Welcome to tender impulse

 Power supply and Electrical Tenders 2017/18  

<<Back
SrNo. Description Deadline Date
1 WA-240 Heating system with district heating. 18/08/2018
2 Rehabilitation of 110 kV OHTL SS Bitola 1- SS Prilep 1 (procurement yet to be initiated); 18/08/2018
3 Supply and connection of diesel generators for Medipark, Tr. SNP 1, Kosice. 09/08/2018
4 o Construction of 500kV single-circuit overhead transmission line 12/07/2018
5 Construction of 500kV single-circuit overhead transmission line OHL Jvari – Nenskra (approx 55km); 12/07/2018
6 Supply and installation of 600 KVA Generator at HQ 30/01/2018
7 Supply, installation, testing, operation and guarantee of transmission lines, antennas and terrestrial digital terrestrial broadcasters (DVB-T2 DVB-T2) 17/12/2017
8 Supply, installation, testing, operation and guarantee of transmission lines, antennas and terrestrial digital terrestrial broadcasters (DVB-T2 DVB-T2) 17/12/2017
9 Uninterruptible Power Supply (UPS) equipment, Integrated Logistics and Technical Services 17/11/2017
10 -Acquisition of 10 dynamic converters of frequency 30 kva, 400 hz. 16/11/2017
11 Procurement of Grid Station and Transmission Line Material 14/11/2017
12 •Supply and Installation of low voltage overhead and underground lines, cable distribution boxes and LV network poles 11/11/2017
13 Urban railway Rotteckring. 06/11/2017
14 Reinforcement and extension of HTA / BTA / EP electricity networks in the city of Abidjan - Telecontrol of Abitjan HTA networks 06/11/2017
15 To duplicate transmission lines of the telemetry of environmental radiation monitoring: 1 set 06/11/2017
16 HEAT EXCHANGER,TAGB- AND SIMILAR REPLACEMENT PARTS, INREPAIR/MODIFICATION OF 06/11/2017
17 Construction of new 132kV sub-stations, transmission lines and Augmentation work/feeder bay works in Jabalpur Circle 31/10/2017
18 24 hour service of the boiler house, spare heat exchangers, networks and heat installations, technological heat. 30/10/2017
19 Supply of sea water plate heat exchangers at RLOC 30/10/2017
20 Acquisition of: Lot 01: LPG refrigerant exchanger Lot 02: Deethanizer condenser heat exchanger Lot 03: Condensate stabilization column feed preheater 27/10/2017
21 16--HEAT EXCHANGER,FLUI 27/10/2017
22 Supply and installation of backup generators and complementary works in the Ministry building by Omar Bin Al Khattab Road (Business Building) in Riyadh 27/10/2017
23 Supply of new and factory-reused server hardware, disk arrays, network devices and uninterruptible power supplies - UPS for KUL. 26/10/2017
24 Steam Generators. 25/10/2017
25 Acquisition of three (03) torque converters for the frame 9 groups of the HMO. 24/10/2017
26 J--HEAT EXCHANGER,AIRC, IN REPAIR/MODIFICATION OF 24/10/2017
27 Purchase of Uninterruptible Power Supply 1 unit 24/10/2017
28 Purchase of Uninterruptible Power Supply 1 unit 24/10/2017
29 Supply of workgroup generators for aqueduct installations. 24/10/2017
30 Living Unit G Range Furnace Replacement (21401-17/18-2076045) 24/10/2017
31 Maintenance, repair and operation of air conditioning, cooling and heating equipment in educational buildings at Wajh and Amluj (Boys - Girls) group3Back BUILDINGS 23/10/2017
32 240 Heating systems. 23/10/2017
33 Preparation of a project for the construction of a new 400 kV line from Maritza East substation to Nea Santa (Greece). 23/10/2017
34 Supply and installation of medium voltage power lines for JSW SA KWK "Pniówek". 23/10/2017
35 Uninterruptible Power Supply (UPS) System 23/10/2017
36 Construction Bac Giang – Lang Son 220kV gridline and Lang Son 220kV substation. 20/10/2017
37 EHB Object planning for structural and landscape-planning conversion according to §§34 and 39 HOAI (2013) incl. Appendix 1 to § 3 paragraph 1 HOAI Performance picture Heat protection LP3 Option Lp4-9. 20/10/2017
38 HEAT EXCHANGER,AIR 18/10/2017
39 16--HEAT EXCHANGER,AIR 18/10/2017
40 16--HEAT EXCHANGER,AIR 18/10/2017
41 Shin Seocheon thermal power water supply heat exchanger and deaerator purchase 17/10/2017
42 16--HEAT EXCHANGER,FLUI 17/10/2017
43 SUPPLY, INSTALLATION AND COMMISSIONING OF A 250 KVA ELECTROGEN GENERATOR IN THE LAAYOUNE 17/10/2017
44 44--HEAT EXCHANGER,BLEE 16/10/2017
45 Supply of a metallizing furnace. 16/10/2017
46 Electrical generators at North west of the port 15/10/2017
47 Electronic Neutron Generator Yield Evaluation Test Instrument 13/10/2017
48 Supply and installation of heating equipment in the building of the Croatian Employment Service Slavonski Brod Branch Office 13/10/2017
49 Construction and Erection Works for Substation and Transmission Line for 220kVThanh Nghi Substation and 220kVNho Quan- Thanh Nghi Transmission Line 12/10/2017
50 Supply, install and commission single phase 20KVA UPS 12/10/2017
51 Heat exchanging equipment (2 lots) 12/10/2017
52 Generators 12/10/2017
53 Supply generator 11/10/2017
54 Construction of the 400 kV Baczyna-Plewiska line. 10/10/2017
55 Corrective preventive maintenance and refurbishment of generators set up in health facilities under the Provincial Health Delegation in Laayoune, namely: • Hassan II Hospital of the ... 10/10/2017
56 Plow for heat recovery boilers, heat exchangers, safety flanges, chemical injection pumps, acid transfer pumps for chemical treatment unit and water pumps for thermocouple thermal power plant in creams 10/10/2017
57 APPOINTMENT OF CONTRACTOR FOR THE CONSTRUCTION OF A NEW 66KV OVERHEAD LINE BETWEEN BALLOTS BAY AND GLENWOOD SUBSTATIONS 10/10/2017
58 Construction and installation of an electric generator for the official residence in Bihougra, Chtouka Ait Bha province 10/10/2017
59 Plow for heat recovery boilers, heat exchangers, safety flanges, chemical injection pumps, acid transfer pumps for chemical treatment unit and water pumps for thermocouple thermal power plant in creams 10/10/2017
60 Construction of a new 400 kV power line between Maritza East and Burgas. 09/10/2017
61 Installation And Maintenance of Uninterrupted Power Supply (Ups) System At Singapore Air Traffic Control Centre (SATCC) 09/10/2017
62 Emergency Generator and Distribution Feed 06/10/2017
63 Supply and installation of two generators with accessories for the RAFC 06/10/2017
64 PROCUREMENT AND INSTALLATION OF THREE (3) DIESEL GENERATOR SYSTEMS (50 kVA, 50 kVA, 100 kVA) FOR MICRO-GRID 2 AT SEMAKAU LANDFILL 06/10/2017
65 ASTM A-179 finned seamless steel heat exchanger 06/10/2017
66 Procure F-16 Heat Exchangers 05/10/2017
67 Construction and modernization of the MV and LV power network enabling the connection of electricity generating units from RES in the district of Tarnowskiego, stage 1. Modernization of nN power supply from transformer substation S-525 Buchcice 8 within RPO WM for 2014-2020. 05/10/2017
68 Diesel generator 05/10/2017
69 Supply, Delivery, Testing and Commissioning of Two (2) units Brand New 50 KVA & 75 KVA Generator Set 04/10/2017
70 Supply of six (06) generators and one (01) batch of spare parts: Lot N ° 01: Four (04) 110 KVA towable generators. Lot N ° 02: Two (02) generators 45 KVA. 04/10/2017
71 Supply of a downstream furnace support for the Meftah cement plant. 04/10/2017
72 Service maintenance of generators and uninterrupted power supply systems Sai of the Autonomous City of Ceuta. 03/10/2017
73 Procurement of shell and tube heat exchangers 03/10/2017
74 Supply of UPS. 03/10/2017
75 Read room full heat exchange system equipment purchase case 03/10/2017
76 Maintenance and repair taking into account replacement of spare parts and consumables of diesel generator set (DGS) - AD-125S-T400 03/10/2017
77 Supply of frequency converters 03/10/2017
78 Stabilizer and uninterruptible power supplies 03/10/2017
79 PR 1-17-09-1667, FOR USE OF THREE (3) BACK TO BACK, TWO (2) PATROL CARS, SEVEN (7) MOTORCYCLES, ONE (1) MULTICAB AND ONE (1) GENERATOR, THIS CITY. 03/10/2017
80 Execution of installation of instrumentation and instrumentation on existing heat exchangers located at the addresses: Nizhny Novgorod region, Dzerzhinsk, Oktyabrskaya street, house 28A, house 36, house 40 (№475-EA-17-AS) 03/10/2017
81 Works on repair of frequency converters of feeding pumps of low and high pressure of Borisovskaya CHPP with replacement of defective and faulty elements in the scope of work sheets 03/10/2017
82 Contract for the relocation of 33kva and 11kva high tension power lines at the Permanent site. 02/10/2017
83 INVITATION TO BID FOR: PROCUREMENT OF GENERATOR SET (SURPLUS/BRAND NEW) – CORELLA, BOHOL 02/10/2017
