelled passenger ladder-1 piece, Lot3 GPU-1 power unit, Lot4 Tractor unit with blade 1 piece. 06/11/2017
2136 Supply, commissioning, training / education, maintenance, related accessories, and supplies needed for operation during the guarantee for: II.2.1) Total quantity or scope (including, where appropriate, all groups and all options): Lot 1 Bus passenger - 1 piece, Lot 2 Self-propelled passenger car staircase - 1 piece, Lot 3 GPU power supply - 1 piece, Lot 4 Tractor unit with blade - 1 piece. 06/11/2017
2137 Runway sweeper 16/10/2017
2138 Baggage belt maintenance, service and repair 24/10/2017
2139 Apron Lighting Upgrade - Region of Waterloo International Airport 06/10/2017
2140 Instalaltion of taxiway lights Installation of airfield lighting system 10/10/2017
2141 E-2D Peculiar Support Equipment 21/10/2017
2142 TH-57 Aircraft Maintenance and Contractor Logistics Support (CLS) 30/11/2017
2143 Broome Port All Tide Cruise Ship Gangway - D & C 03/11/2017
2144 Airport Planning and Engineering Services 18/10/2017
2145 Supply and Delivery of Ground Support Equipment for TC90 Aircraft 07/11/2017
2146 PROVISION OF MAINTENANCE WORKS OF RUNWAYS, TAXIWAYS AND APRONS 24/10/2017
2147 UPGRADE OF PORT MACQUARIE AIRPORT TERMINAL BUILDING 26/10/2017
2148 Indegenous development vehicle mounted aviation refueller capacity 1000-1200 ltrs 13/11/2017
2149 Construction of two gangways one at douar boukaroune and the other at douar bouazier 07/11/2017
2150 General contractor (GU) Erection of the M5 and M6 runways at BER. 10/11/2017
2151 Allied work for geo technical investigation for installation of passenger boarding bridges at Hyderabad Airport 25/10/2017
2152 Inspection & Repair Cougar Heli Component 31/10/2017
2153 Supply & Installation of Stopbar Lights at Runway 06/24 and Rehabilitation of Primary Lines & Airfield Lighting (AFL) Systems at Runway 13/31 07/11/2017
2154 Medium Intensity Approach Lighting System with Runway Alignment Indicator Lights 13/11/2017
2155 Runway End Identifier Light 13/11/2017
2156 1680, fuel cell, aircraft for the H-1 aircraft 13/10/2017
2157 Framework agreement supply and delivery of signs, coils, rigids and accessories for Paris airports. 25/10/2017
2158 Acquisition of Lights for Los Confines Airfield 31/10/2017
2159 Invitation for tenders for the Supply of Airbus Helicopter H175 Ground Maintenance Management Equipment to the Government Flying Service 02/11/2017
2160 Service of management and maintenance of trolleys in Gran Canaria airport. 30/10/2017
2161 Renovation & up gradation of six boarding bridge at HSIA 18/10/2017
2162 China Airlines Airline Co., Ltd. Aviation ground power vehicle procurement tender notice 20/10/2017
2163 Notice of Intent to Award a Single/Sole Source Procurement -Airfield Lighting 20/10/2017
2164 Yan an Airport relocation project civil aviation engineering boarding bridge, bridge loading equipment procurement project 08/11/2017
2165 Regulator Airfield Light 23/10/2017
2166 Spares for the Maintenance of Aerospace Ground Equipment (AGE) 30/10/2017
2167 Replacement of airplane lighting and power control monitoring system at Gimpo Airport 20/10/2017
2168 Supply of new trolley moving equipment at the Cape Town International Airport 27/10/2017
2169 SUPPLY AND INSTALLATION OF CHUTE STRIP CURTAINS, FRICTION BELTS AND BUMPERS IN THE BAGGAGE HALL AT CAPE TOWN INTERNATIONAL AIRPORT 23/10/2017
2170 SUPPLY OF 100 NOS. LED STREET LIGHT FITTINGS TO COLOMBO AIRPORT, RATMALANA 31/10/2017
2171 Airfield Lighting Equipment & Spares Baggage Trolleys & Spares Conveyor Belts & Spares 28/10/2017
2172 22000L Aircraft Refueller (W6399-180406/B) 06/11/2017
2173 UH-60M Black Hawk Helicopter Auxiliary Power Unit Generator 1 item 1 new product purchase 19/10/2017
2174 Class I and Class II MB-2 Tow Tractors 13/11/2017
2175 To provide sole-source procurement for Airfield Lighting. 20/10/2017
2176 To provide sole-source procurement for Airfield Signs. 20/10/2017
2177 16--GENERATOR,AIRCRAFT 13/11/2017
2178 Medium Intensity Approach Lighting System with Runway Alignment Indicator Lights 13/11/2017
2179 The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to purchase and install five (5) dynamic messaging signs at various locations along the Dulles International Airport Access Highway. 08/11/2017
2180 Procurement of Aircraft Spares for the R/M of Aircraft and Aircraft Ground Equipment 07/11/2017
2181 Belt circular conveyor 23/10/2017
2182 1560, manifold, fuel servi for the AH-64 helicopter 01/12/2017
2183 1680, cell, fuel, aircraft for the H-1 helicopter 20/10/2017
2184 J--GENERATOR,AIRCRAFT,, IN REPAIR/MODIFICATION OF 04/12/2017
2185 Upgrading the public lighting of the fast track at Mohammed V airport 29/11/2017
2186 Supply one baggage carousel for conveyor belt 27/10/2017
2187 Adapter Ground Hanling 30/11/2017
2188 SERVICE OF MAINTENANCE AND REPAIR OF GATE GROUND SUPPORT EQUIPMENT 24/10/2017
2189 Alongside Aircraft Refueling Services at NAF El Centro, CA 02/11/2017
2190 Transfer and installation of RW Light and Apron Light 22/10/2017
2191 Niederstetten, army airfield, new building of the airport, dismantling of the airport. 20/11/2017
2192 Purchase of plate circular conveyor 21/11/2017
2193 Year agreement 2018 for the supply of aircraft fuel to the police helicopter headquarters at the airport Stuttgart. 20/11/2017
2194 Supply, installation, commissioning of conveyor lines and integration of existing safety equipment in the baggage handling system of Essaouira airport 13/11/2017
2195 Purchase of plate circular conveyor 21/11/2017
2196 CONSTRUCTION OF TAXIWAYS AND APRON EXTENSION AT BATHURST AERODROME 07/11/2017
2197 SOIL INVESTIGATION WORKS FOR PHASE 4 FIXED GANGWAY AND PASSENGERLOADING BRIDGE REPLACEMENT AT CHANGI AIRPORT SINGAPORE 30/10/2017
2198 Electricity replacement work for emergency power generator for Gimhae Airport control tower 30/10/2017
2199 Purchased 143 kinds of Uljin airfield fluorescent lights and others (4th quarter material) 26/10/2017
2200 Delivery of Aircraft Ground Equipment Capability. 23/10/2018
2201 Procurement of spares on loading bridges 01/11/2017
2202 Professional Engineering Services for Passenger Boarding Bridge Improvement 02/11/2017
2203 Construction And Completion Of The Proposed Remedial Works to R.C. Pontoon And Gangway To Terminal 1, Sarikei Division 15/11/2017
2204 Procurement of portable airfield lighting system 16/11/2017
2205 Runway South Apron Lighting / Lighting Construction„ÄÄ„ÄÄ„ÄÄ„ÄÄ„ÄÄ„ÄÄ 27/12/2017
2206 Purchase of Two Baggage Loading Belts 13/11/2017
2207 Dynamic Message Signs 26/10/2017
2208 Maintenance of public lighting and low voltage at Mohammed V airport. 04/12/2017
2209 Class I and Class II MB-2 Tow Tractors 13/11/2017
2210 Request For Proposal for Ground Handling Services at London 16/11/2017
2211 Eglin- Aerospace Ground Equipment 20/11/2017
2212 RFQ - Apron Lighting Replacement 30/10/2017
2213 Air Terminal and Ground Handling Services in Israel 10/11/2017
2214 Design/Construction of Taxiway Lighting 16/11/2017
2215 Prague - Kbely, taxiways - reconstruction. 29/11/2017
2216 FOR THE APPOINTMENT OF A PROFESSIONAL CIVIL ENGINEERING SERVICE PROVIDER FOR THE REHABILITATION OF TAXIWAYS AT O.R TAMBO INTERNATIONAL AIRPORT 22/11/2017
2217 Fuel Supply for Jet A1 Aviation Jet Ator. 05/12/2017
2218 Schull Pontoon & Gangway - Design, fabrication, supply & commissioning of pontoon & gangway to Schull, County Cork. 10/11/2017
2219 JP-1 AIRCRAFT FUEL FOR THE AN-262 AIR TRANSFER MISSION FROM VICTORIA CANADA TO THE INTERNATIONAL TOCUMEN AIRPORT IN PANAMA 27/10/2017
2220 Taxi Guidance Sign Update Controller CCR Electric Airport Control PLC Airport Khon Kaen Tumbol Ban Duck Amphur Muang Khon Kaen Khon Kaen 1 system with electronic bidding (e-bidding) 30/10/2017
2221 Bidding to improve lighting in passenger terminals Sakon Nakhon Airport Tambon Na Vong District Amphoe Mueang Sakon Nakhon Sakon Nakhon 1 system with electronic bidding (e-bidding) 31/10/2017
2222 Bid for Improve Lighting System, Passenger Light, Threshold / End Fire, PAPI Light, Simple Approach with Duct Bank, Roi Et Airport, Tambon 1 system by electronic bidding (e-bidding) 30/10/2017
2223 Maintenance of public lighting and low voltage at Mohammed V airport 04/12/2017
2224 Replacement of Kaohsiung Airport 09/27 runway lighting purchase case 31/10/2017
2225 Class I and Class II MB-2 Tow Tractors 13/11/2017
2226 Upgrading the lighting of the aircraft parking at Nador airport 13/11/2017
2227 SPARES FOR TUG MA60 TOW TRACTOR 30/10/2017
2228 16--FUEL CELL,AIRCRAFT, 12/12/2017
2229 Air Terminal and Ground Handling Services at Japan 15/11/2017
2230 Modern dynamic messaging signs (DMS) to replace the current DMS, for airport. 16/11/2017
2231 Towable Passenger Stairs 07/12/2017
2232 Purchase of vehicles for refueling helicopters and propulsion of JET-A1 propellants in a sales contract. 04/12/2017
2233 Aircraft ground power unit 08/11/2017
2234 Replacement of Frequency Converters and Connecting Units of Fixed Ground Power (FGP) System 16/11/2017
2235 P 7 GROUND POWER UNIT FOR AIRCRAFT AND SPARES P 8 AIR START UNITS FOR AIRCRAFT SERVICING PLANT 31/10/2018
2236 Seven beautiful, Wangan airport navigation lights and communications equipment maintenance services case 14/11/2017
2237 GROUND SUPPORT EQUIPMENT 07/11/2017
2238 PURCHASE OF GENERATOR SET AT AIRPORT 07/11/2017
2239 Supply of aviation fuel TS-1 08/11/2017
2240 Purchase of Grounds Maintenance Equipment. 28/11/2017
2241 Ground Support Equipment Procurement 09/11/2017
2242 AHQ/17/FS/NTC/1047 RE I PURCHASE OF GENERATOR 10/11/2017
2243 J--GENERATOR,AIRCRAFT,, IN REPAIR/MODIFICATION OF 04/12/2017
2244 Replacement of the bridges of terminal 1 - construction bridges 8 - extension boarding lounge Terminal 1 - Nice Cote dAzur airport. 04/12/2017
2245 Runway lighting maintenance and training Conveyor belt annual maintenance 03/11/2018
2246 Provision of Aviation Fuel NATO F-35 22/11/2017
2247 Construction runway at Buon Ma Thuot airport phase 13/11/2017
2248 Installation of a Category I Instrument Landing System (ILS) for Runway 2L-20R at John Wayne International Airport in Santa Ana, CA 17/11/2017
2249 SUPPLY AND COMMISSIONING OF THREE MOBILE GENERATORS AT BAHRAIN INTERNATIONAL AIRPORT 15/11/2017
2250 Airfield Lighting Controllers 13/11/2017
2251 Overhaul of DC Generators on USAF TH-1H Helicopter 22/12/2017
2252 Runway End Identifier Light 13/11/2017
2253 Supply and Delivery of Unmanned Aerial Vehicle (UAV) and Unmanned Aerial System (UAS) 29/11/2017
2254 Buy sweeper Surat Thani Airport 16/11/2017
2255 Instrument Landing System (ILS). Qualified Flight Procedures Design Services. The MOD requires the appointment of a Qualified Procedure Design Company to support its portfolio of IFPs across 27 aerodromes in the UK and abroad. 06/12/2017
2256 Replace Aircraft Fueling Facilities including above ground fuel storage tanks, fueling cabinet, site work, and electrical. 09/11/2017
2257 PROVISION OF LIGHTNING ARRESTERS AND GROUNDING SYSTEM (2 SITES) AT LEGAZPI AIRPORT 27/11/2017
2258 Aircraft Fuel Tank 13/12/2017
2259 Provide retrofitting of the existing airfield high mast lighting 29/11/2017
2260 Self-propelled gangway for sun passengers 24/11/2017
2261 Install Taxiway Edge Lights 07/12/2017
2262 Replacement of the UN-Flight Hangar Roof, located within the UNPA, Nicosia, Cyprus 24/11/2017
2263 Portable Jet A-1 avn fuel refueling pump 06/12/2017
2264 COMMERCIAL AVIATION GROUND POWER UNIT 11/12/2017
2265 Construction of the ALA 10 Aircraft Hangar. 11/12/2017
2266 The purpose of this tender is to hire a company to supply and install conveyor belts and conveyor belts, which will be used at Juvenal Loureiro Cardoso Airport 24/11/2017
2267 L17119-T-RC Arrivals Hall Baggage Belts Supply and Install. 11/12/2017
2268 Design, supply, installation, integration, training, testing, commissioning and technical support of instrument landing system (ILS) 30/11/2017
2269 Supply, Installation, Integration, Training, Testing, Commissioning And Technical Support Of Instrument Landing System (ILS) At Abeid Amani Karume International Airport (AAKIA) - Zanzibar 30/11/2017
2270 Taxi Guidance Sign Light PAPI Fire Simple Approach with Duct Bank Buri Ram Airport Buriram Buriram Buriram 1 System 13/11/2017
2271 APRON STANDS AND BRAVO TAXIWAY CONSTRUCTION AT KING SHAKA INTERNATIONAL AIRPORT 12/12/2017
2272 RNZAF Aviation Ground Power Units 01/12/2017
2273 AIRCRAFT GROUND POWER UNIT 21/11/2017
2274 FILTER, FUEL ENGINE FOR F16 AIRCRAFT 30/11/2017
2275 Alongside Aircraft Refueling 27/11/2017
2276 The Works of 400Hz Ground Power Units (GPUs) for Aircraft, Pre-Conditioned Air (PCA) for Aircraft and Passenger Boarding Bridges (PBB) for Taiwan Taoyuan International Airport Terminal 3 Area 15/01/2018
2277 Fuel delivery for Jet A1 aviation turbines at Bucharest - Baneasa, Arad, Oradea, Mihail Kogalniceanu - Constanta, Satu Mare, Baia Mare, Targu Mures, Iasi, Suceava, Craiova, Bucharest - Otopeni, Cluj-Napoca, Timisoara, Bacau airports , Sibiu and Tulcea. 12/12/2017
2278 COMMERCIAL AVIATION GROUND POWER UNIT 18/12/2017
2279 Travel trolleys in air traffic 05/12/2017
2280 Supply and installation of Nador El Aroui airport signage 18/12/2017
2281 Provision of Aviation Fuel NATO F-35 22/11/2017
2282 Request for the supply and delivery of conveyor belting to the ports of Saldanha, Port Elizabeth, East London, Durban Agri Ro/Ro and Richards bay for a period of three (3) years, on an "as and when required" basis 21/11/2017
2283 Purchase of self-propelled electric belt loader 06/12/2017
2284 Sale of Surplus - Tow Behind Runway Sweeper 01/12/2017
2285 Supply and delivery of spare parts for passenger loading bridges (PLB) at Singapore Changi Airport 07/12/2017
2286 SIGNS AND INFORMATION BOARDS DESIGN, SUPPLY, DELIVERY AND INSTALLATIONOF SIGNS AND INFORMATION BOARDS FOR CHANGI AIRPORT 30/11/2017
2287 PDX Baggage Handling System PLC Replacement 04/12/2017
2288 Purchase of an aerodrome tow truck for towing aircraft 30/11/2017
2289 Hangar at Tri Cities Airport 01/12/2017
2290 The services for the manufacture of gangways under the SSB and the PNS of the MS-21 family of aircraft The deadline date shown is predictive deadline. Interested firms should contact tendering authority for exact deadline date. 27/11/2017
2291 Procurement of portable airfield lighting system 22/11/2017
 Procurement News 
  •  This provides for control of surface transportation and better utilization of roads and networks. NextTraffic
  •  The statement quoted Mr Robert Dickerman, the Chief Executive Officer of EEDC, as expressing hope that the use of meters would boost revenue collection and reduce lost of energy.
  •  Speed Identity has supplied 35 biometric data capture stations and 200 fingerprint readers to Moldova as a result of an EU-supervised tender aiming to increase security and quality of the countryís passports.