84 Supply, Delivery, Start up and Installation of Uninterruptible Power Supply (UPS) for Escarceo Radar Station and Tingloy Radar Station of PMO Batangas 02/10/2017
85 Supply of heat stabilizers 02/10/2017
86 Supply of UPS (uninterruptible power supply) for the telephone exchange and its accessories 02/10/2017
87 CDN 61 - ACQUISITION OF UPS - 10KVA 30/09/2017
88 Supply of a damped sinusoid generator. 29/09/2017
89 Supply of framework agreement on electricity and forging works, exchange centers District heating plan Horsens. 29/09/2017
90 Mobile App Generator. 29/09/2017
91 ubscription Maintenance of Buildings, Electric Installations and Equipment, Heating Systems, Water Supply and Sewerage Installations of the Military Medical Academy" 29/09/2017
92 PROCUREMENT OF ONE (1) SET GENERATOR 29/09/2017
93 Delivery of high-temperature muffle furnace NT 40/18 / P470 NABERTHERM or equivalent. 29/09/2017
94 HEAT EXCHANGER, FLUI 29/09/2017
95 External Generator System for the Val Rita Water Treatment Plant 29/09/2017
96 Refurbishment of the existing heating system and mechanical plant room 29/09/2017
97 Supply and install of 20KVA UPS 29/09/2017
98 High-voltage voltage converter 29/09/2017
99 supply and installation standby generator 1000KVA and ATS 1600A for the project of rest house T.78 at No 44 Tran Phu, Nha Trang city. 29/09/2017
100 Purchase of Funke heat exchangers of the type BCF 8 "4-weg, used in the composition of the hydro unit PR350 29/09/2017
101 Reagent for flushing of plate heat exchangers 29/09/2017
102 Purchase of efficient plate heat exchangers 28/09/2017
103 Supply of panel for Generator (17-0414 & 17-0457) 28/09/2017
104 Acquisition, assembly and installation of generator set 28/09/2017
105 Supply of step-up frequency converters C range (BUC) 50W P1dB (PPS) 28/09/2017
106 The right to enter into an Agreement for the supply of uninterruptible power supplies with a battery module in accordance with the terms of reference 28/09/2017
107 Modernization of tram tracks - Dúbravsko-Karloveská radiála. 27/09/2017
108 Heat exchanging devices for compressors ЦК-135/8 27/09/2017
109 Acquisition of heat exchangers for the needs of the municipality "Asinovskoe urban settlement" 27/09/2017
110 Supply of heat exchangers 27/09/2017
111 Buying a signal generator 27/09/2017
112 SUPPLY OF UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEMS 27/09/2017
113 Barmherzige Brüder - Hospital St. Barbara Schwandorf / SAD_4200 - Heat supply systems (heating). 26/09/2017
114 GENERATORS, STATIC FREQUENCY CONVERTER 26/09/2017
115 Modernization of district heating network by tasks 1 to 6. 26/09/2017
116 University of Mannheim, Schloss Ostflügel, reconstruction hall, catacombs and artificial tower, heating systems. 26/09/2017
117 RFQ-WMS-015 - Supply & Delivery of 300kW Standby Diesel Generator Set 26/09/2017
118 CATERPILLAR GENERATOR ACCESSORIES 26/09/2017
119 Fire emergency generator 26/09/2017
120 ASTM A-179 finned seamless steel heat exchanger 26/09/2017
121 Procurement of generators of the GIP-1 damage seeker or analog 26/09/2017
122 Vertical Furnace HT Anneal 26/09/2017
123 Jeju Airport cargo terminal building Heat source equipment replacement work Purchase of government materials (cooling tower) 26/09/2017
124 SIGHT,GRENADE LAUNCHER (NSN: 1010016086053) 25/09/2017
125 HEATING DEVICE. 25/09/2017
126 Supply heat exchanger for equipment E26001 25/09/2017
127 Uninterruptible power supply (Iom.vov = 250A) 25/09/2017
128 Plate heat exchanger 25/09/2017
129 Generator AAN 5930 (28V / 120A) 25/09/2017
130 Uninterruptible Power Supply 25/09/2017
131 132 kV transmission line Muttenz-Delémont detailed design phase 41-53. 22/09/2017
132 Supply of a high-temperature furnace of large dimensions for heat treatment under controlled atmosphere. 22/09/2017
133 Armasuisse Real Estate, Auenfeld, DNA-A / 1788: BKP 242/243/346 Heating and Cooling Systems, Building Site 2 / SÜD - Frauenfeld, TG. 22/09/2017
134 Armasuisse Real Estate, Auenfeld, DNA-A / 1788: BKP 242/243 Heating systems, Building site 3 / NORD + WEST - Frauenfeld, TG. 22/09/2017
135 Installation of New Standby Gas Generator at Fire Hall 313, 333, 315 22/09/2017
136 Supply, installation, synchronization and commissioning of 1,200kva generator set for its campus located in Addis Ababa 22/09/2017
137 New building BMZ II - Heating systems. 22/09/2017
138 SUPPLY, DELIVERY AND INSTALL OF UPS 22/09/2017
139 61--Purchase one (1) Uninterruptable Power Supply (UPSP) installed in one (1) International Organization for Standard (ISO) Standard Containers 22/09/2017
140 Acquisition of heat exchangers for the needs of the municipality "Asinovskoe urban settlement" 22/09/2017
141 Supply of server, network equipment and uninterruptible power supplies 22/09/2017
142 Uninterruptible Power Supply APC by Schneider Electric Smart-UPS SRT 3000VA RM 230V with Network Card 22/09/2017
143 Agreement for construction, installation and commissioning works: re-construction of power transmission lines 22/09/2017
144 SURFACE MOUNTABLE FILTERS FOR FREQUENCY CONVERTERS (ARTES AT REF. 5C.332) 21/09/2017
145 Construction work for heating network construction from M-bus to Rocket 25A boiler house. Stage I Phase I (Part 3), excluding the section on the school grounds at ul. Children of Warsaw 42. 21/09/2017
146 17c0014 - Framework Agreement for the supply and transmission of electric power. 21/09/2017
147 Annual Generator Inspections & Repairs 21/09/2017
148 UPS for Electro-spining Machine. 21/09/2017
149 CONSTRUCTION OF THE 69 kV ORANGE SUBTRANSMISSION LINE - LOTS OF LOTS 21/09/2017
150 Supply service for maintaining UPS system at No 11 Cua Bac. 21/09/2017
151 Supply furnace sealing system by Graphite 21/09/2017
152 The Dalles Generator Air Coolers / Heat Exchangers - Revised 21/09/2017
153 Supply of Generator 21/09/2017
154 Procurement of Plate Heat Exchanger 21/09/2017
155 Petrochemical Division A-179 seamless steel heat exchanger tube batch 21/09/2017
156 The Dalles Generator Air Coolers / Heat Exchangers - Revised 21/09/2017
157 Construction and installation equipment for LV, MV gridline and substations in Loc Thien, Loc Tan, Loc Hiep, Loc Hung communes in Loc Ninh district. 21/09/2017
158 Supply and Installation of Heat Exchange Units and Valves 20/09/2017
159 Supply of electrical energy (green electricity and conventionally generated electricity) at the collection points of the BImA in various network areas of the Federal Republic of Germany from 2018 to 2020 (VOEK-142-17). 20/09/2017
160 Registration of Contractors for Way Leave Clearance around MV/LV Electricity Distribution lines and Substations. 20/09/2017
161 11/0.4 KV Line Maintenance, 0.4 KV Line Maintenance, 11/0.4 KV New Transformer Installation, System Up gradation And Related Maintenance Work for 11kv Mizan pada, Academi, Ranirhat Feeder Of Distribution Division, BPDB, Feni 20/09/2017
162 Replacement of electrical generators 20/09/2017
163 SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 500±10 KVA DIESEL GENERATOR AT MAIN INSTALLATION, CHITTAGONG. 20/09/2017
164 SUPPLY OF UNINTERRUPTIBLE POWER SUPPLIES 20/09/2017
165 Move and installation of UPS 20/09/2017
166 Electric motors, generators and transformers 20/09/2017
167 Purchase diesel engine generator set 10kW-3, 20kW-2, 50kW-1 20/09/2017
168 Purchase of heat exchangers 20/09/2017
169 Paul Mueller Company Plate Heat Exchanger Parts 20/09/2017
170 Delivery of lighting masts with generator set on the trailer. 19/09/2017
171 Demineralized Water Shell & Tube Heat Exchangers 19/09/2017
172 Supply and installation of electrical generators works in Diesel 19/09/2017
173 UPS for network hubs for PHC,IPR# 11750134-21702686/WMG, IT Dept. 19/09/2017
174 Demineralized Water Shell & Tube Heat Exchangers 19/09/2017
175 Supply and delivery of Computers, Printers, Scanners, Laptops, UPSs, Shredders, Photocopiers 19/09/2017
176 Frequency Converters 2018g 19/09/2017
177 Supply of heat exchangers 19/09/2017
178 Acquisition of new tramway trains of large capacity - resumption of the consultation. 18/09/2017
179 Acquisition of new tramway trains of large capacity - resumption of the consultation. 18/09/2017
180 Frequency converter Rupperswil - total renewal 18/09/2017
181 Generator Diezel 50 Hz And 380 V With Power 500kva And Change Over Board And Equipment And Related Goods 18/09/2017