    According to Speed Identity, as part of the EU programme, countries with high volumes of people entering the EU, receive support in project management, know-how and financing by the EU in establishing reliable, high-security ID documents for travel. Moldovaís new ePassports now include digital, ICAO-compliant facial photos and fingerprints, as well as a number of other document security features to prevent forgery and the creation of false identities.
    Speed Identity says its Speed Identity SCL1000 (Speed Capture Light station), is a proven all integrated solution for instant live capture of facial photos, fingerprints and digital signatures. It has been in use with national authorities in Luxembourg and Sweden since 2008, in both mobile and fix-mount applications. The Speed Capture API has enabled the systems integrator to easily develop a customized enrolment workflow application controlling all features of the capture system, from data acquisition and photographic illumination, to data quality control and file output.
    ďThis is an important project where Speed Identity, being the expert partner, contributes in upgrading a non-EU country to comply with EU and ICAO regulations for travel document security. Normally such projects require a period of fine-tuning the system after implementation, but we have confirmations from the end user that the deployment phase went very smoothly,Ē says Magnus LŲfgren, CEO at Speed Identity.

    Source: http://www.securitydocumentworld.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Regulating body armour wonít stick, said retailers.

    Starting June 15, Albertans who own or want body armour need a legitimate reason under the Body Armour Control Act, or a permit from the Solicitor General and Public Security office.

    Officers will soon be able to charge people wearing bullet or stab-resistant vests, along with seizing the armour if they donít have a permit. And those people can expect to pay a fine up to $10,000, along with serving six months in the clink.

    ďPolice now have another resource in their fight against gangs in our communities,Ē said Jonathan Denis, Albertaís Solicitor General and Minister of Public Safety.

    ďThis initiative doesnít penalize those with a legitimate reason to wear body armour, such as police or security personnel.Ē

    Albertans with professions in policing, security or safety are exempt from the act, while everyone else needs to explain themselves to the solicitor general and public security office.

    A body armour permit costs $50 per year and takes five days to process. Citizens have to pass a criminal background check in order to get a permit.

    Gordon McGowan, president of rearmament distributor MilArm in downtown Edmonton, thinks the act is ďa knee-jerk reaction to a nonexistent problem.Ē

    Body armour vests are just an Internet search away from anyone who wishes to hide their purchase from the government, McGowan said.

    ďIf I have a reason to own body armour and I want it, why is it up to the government to determine if my reason is legitimate or not?Ē McGowan asked.

    Milarms carries around a dozen VestFriend stab-resistant vests and McGowan said they sell only a few each month. Their most common body armour buying customers are nightclub owners looking to equip their bouncers and doormen.

    He has a strict store policy not to sell body armour to civilians, which keeps the gang-bangers from inquiring said McGowan.

    Source: BY MATT DYKSTRA, http://www.edmontonsun.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  AMMAN -- An armoured vehicles manufacturing plant was inaugurated at the Zarqa Free Zone on Tuesday. The JD2 million Jordanian and Russian investment will provide regional countries, particularly the Iraqi market, with bullet resistant cars, generating around JD24 million in production annually, according to plant Executive Director Ahmad Suleiman.

    Built on a 3,200 dunums of land, the factory will employ 100 workers from the local community and exploit 80 per cent of the national resources, said Nasser Shreidah, chairman of the Jordanian Free Zones Corporation. He added that the plant, the first of its kind in the region, will provide the regional market with highly developed bulletproof vehicles according to European standards.

    Source: http://www.zawya.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  New legislation to guard against the use of body armour and fortified vehicles by gang members goes into affect this weekend. People who either have or sell the armour must now have proper licenses or permits. However licensed security guards, and corrections officers are exempt. Anyone driving or owning a vehicle that has been adapted to resist bullets or explosives must also have a special permit. All armoured vehicles must also be inspected. Failure to comply results in fines in the thousands of dollars, and possible incarceration.

    Source: http://www.cjob.com,

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Visiongainís analysis indicates that the global military body armour and personal protective gear market will be worth $1.07bn in 2012. The Military Body Armour & Personal Protective Gear Market 2012-2022 report finds that spending on military protective gear and body armour, despite pressure in the form of defence cuts from many predominant military nations, will remain central to defence budgets worldwide.

    The visiongain author of The Military Body Armour & Personal Protective Gear Market 2012-2022 report commented that: ďSpending by militaries worldwide on body armour will remain a fundamental aspect of defence budgets for years to come, as despite budgetary pressures affecting many Western nations at present, an underlying desire and responsibility to provide the best protection to military personnel will spur demand for new and advanced equipmentĒ.


    The report contains 100 tables, charts and figures that quantify and forecast the military body armour & personal protective gear market. Visiongain provides forecasts for the period 2012-2022 in terms of value (US$) for the military body armour & personal protective gear market 2012-2022, as well as for 3 submarkets and 12 leading national military body armour & personal protective gear markets. The report provides profiles of 20 leading companies operating within the market, and includes 3 interviews with experts in the field military body armour, providing specialist insight alongside visiongain analysis.

    The Military Body Armour & Personal Protective Gear Market 2012-2022 report will be of value to current and future potential investors in the field of body armour, as well as companies and research centres who wish to broaden their knowledge of the military body armour & personal protective gear market.

    For sample pages and further information concerning the visiongain report The Military Body Armour & Personal Protective Gear Market 2012-2022 please visit: www.visiongain.com/Report/794/The-Military-Body-Armour-Pe...

    For an executive summary of this report or to order it today please email:
    Sara Peerun at sara.peerun@visiongainglobal.com
    Tel: +44 (0) 20 7336 6100


    Source: http://www.openpr.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  OSWEGO ó Aging police vehicles are slated for discussion during tonightís Administrative Services Committee meeting, as Oswegoís police chief submitted five requests to bolster the departmentís fleet, which would include the addition of an armored surplus military vehicle.

    Oswego Police Chief Tory DeCaire is asking councilors to approve the purchase of a 2012 Chevy Tahoe and a 2012 Chevy Impala. The vehicles would be purchased at or below New York state contract pricing and the funds would come from the police departmentís existing budget allotment for vehicles and equipment.

    Also up for discussion is the additional purchase of a 2012 Chevy Tahoe as part of the ďOperation StonegardenĒ grant administered through the U.S. Border Patrol. According to the Department of Homeland Security website, Operation Stonegarden accepted competitive proposals for $46.6 million available in 2012. The purpose of the grant money is to enhance ďcooperation and coordination among local, tribal, territorial, state and federal law enforcement agencies in a joint mission to secure U.S. borders along routes of ingress from international borders,Ē including Canada and Mexico as well as international water borders.

    Along with the updated traditional fleet vehicles, DeCaire is also seeking to acquire a used ďup-armoredĒ surplus military vehicle. Administrative Services Committee Chairman Ron Kaplewicz, R-7th Ward, said he looked forward to hearing about this unusual vehicle. ďIím sure the chief will tell us what itís all about,Ē the chairman said.

    DeCaire noted in his request that there is no cost for the surplus military vehicle, as it will remain the property of the U.S. Department of Defense. He noted there would, however, be some cost associated with shipping the vehicle. The committee agenda described the ďup-armoredĒ addition to the fleet as useful to the police department in quality-of-life enforcement and outreach programs, as well as being available for use in the event of an armed emergency situation.

    Rounding out the departmentís vehicle requests, the police chief would also like to accept a used 1998 Ford pickup truck as a result of a civil forfeiture. If the department of public works deems the vehicle safe, police plan to use it during investigative work. If the vehicle is deemed unsafe, it will be turned over to the DPW for disposal at auction or other approved means.

    During last yearís budget negotiations on Aug. 2, DeCaire informed council members that his request of $84,000 for equipment, which included three new police vehicles, had been reduced to $32,000 in the mayorís proposed 2012 budget. That would be enough to buy only one new fully equipped police vehicle. The police chief noted that his department used to have a car replacement policy, with two new vehicles included in the budget each year to replace those in the fleet that had acquired high mileage and other maintenance problems from constant use.

    ďThen we were told, ĎNo cars,í and we got behind the eight ball,Ē he told councilors at the time. ďTo maintain our cycle, we need two vehicles.Ē

    Councilors Mike Myers, R-2nd Ward, and Shawn Walker, R-4th Ward, looked for ways the city budget could accommodate the police departmentís needs. City Chamberlain Deb Coad noted before the finalized budget that there were a few key items that had changed since she and former Mayor Randy Bateman had put the initial proposal together and she re-examined it to see if there was possible funding for an additional vehicle. As a result, additional funds were delegated to the police department, increasing the equipment line to $58,000 in the final adopted budget.

    Even though Crown Victorias would no longer be produced, DeCaire believed at the time that there should be enough of these police vehicles to supply his department through 2012.
    Other committee matters up for discussion will include the request to forward a zone change request at 253 W. Utica St. from an R-2 residential to a B-1 neighborhood business district; a request from the cityís purchasing agent to forward to the Common Council a resolution to accept the lowest bid submitted by WD Malone Trucking & Excavating Inc. in the amount of $1,341,736.00, for the Sanitary Sewer Rehabilitation project, Area 1-Turrill Street Basin; a discussion by the cityís fire chief regarding ďspecial detailsĒ for the cityís ambulance service; and a proposal from the DPW commissioner for a life jacket loaner program.

    Committee meetings are held in the council chambers on the second floor of City Hall and begin at 7 p.m.

    Source: By JANET REBEOR-DEXTER, http://palltimes.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  RR Donnelley isnít a name you see very often in TechCrunch, but companies donít survive for nearly 150 years without having one eye trained on the future. With 2011 revenues at an estimated $10.6 billion, the company is one of the worldís largest commercial printers. The printing giant has been stepping up its digital investments of late, and today announced that it has invested $2.5 million in Real Value Corporation, the makers of iPad shopping app, CoffeeTable.

    The Series A investment is the first tranche of a larger investment by RR Donnelley and includes an exclusive marketing relationship between the two companies. CoffeeTable will be using the infusion of institutional capital to launch new personalization and engagement features and hire developers.

    For those unfamiliar, CoffeeTable is a free shopping app for the iPad that aggregates hundreds of retail catalogs to allow users to browse their products on the go, online or offline. CoffeeTable gives shoppers the ability to make purchases from their iPad through secure in-app checkout, while in turn giving retailers a suite of benchmark data and catalog analytics tools that they can use to boost their multi-channel marketing efforts.

    As RR Donnelley is one of the largest printers of retail catalogs in the world, it can now leverage its existing relationship with retailers to help bring CoffeeTable access to a wide range of content from the companies whose products it aggregates, while, in turn, giving those major retailers an additional point of access into the tablet market.

    CoffeeTableís app allows users to browse full-screen images of products, with zoom functionality, adding products to a shopping cart, both online and offline. Users can subscribe to their favorite brands and have the latest catalogs delivered to their iPad from retailers that include Crate & Barrel, Landsí End, West Elm, etc. Beyond offering quick checkout across all catalogs through its ďExpress Checkout,Ē CoffeeTable also offers giveaways, seasonal pop-up shops, and flash deals which are applied at check out.

    Catalogs are collectively a $270 billion industry, and while individual retailers may offer their own tablet shopping apps, CoffeeTable brings them all together in one place, presumably offering a better shopping experience for the end user. Together, the two companies seem to be looking to establish an Amazon for retail catalogs, and with further development of analytics tools, retailers will be able to get a better sense of the mobile purchasing behavior of consumers ó something many of them are lacking.

    Source: http://techcrunch.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  A new blast defence mechanism could double vehicle protection against mine explosions without additional armour, according to its inventor.

    The active belly plate system developed by Advanced Blast & Ballistic Systems (ABBS) exerts a force against the floor of the vehicle to reduce floor deformation and help stop the vehicle from being thrown into the air.

    The technology, which has been taken to proof-of-concept stage, works by exploiting the short delay between a mine going off and the explosion hitting the underside of the vehicle, using this time to counteract the force of the mine.

    ĎOriginally I was dealing with the global acceleration, which is the vehicle jumping in the air, and that on its own can kill you,í Roger Sloman, managing director of ABBS and inventor of the system, told The Engineer.

    ĎAnd then I thought that if you put the force down a column in the vehicle onto the belly plate, you can keep the floor down as well, which is even more important. So itís a very simple concept of actively opposing the force of the mine.í

    Because it deals with global acceleration, the technology should protect lighter cars as well as armoured vehicles. ĎYou donít carry around huge amounts of mass to counteract the blast,í said Sloman. ĎYou can double the mine blast capability of a system, at least.í

    The system detects the shockwaves of a blast, which travel at the speed of sound and arrive around 20 milliseconds before the mass of the explosion, providing enough time for the belly plate to react.

    ABBS received £116,000 from the Ministry of Defenceís Centre for Defence Enterprise to develop the technology and is now seeking funding to build a commercial prototype of the device.

    Sloman said it could be further developed to provide specific forces to match each explosion. ĎEither you can set everything off or you can analyse the strength of the shockwave and get an estimate of the size of the mine and where it is and therefore you can tune the response.í

    Source: By Stephen Harris, http://www.theengineer.co.uk

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  A liquid body armour is being developed by BAE Systems (a global defence company) that hardens on impact. The liquid is made up of "freely suspended" particles that "lock" together when disturbed. The benefits include its lightness, flexibility and a reduced injury risk compared to alternatives such as Kevlar.

    Self-sculpting smart sand

    Researchers at the Distributed Robotics Laboratory of MIT are developing robotic cubes that will work like smart self-sculpting sand. In one experiment, one-centimetre-squared cubes contained a microprocessor cabable of storing 32 kilobytes with tiny magnets on the edges that could enable the formation of complex 3D shapes.
    Via BBC.

    Make your own robot

    Another MIT initiative may allow people with no specialised training to become robotics engineers thanks to the ubiquitous technology of 3D printing. If a bespoke robot is required, any individual could download a blueprint, tweak it to suit their need and print a rudimentary robot that will be fully functional within 24 hours.

    Source: http://www.nzherald.co.nz

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  MEPs in Strasbourg have questioned the European Commission (EC) about the security of biometric passports following reports of problems with the documents in a number of countries including France and the Netherlands.
    Back in 2008, the European Parliament (EP) identified weak points in the system including problems with the reliability of fingerprints taken from children and the elderly; error rates; lack of experience of the technologies being used; and the risk of fraud at various stages of document deployment. As a result, the EP asked the EC to commission studies into these areas, which are expected to conclude later this year.
    According to the EP, between 500,000 and 1 million of Franceís 6.5 million biometric passports in circulation are estimated to be false, having been obtained using counterfeit documents.
    In the Netherlands, an examination of 448 cases by local the authorities in Roermund found that 21% of the fingerprints were non-verifiable and therefore useless.
    As a result, MEPs invited EC representatives to a plenary session on 19 April 2012 to respond to their questions about the effectiveness of biometric passports. They have also asked if it will now consider re-evaluating the rules governing the issue of ePassports in the EU.

    Source: http://www.securitydocumentworld.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The U.S. Government Printing Office (GPO) has produced 75 million electronic passports at its secure production facilities in Washington, D.C. and Stennis Space Center in Mississippi.

    The electronic, or e-passport program, launched in 2005 and includes an integrated, secure chip and antenna incorporating numerous security features. GPO and the Department of State developed the U.S. e-passport in response to the requirements for Visa Waiver Program countries in the 2002 Enhanced Border Security and Visa Entry Reform Act.

    The Department of State loads personal information, including the travelerís photograph, digitally onto the chip in each passport. This is the same data that is visually displayed on the photo page of the e-Passport. No personal data is handled by GPO or its suppliers.

    ďWe appreciate GPOís continued support of the Department and our efforts to modernize the U.S. passport. Passport issuance, a function of the Departmentís Bureau of Consular Affairs, is our most visible domestic public service program,Ē said Michael D. Kirby, principal deputy assistant Secretary of State for Consular Affairs.

    Source: http://www.contactlessnews.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Chinaís Ministry of Public Security announced that after three years of preparations, the authorities countrywide will start issuing electronic ordinary passports from May 15 onwards.
    Photos

    View photos
    Related Articles

    China to pilot emissions trading system
    China standardises social security cards
    Sri Lanka to launch e-passport services

    Related Categories

    CENTRAL GOVERNMENT
    GOVERNMENT SECURITY

    From this Section

    NEWS

    The e-passport will contain an electronic chip, which stores personal information of the holder, including name, data of birth, photo, fingerprint and signature.

    The Ministry says that the e-passports are compliant with standards released by ICAO (International Civil Aviation Organisation), ensuring security and privacy of the personal information of holders.

    The application process will largely remain the same, with two additional steps to collect the applicantís fingerprint information and signature. Citizens who are under 16 years old or whose fingerprints are missing are exempted from the fingerprint collection process, according the Ministry.

    The new e-passports will have a refined design, with images representing the 31 provincial level jurisdictions, Hong Kong & Macau Special Administrative Regions, as well as Tiananmen, the Great Wall and the Temple of Heaven.

    The Ministry says that more than 10 million passports were issued countrywide last year. And this figure is expected to rise by 20 per cent this year.

    Since 2004, more than 90 countries and territories have started issuing e-passports. And China started issuing electronic official & diplomatic passports last year.

    Source: FutureGov- Asia
  •  MONEY printer De La Rue has cashed in on strong demand for banknotes and passports but stayed quiet over talk it was stockpiling new Greek drachmas.
    The group, which produces more than 150 national currencies, stamps, driving licences and cash sorting equipment, printed 6.4 billion banknotes last year, 8 per cent more than the previous year.
    The start of production on a UK Government deal to produce passports also contributed to a 73 per cent rise in annual profits to £57.7million on revenues up 14 per cent to £528million.
    The firm has won contracts from countries such as South Sudan, which introduced a new currency following independence.
    But it stayed tight-lipped on talk that it had drawn up draft plans to print a new Greek currency should Athens quit the euro.
    De La Rue said last year that the eurozoneís problems could create opportunities.
    Chief ≠executive Tim Cobbold said: ďItís always our policy not to comment on matters like that.Ē
    The group, the profits of which in 2011 tumbled after paper production issues with major ≠customer the Reserve Bank of India, has begun a shake-up to boost ≠profits to more than £100million next year.
    It said it made good progress, achieving efficiency improvements that contributed about £8million to operating profit.
    A new banknote sorter, which can handle up to 2,000 notes a minute, drove a 14 per cent rise in revenue in the cash processing gear arm.
    But lower customer demand led to falling profits and flat revenues at its security product division, which makes holograms for sports tickets and other valuable printed items.
    De La Rue said orders rose 14 per cent to £248million and it was on track to hit annual hopes. Cobbold said: ďThe face value of cash in ≠circulation is growing, particularly in countries where populations and affluence are rising.Ē
    The shares fell 32Ĺp to 976Ĺp.

    Source: By Philip Waller, http://www.express.co.uk

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Indiaís electronic passport project has hit a roadblock as the Amsterdam-based company Gelmalto, selected for supplying chips came under scanner for its alleged role in smart card rollout in Pakistan.

    The Ministry of External Affairs has sought a fresh security clearance from the Ministry of Home Affairs for Gemalto, which was selected to supply chips for the pilot project in 2008. The MNC was reported to be impementing smart card project in Pakistan.

    The Ministry of Home Affairs asked the Department of Economic Affairs under the Ministry of Finance to obtain a self-disclosure report from Gemalto, detailing its businesses in Pakistan. It is also understood to have engaged intelligence agencies to assess if Gemaltoís business in Pakistan could pose a security threat to India in case it is allowed to continue supplying chips for the project.

    Gemalto, however, claimed that the company had never participated in any government project in Pakistan. ďWe have never had any government projects with Pakistan,Ē a spokesperson of the company stated in response to queries from Deccan Herald.
    The Gemalto spokesperson said the company did serve governments of over 50 countries with its secure document and e-government solutions.

    Gemalto was known as Axalto before the latter merged with Gemplus on June 2, 2006. Axalto, however, had in August 2005 announced to have supplied high-end EMV (Europay-Mastercard-Visa) chip to Pakistanís United Bank Limited.

    As the UBL had pioneered EMV rollout in Pakistan, Axalto had provided the bank with a package that included data preparation, cards supply and personalisation solution.

    Gemalto was in September 2008 selected to supply its ďSealys eTravelĒ solution to India Security Press for the e-passport pilot project, aimed at issuing tamper-proof and secure travel documents to diplomats and officials. The Sealys eTravel package included contact-less communications component of the electronic passports made by the India Security Press. It also included advanced secure operating system and microprocessor that stores and protects the holderís digital identity as well as the communications antenna.

    The MEA had plans to start issuing e-passports to ordinary citizens in the second phase. But it recently said that the project had to be deferred as it had to seek ďfresh security clearance from the MHA in respect of a technically qualified bidder (Gemalto)Ē.

    Gemalto did not give a specific reply to a query from Deccan Herald on whether the company had submitted the self-disclosure report to the Indian Government. However, in a consolidated response to a set of queries, its spokesperson said the company maintained the policy of customer confidentiality and did not comment on the details of its customersí operations and processes.

    Notably, in a recent report, the Parliamentary Standing Committee on External Affairs had expressed ďconcern over the doubtful backgroundĒ of Gemalto.

    Source: http://www.deccanherald.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  With big government contracts up for grabs, we take a look at six of the vehicles vying for military money.
    In service since 1984, the Humvee isnít getting any younger. Right now the United States military is in possession of nearly 18,500 of them, all of which are set to be replaced by an as-of-yet-to-be-determined successor in 2015. Enter the suppliers and contractors who are all vying for a piece of the government pie. And who can blame them? With $5 billion being awarded across three winning companies Ė each liable to receive up to $65 million for preproduction engineering, manufacturing, and development Ė the race to supply the military with its next Joint Light Tactical Vehicle is underway.
    Of course, whenever government contract money is at stake rest assured there are multiple players in line gunning for it. And with the United States government preparing to dish out billions in contract cash in order to replace the iconic military Humvee, competition is fierce.
    Last month, AM General, makers of the original Humvee, unveiled its Blast-Resistant Vehicle-Off Road (BRV-O) in Detroit, but they arenít the only ones aiming to win those government greenbacks. Stiff opposition from Oshkosh Defense, Lockheed Martin, and BAE Systems, among others, all of which are vying for one of three contracts on the line.
    Given that these hardcore military machines are truly a sight to behold, here is a quick rundown of the six vehicles battling it out.

    BRV-O:
    Makers of the original Humvee, AM Generalís BRV-O is somewhat of a latecomer to the party. Shown for the first time last month in Detroit, the BRV-O features a six-cylinder, 3.2-liter turbocharged engine which is said to churn out 300 horsepower and 500 pound-feet of torque.
    Inside, the BRV-O Ďs crew capsule features energy-absorbing seats, shaped underbody, and modular armor for maximum protection. Of course, added armor can quickly pack on the pounds, reducing overall vehicular mobility. AM General seems to have addressed these issues thanks in large part to an increased payload that provides a margin for added armor, as well as a unique self-leveling suspension aimed at increasing the BRV-Oís tactical maneuverability.

    Eagle:
    A joint effort between General Dynamics Land Systems and AM General, The Eagle may not appear as shiny and bleeding edge as some of its counterparts, but that may just provide it with the advantage it needs to allow the Eagle to soar over the competition. In fact, military buffs will no doubt already be familiar with the Eagle, seeing as how itís a repurposed version of the Eagle IV, which General Dynamics European Land systems has supplied to the German military since 2008.
    The Eagle isnít as new, but it is tried and tested; and, perhaps more importantly, itís relatively cheap at less than $260,000 a pop.

    Lockheed JLTV:
    With utility in mind, the JLVT ó a collaborative endeavor consisting of multiple companies including Meritor Defense, L-3 Combat Propulsion Systems, Vehma International of America, with Lockheed Martin at the helm ó has been designed from the ground up to be one of more versatile and cost effective entries into the U.S. Army and Marine Corps JLTV competition.
    Already a winning bidder for the first phase of JLTV development, Lockheed was forced into making several modifications to its design by reducing the amount of exotic (read: expensive) materials such as titanium after the Pentagonís requirements changed for the second phase of the competition.