182 GCS UniHA: Acquisition of refrigeration generators and refrigerant helmets with associated maintenance services. 18/09/2017
183 Purchase of gasoline generators 18/09/2017
184 Construction and installation equipment for LV, MV gridline and substations 18/09/2017
185 Eaton PW9130L1000T-XL UPS 18/09/2017
186 Uninterruptible Power Supply 18/09/2017
187 Condensing Heat Exchanger (CHX) 18/09/2017
188 16--STATIC INVERTER/FREQUENCY CONVERTER 17/09/2017
189 Supply of Power Generator 17/09/2017
190 Supercritical CO2 Generation System Heat Exchanger 15/09/2017
191 Framewok agreement on spar part for hot air generators of the Dantherm make. 15/09/2017
192 Framework agreement for spare parts for electricity generators, type PE. 15/09/2017
193 Decentralize Heating Plants 15/09/2017
194 To Provide Interrupted Power System (UPS) Enhancement 15/09/2017
195 -UPS -Solar panels 15/09/2017
196 Supply and installation of a 40 kVA UPS at MAPP Ozinki for the needs of Volgograd Branch of FGKU Rosgranstroy 15/09/2017
197 Supply pump and standby frequency converter 15/09/2017
198 Check-up/Repair/Rewinding of One(1) Set Dynamo of Generator No.2 at Radar Station 2,Corregidor Island 15/09/2017
199 HEATING ELEMENT 15/09/2017
200 HEATING MATERIAL 15/09/2017
201 Supply of Muffle furnace and accessories 15/09/2017
202 Purchase of uninterruptible power supply: UPS 1500VA / 1350W UPS 1000VA / 800W 15/09/2017
203 GPG-B1-2017-168 SUPPLY, DELIVERY, TESTING AND COMMISSIONING OF ONE (1) LOT VARIOUS BRAND NEW ULTRASONIC GENERATOR AND ONE (1) LOT ELECTROCAUTERY MACHINE FOR THE UNIVERSITY OF THE PHILIPPINES (MANILA) 14/09/2017
204 Rehabilitation of high voltage lines 11 k. In the Sohar area in northern Batinah 14/09/2017
205 Heat energy supply. 14/09/2017
206 Replacement heat exchanger for flue gas reheating (Reingas-WT) in the rotary kiln 1 (DRO1) and fluidized bed furnace 1 (WSO1) in the Simmeringer Haide factory. 14/09/2017
207 RFQ for purchase new UPS to replace the existing End of Support UPS at TTSH 14/09/2017
208 Installation of uninterruptible power supply system in server rooms 14/09/2017
209 58--CONVERTER,FREQUENCY 14/09/2017
210 FREQUENCY CONVERTER 14/09/2017
211 The work include furnace replacement 13/09/2017
212 Framework Contract Procurement of Generators (200KVA & 100KVA) 13/09/2017
213 Re-Invitation for procurement of Generators 13/09/2017
214 Supply and Installation of Generator sets in Khal No-7 Yard sub-station 13/09/2017
215 ACQUISITION OF UPS 13/09/2017
216 12 Frequency Converter and Install 13/09/2017
217 Reconstruction of a tram track in Bytom in ul. Katowice on the stretch from pl. Sikorskiego to ul. Siemianowicka (second track extension) 12/09/2017
218 Installation of New Stand by Gas Generator at Fire Halls 432, 415 and 441 12/09/2017
219 Dual Flame and Furnace System 12/09/2017
220 Hobart 400Hz Converter 12/09/2017
221 Dual Flame and Furnace System 12/09/2017
222 Supply generator set, tanks and piping system 12/09/2017
223 Purchase of uninterruptible power supply 12/09/2017
224 Heat exchangers. 11/09/2017
225 WA-240 Heating system with district heating supply. 11/09/2017
226 HEATING AND COOLING SYSTEM WITH BATTERY REFRIGERATOR SYSTEM 11/09/2017
227 FREQUENCY CONVERTER 11/09/2017
228 Supply furnace sealing system by Graphite 11/09/2017
229 Supply of uninterruptible power supplies 11/09/2017
230 Supply, installation, operation and maintenance of (5) generators for electricity and refrigerators for dead 10/09/2017
231 Purchase 8 Device Types Of Diesel Generator 10/09/2017
232 UPS System 10/09/2017
233 CONTRACT TITLE: PROCUREMENT OF 132kV TRANSMISSION OVERHEAD LINES FROM LUSAKA SOUTH MULTI-FACILITY ECONOMIC ZONE TO CHAWAMA AND FROM CHAWAMA TO CHILANGA. 08/09/2017
234 Maintenance of heating installations, hot water production and air conditioning. 08/09/2017
235 Procurement of 132kV Transmission Overhead Lines from Lusaka South Multi-Facility Economic Zone 08/09/2017
236 Procurement of Generator (20-KVA) 08/09/2017
237 Replacement of Generator #2 Rottnest Island Powerhouse 08/09/2017
238 Honda EG 6500 CXS Self Start 5.5 KVA Generator 08/09/2017
239 EA-121 heat exchanger 08/09/2017
240 UPS systems. 08/09/2017
241 Pad-Mounted Propane Generator System in Trent Lakes 08/09/2017
242 Supply, installation, commissioning and maintenance of 2 UPS (inverters) at the CHI de Redon 08/09/2017
243 Uninterruptible Power Supply 3000VA 08/09/2017
244 Procurement of 6 ea Baring Starter Generator with PN: 410964 and 5 other L/I for use of C-295 aircraft with tail nr 129 08/09/2017
245 Procurement of Electrical Overhead Distribution Line Materials 07/09/2017
246 Replacement subway rectifier stations ABC line. 07/09/2017
247 Reconstruction of a tramway track, contact and cable network on Bulgaria Boulevard from Vitosha Blvd to Borovo Ear II Stage. 07/09/2017
248 Supply and installation standby generator 530kVA for the head office of An Giang Customs Department. 07/09/2017
249 Three compartment vacuum casting furnace 07/09/2017
250 BID REF. NO. GPG-B1-2017-119-SUPPLY AND DELIVERY OF BRAND NEW GENERATOR SET FOR THE PHILIPPINE NATIONAL POLICE (PNP) 06/09/2017
251 Gas generator Diesel generator 06/09/2017
252 Supply, Delivery, and Installation of four (4) units 15kVA Generator Set at VTS Radar Station 3 and Radar Station 4 of PPA, Port of Batangas 06/09/2017
253 UoEm/12/2017-2...Supply, Delivery, Installation and Commissioning of 500 KVA Stand- by Generator 06/09/2017
254 Purchase of heat exchangers 06/09/2017
255 Construction LV, MV gridline and substation in Long Binh, Ho Nai, Trang Dai, Tan Hiep wards. 06/09/2017
256 Construction of 2*2.5MW diesel generator 05/09/2017
257 Services in heating plants, central water heating plants, gas, water and sewage plants within urban buildings; 2-year contract. 05/09/2017
258 Supply and installation two 3-phase generators 500kVA 05/09/2017
259 Supply and installation of heat exchangers in BH3 05/09/2017
260 Uninterruptable Power Source (UPS) Maintainance Service Contract 05/09/2017
261 4 sets of solar-powered turbine generator at Phitsanulok Air Traffic Control Center 04/09/2017
262 JCRC/SUPLS/18-20/0008: Supply of generators, Incinerators and spares parts. 04/09/2017
263 Rectifier 04/09/2017
264 supply and installation generator for branch 2- HCM city Culture University phase 1. 03/09/2017
265 REPLACEMENT OF 22KV OVERHEAD LINE BETWEEN MIDBRAK AND KLEINBRAK SUBSTATIONS 01/09/2017
266 Three compartment vacuum casting furnace 01/09/2017
267 The transfer of heat supply networks with an increase in diameter from the boiler room No. 43 in md. Kantemirovsky town of Naro-Fominsk (overhaul of the heating network from TK-001 to railway No. 50 on Shibankova street) MUP "Teploset", Naro-Fominsk 01/09/2017
268 Supply of plate heat exchangers 01/09/2017
269 Decentralize Heating Plants 01/09/2017
270 Supply of the Generator, Counter-frequency meter for the needs of FSUE MOTCB Mars. (Purchase is one-stage) 01/09/2017
271 Power supply rectifier module procurement 01/09/2017
272 Work consist addition of a new medium voltage 1250 kilowatt generator 31/08/2017
273 Supply, Delivery, Installation of one (1) unit of 250-kVA Generator Set 31/08/2017
274 Purchase of frequency converters 31/08/2017
275 Acquisition and Installation of Generator of 500 KVA for the Building of the Ministry of National Defense 31/08/2017
276 MU/ONT/12/2017: PECVD Split Tube Furnace Systems 31/08/2017
277 Heating System Upgrades 31/08/2017
278 Monoblock machines (split-systems) with installation, power generators (power plants) 31/08/2017
279 Thermal insulation of furnaces ФТЛ-2-81№4, №5 31/08/2017
280 RF Generators 31/08/2017
281 Heat exchanger assembly B 31/08/2017
282 Supply one new generation partial discharge meter. 31/08/2017
283 Design, Supply, Installation and Commissioning of Kusma-New Butwal 220 kV Transmission Line 30/08/2017
284 Supply of heat energy (purchase along with sewed) to heat exchangers supplying heat to the buildings of the Office of the Ministry of National Defense. 30/08/2017
285 Supply nad installation of 7.5 kva single phase sound proof diesel generator 30/08/2017
286 INVITATION TO BID for SUPPLY and DELIVERY OF 1 UNIT 50-60 KVA GENERATOR SET AND 1 UNIT 100 KVA GENERATOR SET 30/08/2017
287 Supply furnace sealing system by Graphite 30/08/2017
288 BAFFLE ASSEMBLY, HEAT EXCHANGER, NSN: 2840-00-980-0301, Part Number: 2-060-390-04, applicable to the BK CH-47 (CHINOOK) weapon system 30/08/2017