    Saratoga:
    Launched in October of 2011, Navistar Defenseís Saratoga is yet another entry into the U.S. militaryís Joint Light Tactical Vehicle program. Originally designed to target a gap in the light tactical vehicle market, the Saratoga provides a tactical salvo of components aimed at improved mission effectiveness, including metallic or composite add-on armor, and is capable of withstanding arms fire, mine blasts, and IEDs.
    Under the armored hood the Saratoga features a fire-breathing V8 capable of pumping out 340 horsepower and 660 pound-feet of torque.

    Valanx:
    Aside from sporting the coolest name of the bunch, BAE Systemsí Valanx also happens to feature a Ford Power Stroke 6.7-liter turbocharged diesel engine, which BAE indicates gives it a leg up against the competition by providing the best fuel economy, horsepower, and torque of any engine in its class.
    Truck enthusiasts out there will immediately be familiar with the Power Stroke. Itís the same engine Ford uses in its F-Series Super Duty trucks. Previously, the Valanx utilized a Navistar engine in favor of its current mill, but made the switch to the more powerful Ford engine, which is capable of producing an impressive 400 horsepower and 800 pound-feet of torque.
    Other specifics regarding the powertrain remain undisclosed, so weíre not entirely sure whether the engine specs in the Valanx will exactly match up with that of a 2012 F-250 Super Duty.

    L-ATV:
    While the Valanx may score points with its tough-as-nails name and rather futuristic mobile-command-on-wheels design, it is the Oshkosh Defenseís L-ATV that wins us over with its rugged looks and take-no-prisoners attitude.
    Built independently and from the ground up, the Light Combat Tactical All-Terrain Vehicle will make use of Oshkoshís Tak-4i intelligent suspension system already used in more than 20,000 vehicles. And because fuel economy is a growing concern, Oshkosh offers its ProPulse hybrid diesel-electric drive train.
    According to Oshkosh, the L-ATV features a scalable and advanced crew protection system which can provide dynamic defense capabilities depending on operational and battlefield needs.

    Source: BY AMIR ILIAIFAR, http://www.digitaltrends.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  OGDEN ó After being questioned about their use of new license plate recognition technology, the Ogden Police Department put the equipment on display.

    The OPD gave a demonstration to local media Wednesday on how and why they use Automated License Plate Recognition, a new technology that provides continuous and high-speed monitoring of traffic areas.

    Ogden has one ALPR-fitted vehicle, which costs about $50,000 and features four cameras mounted on top of the police car, with a special computer inside. The department has had the vehicle for about one year.

    OPD crime analyst Dave Weloth said the technology can be used in data-mining efforts related to crime scene investigation, criminal travel patterns, hot spots and for other intelligence purposes.

    Weloth said that, among other things, the system can immediately alert officers of wanted individuals, assist in stolen vehicle recovery and assist in Amber alerts.

    Master Officer Tim Shelstead said he has found three stolen vehicles in the past year as a result of having the technology.

    ďMy job would be greatly hindered without it,Ē Shelstead said.

    But the Utah Chapter of the American Civil Liberties Union said it is concerned with how information associated with the technology is used, stored and protected.

    In late May, the OPD was one of three Utah law enforcement agencies targeted by the Utah ACLU with records requests seeking information about the technology.

    The ACLU also sent requests to the Utah Highway Patrol and the Iron County Sheriffís Office.

    A copy of the records request to the OPD shows that the ACLU is seeking information on exactly what type of data is obtained with the technology, who within the OPD can access that data, what procedures those outside of the department must go through to obtain the data and how long data is stored.

    Ogden Police Chief Mike Ashment said he understands the ACLUís concern about the possible misuse of citizen information, but proper safeguards are in place to make sure that doesnít happen.

    ďWe implement the same policies we do with everything else,Ē he said. ďThis is no different than any other tool we use that involves information on people or their vehicle.Ē

    Ashment said the technology fits in with the departmentís overall approach of using technology to be more effective and efficient in solving crimes.

    ďWe are tasked with ensuring the safety of the community,Ē he said. ďThis is another tool to help us do our jobs better and more efficiently.Ē

    Source: By Mitch Shaw, http://www.standard.net

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Iowa City parking officers may soon hear an alarm if they pass vehicles parked illegally or harboring unpaid tickets using an expensive technology thatís the envy of many law enforcement officials.

    The cityís Transportation Services Department is looking for vendors and has set aside $154,000 in its budget for a License Plate Recognition system, which works by mounting a high-definition camera on top of a vehicle that takes photos of license plates and runs them through a scofflaw database. Such software still is rare in Iowa but is picking up steam as it becomes more affordable and accessible.

    The idea is to make parking enforcement more efficient, said Mark Rummel, associate director of Transportation Services. Rather than checking each vehicle in a parking lot or row of meters individually, the software would automatically scan nearby vehicles and sound an alarm if it detects a violation.

    I think just the time itís going to save us is going to be huge,Ē he said. ďItís a pretty vast area that we try and cover.Ē

    Police departments in Iowa, including Des Moines and Cedar Rapids, have looked into such software, but most say itís too expensive.

    ďWe couldnít afford it right now,Ē said Sgt. Cristy Hamblin, spokeswoman for the Cedar Rapids Police Department.

    Officials with the Iowa City Police Department didnít return calls for comment, but Assistant to the City Manager Geoff Fruin said LPR technology hasnít been discussed for the ICPD.

    Johnson County Sheriff Lonny Pulkrabek said LPR would be ideal for recovering stolen vehicles or catching barred drivers, but it ultimately is too expensive to be worth it.

    ďAs youíre going through downtown Lone Tree, to be running every license plate you go by, I could see where that could be useful,Ē he said.

    Private vendors must submit their proposals to the city by July 12, and the City Council will need to approve the contract. Rummel said he hopes to have the software up and running by late fall at the earliest. It would be installed in one of the departmentís Ford Connects but could be put in more in the future, he said.

    The Transportation Services Department only has access to parking violations, permits and meter records, Rummel said, so the software wouldnít be able to tell whether a vehicle is stolen or whether thereís a warrant for the ownerís arrest, at least not without access to those databases. It would detect whether vehicles have more than $50 in citations that are more than 10 days old, he said.

    University of Iowa Parking and Transportation Director Dave Ricketts said that depending on the cost, his department would be interested in using the software as well.

    ďWeíve got 16,000 parking spaces,Ē he said. ďYes, it would help.Ē

    LPR technology has become much more reliable and less expensive over the past 10 years, Ricketts said.

    ďLPR is definitely going to be in our future,Ē he said. ďHow we use it is unclear yet, whether itís enforcement, cashiering or security, but weíre headed that way.Ē

    The Polk County Sheriffís Department installed an LPR system in one of its patrol cars last summer that can check for things such as arrest warrants, stolen vehicles and missing persons, Sgt. Jana Rooker said. The department received a nearly $26,000 Department of Justice grant to pay for the software.

    Rather than having the officer type license plate numbers into their computers while driving, the software automatically scans plates and sounds an alarm if it detects a warrant or violation, she said.

    ďSo as the officer is driving down the road, almost every vehicle it encounters on the road, that license plate can be checked within a matter of seconds with this software,Ē Rooker said.

    But not everyone is excited at the sound of that.

    Ben Stone, executive director of the American Civil Liberties Union of Iowa, said heís concerned about the governmentís ability to store the data it collects through LPR software. Steps must be taken now while LPR use is in its early stages to ensure data thatís collected is destroyed, Stone said.

    ďAs databases become interconnected and synced, more and more and more of this kind of surveillance technology can create the ability of the government to instantly create a dossier, a profile of what people are doing,Ē he said.

    Source: By Tara Bannow, http://www.press-citizen.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Infineon Technologies announced it is supplying the security chips for Malaysiaís new national electronic identity cards. Known as MyKad, the smart card features Infineonís SLE 78 security controller with Integrity Guard security technology, combined with SOLID FLASH for fast deployment capability. ??

    MyKad is a multi-application national electronic identity card, including biometric identification, which will enable the implementation of additional functions such as driver license, health, ATM, e-signature and eGovernment services. In the past years, Malaysia issued approximately 2 million new identity cards each year.

    Identity cards are used for many years and are subject to intense wear. This is why they must meet specific high requirements. In particular, the bearerís personal data should be secured during the entire life of the card. ??

    ?The Infineon SOLID FLASH product provides flexibility by using non-volatile memory technologies. The security certified flash product enables a faster reaction to market changes through short lead times and flexible product usage and offers advantages in logistics, development and throughout the certification process.

    A full range of SOLID FLASH products are Common Criteria certified by the Federal Office for Security in Information Technology in Germany as well as type approved by EMVCo making it the choice for many applications while keeping flexibility for upcoming changes. ??

    MyKad also uses Infineonís Integrity Guard security technology. For identification documents with high demands on security, it offers long lasting security with encrypted Dual CPU-core. With this technology, data is encrypted along the entire data path during processing. The security controller core has two processing units, constantly checking each otherís correct function by utilizing error detection.

    Infineonís SLE 78 product family with Integrity Guard is used in eGovernment applications, such as the electronic health card, the electronic identification card and in residence permits with biometric data

    Source: http://www.secureidnews.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  May sound strange nevertheless true. The armoured car business is booming in the drug-hit Mexico, which, after Sunday election, voted back to power the Institutional Revolutionary Party after 12 years. This party had the unique history of ruling Mexico for over 70 long years between 1929 and 2000.

    The purchase of armoured car has been necessitated by the fact that the country has lost 55,000 people in the last six years in drug-related violence.

    To keep themselves safe (from various drug cartels) while travelling many people are opting to buy armoured cars. They consider their vehicles as safe havens.

    Media reports from Mexico suggests that the sale of armoured cars in the last four years have increased by 1000 per cent.

    A middle-size SUV outfitted with armour is bullet-resistant and can withstand 15 to 20 rounds of bullets fired from a handgun. They are also called ďfamily tanksĒ and became a top issue in the recently held election.

    Enrique Pena Nieto, who finally won the presidential election, had said during the campaign that he wants to focus on curbing violence in the streets and less on catching drug cartel leaders and blocking the flow of drugs into the United States. The US wants most of the Latin American countries, where the drug mafia rules the roost, to intensify their battle against the drug mafia.

    Countries like Peru in South America, which saw decline in the drug cartel, has witnessed their re-emergence recently.

    President-elect 45-year old Enrique Pena Nieto had promised to reinvigorate the economy and reduce rampant drug violence. He will take office in December for a six-year term and thus will restore the party that dominated Mexican politics for most of the past century, at times ruthlessly.

    But against he general prediction of a big victory he ended up only 5.4 percentage points ahead of his leftist rival, Andres Manuel Lopez Obrador.

    Pena Nieto got 37.6 percent support compared to 32.2 percent for Lopez Obrador and 25.4 percent for ruling party candidate Josefina Vazquez Mota.

    The ruling National Action Party (PAN) suffered a crushing defeat as it failed to curb the fierce violence of a drug war that has killed 55,000 people and battered Mexicoís image.

    Having run Mexico as a virtual one-party state for most of the 20th century, the PRI was ousted in an election 12 years ago. It finished third place in the 2006 presidential election.

    But Pena Nieto, a former governor of the state of Mexico (2005-11), restored the partyís pride.

    Not only has he promised to lift economic growth to about six percent a year and create jobs but also draw the heat out of a drug war that has killed more than 55,000 people since late 2006. His main reform proposals include allowing more private investment in Mexicoís state-run oil industry.

    Source: http://nvonews.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Xtek has announced that it has completed construction of its first large scale XTclave body armour production plant.

    According to the company the new plant is capable of manufacturing more than 1000 high tech body armour plates per day, and will enable the Australian company to supply defence and law enforcement agencies around the world.

    The company has spent the last five years working towards construction of its commercial scale manufacturing plant, after building its initial small prototype plant in 2008.

    XTek says "the ability of this technology to consistently produce advanced technical composites, such as precision, void free, structural carbon fibre reinforced laminates, capable of withstanding extreme thermal loading is significant.

    "It is believed that this could have considerable utility in areas such as aerospace and aviation industries, in which small numbers of high value products are routinely manufactured according to exacting standards."

    Source: http://www.myfen.com.au

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  BANGALORE: From July, including the first Sunday, the regional passport office (RPO), in Bangalore will accept passport application manually at its office in Koramangala.

    "Beginning with the Passport Mela scheduled on June 30 and July 1, the applicants for passport can directly approach the counters at RPO and the passports issued at RPO will have all security precautions, though the applications are accepted manually," said a spokesperson of Ministry of External Affairs ( MEA).

    Biometrics: The ministry will commence incorporating the biometrics as required in countries abroad from 2013. "The passports with biometrics will be introduced from next year and the ministry is trying to install required technical back up by then. For the present the passports will not have bio-metrics as per international standards," the spokesperson said.

    The ministry also held discussions with the employees representatives of RPOs across the country and has reached for an understanding to re-schedule of working hours in view of seven day working day for RPOs to overcome the large quantity of pending applications before the various RPOs.

    "We have convinced the employees of RPOs about the fatigue factor they had to face because of the long working hours, that include the week-end holidays. Once we stabilize the pending numbers of passport applications through the exercise we will revert back to five-days a week schedule. We hope that the pending applications can be cleared by July 7 and July 8, the last two days for Passport Mela," the he said.