289 Supply of kits for extension of low voltage power lines. 30/08/2017
290 66 -- Optical Turbulence Generator System 30/08/2017
291 Generators 29/08/2017
292 Lift station 73 generator 29/08/2017
293 Emergency standby generator replacement 29/08/2017
294 Electronic tender for the purchase of maintenance services for diesel generating sets produced by FG Wilson with the use of trades on a decline 29/08/2017
295 Matsu District Office East Electric Power Plant # 2, # 3 machine cylinder head heating system 2 sets 29/08/2017
296 Execution of works on replacement of pump units with the installation of frequency converters in the pumping station of the 3rd lifting of the 2nd stage of the NFS, in accordance with the terms of reference approved by the Customer. 29/08/2017
297 Purchase of heating elements 29/08/2017
298 Heat exchanger replacement 29/08/2017
299 Purchase of component materials for the electric heating system 29/08/2017
300 Electric locomotive parts AUXILIARY CONVERTER 4 items 28/08/2017
301 Vector signal generator and frequency converter including signal source 28/08/2017
302 Generator 100-KVA, 03-Phase Imported / Branded 28/08/2017
303 MAINTENANCE OF PLANT HEATERS ON CALL-OFF BASIS IN DUKHAN FIELDS 28/08/2017
304 Construction gridline from Rach Gia 220kV substation to Rach Gia 110kV substation 28/08/2017
305 Purchase of boilers for boiler and heat exchanger reconstruction 28/08/2017
306 Supply and Installation of Electrically Heated Evaporator 28/08/2017
307 Installation of heaters - radiators 28/08/2017
308 Back-up generator purchase and installation 25/08/2017
309 Generators and ancillary facilities procurement 25/08/2017
310 REPLACE EXISTING DAMAGED WATER HEATERS 25/08/2017
311 Request for Information (RFI) Signal Generator 25/08/2017
312 Maintenance of Standby Generators and Refill of Diesel-Northwest Area 25/08/2017
313 Brussels - FPS Justice - Installation of a generator. 25/08/2017
314 Harris DC/DC Converters 25/08/2017
315 Choice of the supplier of the plate heat exchanger in residential house No. 15 on Dimitrov street in Baranovichi to replace the failed one 25/08/2017
316 GEN/01/2017: Standby generator set installation 24/08/2017
317 Supply, delivery and commissioning of a 300 KVA 3 phase towable trailer mounted diesel generator 24/08/2017
318 Replace boiler & heating system at the Oshawa Water Supply Plant 24/08/2017
319 Provide full service inspection, testing and maintenance for emergency generators and mobile lighting units. 24/08/2017
320 Service and maintenance of equipment to frequency converters starter motor type "ACS 800" 24/08/2017
321 Supply, testing and commissioning of a new 20 KW standby generator 24/08/2017
322 Refurbishment of the AWR 11Kv overhead lines At Kriel Power Station 24/08/2017
323 Switch Heater Controllers 24/08/2017
324 OVERHAULING / REPAIR OF 100/40/20 KVA GENERATORS 24/08/2017
325 Heat exchanger assembly B 24/08/2017
326 Purchase of diesel engine generator sets 24/08/2017
327 PURCHASE OF THREE AIR AND A HEATER 24/08/2017
328 Supply of frequency converters 24/08/2017
329 SCOPE OF WORKS / OQ# # 1#REMOVAL AND SHIFTING OF DIESEL ENGINE GENERATOR-01 NO FROM HAA PHASE-2 TO PHASE-1# # # # A#REMOVAL OF GENSE T FROM ITS INSTALLED LOCATION USING APPROPRIATE LIFTING EQUIPMENT AS PER OEM RECOMMENDATIONS. 24/08/2017
330 Procurement of 29 ea Brush Starter Generator with PN: P601952 for use in the maintenance of C-295 with tail nr C-140 24/08/2017
331 Procurement of Electrical Overhead Distribution Line Materials 23/08/2017
332 Supply of three mobile generators. 23/08/2017
333 Maintenance services for central heating and heating systems owned by the Ministry of Interior 23/08/2017
334 Provide pricing for 2 portable trailer mounted light tower with 8KW generator 23/08/2017
335 Auxiliary generator 23/08/2017
336 AC constant current source generator and handheld liquid hydrometer purchase 23/08/2017
337 supply one generator >=250kVA. 23/08/2017
338 Acquisition of Electric Generator 22/08/2017
339 SUPPLY AND DELIVERY OF 80KVA MOBILE GENERATOR SET AT THE PORT OF RICHARDS BAY 22/08/2017
340 Frequency converter 22/08/2017
341 The provision of MV and LV Feeder Line Construction for various zones within the Limpopo Operatimg Unit on an " as and when" required basis over a period of 36 months 21/08/2017
342 Deliver, deploy frequency controllers and perform service interventions. 21/08/2017
343 Deliver, deploy frequency controllers and perform service interventions. 21/08/2017
344 Supply and installation 5 standby generators 100kVA for Hoai An, Phu My, Phu Cat, Tuy Phuoc, Vinh Thanh district medical centres. 21/08/2017
345 Purchase of heat exchangers and heat meters 21/08/2017
346 61--CONVERTER,FREQUENCY 21/08/2017
347 Contracting a supply of current converters 21/08/2017
348 Frequency Converter 1 year 21/08/2017
349 Purchase of plate heat exchangers (again). 21/08/2017
350 Processing of E-102 heat exchanger pipe 20/08/2017
351 Supply of Different types of Heat Exchanger Pipes. 19/08/2017
352 Maintenance and servicing of MAFRD generators 19/08/2017
353 Visual appraisals on power electronics converters classified as E-IPS and E-IPS 1E of the 900 MW units. These expertises must make it possible to pronounce the maintenance of qualification on all the sensitive components of these equipments 18/08/2017
354 161kV Voltage Transformers 18/08/2017
355 16--HEAT EXCHANGER,AIRC 18/08/2017
356 Supply and instalaltion of resistance electrical heat treatment furance 18/08/2017
357 Supply generator and related equipment for Tua Chua District Peoples Committee 18/08/2017
358 61--MOTOR-TACHOMETER GENER 18/08/2017
359 Supply of electrical converters 18/08/2017
360 Heating boiler 18/08/2017
361 Purchase of water heaters with a capacity of 30,50,100 liters 18/08/2017
362 Supply one-phase generator 10kVA 18/08/2017
363 Complex Transformer Substation 17/08/2017
364 CONVERTER,FREQUENCY 17/08/2017
365 Supply RMU cabinets, RMU terminal, charger and breakdown indicator 17/08/2017
366 Supply, installation and commissioning of 2 units of diesel engine standby generator 17/08/2017
367 Jeju Airport cargo terminal building heat source equipment replacement public material purchase installation (cooling tower) b 17/08/2017
368 Reconstruction of overhead line V509. 16/08/2017
369 SUPPLY, DESIGN, INSTALLATION OF ECOLOGICAL THREE-PHASE DISTRIBUTION LINE AT 35 KV AT THE STATION 16/08/2017
370 Repair and maintenance of heat exchanger 16/08/2017
371 CORRECTIVE MAINTENANCE OF HEAT EXCHANGERS, BETTER PETRO SAN FELIX, SA 16/08/2017
372 Dunkirk heat network - supply of 2 heat exchangers. 16/08/2017
373 Guokeng mobile generator additional project 16/08/2017
374 1000504980: Heat Exchanger 16/08/2017
375 He purchased a 13KVA three-phase generator. 16/08/2017
376 X-ray control system and 80kW high voltage generator 16/08/2017
377 Purchase of plate heat exchangers in the set 16/08/2017
378 Electrical HV, MV and LV overheadlines and substation 15/08/2017
379 Servicing diesel tank bulk and tanks servicing generators 15/08/2017
380 106 years of the second media workshop heat exchanger and air cooler overhaul work 15/08/2017
381 Supply one generator 350kVA 15/08/2017
382 Generator including installation 15/08/2017
383 To Supply and Deliver an Air Cooled Heat Exchanger 15/08/2017
384 Interface converter 15/08/2017
385 Supply generator 250KVA 14/08/2017
386 Addition of emergency natural gas generator and transfer switch 14/08/2017
387 Hydraulic (hydropneumatic) flushing of heating systems and heat exchangers, chemical flushing and mechanical cleaning of heat exchangers at the facilities of the VSU named after PM Masherov 14/08/2017
388 SCOPE OF WORKS / OQ# # 1#REMOVAL AND SHIFTING OF DIESEL ENGINE GENERATOR-01 NO FROM HAA PHASE-2 TO PHASE-1 13/08/2017
389 Generators for Critical Infrastructures On the Navajo Nation 11/08/2017
390 Supply four diesel generator for emergency power 11/08/2017
391 Installation of frequency converters on electrical equipment 10/08/2017
392 Heat Exchanger Replacement 10/08/2017
393 Expansion and Reconstruction OP Department DRK KKH Neuwied - Heat supply systems. 09/08/2017
394 Electronic control board for ACS800 frequency converter 09/08/2017
395 Purchase of frequency converters 09/08/2017
396 Construction of Distribution Line with Three (3) units 75 KVA Distribution Transformer 08/08/2017
397 1426851 record - IO-E4905-CONST LINE ELECT medium and low voltage COLONIA NVO DESERT (CompraNet) 08/08/2017
398 Supply of frequency converters 08/08/2017
399 Purchase of components (digital indication devices, linear converters, angular displacement converters) 07/08/2017
400 Execution of works on replacement of pump units with the installation of frequency converters in the pumping station of the 3rd lifting of the 2nd stage of the NFS, in accordance with the terms of reference approved by the Customer 07/08/2017
401 "Flight overhead transmission lines of KEGOC branch" Sarbai MES "using unmanned aerial vehicles" 01/08/2017
402 Supply and electricity transmission and distribution on behalf of the central administration site of economic and financial ministries (Bercy) and some of its public institutions. 31/07/2017
403 Construction TBA and LV gridline of TBA in UngHoa district 31/07/2017
404 Conformity assessment of investment projects and construction supervision within the meaning of Art. 166 of the LSP for the project: "Replacement of oil-filled cable transmission line 110 kV" Dragalevtsi "". 24/07/2017
405 Railway works belonging to the STIB located in the Brussels-Capital Region and some adjacent municipalities. This involves the construction, renewal and maintenance of trams, metro and pre-metro tracks, including ancillary works (welds, road surfaces, etc.). 24/07/2017
406 Construction of New Transmission Lines Vasilikos — Moni 132 kV and Vasilikos — Mari — Kofinou 132 kV. 19/07/2017
407 Upgrading of Electrical Transmission Lines and Transformers 21/06/2017
408 Preparation of detailed design for construction of a new 400 kV overhead line from S / S "Varna 19/06/2017
409 CEB/TCP/DGM/ANAGS/2017/03:- Supply and Delivery of 02 Nos. of 220 kV Transmission Line Protection Cubicles, 02 Nos. of 220 kV Transmission Line Control Cubicles, 02 Nos. of 220 kV Transmission Line Panel Fascia and 02 Nos. of Marshaling KIOSKS each for 02 Nos. of 220 kV Transmission Line Bays for Augmentation of New Anuradhapura Grid Substation 06/06/2017
410 Framework agreement - delivery of overhead wires. 02/06/2017
411 Supply and electricity transmission and distribution and related services on the perimeter of the region Bourgogne Franche-Comté. 02/06/2017
412 Design, Supply and Installation of Neighborhood Electrification works consisting of 33/11kV New Substations and associated 33kV, 11kV & 0.4kV Lines under the 220kV Chilime-Trishuli Transmission System Project, Neighborhood Electrification Component (Package -3). 25/05/2017
413 17C0003 - supply and electricity transmission and distribution and related services. 02/05/2017
414 2. Construction of a new 400 kV power line from substation Plovdiv to substation Maritsa Iztok (estimated contract value up to € 21,600,000). 27/04/2017
415 Construction of New Polpitiya – Hambantota 220kV Transmission Line 29/03/2017
416 Performing maintenance activities in line scope of the 380- / 220- / 110-kV overhead lines TenneT TSO GmbH under the responsibility of the operating center Bamberg. 27/03/2017
417 The contracting authority invites tenderers to a competition for the contract ‘Construction Work’ in the projects ‘Transformer Stations Neset, Ugulsvik and Heggmyrane’. Luster Energiverk AS has been awarded the site concession for the construction and operation of a 66 kV power line connection between Hafslo and Veitastrond in Luster municipality (NVE ref. 200700951-73), including new transformer stations. This procurement is for construction work for the construction of Neset Transformer Station, Ugulsvik Transformer Station and Heggmyrane Connection Substation. 20/03/2017
418 Construction of MV Lines in ECOU 21/02/2017
419 Construction of 10 kV overhead lines of 220 kV Substation EPA-SS 1150 kV Ekibastuz 20/02/2017
420 SDLA - Increased transport supply in sectors II, III and IV of Marne La Vallee Chessy between Noisiel and - lot 10 - studies and work for the overhead lines and traction. 17/02/2017
421 Construction of 25.572 km overhead distribution line under the geographical area of Jamalpur PBS against 1.5 MCCP 14/02/2017
422 Construction, Extension &Renovation of 11kV, 11/0.4kV, 0.4kV Line & Installation/Renovation of Distribution X-Former 14/02/2017
423 Construction, Extension &Renovation of 11kV, 11/0.4kV, 0.4kV Line & Installation/Renovation of Distribution X-Former. 14/02/2017
424 Procurement of Plant, Design, Supply, Installation, testing & commissioning of 500kV Transmission Line 05/02/2017
425 Improvement of Distribution Line and Transformer Suspension in 02/02/2017
426 The right to enter into an Agreement for design, survey, construction, installation and commissioning of LEP-10 (6) kV overhead line, 10 (6) / 0,4 kV, 0.4 kV transmission line, upgrade of 35/10 kV Substation Avangard, located in Yelets area TA contracts (lot 341), a branch of IDGC of Centre PJSC (the branch ... 01/02/2017
427 Various performing assembly work on 132 kV overhead line which forms part of the main distribution network ELMU Network Ltd. 01/02/2017
428 Supply of the works and services related to construction of the overhead transmission line 29/01/2017
429 Installation of 11 kv overhead lines 26/01/2017
430 Establishment of the overhead line system. 24/01/2017
431 Supply of equipment and construction of the transmission line 2x35 kV TS Osijek 1-TS Orlovnjak (shares pillar number 16 to TS Orlovnjak) 24/01/2017
432 Supply - electricity transmission and distribution. 23/01/2017
433 Construction of a new 400 kV power line in Bulgaria 20/01/2017
434 LV, MV cables (NAYY-J, NYY-J, NA2XS (F) 2Y) and insulated overhead lines (NFA2X) shipments. 20/01/2017
435 Job Construction 225/60 kV DAKHLA, post 60/22 kV DAKHLA and the construction of three 60 kV overhead lines and 60 kV three underground lines 18/01/2017
436 110 kV overhead line fittings. 18/01/2017
437 Construction of 11 KV OHD line 18/01/2017
438 Framework agreement tramway project signal and overhead. 16/01/2017
439 Estonian - Latvian third 330 kV interconnection transmission line construction 13/01/2017
440 Construction of overhead power lines 11/01/2017
441 Improvement of Distribution Line and Transformer Suspension in 09/01/2017
442 The Project will enable AD MEPSO to construct the Macedonian portion of the planned 400 kV cross-border electricity interconnection between FYR Macedonia and Albania, the first interconnection between the two countries, and the introduction of grid efficiency improvements to the MEPSO's infrastructure. The Project will provide crucial cross-border infrastructure, delivering transition impact through the expansion of competitive market interactions and setting standards for corporate governance and business conduct. 06/01/2017
443 Design, Supply, Installation and Commissioning of Udipur-Markichowk-Bharatpur 220 kV Transmission Line 05/01/2017
444 Improvement of Power Distribution Line and Transformer Suspension in 03/01/2017
445 Reconstruction of 110 kV overhead line Kromolice - Nagradowice - Kromolice - Swarzedz and Kromolice - Gadki with the construction of the RS 110 Garaszewo to enhance energy security agglomeration. 30/12/2016
446 Construction of 10 kV overhead lines of 220 kV Substation EPA-SS 1150 kV Ekibastuz 29/12/2016
447 Procurement of Electrical Overhead Distribution Line Materials 28/12/2016
448 Construction of 132kv transmission lines between proposed kirindiwela Switching Station 28/12/2016
449 Construction & Renovation Works of 11KV, 11/0.4KV & .4KV Distribution Line. 28/12/2016
450 Construction of connected double circuit 110 kV transmission line for TS Neokazi by cutting the existing 110 kV line ‘TS Stip — TS Probistip’. 28/12/2016
451 Supply and electricity transmission and distribution for higher power sites is 36 kVA and associated services. 27/12/2016
452 TENDER FOR PROCUREMENT OF TRANSMISSION LINES AND SUBSTATIONS 23/12/2016
453 Assembly / disassembly of low and medium voltage overhead lines. 22/12/2016
454 REHABILITATION AND CONSTRUCTION OF DISTRIBUTION LINES AND SUBSTATIONS. 15/12/2016
455 Construction of under ground power line to replace the existing 11 kv and 33 kv medium voltage overhead line 14/12/2016
456 Transmission lines VA and district heating.
Borås Energy and Environment AB intends to build new lines of VA and district between Boras and Refuge starting in spring 2017. The contract includes earthworks, laying, jointing, recovery etc.
are hereby invited interested parties to submit their application to tender.