    Source: http://articles.timesofindia.indiatimes.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  HID Global says it has shipped more than 150 million high-technology eID solutions to governments for citizen IDs around the world.
    The firm has marked this milestone at a ceremony in Ireland, where it has a high-security eID credential facility producing products for access and identification-related applications such as ePassports and contactless swipe ID/access cards.
    ďWe are proud to be a key provider of secure contactless technology to governments for eIDs worldwide,Ē says Anthony Ball, senior vice president, Identity and Access Management (IAM), HID Global. ďMore than 150 million people worldwide, almost a third of all citizens using high-security ePassports and identity credentials, carry our technology with them. We are exporting technology and know-how to every continent, and our local workforce and the entire community can be very proud of this milestone, as well as our contribution to a critical aspect of the worldís security.Ē
    HID Global says it has shipped more than 100 million components used in ePassports in 30 countries, which comprises approximately 28% of the worldís market. According to the International Civil Aviation Organization (ICAO), as of December 2011, a total of 355 million ePassports had been issued globally. The vast majority of EU countries, as well as numerous states outside of Europe, are now issuing machine-readable ePassports. The company has also shipped more than 50 million microchip-based inlays used in eIDs in 22 countries. Other notable achievements include providing tens of millions of units for a variety of European ePassports.
    Set up 15 years ago, the Ireland facility was acquired in 2007 by HID Global. According to the company, it has expanded the operation and made it into one of the countryís most advanced secure technology facilities to accommodate the growing global trend toward eIDs and ePassports. Now one of Connemara Gaeltachtís largest employers, the operation is dedicated to eGovernment product research, development and manufacturing, and includes a world competence centre for HID Globalís high technology RFID-enabled components.
    ďHID Global is at the centre of an important global trend,Ē says Craig Sandness, vice president of sales at the firmís Government ID Solutions division. ďGovernments worldwide are shifting to eIDs to dramatically improve the security, privacy, convenience and confident authentication needed in border and access control, and other important identification-related applications such as national IDs, driving licences, electronic voting and health care. As a leading high-security ePassport and eID component producer, we are able to provide the complete assembly of these critical components from one source.Ē

    Source: http://www.securitydocumentworld.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The International Armoring Corporation (IAC) was founded by Mark Burton in Ogden, Utah, in 1993. He initially planned to manufacture 24 vehicles, but ended up with more than 225 in the first year in business. Since then more than 8,000 vehicles have rolled out of the IAC facilities. Although at the beginning the company provided heavy-duty armored vehicles only for security companies and military contractors, the emergence of the civilian armored-vehicle market made IAC focus on conventional vehicles too.
    IAC offers a lightweight, flexible, bullet-resistant material, which is a blend of synthetic fiber laminates called Armormax, which weighs only 3.9 pounds per square foot. For $65,000 to $85,000 IAC can transform any car into an armor-plated automotive fantasy. The most popular choices are large luxury sedans and suburban-type SUVs, but IAC has also transformed smaller cars such as Toyota Camrys, Maybachs and Aston Martins.
    Burton estimates that around 20% of his customers seek protected transportation to mitigate a known threat or have been targeted for attack in the past, and around 50% just seek an insurance against random acts of violence, such as carjackings.

    Source: http://www.inautonews.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  William Whyte once boasted in an interview with a Toronto newspaper that his armour-plated vehicles were ďpretty awesome machinesĒ and that his customers included a good friend of Arnold Schwarzenegger.

    But when the Canadian man entered into a multi-million-dollar contract to supply the U.S. Defense Department with 32 armoured gun trucks to protect VIPs in Iraq, he only delivered seven ó and none of them met the bullet- and blast-protecting requirements, according to a federal grand jury indictment handed down this week in Virginia.

    Federal prosecutors announced late Thursday that Whyte, 67, president of Ontario-based Armet Armored Vehicles, and his company have been charged with three counts of major fraud against the United States, seven counts of wire fraud and three counts of false, fictitious and fraudulent claims.

    The charges have not been proven in court and in a statement emailed to Postmedia News, Whyte, who is not in custody, said he was ďshocked at the allegations against me, which I totally deny.Ē He also said he was prepared to meet with U.S. prosecutors.

    John Lichtenstein, Whyteís lawyer in Roanoke, Va., said Friday there was nothing he could say about the case.

    Armet, based in King City, Ont., has been armouring vehicles for more than 30 years and has manufacturing sites in Bradford, Ont., Danville, Va., and Tangiers, Morocco, according to a detailed company profile on Industry Canadaís website, which was updated in late 2011.

    The company has an ďimpeccable worldwide standingĒ and counts as its clients heads of state, diplomats, government agencies, multinational corporations, police forces and ďdiscriminating individuals worldwide,Ē the profile states. Its government clients include departments in Canada, the U.S., United Arab Emirates, Europe and Russia.

    Officials with Public Works and Government Services Canada said Friday they were searching to see what, if any, contracts the government may have had with Armet.

    According to the indictment, the U.S. Joint Contracting Command in Baghdad awarded Armet a $4.7 million contract in April 2006 for 24 armoured gun trucks.

    A few months later, a $1.5 million contract was awarded to Armet to build eight more trucks.

    The vehicles were to be used to transport Iraqi VIPs through ďhostile and dangerousĒ environments.

    According to the indictment, the first 24 vehicles were to be delivered by July 31, 2006, but Armet failed to meet the deadline.

    By October 2006, only four trucks had been delivered.

    The following month, Armet, citing cash-flow problems, sought an advance payment of $1 million, the indictment says. The U.S. military agreed to pay the company $824,531.

    But instead of using that money to build more trucks, the money was diverted for ďother business and personal expenditures,Ē the indictment alleges.

    By early 2008, the company had delivered a total of seven vehicles, six of which were accepted by the U.S. military.

    There were other problems.

    The contracts required that the vehicles be bulletproof and that their undercarriages be able to withstand explosions. Armet had promised that the floors of the vehicles could withstand various assaults, including blasts from two U.S. M67 anti-personnel grenades.

    But none of the trucks delivered met the required specifications, according to the indictment.

    The vehicles were also supposed to be equipped with special tires that could withstand punctures. The first five vehicles did not have such tires.

    ď(The defendants) knew that all of the armoured gun trucks they had provided were defective and would not protect the officials that they were intended to protect,Ē the indictment states.

    The U.S. military ended its contracts with Armet in March 2008.

    On Friday, Armetís website, www.aavi.com, redirected visitors to the website of another company, Terradyne Armored Vehicles, based in Newmarket, Ont.

    In an emailed statement, Terradyne president Durward Smith said: ďI can tell you that we have no affiliation with Armet nor its owner. A vehicle design was purchased from them with a temporary redirect of the website to capture any potential business as our understanding is that Armet is no longer making armoured vehicles.Ē

    Whyte, an ex-York Regional Police officer, has a connection to an infamous heist at an armoured car company 20 years ago.

    In November 1992, armed and masked robbers targeted National Armored Ltd. in Concord, Ont., and made off with more than $8 million in cash and cheques from a vault.

    Whyte managed the armoured carrier company at the time.

    Source: By Douglas Quan, http://o.canada.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  JD Leipold of U.S. Army public affairs has this article on female body armour:

    Today, both male and female Soldiers wear body armor that has been designed for men. But the Army plans to field to women next summer a new type of body armor, designed for them, that will be shorter in the torso with more customized adjustments specific to the female form.

    Until that happens, the 14 percent of the Army who are women will continue to wear one of the 11 sizes of the Improved Outer Tactical Vest, or IOTV, that are worn by their male counterparts.

    Following anthropomorphic sizing and fitting studies overseas, and also at Fort Bragg, N.C., West Point, N.Y., and Fort Campbell, Ky., between 2009 and 2011, Program Executive Office, or PEO, Soldier started developing female body armor prototypes that addressed the physical differences between the sexes.

    Lt. Col. Frank J. Lozano, the product manager for Soldier Protective Equipment, said one thing his shop realized quickly from the studies was that women generally have narrower shoulders than males. The shoulder area on the new IOTV design was brought in closer to the neck by adding more fabric and opening the area around the armpits.

    The change translates to increased range of motion in the shoulders and upper arms and also allows weapons to be seated in the shoulder weld. The extra material and adjustment straps also allows darting to be incorporated much as it is on a womanís blouse which will give a more secure and customized fit.

    ďMost females tend to have a narrow or thinner waist as it relates to the chest area, so we pulled the waist area in,Ē Lozano said, adding that itís not always a one-to-one relationship. ďSome women will want more room in the waist area so we allowed for adjustability in the cummerbund in the back which can be pulled in tighter or let out more than on the standard IOTV.Ē

    PEO Soldier also realized through its multiple studies that the typical torso length for women was for the most part shorter than that of men. The female IOTV will be shorter at the bottom. Lozano said the new design will keep the IOTV from rubbing on the hips, which can cause chafing while walking.

    Female Soldiers had also advised PEO Soldier that the standard IOTV, with its longer torso, causes the front armor plate to press into their thighs when they are seated. This cuts off blood flow to their legs. The female version of the IOTV, with its shortened torso, will address this issue. Additionally, a new exterior plate pocket will allow the armor plate to be inserted from the side in a more diagonal fashion.

    Though not part of the female version of the IOTV design, the Army is also looking for ways to develop armor plating that better conforms to the human body.

    ďThe challenge right now is that when you bring in those complex curvatures, the plate loses some of its strength,Ē Lozano said. ďWeíre working with some armor manufacturers to invest in a manufacturing capability that finds the right chemistry to develop the soft and hard armor necessary to have a complex curved plate at a light weight that still defeats the threats.Ē

    Developments in protective plate design will make ballistic protection more comfortable and form-fitting for both female and male Soldiers, but thatís a way off.

    Lozano said in the September-October timeframe PEO Soldier will begin fielding 100 prototypes to female engagement teams from the 101st Airborne Division to evaluate.

    ďThere are 30 females who weíll provide with spares and repair parts,Ē he said. ďWeíll hold some in reserve in case other females get added to the teams. Theyíll do user evaluations, then provide feedback to us that weíll wrap into the final iteration of the design and look to field to a brigade combat team by next summer.Ē

    Source: http://blogs.ottawacitizen.com
  •  KATHMANDU: The government is planning to introduce the smart card concept in the transport sector after a gap of two years. The Department of Transport Management has decided to introduce smart cards for driving licences and bill books from the current fiscal year.

    The department will call a global tender for the smart card soon, said director general of the department Chandraman Shrestha. ďWe have regenerated the concept following a directive from the Ministry of Physical Planning, Works and Transport Management,Ē he said. The ministry has decided to introduce smart cards in mid-July to reform the transport sector.

    Earlier, in 2010, minister for labour and transport management Mohamed Aftab Alam had tried to introduce smart cards for licences and bill books. However, the process was halted after the Commission for the Investigation of Abuse of Authority suspected irregularities in the process.

    Minister Aftab had formed a committee in the ministry to carry out the bidding process breaching the area of the department. According to law, the department should have started the bidding process. The commission found discrepancies in the process.

    According to Shrestha, the tender process will start in three months and implementation of the smart cards will begin at the end of the current fiscal year. ďWe are serious about implementing it,Ē he said, adding that smart cards can be effective in controlling the use of fake driving licences and bill books.

    The Asian Development Bank is providing financial support for the initiative.

    Similarly, the department is also planning to introduce embossed number plates for vehicles. The introduction of embossed number plates will help control criminal activities. ďEmbossed number plates canít be changed easily, so it will reduce the use of vehicles in crimes,Ē he said.

    Former director general of the department Saradchandra Paudel had envisioned the concept three years back. ďWe have been conducting a feasibility study,Ē he said, adding it will be implemented this year once the study shows a positive result. Tender will be called soon, he added.

    Nearly 1.4 million vehicles are registered in the country including more than 850,000 motorcycles. The policy will affect vehicles plying across the country. The department is planning to implement the smart card from Bagmati zone where about 50 per cent vehicles are registered.

    Meanwhile, the department has completed building digital record of driving licences and bill books in all its 14 zonal offices. The process was started about a decade back. Similarly, the department has introduced e-billing system for collecting transport revenue ó licence or vehicle registration and for renewing them.

    Source: http://www.thehimalayantimes.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  ALEXANDRIA, VA.óProsecutors indicted a South Korean company and five of its employees on Thursday for stealing the recipe for making Kevlar body armour from the DuPont Co.

    The indictment in U.S. District Court in Alexandria alleges that Kolon Industries engaged in a seven-year conspiracy to steal secrets on the manufacturing process for Kevlar and a similar product called Twaron produced by a large Japanese chemical company, Teijin Limited.

    Kolon would hire current and former DuPont employees as ďconsultantsĒ who would provide confidential information about Kevlar, including its polymerization process and details of the manufacturing process, according to the indictment. Kevlar is made at a factory in Richmond.

    Kolon used those secrets to improve its process for making Heracron, a product that competes with Kevlar, according to the indictment.

    Several longtime DuPont employees are identified as unindicted co-conspirators in the indictment who received payments of up to $143,000 (U.S.) to engage in the scheme, according to court records. One of the former employees, Michael Mitchell, has already been sentenced to 18 months in prison for his role in the scheme.

    Last year in Richmond, a civil jury awarded DuPont a $920 million (U.S.) judgment against Kolon, which is appealing the verdict and also fighting an injunction that would bar it from selling Heracron in the U.S. for 20 years.

    Source: http://www.thestar.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The Imprimerie Nationale, the official supplier and printer to the French government, has chosen Datacard Group to provide systems for Franceís e-passport program.

    Datacard will install Datacard PB6500 passport issuance systems. These automated, inline high-volume passport production systems will be able to issue up to 25,000 passports a day.

    The systemís configuration includes automated leafing, inline inkjet printing, smart card encoding, laser perforation and enhanced lamination of secure thin-film overlays. The systemís universal interface comes through Datacardís Syntera customization suite software to act as a bridge to link the PB6500 passport systems.

    With the system Imprimerie Nationale has been able to cut passport delivery time from six days to two.