12/12/2016
457 Technical supervision of construction 2 a chain of 35 kV power transmission line length of 50 km., with 2 transformer substation P / ST-35/6 kV metal-clad switchgear 6 kV to 20 cells for the power supply of the mine "Zhalpak". 12/12/2016
458 Construction of high voltage and medium voltage power lines 09/12/2016
459 Supply and electricity transmission and distribution. 01/12/2016
460 The subject of the work is the implementation of the project IE-12-2003679, "Shelf-Svitavy outdoor 110 kV line" and that construction of a new overhead overhead power lines 2 x 110 kV in TR section shelf - TR Svitavy. Within the implementation of inter alia provedana building a new lattice towers, including concrete foundations and coatings, installation of new curtains insulators, phase conductors and earth wire, connecting the planned and existing 110 kV lines and commissioning. Construction will be carried out according to the project documentation and all related standards.

30/11/2016
461 SPN - Engineering, Procurement & Construction of Opuyo - Moroto 132 KV Double Circuit Transmission line and Substation
30/11/2016
462 NgheAn Power Co Bid for package 03: construction internal transmission line from Do Luong power branch to Yen Thanh power branch; from Cua Lo to Cua Lo 110kV substation and from Ky Son power branch to Tuong Duong/Ky Son 110kV substation, from Tuong Duong power branch to Ky Son power branch. 26/11/2016
463 PROCUREMENT OF TRANSMISSION LINES AND SUBSTATIONS 24/11/2016
464 Construction of MV/LV distribution line and substation 23/11/2016
465 The 154 kV transmission line Samandag TM Contacts Plant 21/11/2016
466 Procurement of Plant, Design, Supply, Installation, testing & commissioning of 220kV Transmission Line from Sheberghan to Andkhoy 20/11/2016
467 Construction of Single Phase Distribution Line for SitioDanac 17/11/2016
468 Processing and implementation of power transmission lines 132 k. P air and ground Order term 16/11/2016
469 330 kV overhead line Jurbarkas - Bitenai (LN 531) of defective reinforced concrete supports unifloral with guys replacement with new metal supports 14/11/2016
470 Construction internal transmission line in TuyenQuang province 14/11/2016
471 This Qualification System is introduced to qualify candidates for future tenders concerning air insulated circuit breakers (50 kV, 110 kV, 150 kV, 220 kV and 380 kV) for its high voltage infrastructure in The Netherlands and Germany.
12/11/2016
472 11kv, LV Lines and Substations Construction within Bulawo West District 10/11/2016
473 Construction of transmission line for the 500kV My Tho - DucHoa Transmission Line. 09/11/2016
474 Construction of 765 KV D/C Hexa-Zebra Transmission line 08/11/2016
475 Construction of LT , HT lines and substation , shifting and improvement of LT, HT lines 08/11/2016
476 KAVAKLIMES the PROTECT NATURAL PARK POWER TRANSMISSION LINE AND TRANSFORMER PLANT CONSTRUCTION 08/11/2016
477 Design,manufacture, test, supply, erection and commissioning of33kV, 3 phase lines 07/11/2016
478 Suspension and Jointing Equipment dor 110 and 400 kV Transmission Line.

04/11/2016
479 KOSTT (the Borrower or the Company) the electricity transmission system operator (TSO) in Kosovo intends using the proceeds of a loan from the European Bank for Reconstruction to enable KOSTT to achieve full compliance with the N-1 electricity transmission grid security criteria 03/11/2016
480 They will be contracted engineering services in distribution networks HV / MV / LV and, without limitation but not limitation, include:
1. Projects of high voltage power lines U> 1000 V
2. Projects of low voltage power lines U <1000 V.
03/11/2016
481 Establishment of Transmission line 132 KV dual circuit TT To feed the citys station
31/10/2016
482 RECONSTRUCTION OF GRP-750 KV TRANSMISSION LINE TO CONNECT THE 750-KV 31/10/2016
483 Construction of the foundation, tower installation and wiring military airport Naein 63 kV transmission line 2 29/10/2016
484 ACSR Moose Conductor-CD01 (1,158 KMs) for 400kV D/C Banaskantha (Radhanesda) Pooling Station – Banaskantha (PG) Transmission Line under Transmission System 26/10/2016
485 Supply of the works and services related to construction/reconstruction of the overhead transmission lines for Double 400 kV OHL Križovany - Bystricany 25/10/2016
486 WORKS PEMEBERSIHAN & PATROL parentis TNB TRANSMISSION LINE PACKAGE I 132KV CITY STAR - POWER STATION T001-147 Perlis (3 ROUND) FOR STATE OFFICE MANAGER (MUST & MANAGED), DEPARTMENT OF ASSET MAINTENANCE, TRANSMISSION TNB 20/10/2016
487 Construction of 400 kV D/C Quad ACSR Moose Transmission line from Korna- Jasalmer-II on turnkey basis and the packages are covered under the Rajasthan Renewable Energy Transmission Investment Program and likely to be funded by the Asian Development Bank under Bid Enquiry No. 18/10/2016
488 The subject of the work is the replacement of the double overhead power lines of 110 kV V307 / 308 TR Reporyje - TR Chyne and V306 / 307 TR Chýne - TR Tuchlovice its original route. The construction will be dismantled existing poles incl. the elimination of existing foundations and towers will be built new, stretched phase conductors, combined grounding cable (KZL) or grounding cable etc. 18/10/2016
489 Construction of a new 400 kV power line in Bulgaria 15/10/2016
490 330-110 kV voltage overhead line aluminumuninsulated wires with steel core strands of laboratory measurements and testing services 14/10/2016
491 Construction of (i) 400 kV D/C Quad ACSR Moose Transmission line from Korna- Pokaran (115 Km.), (ii) LILO of one circuit of 400 KV D/C Raj. West LTPS-Jodhpur (Mandore) line at 765 KV GSS Korna (Twin Moose) (10 Km.) and (iii) LILO of both circuits of 400 KV D/C Akal-Jodhpur (New) lines at 765 KV GSS Korna (2X2 Km. D/C = 4 Km. D/C Quad Moose) on turnkey basis 13/10/2016
492 Supply and electricity transmission and distribution for municipal facilities in the city of Coignières. 13/10/2016
493 Construction of balance work of 132kv tein bundle double circuit transmission line 13/10/2016
494 PROPOSED 500kv OVERHEAD LINE TERMINATION WORKS FOR DIAMETER BNTS 1 & 2 AT PMU 500kv LENGGENG 13/10/2016
495 Supply, delivery and installation of towers and other equipment for 10kV and 35kV transmission line Vrutok - Vrben 12/10/2016
496 PROPOSED TRANSMISSION LINE 11/10/2016
497 33 kv transmission line 10/10/2016
498 Rehabilitation and security AT 2001 power line 63 kV Pontiffroy - WOIPPY + Pontiffroy - ST JULIEN 2 07/10/2016
499 Supply and electricity transmission and distribution. 06/10/2016
500 Design, Supply, Installation, Testing and Commissioning of 150 kV Overhead Transmission Line Tayan - Sanggau 06/10/2016
501 Design, Supply, Installation, Testing and Commissionig of 150kv Overhead Transmission Line 06/10/2016
502 Renewal work of low voltage overhead line network cable to twisted SahrijGnaoua- sector first tranche 06/10/2016
503 Open procedure for the award of the garrison service, scheduled and corrective maintenance of the contact line of 20KV / 1500 cc conversion systems (ESS). 05/10/2016
504 Supply, febrication and erection of hydro-mechanical, electro-mechanical, civil work and transmission line (33kv) 05/10/2016
505 Construction of power lines to supply power to propose sub division 05/10/2016
506 Construction of transmission line 03/10/2016
507 Reconstruction of 0.4 kV power lines 28/09/2016
508 Agreement for the construction of sections of 10 kV overhead line 27/09/2016
509 Design, Supply, Installation and Commissioning of Barhabise - Kathmandu 400/220 kV and 132 kV Transmission Line 26/09/2016
510 Design, Supply, Installation and Commissioning of Barhabise-
Kathmandu 400/220 kV and 132 kV Transmission Line.
26/09/2016
511 VinhPhuc Power Co Bid for construction transmission line of private telecom network in VinhPhuc province. 26/09/2016
512 Installation of 132kV Transmission Line 45Km between Tal-Awainat and Sinuni District in Ninawa Governorate. 25/09/2016
513 Determination of a contractor for design, survey, construction, installation and commissioning of equipment for the project: Construction of 6 / 0.4 kV insulated overhead line 6 kV insulated overhead line from 6 kV f.20 PS ?325 «Meadow», 23/09/2016
514 Construction of new overhead distribution line 22/09/2016
515 CONSTRUCTION OF POWER LINE FOR Macolla 34.5 KV 40 MORICHAL. 21/09/2016
516 Construction of overhead elecrical distribution line 20/09/2016
517 DC Minor Distribution line construction for NC OU 19/09/2016
518 "Reconstruction of 110 kV overhead line in the extension of the glades" 19/09/2016
519 Bid for construction transmission line in Bac Giang province in 2016. 19/09/2016
520 Supply, delivery and installation of conductors ranging from 10kV transmission line Vrutok- Brben 19/09/2016
521 As part of the construction of a new 380 kV HV line, you have to cross the Scheldt. 16/09/2016
522 Azerbaijan has applied for financing from the Asian Development Bank (ADB) towards the cost of Power Distribution Enhancement Investment Program – Tranche 1. Part of this financing will be used for payments under the contracts named above. 16/09/2016
523 Construction of 33kv OHD new line 15/09/2016
524 Design, Supply, Installation/Erection, Testing and Commissioning of
11/0.4 kV Distribution System
12/09/2016
525 2. The Nepal Electricity Authority (“the Employer”) invites sealed bids from eligible bidders for the construction and completion of Design, Supply, Installation and Commissioning of Kusma-New Butwal 220 kV Transmission Line (“the Facilities”).Design, Supply, Installation and Commissioning of Kusma-New Butwal 220 kV Transmission Line 09/09/2016
526 Supply and electricity transmission and distribution for municipal facilities in the city of Coignières.
Reference number: 1605DT
09/09/2016
527 Design, Supply,Installation and Commissioning of Kusma-New Butwal220 kV Transmission Line 09/09/2016
528 Construction internal – province transmission line from Vu Quang Power to Huong Son Power 08/09/2016
529 20 kV overhead lines PL-27 technical design development and reconstruction AknisteAkniste county town 08/09/2016
530 Contractor to perform work on the reconstruction of overhead line 08/09/2016
531 DETAILED ENGINEERING DESIGN, PROCUREMENT, CONSTRUCTION AND COMMISSIONING WORKS
Botswana Power Corporation wishes to invite tenders for Detailed Engineering Design, Procurement, Construction and
Commissioning of Morupule B to Isang 2nd 400kV Transmission line and associated works
07/09/2016
532 Supply of 120mm 4Core Power Cable for Main Power Supply of Cubator-1ne, CIIT Islamabad 07/09/2016
533 39/2016: Contract for overhead line 06/09/2016
534 Supply and electricity transmission and distribution for the 3000 group of sites and related services. 06/09/2016
535 Construction inter- province transmission line to power of Ha Quang, 06/09/2016
536 RE- ADVERTISEMENT: VARIABLE SPEED DRIVE SKILLS PROGRAMME 06/09/2016
537 PANEL CONTRACT FOR THE MINOR DISTRIBUTION LINE CONSTRUCTION (11-33KV) 05/09/2016
538 Construction transmission line from BacKan Power Co to Be Be power branch, from Ba Be power branch to Cho Don power branch 05/09/2016
539 : Construction of 220kV Overhead line (including supplying of materials) for Nam SaiGon - District 8 220kV Transmission Line (ADB-EVNHCMC-NSGD8-D2) 05/09/2016
540 Construction 132 Kv Line With 17 Km Length 01/09/2016
541 "Construction of a double circuit transmission line 35kV " 31/08/2016
542 Construction work on the construction and reconstruction of electric power distribution network in Elektra Zagreb by groups 30/08/2016
543 University of Mannheim, Schloss East Wing, rehabilitation hall, catacombs and Arts Tower, technical equipment, power lines, communication and information technology equipment. 30/08/2016
544 110kV overhead L017 Keila-hub section from No. 90Y - AJ wireless communication hub, trimming the gauge 30/08/2016
545 Construction of power lines and associated networks. 29/08/2016
546 Construcion of overhead electrical distribution line 29/08/2016
547 Construction of high-voltage power line 29/08/2016
548 Construcion of transmission line 24/08/2016
549 Power Transmission Line Work 24/08/2016
550 Construction of new overhead high-voltage power with a total length of 28 km, of which 15.8 km in length with a combined 110/35 kV lines. Phase conductors (110 kV) - 243-AL1 / 39-ST1AM; Grounding line - 184-AL1 / 30-ST1AM; Combined grounding rope - AL3 / A20SA 92/43 - 11.5 to 24 optical fibers.

23/08/2016
551 Substitutes grounding pillars 110kV transmission line 23/08/2016
552 Construction of 220kV Overhead line 22/08/2016
553 Construction of 220kV Overhead Line 22/08/2016
554 Upgrade of 6-10 kV overhead lines 22/08/2016
555 Selection of engineering company to provide engineering services for the integrated management of construction activities to the implementation of customer functions, mandatory implementation of the technical supervision during construction, engineering services and perform the functions of the customer during the construction of power line procurement procedures for the project: "Permanent forest nursery in FME" Lepel forestry ". 22/08/2016
556 Implementation of works on installation of a 100 kVA to 100 kVA at TMG-division of a 0.4 kV overhead line from Transformer Substation # 5111 in with. Maginsk Karaidelsky District RB 22/08/2016
557 Construction of 6 kV electricity transmission line 22/08/2016
558 Undertake study of the area in question and establish the optimal line route for the proposed 132kV double circuit line from Mazenod substation to Thetsane substation
18/08/2016
559 Procurement of 132kv Double Circuit Line from Mazenod Substation 18/08/2016
560 Maintenance, inspection and fault services of power lines.

17/08/2016
561 Construction of 25.236 KM OHD line at comilla PBS-2 17/08/2016
562 Operation of Cable Crossing and Electricity Transmission Line of 20 kv for Power Provision of Parand City Sewage Treatment Power 17/08/2016
563 Supply, Construct, Install and Commission at Aries/Loop 12 and Juno/Loop 4,
New 50kv Overhead Distribution Lines (Eskom Self Build) and Associated
Transnet Rail Traction Feeder Substations required for the Electrical and Civil
Infrastructure Upgrade on the Transnet Ore Line between Saldanha Bay and
Sishen
16/08/2016
564 WR29/16 Annual Contract for 33kV, llkV, LV Lines 27/07/16 09:30hrs Bulawayo West Client and Substation Construction in Bulawayo Services Centre
16/08/2016
565 Selection of a contractor to perform work on the reconstruction of overhead line VLP-10 and apparatus of 0.4 kV at the object overhaul "The road N-144-Olizara Becoming Mateevici-Butch" Zhabinka district 16/08/2016
566 Electronic Auction - press Acquisition of 120 tons for use in mounting transmission line cables, with delivery in Rio de Janeiro / RJ. 16/08/2016
567 Electricity Distribution LLC network area electrical cables and overhead lines under specific conditions masts searching and mapping 16/08/2016
568 Procurement of Goods for 20/0.4 kV Transmission Line and Substation Equipment for Gereshk, Helmand Province. 15/08/2016
569 Assessments establishing the right to build on land - agricultural territory for existing overhead line 110 kV "Slavs" and landed properties within the forest area to determine the price of indefinite servitude existing overhead line 110 kV "Krumovitsa" 15/08/2016
570 TenneT is looking for further more qualified partners for their supply and demand in Overhead Line Insulators 10/08/2016
571 POWER LINE INSTALLATION 34.5 KV FOR OPERATING CENTER Macolla 22 PetroMonagas 10/08/2016
572 Implementation of Transmission Line, Tank Completion, Install of Installation 10/08/2016
573 Annual Contractor for 33kv, 11kv Lv lines and Substation Construction 09/08/2016
574 Electrical installation works on construction and reconstruction of electric power distribution network in the area Elektrojug Dubrovnik 09/08/2016
575 Expansion of protected zones of overhead power lines 09/08/2016
576 Crossings Redevelopment 60KV lines at Oued Tensift and Nfis in Marrakech 09/08/2016
577 Amplifying the power through the construction of a 380 kV line with a total length of 124 kilometers (Chippis - Lavorgo)., Dismantling existing lines over a length of 67 km 08/08/2016
578 Installation transmission line and control equipment of MCU centre for online teleconference system of State Bank of Vietnam 08/08/2016
579 Purchase of Single-concrete supports of overhead power lines SCC - 11.5 - 34 08/08/2016
580 Construction of a 10 kV insulated overhead line and cable line 0,4 kW. Flowers Toropetzkaya district 08/08/2016
581 Construction, modification and removal of overhead lines HTB (greater than 50 kV voltage) 06/08/2016
582 Ads published estimates of 20 kV transmission lines and sub-stations cream Abad plan demands an approximate length of 100 km 06/08/2016
583 Construction of power lines feeding the PSA website (Peugeot Factory) 04/08/2016
584 Construction of Mannar- Nadukuda 220kv Transmission Line 03/08/2016
585 Construction of Mannar – Nadukuda 220kv Transmission Line 03/08/2016
586 Reconstruction of 0,4Kv line HPP Spilje - Objects of MRD, police, mobile operators 02/08/2016
587 Upgrading distribution gridline of substations of Ong Long, Me Linh, Tu Vien 1, T1, T2, T3 Kenh Cay Giong, Bang Tang, Nam Tieng, Nam Dong, Muong Cui 1, Muong Cui 2, Tay Hue, Muong Can 1, Mu Chin, Le Hong Phong, Long Xuyen city. 01/08/2016
588 The right to enter into an Agreement designing the construction / reconstruction of transmission lines (10 kV) and distribution network of 6-10 / 0.4 kV on the First, Lyubimsky, Uglich, Nekrasov, Rybinsk, Pereslavl, Poshehonsky, Rostov, Danilovsky, Tutaev and I ... Expand 01/08/2016
589 The right to enter into an Agreement designing the construction / reconstruction of transmission lines (10 kV) and distribution network of 6-10 / 0.4 kV in Danilov, Yaroslavl, Pereslavl, Nekouz, Rybinsk, Day, Nekrasov, Gavrilov-Yamskaya Poshehonsky and growth ... Open 01/08/2016
590 Prior information notice for Construction of OHL 750 kV Zaporizhzhia NPP - Kakhovska (190 km long), including installation of OPGW and construction of repair/maintenance unit. Construction of SS 750/330 kV Kakhovska, supply and installation of AT 1000 MVA, automated control system for technological processes and relay protection and automatics as well as construction of related infrastructure. Construction of SS 750/330 kV Kakhovska, supply and installation of AT 1000 MVA and related infrastructure. 30/07/2016
591 CONSTRUCTION OF POWER LINE IN 34.5 KV FOR Macolla C2N-1 EMX PETROVICTORIA, S.A. 29/07/2016
592 Supply and transportation of Supply, transportation of insulators, optical cable and accessories for 220kV Thuong Kon Turn - Quang Ngai transmission line Implementation period 29/07/2016
593 Design, Supply, Installation and Construction of Transmission and Distribution Works Lot 1 for 132kv Overhead Lines, Lot 2 for Substation and Switching Stations. 29/07/2016
594 Contract Title Veneer substation section I of the medium-voltage distribution equipment purchases (LP2252) 29/07/2016
595 Medium and low voltage electrification of 24 villages under the PERG IV (Province MIDELT). 27/07/2016
596 "Construction of a new 400kV overhead line from S / S" Maritsa East "until s / s Maritza East 3 - LOT 2" 27/07/2016
597 19 Mayis Dam Transmission Line DAM will BIRTHS TRANSMISSION LINE
25/07/2016
598 Power Transmission Lines and Distribution Facilities Construction 25/07/2016
599 Supply & Installation Of 66kv Transmission Lines In Greater Monrovia And Bomi Corridor 22/07/2016
600 PQ/ 161kV VOLTA - ACHIMOTA – MALLAM TRANSMISSION LINE PROJECT 21/07/2016
601 Supply consulting service for technical economic report, bidding document for the project of applying management technical on GIS on transmission gridline 21/07/2016
602 Medium and low voltage electrification of 30 Villages in the PERG IV (Province MIDELT). 20/07/2016
603 353 KIIIO BA 4b - expansion and structural improvement, building section 4b (especially enlargement surgical area.), 369 KIIIO NSHV - restructuring / extension
of the low voltage distribution - 3040 insulation.