    Source: http://www.contactlessnews.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The ePassport is the culmination of a sustained process of development of technical specifications for machine readable travel documents (MRTD). It introduces a new dimension to aviation security in that, within the conventional machine readable passport with its machine readable zone, an additional layer of verification of information contained in an electronic chip is placed, which verifies the information in the passportís machine readable zone by the use of a special reader. Much research has gone into the areas of the technology and verification in the development of the ePassport.

    ver 104 States are currently producing and using ePassports and there are approximately 400 million in circulation. This accounts for 33per cent of all passports used globally. The additional feature that the ePassport carries in the conventional machine readable passport is a chip containing biometric and biographic information which have to be validated accurately, efficiently and quickly while retaining the security and integrity of the information. Ideally, an ePassport should be issued in accordance with the technical specifications approved by the International Civil Aviation Organization (ICAO) . However, this does not happen in all cases of issuance of ePassports. This lapse could seriously compromise global security. The nuances of this threat are described and discussed in this article against their legal background.

    At a recent Symposium on machine readable travel documents, biometrics and security standards.held at ICAO on 10 to 12 October 2012, experts addressed ICAO machine readable travel documents (MRTD) standards and specifications, identity management best practices and related border security issues. Sri Lanka, an issuer of machine readable passports, was represented at this Symposium. Foremost among these discussions was the ePassport, which is defined by ICAO as a passport which has a contactless integrated circuit (IC) chip within which is stored data from the machine readable passport page, a biometric measure of the passport and a security object to protect the public key infrastructure (PKI) cryptographic technology, and which conforms to the specifications of Doc 9303 part 1 . The ICAO Facilitation Manual defines the ePassport as a machine readable passport that has a contactless integrated circuit embedded in it and the capability of being used for biometric identification of the machine readable passport holder in accordance with the Standards specified in the relevant part of ICAO document 9303 (Machine Readable Travel Documents) . ePassports are easily recognised by the international ePassport symbol on the front cover .

    Biometric Identification

    It is important to note that the operative terms in the definition of the ePassport are ďbiometric identificationĒ and ďpublic key infrastructure (PKI) cryptographic technologyĒ. Biometric technology involves a measurable, physical characteristic or personal behavioral trait used to recognize the identity, or verify the claimed identity of a person. Biometric identification has been defined as ďa generic term used to describe automated means of recognizing a living person through the measurement of distinguishing physiological or behavioural traitsĒ .

    Biometrics target the distinguishing physiological or behavioral traits of the individual by measuring them and placing them in an automated repository such as machine encoded representations created by computer software algorithms that could make comparisons with the actual features. Physiological biometrics that have been found to successfully accommodate this scientific process are facial recognition, fingerprinting and iris-recognition which have been selected by ICAO as being the most appropriate. The biometric identification process is fourfold: firstly involving the capture or acquisition of the biometric sample; secondly extracting or converting the raw biometric sample obtained into an intermediate form; and thirdly creating templates of the intermediate data is converted into a template for storage; and finally the comparison stage where the information offered by the travel document with that which is stored in the reference template.

    Biometric identification gets into gear each time an MRTD holder (traveler) enters or exists the territory of a State and when the State verifies his identity against the images or templates created at the time his travel document was issued. This measure not only ensures that the holder of the document is the legitimate claimant to that document and to whom it was issued, but also enhances the efficacy of any advance passenger information (API) system used by the State to pre-determine the arrivals to its territory. Furthermore, matching biometric data presented in the form of the traveler with the data contained in the template accurately ascertains as to whether the travel document has been tampered with or not. A three way check, which matches the travelerís biometrics with those stored in the template carried in the document and a central database, is an even more efficacious way of determining the genuineness of a travel document. The final and most efficient biometric check is when a four way determine is effected, were the digitized photograph is visually matched (non electronically) with the three way check described above . In this context, it is always recommended that the travelerís facial image (conventional photograph) should be incorporated in the travel document along with the biometric templates in order to ensure that his identity could be verified at locations where there is no direct access to a central database or where the biometric identification process has not entered into the legal process of that location.

    Public Key Infrastructure (PKI) Cryptographic Technology

    PKI Cryptographic technology uses a brand new technique known as quantum cryptography, designed to eliminate the terrifying vulnerabilities that arise in the way digitally stored data are exposed to fraudulent use. This new technique uses polarized photons instead of electronic signals to transmit information along cables. Photons are tiny particles of light that are so sensitive that when intercepted, they immediately become corrupted. This renders the message unintelligible and alerts both the sender and recipient to the fraudulent or spying attempt. The public key directory - designed and proposed to be used by customs and immigration authorities who check biometric details in an electronic passport, is based on cryptography - and is already a viable tool being actively considered by the aviation community as a fail-safe method for ensuring the accuracy and integrity of passport information.

    In order to assure inspecting authorities (receiving States) that they would know when the authenticity and integrity of the biometric data stored in the MRTD, which they inspect, are compromised and tampered with, the Public Key Infrastructure (PKI) scheme was developed by the TAG/MRTD, which has been pioneering work on the MRTD for over a decade . The scheme is not calculated to prescribe global implementation of public key encryption, but rather acts as a facilitator enabling States to make choices in areas such as active or passive authentication, anti-skimming and access control and automated border crossing, among other facilitative methods. The establishment of a public key directory, through means of public key cryptology and in a PKI environment, is consistent with ICAOís ultimate aim and vision for the application of biometric technology on the fundamental postulate that there must be a primary interoperable form of biometric technology for use at border control with facilities for verification, as well as by carriers and the issuers of documents. This initial premise is inevitably followed by the assumption that biometric technologies used by document issuers must have certain specifications, particularly for purposes of identification, verification and the creation of watch lists. It is also ICAOís vision that States, to the extent possible, are protected against changing infrastructure and changing suppliers, and that a technology, once put in place, must be operable or at least retrievable for a period of ten years.

    The ePassport

    The story of the passport- the precursor of the ePassport Ė starts with the birth of an individual and his birth certificate, which records the event of birth and time and place thereof. The Civil Registry is able, with this document to primarily establish the identity of the person at birth and inform his country of his details for purposes of maintaining census and vital statistics. The passport, which uses this information, gives a person a name and natonality that is required for him to travel internationally. The passport is a basic document in the transport by air of persons. Its use therefore is of fundamental importance as a travel document, not only because it reflects the importance of the sovereignty of a State and the nationality of its citizens but also because it stands for the inviolability of relations between States that are linked through air transport.

    The key consideration of an ePassport is Global Interoperability ó the crucial need to specify a system for biometrics deployment that is universally interoperable. a Logical Data Structure (LDS) for ePassports required for global interoperability. It defines the specifications for the standardized organization of data recorded to a contactless integrated circuit capacity expansion technology of an MRP when selected by an issuing State or organization so that the data is accessible by receiving States. This requires the identification of all mandatory and optional Data Elements and a prescriptive ordering and/or grouping of Data Elements that must be followed to achieve global interoperability for reading of details (Data Elements) recorded in the capacity expansion technology optionally included on an MRP (ePassport). The other considerations are Uniformity ó the need to minimize via specific standard setting, to the extent practical, the different solution variations that may potentially be deployed by member States; Technical reliability ó the need to provide guidelines and parameters to ensure member States deploy technologies that have been proven to provide a high level of confidence from an identity confirmation viewpoint; and that States reading data encoded by other States can be sure that the data supplied to them is of sufficient quality and integrity to enable accurate verification in their own systems; Practicality ó the need to ensure that specifications can be operationalized and implemented by States without their having to introduce a plethora of disparate systems and equipment to ensure they meet all possible variations and interpretations of the standards; and Durability ó the requirement that the systems introduced will last the maximum 10-year life of a travel document, and that future updates will be backward compatible.

    The major components of a biometric system are: Capture ó acquisition of a raw biometric sample; Extract ó conversion of the raw biometric sample data to an intermediate form; Create template ó conversion of the intermediate data into a template for storage; and Compare ó comparison with the information in a stored reference template.

    In terms of security and privacy of the stored data, both the issuing and any receiving States need to be satisfied that the data stored on the IC has not been altered since it was recorded at the time of issue of the document. In addition, the privacy laws or practice of the issuing State may require that the data cannot be accessed except by an authorized person or organization. Accordingly ICAO has developed specifications in Section IV regarding the application and usage of modern encryption techniques, particularly interoperable public key infrastructure (PKI) schemes, to be used by States with their machine readable travel documents as made in accordance with the specifications set out in Doc 9303. The intent is primarily to augment security through automated means of authentication of MRPs and their legitimate holders internationally. In addition, ways and means are recommended to implement international ePassport authentication and to provide a path to the use of ePassports to facilitate biometric or e-commerce applications.

    Conclusion

    The foremost necessity is to establish a strong security culture in every State. For this, there must be a clear definition of State responsibility and accountability brought to bear by a close and unbreakable link between government and industry stakeholders. A security culture would make States aware of their rights and duties, and, more importantly, enable States to assert them. Those who belong to a security culture also know which conduct would compromise security and they are quick to educate and caution those who, out of ignorance, forgetfulness, or personal weakness, partake in insecure conduct. An ePassport must necessarily be the result of efficient and fail-safe organizational arrangements. It should be tested at border control by trained professionals.

    eGovernment and eID are the bare essentials for State security. The digital economy has also brought much facilitation that helps the world move to paperless processes which result in greater economy and streamlined processes. However, there must essentially be global harmonization in this process. In this regard ICAO has made remarkable progress in advancing its MRTD programme to the level it is at now. If harmonization means ensuring consistency between global practices, standardization means compliance with international Standards. There is no room for doubt that both harmonization and globalization are needed in this context.

    Source: by Dr. Ruwantissa Abeyratne, http://www.srilankaguardian.org

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The Conservative governmentís fervour for Canadian history will play out on the pages of your new passport, soon to be unveiled after nine years of delays and cost overruns.

    After a multimillion-dollar advertising campaign for the War of 1812 and the announcement that they plan to rename the Canadian Museum of Civilization in Ottawa as the Canadian Museum of History, the Tories are set to unveil new designs for Canadaís electronic passport that focus on key historical moments, HuffPost has learned.

    Bureaucrats at first recommended the government adopt images of fauna and flora to grace the inside pages of the new travel document, similar to the United Kingdomís passport. The Conservatives chose instead to follow the example of the U.S. passport, which features images of the Declaration of Independence and Mount Rushmore, and focus on history.

    ďIt will be something that Canadians can be proud to carry,Ē said Rick Roth, a spokesman for Foreign Affairs Minister John Baird. Roth refused to elaborate on the design sketches that will be part of the new electronic passport, which will be issued for five- and 10-year time periods.


    What would you like to see in the passport design? Share your comments
    The implementation of Canadaís ePassport, which includes an electronic chip with facial recognition information, has been delayed for nine years. A pilot program for diplomats and public office holders was planned for 2005 but did not get under way until 2009. The national roll-out was put on the back burner until the 2008 budget announced ePassports would be ready in 2011. Then it was 2012. Now, they should be ready in 2013.
    Canada is the last G7 country to implement the international standards established by the International Civil Aviation Organization (ICAO) in 2003. All of Canadaís key allies and more than 95 countries, including Pakistan, Sudan and Tajikistan, have pushed ahead with the technology.

    Source: By Althia.Raj, http://www.huffingtonpost.ca

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Zimbabwe is exploring the implementation of ePassports before the end of the year, according to the countryís Home Affairs co-minister Theresa Makone.
    ePassports, also known as ďbiometric passportsĒ contain an electronic chip that is encoded with surname, given name, date of birth, place of birth and gender information. It also includes a digital picture of the bearerís face. Signatures are not reproduced on the chip.
    The Zimbabwe government believes that the introduction and mass production of the new travel document will reduce the price of the document. Currently, an ordinary Zimbabwean passport costs US$50 while other regional countries charge less than US$30.
    Makone said that a new digitalized document would curb counterfeit documents and would also allow the country to match the rapidly adopted international ePassport standard.
    The deployment of the ePassport also coincides with the Foreign Ministryís new digitalized passport application processes, which allow residents to obtain passport applications online.
    Despite the online availability of ePassport applications, applicants will still need to go to the passport office to complete their applications in person, and will also require a national ID card in order to submit their application.

    Source: By Stephen Mayhew, http://www.biometricupdate.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  
    TrŁb has signed a new agreement to continue to provide electronic and secure polycarbonate data pages for Republic of Lithuania ePassports.
    According to the firm, the electronic data page is attached to the ePassport booklet through a patented and robust page binding element, and is designed for a lifespan of 10 years. Issuance of passports with an electronic polycarbonate data page started in January 2008. The chip stores personal data, a facial image and two fingerprints of the document holder.
    The latest contract builds upon a 2008 agreement which engaged TrŁb to supply highly secure polycarbonate data pages with embedded chip to the Lithuanian Personalisation Center of Identity Documents.
    The data pages are integrated into the Lithuanian passport booklets by UAB Garsu Pasaulis and then personalized by the Personalisation Center of Identy Documents, which is part of the countryís Ministry of Internal Affairs.
    ďIt is widely recognised that the Lithuanian biometric passports are a valuable indicator of the countryís distinctive attitude to security-oriented innovation,Ē said a Ministry of Internal Affairs official.
    ePassports, also known as ďbiometric passportsĒ contain an electronic chip that is encoded with surname, given name, date of birth, place of birth and gender information. It also includes a digital picture of the bearerís face. Signatures are not reproduced on the chip.

    Source: By Stephen Mayhew, http://www.biometricupdate.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Morpho has won another international call for tenders from the Finnish National Police Board to supply the countryís new ePassports, as part of a consortium including Oberthur Technologies. The consortium has been providing Finland with secure ePassports since 2006.
    Within the consortium Morpho provides the passport booklet which includes a set of new and improved security features on its polycarbonate data page. The data page also contains an integrated microchip which stores the holderís personal details and biometric data (fingerprints and facial image). Morpho also supplies its ICAO PKI system and its personalization solution.
    With enhanced physical and electronic security features, Finlandís new passport will provide greater protection against identity theft and fraud, and enable fast, secure identification of passport holders.
    Finland began issuing its new ePassports at the end of August 2012.

    Source: http://www.planetbiometrics.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Cash-strapped New York has tentatively chosen the highest bidder to produce driverís licenses under a disputed contract that would provide only black-and-white photos and end up costing the state nearly $38 million more than the current contract if itís approved.

    According to court papers reviewed by The Associated Press, the losing vendors, including the company that has produced New York licenses with color photos for 16 years, are protesting the $88.5 million award to a Canadian company.

    The award to CBN Secure Technology Inc. of Ottawa is also being reviewed by the state comptroller.

    CBN is part of the Canadian Bank Note company that prints Canadian money, passports and driverís licenses worldwide. Company officials did not respond to repeated requests for comment.

    The DMV tentatively awarded the contract to the high bidder 10 months after New York advised the current vendor, De La Rue North America Inc., that because of ďsignificant budgetary constraintsĒ the state would have to reduce the cost of the contract, according to the court filings. As a result, De La Rue submitted a bid 10 percent lower for the new, eight-year contract, which ended up being nearly $38 million less than CBNís bid.

    De La Rue, based in England, and Massachusetts-based MorphoTrustUSA, another unsuccessful bidder, want a rebid.

    They claim CBN offered a black-and-white ďpolycarbonateĒ card they say is less secure than their color-picture IDs on cards made of ďTeslin.Ē The losing bidders say they also werenít informed the state wanted a black-and-white polycarbonate card and that CBN received an illegal advantage. De La Rue and MorphoTrustUSA said they could have offered a bid on that type which could save taxpayersí money.

    The lawsuit also claims the state had required a color image ID, a requirement they claim CBN violated.

    The driverís license contract is rebid under the federal ďReal IDĒ measure from the Department of Homeland Security to make licenses more secure and more states are expected to face similar contract decisions.

    The state Department of Motor Vehicles wonít comment until the comptrollerís review concludes and the contract award is final. State records show cost was valued at just 20 percent of the evaluation of bids, with a 30 percent emphasis on security. Other categories included production and quality control, the production site and data security, the imaging device and experience and expertise, according to the record.

    Trade publications note the CBN technology and black-and-white photos are well-regarded for security in driverís licenses and other documents.

    The losing companies claim poor judgment and mishandling of the bid is apparently to blame for the stateís decision.

    ďPolycarbonate and Teslin are both highly secure materials suitable for driversí licenses,Ē said MorphoTrust Vice President and General Counsel Scott Boylan. ďThe key differences are value and flexibility. Polycarbonate is far more expensive than Teslin while providing no additional security benefit. Teslin cards also can accommodate color photos, which enable more security features, whereas polycarbonates cannot.Ē

    CBN ďfailed a mandatory technical requirement which related to the ability to provide color text for the cards, a mandatory requirement,Ē stated De La Rue in its lawsuit.

    State records show the DMV criteria for the bid, however, appear to not require a color image ID, according to a court filing.

    The state comptrollerís office is now evaluating the bids.

    ďWhile I canít comment on specific contracts, our impartial review of bid protests is essential to protect New Yorkers from millions of dollars in unnecessary costs,Ē said Kate Gurnett, spokeswoman for state Comptroller Thomas DiNapoli.

    ďOur bid exactly met the requirements of the (Request for Proposal) and at significantly less cost to the New York taxpayer,Ē said De La Rue spokesman Rob Hutchison

    CBN and De La Rue are close competitors with a long history of providing secure documents including driverís licenses. CBN also holds government contracts to print postage stamps, passports and visas that must be counterfeit-proof.

    State records show no campaign contributions from its top officers to any New York officials. CBN, founded in 1897, also has a lottery systems division for gaming run by governments, but has no contracts with New York where Gov. Andrew Cuomo is trying to expand gambling.

    Source: http://libn.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  A UK-based military hardware manufacturer will open a Sh3.5 billion plant in Mombasa to capture the growing arms race in Eastern Africa as well as target peace-keeping missions.

    Osprea Logistics has started construction of the plant following approval from the Kenya Investments Authority to assemble armoured cars and military trucks under the Mamba brand ó which is commonly used by Africa Union peacekeepers, private contractors in Iraq and several African countries.

    This will be the first armoured vehicle manufacturer in the region and the company is targeting regional governments and peacekeeping missions in Congo, Sudan and Somalia, which are emerging as a fertile markets for military hardware.

    ďOsprea plans its first-year production of Mamba Mk5ís to be over 100 vehicles, which can translate to work for over 200 people,Ē said Salih Brandt, the chairman of Osprea Logistics in an email response to the Business Daily.

    ďKenya is strategically located and offers great access to the rest of Africa compared to South Africa where Ospreraís other manufacturing plant is.Ē

    Mamba is a South-African made armoured personnel carrier that offers protection against small arms fire and land mines.

    Powered by a Mercedes Benz engine, it is suited for a rough terrain and can carry up to 10 passengers plus the driver.

    This has made it a favourite for military operations in remote zones and it became the face of the Iraq war following increased use by private security contractors.

    Rising threats of terrorism, cross-border raids and internal conflicts in East Africa have seen countries increase their military budgets.

    Kenya, Uganda and Tanzania have together increased their defense spending to Sh87 billion last year from Sh59 billion in 2007, according to data from the Stockholm International Peace Research Institute (Sipri), an independent research organisation.

    The data shows that Kenyaís spending at Sh45.8 billion was far much higher than that of Uganda, which had a budget of Sh21 billion, and Tanzania whose budget stood at Sh22 billion.

    Kenya, last year, ordered 67 US-made heavy truck diesel engines from South Africa, 37 of which have so far been delivered at an undisclosed cost.

    Uganda also showed the highest number of military equipment imports among EAC member countries.

    Burundi depicted one of the highest military budgets on the continent according to Sipri making the region a good market for an arms manufacturer.
    The regionís defense forces buy their armoured cars and trucks mainly from Russia and South Africa.

    ďThere is a tangible move world-wide towards Ďsmart investingí in defence budgets, with an emphasis on domestic procurement and industry in order to capture a dual benefit of domestic investing as well as platform efficiency,Ē says Mr Brandt.

    Source: By RAWLINGS OTINI, http://www.businessdailyafrica.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The Smart Card Alliance has released its second annual E-Yearbook, highlighting the events that happened in the North and Latin American smart card industry throughout 2012.

    This yearís review contains industry briefs, perspectives, insights and company profiles covering a wide range of markets and technologies. It also contains an expanded section on the EMV Migration Forum, information about the new Mobile and NFC Council, highlights of Septemberís Transportation Council meeting and reprints of white papers and position documents produced by the SCA throughout the year.

    The E-Yearbook is available at the SCAís website. The SCA will send printed copies to members and have them available at Alliance conference events

    Source: http://www.contactlessnews.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The UAE Central Bank and the Emirates Identity Authority have met to consider enhancing co-operation in regards to using the smart ID card and activating its applications in the financial sector.
    The two agencies discussed creating a joint committee to draft a strategic co-operation agreement that includes a number of initiatives aimed at promoting the culture of digital ID and knowledge-based economy, as well as enabling the UAE Central Bank to upgrade the performance of the financial sector while protecting the identity of consumers with the advanced features of the Emirates ID card.
    According to a report in The Emirates News Agency, the UAE Central Bank clarified that its draft strategic and operational plan includes an initiative for creating an e-wallet system using the ID card that would ultimately replace cash for the management and operation of the UAE Central Bank.
    Emirates ID says itís ready to provide maximum support to ensure the success of all the development projects and initiatives that are implemented or planned to be implemented, as a part of the governmentís initiative to engage in a knowledge-based economy in a manner that serves the top interest of the UAE.
    As reported previously in BiometricUpdate.com, official transactions related to Emirates ID cards were disrupted for nearly two days following a technical glitch with its online e-form system.
    In 2009, Emirates ID developed a plan which contributed to doubling the number of population register and therefore, the fingerprints of individuals over the past three years by six times.

    Source: By Adam Vrankulj, http://www.biometricupdate.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The Egyptian government has recently approved a new smart card system for subsidized fuels, originally proposed by the ministries of finance and petroleum.
    The program, designed to ensure that those in most need of these subsidizes are indeed those who receive it, would charge the ministries of petroleum and mineral resources with implementing and overseeing the new smart card program for the National Bank of Egypt and Ahly banks.
    In this process, contracts were awarded to both government banks without a bidding process, in order to quickly implement the new laws to take hold in April, Daily News Egypt reports.
    Logistically, daily transfers will be made to companies producing petroleum products and will be represented in the difference in price for fully and partially subsidized fuel for the amount consumed through the smart card program. A database of beneficiaries will also be created.
    Many distribution programs like this take off without a hitch, but there are also those that encounter resistance along the way.
    Reported in BiometricUpdate.com, a system in India has been implemented which sees the production and distribution of biometric food ration cards, though members of an indigenous group have demanded the withdrawal of the cards, citing irregularities and complications in obtaining food.

    Source: By Adam Vrankulj, http://www.biometricupdate.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Gemalto is providing the Royal Oman Police with an electronic passport solution for the Sultanate. Applicants will be issued with secure travel documents in line with Omanís goal to provide enhanced services and protection to its citizens, using digital security technologies. ??

    The solution includes Gemaltoís ICAO compliant Sealys e-passport documents and a full Coesys solution suite to enroll citizens, personalize and issue secure documents. The multi-year contract also covers training, support and maintenance services.

    Major Royal Oman Police offices will be equipped with fixed and mobile stations to register e-passport applicants with personal information and biometric data. Each e-passport will feature secure embedded software and a contactless microprocessor which will contain the holderís digital fingerprints and. The solution will facilitate Omani travelers immigration control, and speed up the passport application and document issuance process. ??

    In the public sector, Gemalto is contributing to more than 80 government programs worldwide, supporting for example e-passport initiatives in CŰte díIvoire, Denmark, Estonia, France, Korea, Norway, Malta, Morocco, Portugal, Singapore, Sweden and the U.S.

    Source: http://www.secureidnews.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Libya has taken delivery of 49 armoured support vehicles from Jordan. Some 120 of the UAE-designed and built NIMRs, in two variants, have already been in service with the Libyan army .

    The spokesman for the Libyan General Staff. Ali Shiekhi was quoted by Chinese news agency Xinhua today as saying that the new NIMRs had been supplied as a result of an agreement made last year, between the Ministry of Defence and Jordan. The new armoured vehicles are to be deployed immediately on border patrol duties.

    More than 500 NIMRs have been sold, mostly in Jordan, Lebanon, Libya and the UAE, and the firm says that it has a further 1,800 orders. The composite ceramic-armoured NIMRs, which come in four and six-wheel variants and a range of configurations, are according to the manufacturers, the first such military vehicles to be designed specifically to operate in extreme desert conditions. NIMR Automotive which conceived and makes the armoured vehicle, is a part of the UAEís Tawazun conglomerate, which specialises in defence equipment. Algeria was last year seeking to establish a local plant to build and assemble NIMRs.

    Source: http://www.libyaherald.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  ABI Research forecasts 8.6 billion smart cards will ship in 2013, spanning all smart card markets. Of the total shipments, 16% are forecasted to use a contactless interface but that will rise to 30% by 2018.

    Government ID, transportation and ticketing, and payment cards continue strong double-digit growth in contactless adoption. Single-wire protocol SIM card volumes continue to strengthen, and are expected to break the 500 million mark in 2018.

    ďThe increase in contactless adoption is not limited to a selection of markets, although itís the banking and government verticals which are adopting contactless technology at a quicker rate, with the SIM market close behind,Ē comments Phil Sealy, research analyst at ABI.

    Over the next three years ABI Research expects to see a shift in the penetration ratio of pure contactless and dual interface shipments. In 2013, ABI Research forecasts 59% of all contactless deployments will utilize a pure contactless interface, reducing to 38% in 2018.

    The increase in dual interface adoption is apparent across multiple markets. IC vendors NXP, Infineon, and STMicroelectronics are positioned to offer the best combination of convenience and high-end security over multiple applications. Additionally, the increase in dual interface adoption will deliver greater margins benefiting IC and smart card vendors alike.

    ďABI Research tracks new services and credentials regionally, including governments issuing new national ID and social welfare cards, mobile network operators with SIM-based NFC payment services and wallets, and banks jumping to next-generation dual interface EMV cards,Ē Sealy states. ďAs a result ABI Research forecasts that dual interface shipments will exceed the 1 billion mark in 2015.Ē

    Source: http://www.secureidnews.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The National Health Insurance Scheme (NHIS) will this year introduce biometric identity cards which will be issued instantly at the point of registration to subscribers.

    It would also start work on piloting electronic claims (E-claims) processing and host an extended stakeholder review of the capitation pilot in the Ashanti Region to inform its improvement and the subsequent nationwide rollout of this provider payment method.

    The Chief Executive of the National Health Insurance Authority (NHIA), Mr Sylvester A. Mensah, disclosed this when he addressed members of the core management team of the NHIS and some key stakeholders at a management retreat held at Elmina in the Central Region.

    Mr Mensah noted that although remarkable progress had been made in meeting targets, there was the need to consolidate those achievements and make the scheme more efficient, adding that 2013 would be a busy year for the authority.

    He said the NHIA intended to establish three more claims processing centres in the Northern, Central and Ashanti regions, to complement the centre in Accra. This, he maintains, would complete efficiency measures into claims management nationwide.

    Among other numerous initiatives, Mr Mensah disclosed that the scheme would be re-branded consistent with the new law, new vision and mission and operational architecture of the NHIS, adding that the financial manual of the NHIA would also be reviewed to place greater responsibility on the centre to prevent the abuse and fraud occurring at the regional and scheme levels.

    Others are: a permanent and joint clinical and claims audit team would be established to undertake forensic claims audit across the country all-year round to track isolated cases of connivance between schemes and providers.

    Mr Mensah mentioned that subscriber satisfaction was a key performance indicator for the NHIA, therefore, a subscribersí handbook detailing the benefit package, medicines and subscriber rights and obligations would be compiled and made available to all subscribers at the point of registration and membership renewal.

    In order to further educate the public on the operations of the scheme, Mr Mensah said a quarterly NHIS policy dialogue forum to be beamed live on television stations would be instituted.

    Also, the NHIS medicines list/pricing would be reviewed to reflect market realities.

    He further said the authority would begin modernising and transiting from an ICT concept, ďwhich places more emphasis on infrastructure, to a management information system (MIS) which places premium on generating information for management decision-makingĒ.

    Among a litany of achievements recorded in 2012, he cited the passage of the new law, NHIA 2012, Act 852, the upward review of provider Tariffs by 26 per cent, creation of the condition to accommodate family planning in the NHIS benefit package, development of a consolidated premium account, the pilot of capitation in the Ashanti Region, the establishment of an operational call centre and functional clinical audit division.

    Mr Mensah told the management team that ďposterity will not forgive us if, in nurturing this infant institution, it slips into structural, operational, and financial inefficiencyĒ.

    The President of the Ghana Medical Association (GMA), Dr Kwabena Opoku-Adusei, who was present at the event, pledged his associationís commitment to the NHIS.

    He gave an assurance that the GMA would continue to be a strong ally of the NHIS and would collaborate with the authority on the rollout of capitation across the country, if all their concerns were addressed.

    He said the GMA would continue to constructively criticise the NHIA to ensure that the scheme stands the test of time.

    Other participants and contributors included a former Health Minister, Dr Richard Anane, under whose watch the law which established the NHIS was passed in 2003 (Act 650), and other foreign delegations.

    Source: http://graphic.com.gh

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  New research from ABI Research forecasts 8.6 billion smart cards to be shipped worldwide in 2013; a combined number spanning all smart card markets. Of the total forecasted shipments, 16 percent are expected to use a contactless interface.
    ABI attributes most of this growth to the increase in adoption of Government ID, transportation and ticketing and payment card systems. In 2013, ABI forecasts 59% of all contactless deployments will utilize a pure contactless interface, reducing to 38% in 2018.
    According to the company, ďThe increase in dual interface adoption is apparents across multiple markets. IC vendors, NXP, Infineon and STMicroelectronics are positioned to offer the best combination of convenience and high-end security over multiple applications. Additionally, the increase in dual interface adoption will deliver greater margins benefiting IC and smart card vendors alike.Ē
    ABIís Market Data report focuses on the collection of primary data from leading manufacturers of smart cards and secure ICs. The data includes the installed base and annual shipments of smart cards and secure ICs by technology and interface type, by region and vertical markets.
    ďThe increase in contactless adoption is not limited to a selection of markets, although itís the banking and government verticals which are adopting contactless technology at a quicker rate, with the SIM market close behind,Ē Phil Sealy ABI Research analyst said. ďABI Research tracks new services and credentials regionally, including governments issuing new national ID and social welfare cards, MNOs with SIM-based NFC payment services and wallets, and banks jumping to next-generation dual interface EMV cards. As a result, ABI Research forecasts that dual interface shipments will exceed the 1 billion mark in 2015.Ē
    Last year, in a Biometrics Research Note, Rawlson King forecasted that the market for electronic identity cards Ė for which smart cards are often used Ė will reach US$5.2 billion by 2015.
    Smart cards often carry biometric data of the card holder and are finding their way into many workflow processes, identity programs among a long list of uses.
    BluStor is an emerging player in the smart card market, currently developing a smart card with an 8GB capacity, to enable the downloading of apps and to verify identity absent of a data connection. BiometricUpdate.com recently had a chance to talk shop with CEO Finis Conner about how BluStor came to be, his ambitions as chief executive as well as what the future holds for his company.

    Source: By Adam Vrankulj, http://www.biometricupdate.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Papua New Guineaís Defence Minister, Fabian Pok, says a two-million US dollar military aid grant from China will be spent on armoured cars, troop carriers and uniforms.
    The grant follows Dr Pokís talks with his Chinese counterpart General Liang Guanglie in Beijing last month and meetings there with exporters of military ware.
    The visit comes as PNG plans a five fold increase in troops over the next decade.
    Dr Pok says PNG will also ask China to help maintain swimming pools and gymnasiums at PNGís military barracks.
    ďThey want to be seen as not being too involved in our military issues here. China is also trying to export things like uniforms and armoured cars and all these things. So itís also in the business interests of not the Chinese military but people who are building these things to market their products to countries like Papua New Guinea.Ē

    Source: http://www.rnzi.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Frost & Sullivan has released new analysis stating that the global border control and biometrics market will see increased growth due to international cooperation. However, this growth may not be realized unless privacy issues are resolved and organizations are able to measure ROI.

    The analysis, ďGlobal Border Control and Biometrics Market Assessment,Ē covers the security, military, government and law enforcement sectors of the industry. It found that the marketís 2012 revenues were $5.8 billion, and it anticipates that the market will earn $15.8 billion in 2021.

    Frost found that one of the main drivers in this market growth stemmed from agencies and organizations working together on an international level to collaborate on travel security, which has led to more implementation of electronic documents and readers.

    Western markets have been at the forefront of this trend, with many countries having e-passports and testing eGates. Many pilot projects are taking place in Europe, with facial recognition technology being the preferred biometric modality. Russia is also looking into the use of biometrics as an identifier.

    Eastern markets, such as China and India, are just starting to incorporate e-passports and eGates into their travel processing systems.

    While the opportunity for growth is good, Frost does caution that budget cuts and privacy concerns could have a detrimental effect on plans to invest in biometric technology; however, cheaper technology and public education could mitigate those possibilities.

    Source: http://www.secureidnews.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  For many years now, IT professionals have become more and more active in discussions about physical access control systems and there has been an active debate about the need for convergence between physical and logical access. IT managers use electronic means to secure logical assets; security managers use physical access control methods to secure facilities. On the surface, it would seem that both departments would benefit greatly from collaboration since both of their problems boil down to permitting access to the right people.

    With such an obvious synergy and benefit to taking a more holistic view of enterprise security, why hasnít this yet happened? What are the real barriers preventing companies from moving in this direction?

    Perhaps one of the answers lies with the fact that weíve been more focused on the ďwhatĒ than the ďwho.Ē If organizations are really going to make a meaningful impact on protecting their assets, whether physical or virtual, itís most important to focus on the ďwhoĒóand coordinating that task between IT and security is becoming important.



    Who was that (really)?

    Although privileges are assigned to people, itís not always clear who is entering a password or who is carrying an RFID card. The risk of not knowing ďwhoĒ varies from asset to asset. Is it enough to be the holder of a swipe card to enter a parking garage? Probably. How about to access a medical record? Absolutely not!

    It is in this context that biometrics is playing a larger role in securing facilities and assets of all kinds. With the introduction of multispectral imaging, biometrics has become reliable enough to deal with the fundamental issue of knowing ďwhoĒ to a much higher degree of confidence.

    In fact, by linking physical identity to a myriad of digital identities, converged identity and access management solutions become much more powerful. There is no meaningful access management without first establishing the ďwhoĒ in transactions. Who is accessing my facility? Who is punching the time clock? Who is withdrawing funds from that ATM? The question is always, ďWho?Ē

    Thus, while access and authorization have always been granted to individual people, knowing a password or having a key is only superficially related to the authorized personóand neither can establish who exactly that is. Only biometric technology can do that.



    Itís more than just about security

    Weíve all seen it: business grinds to a halt after the deployment of a new security system. Designing an authentication solution that is both secure and convenientóthatís where the value is for the customer.

    Convenience in an authentication solution is ease-of-use, accessibility, speed and all of the other things that become important to an organization after the primary objectiveósecurityóis met. Staffing help desks to reset passwords or reissue swipe cards while the employee is standing by is not an efficient use of resources. Nurses on a hospital floor cannot waste valuable seconds fumbling with the numbers and special characters in a password when accessing medical supplies.

    A biometric solution can lower risks, reduce costs and improve efficiencies. It can meet regulatory requirements, provide an audit trail and facilitate transactions, all without getting in the way of business. Today, biometric solutions authenticate people requiring access to secure facilities, sensitive records, government services and controlled substances. The possibilities and benefits are real if the biometric is chosen carefully.

    Security integrators are already aware that biometric technologies and scanners are not created equal. Some optical sensors work very well when the finger is clean and prepped with lotion. Is that convenient? Other sensors work perfectlyóon the third or tenth try, while a line forms behind the user. These situations are the cases that cause security managers to abandon an application.

    On the other hand, multispectral imaging is capable of overcoming the myriad of fingerprint capture problems that conventional imaging systems have in less-than-ideal conditions. The high performance delivered by multispectral biometrics affects more than security, it allows authentication to recede into the background while authorized people go about their business. Thatís no compromise, thatís convenience!



    What about customers?

    Because biometrics can be so quick and easy to use, they are ideal for customer-facing applications. Today, financial institutions around the world are embracing multispectral fingerprint biometrics for authenticating customer transactions. In addition to enhancing transaction security, banks are able to provide additional convenience for their customers because there is no need for training; customers just present their finger at the ATM.

    Biometric patient authentication is becoming important for reducing medical errors and for minimizing fraudulent access to healthcare. Government and private insurance programs around the world rely on multispectral fingerprint biometrics to prevent fraudulent use of the policy. Officials at one government program report that the biometric deployment actually facilitates faster access to medical service by authorized patients while saving costs.

    Theme park access is a customer-facing application where convenience plays a special role. To prevent ticket fraud, one major international theme park wanted to be able to link each ticket to a specific customer. However, because the overriding goal was to create a positive environment for paying customers, there couldnít be even the illusion of a barrier between a customer and the park. The transaction had to be quick and intuitive for anyone to use. Itís significant to note that this biometric solution did not require identification of the customer, assuring the privacy of guests. Multispectral fingerprint authentication was chosen for its reliability and convenience. As a result, the solution reduced transaction time, enhanced customer experience and reduced ticket fraud.

    This scenario is being repeated in other commercial customer-facing situations, such as membership-only fitness clubs, large sporting events, nightclubs and other places where itís important to maintain convenience for the customer, even during an authentication transaction.



    Deploy an enterprise-wide

    authentication solution

    IT managers have their hands full. Threats are coming from every direction and on top of it all employees want to use their own devices. Users hate security solutions that simply get in the way of them doing their jobs. Multifactor authentication is becoming a must, but the difficulty of managing point solutions is increasing risk, not reducing it. And the smartest smartcard still cannot assure the organization that the person holding is it the person it was issued to. They need to know ďwho.Ē

    Security integrators know ďwho.Ē Theyíve been integrating biometrics at the door for some time now. Perhaps itís time to walk across the hall and have a conversation with the IT manager about integrating biometrics into an enterprise-wide authentication solution.

    Source: By BY PHIL SCARFO, http://www.securityinfowatch.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Brigadier-General Kwame Opoku-Adusei, the General Officer Commanding the Northern Command of the Ghana Army, on Tuesday said the government has purchased 34 armoured reconnaissance vehicles to argument the logistics of Ghanaian peacekeepers.

    The armoured vehicles are to facilitate the migration of Ghanaian peacekeepers from the ďDry LeaseĒ to the ďWet Lease system,Ē Brig-Gen. Opoku-Adusei stated during Ghanbatt 77ís Medals Presentation Parade at Lebanon.

    He said the military high command had outlined plans to provide logistical support for the migration of the Ghanaian contingent on peacekeeping duties in Lebanon (Ghanbatt) from the ďDry LeaseĒ to the ďWet LeaseĒ system to enable it to be self-sufficient.

    A Ghana Armed Forces statement issued in Accra and signed by Lieutenant Commander M. A. Larbi and copied to the Ghana News Agency (GNA) said the Commander of the Northern Command commended the Ghanbatt 77.

    ďI am personally satisfied with what I have seen and heard about your performance during my visit to the Ghanbatt Area of responsibility and I urge you all to continue with the good workĒ.

    Brig Gen Opoku-Adusei, who was the head of a six-member military delegation to Lebanon, used the occasion to update troops on current developments in the country as well as within the Ghana Armed Forces.

    The Commander and his team also paid a courtesy call on United Nations Interim Force in Lebanon (UNIFIL) Deputy Force Commander, Brig Gen Patrick Phelan, who expressed appreciation for the performance of Ghanaian troops.

    The Commanding officer of Ghanbatt 77, Lt Col Francis Anemana, assured the delegation that Ghanbatt is poised in executing its assigned tasks successfully despite the challenges.

    Chief Military Personnel Officer, Col Reginald Yemo Odoi, thanked the government of Ghana for the high profile delegation to the Medals Day Parade and described Ghanbatt 77 as a wonderful battalion which executed its task with high professionalism to the admiration of UNIFIL High Command.

    Source: http://www.ghanaweb.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The Government of the Macau Special Administrative Region of the Peopleís Republic of China has awarded a contract for the manufacture and development of smart ID cards for its residents.

    The new generation of ID cards will be purely contactless, and will store personal data and biometric information such as fingerprints on a digital chip embedded in the card. The IDs can be used as conventional IDs, providing sophisticated visual and electronic proof of identity, but will also allow citizens to carry out transactions with the government electronically, saving time and effort.

    The contactless system will also provide faster data transfer rates while card reading, useful especially for the large number of people who use their IDs in regular travel between Macau, Hong Kong, and China, as the processing time for travellers will significantly reduce. The new national ID card will also support contactless electronic signatures.

    A security protocol developed by Germanyís Federal Office for Information Security will be used to ensure the security of data on the cards and during contactless transactions. Named PACE (Password Authenticated Connection Establishment), the protocol will create a secure connection between the chip in the card and a card reader, and encrypt data before the transfer.

    The contract for the manufacture and delivery of the cards was awarded to Munich-based technology company, Giesecke & Devrient. In addition to development and manufacture of the cards, G&D will develop the required smartcard applications and modify the existing infrastructure according to the needs of the new technology.

    The government will also receive an advanced operation system platform for smartcards, which will be ready to support additional features in the future, such as contactless payment. The new set of ID cards is expected to be introduced in October 2013.

    Source: By Sumedha Jalote, http://www.futuregov.asia/

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.