20/07/2016
604 353 KIIIO BA 4b - expansion and structural improvement, building section 4b (especially enlargement surgical area.), 369 KIIIO NSHV - restructuring / extension of the low voltage distribution - 3030 plumbing. 20/07/2016
605 Construction of cable lines of power low-voltage power distribution equipment, reconstruction of the existing substation Sn / LV in 42 Aviation Training Base in Radom. 19/07/2016
606 Package ADB-EVNHCMC-CBBT -W2: Construction of 220-110kV Cau Bong - Binh Tan Transmission line from G 19 to 500kV Cau Bong substation 18/07/2016
607 Framework agreements for survey of infrastructure objects — energy infrastructure, electric lines, (underground and overhead power lines with voltage level 110 kV, 35 kV, 20 kV and 10 kV) and preparation of geodesic elaborates for determining facts of the case of illegal overhead/underground linear infrastructure facility 18/07/2016
608 Electricity Distribution LLC Linda substation 110/10 automaatikakappide procurement, IK07221 18/07/2016
609 Cont. of 25. 005 km ohd line 17/07/2016
610 Thanh Cong – Thuong Dinh 110kV Transmission Line: Design, Supply, Installation and Commissioning of 110kV Underground Cable 15/07/2016
611 Ecological building as part of the construction of a 380 kV power line construction project. 15/07/2016
612 Consulting within the meaning of article 166 of the SPA in the performance of works on the project "Reconstruction of overhead line 110 kV" Bohot "with replacement of poles and wires. 15/07/2016
613 13.8kV Overhead Feeder Extension - Construction Services 14/07/2016
614 Implementation of structured cabling network with a dedicated power supply installation and supply of active devices 13/07/2016
615 SPLITTING THE RP 6011 RELIANT BERKANE A SAIDIA PK OF 1 TO PK 300 + 17 + 000: WORK OF MOVING AVERAGE POWER LINES AND LOW VOLTAGE OF ONEE - ELECTRICITY SECTOR PROVINCE BERKANE ... 12/07/2016
616 This item includes procurement performance of electrical installation works on construction and reconstruction of electric power distribution network in the area of external drives Elektra Zagreb 12/07/2016
617 Construction of cable lighting power line 0,4 kV in Jodlów gm. The new sol phase II 12/07/2016
618 "Construction of power lines on the street ag.Kolodischi Minsk Minsk region." 11/07/2016
619 Alberta Electricity Distribution System Modelling and Analysis 11/07/2016
620 improving electric pressure of grid 973 – TGPT2 to 22kv. 11/07/2016
621 construction MV grid, LV grid, transformer station and lighting system for resettlement area for road connection Vi Thanh town, Hau Giang province to Can Tho city ( section of Can Tho city ) 11/07/2016
622 Construction of 33KV Line bays in form of indoor GIS Panel at 220/132/33KV & 132/33KV AIS Substation of BSPTCL in Patna districts of Bihar 08/07/2016
623 supply and installation MV gridline and substation III-160kVA to supply power for Viet Huong industrial zone branch. 08/07/2016
624 SUPPLY & DELIVERY OF OVERHEAD TERMINATIONS FOR JEN RFT 2016_0071 07/07/2016
625 High Voltage (HV) line construction for various zones within the Limpopo Operating Unit on an “as and when” required basis over a period of 36 months 06/07/2016
626 CONSTRUCTION OF POWER LINE OF DOUBLE TERNA FOR SUPPLY 34.5 KV tillers AREA RESERVE PETRO SAN FELIX, DIVISION JUNIN. 05/07/2016
627 The task here is for the construction of the output of electricity (2x400 kV line block) for the New power unit with electric power of 910 MW. The line block is designed as a double circuit 400 kV insulation. One track lines will operate at 400 kV (output power from a block of 910 MW), the second track will operate at a voltage of 220 kV (power supply on reserve-boot block 910 MW) station Byczyna track overhead goes into the cable line 220 kV.
The detailed scope Subject of the Contract will be determined by the Employer in the Terms of Reference (hereinafter abbreviated as "Terms of Reference").
04/07/2016
628 Construction of 110 kV facilities in TS 110_20 kV Medulin 04/07/2016
629 Dismantle and Construct 69kV Transmission Line 0039 Structure 1 04/07/2016
630 Electricity line construction 04/07/2016
631 Construction of a new single circuit overhead transmission line and substation 30/06/2016
632 Bid for supply and installation MV grid 22kv and technical services for Da Dang hydropower work in Lac Duong district, Lam Dong province. 30/06/2016
633 Proposed 500kV Transmission Lines 30/06/2016
634 Electric Grid and Transmission Line Construction Work 30/06/2016
635 Supply and installation MV grid 22kv and technical service for the project of connection Da Dang hydropower factory to transformer station 110/. 30/06/2016
636 CONSTRUCTION OF POWER LINE OF PLATFORMS TO HOME DISTRIBUTION FIELD ISLANDER. 29/06/2016
637 Supply and distribution services of electricity to the headquarters of the Regional Fund for Environmental Protection and Water Management in Poznan 29/06/2016
638 Of 380 kV feeder line of 380 kV PARTS 1 PCS TM CCPP (FREE ZONE) ADDITIONAL ACTION 28/06/2016
639 The existing 380kV line of swissgrid and 132kV line 27/06/2016
640 The services of the procurement item D-1.2 include low voltage installations for the coverage of cat Lake, the overburden stilts, the electric rooms of open track on the Northern bypass of Zurich and the electrical room Wehntalerstraße. The low voltage equipment for the 3rd tube Gubristtunnel and for the 1st and 2nd tube Gubristtunnel are written out as options. The Builder reserves the right to perform only some or no option. 27/06/2016
641 Supply materials and construction 0.4km of gridline 22kV, 8 substations 250kVA-22/0.4kV and improving 12km of gridline 0.4kV 27/06/2016
642 Construction MV & LV grid and transformer station in Muong Lum 24/06/2016
643 Low voltage supply terminal 24/06/2016
644 CEB/DGM/TCP/SPSSBFP/2016/05 :- Removing of Towers from New Chillaw GSS to Narawila under the project for Reconstruction of New Chillaw – Bolawatte 132kV Transmission Line 23/06/2016
645 Electric Grid and Transmission Line Construction Work 23/06/2016
646 Construction of 11 Kv. 11/0.4 KV, 0.4/0.23KV Lines. 23/06/2016
647 Designs for construction powerline and a 20MVA 132/11KV Substation at T-Project in Kinross 22/06/2016
648 Construction of overhead power lines 22/06/2016
649 Divisional Offices - Zona Leon - Construction of LST 115 Kv Colinas de Leon 22/06/2016
650 Construction MV gridline 22/06/2016
651 Renovation of existing 33 kv overhead line. 22/06/2016
652 Construction rural MV gridline at cattle – breeding planning area in Long Khanh town 21/06/2016
653 construction rural MV gridline at concentration production zone in Long Khanh commune. 21/06/2016
654 Construction of the 110 kV line to the station Korczowa 20/06/2016
655 CONSTRUCTION OF ZAMDELA - LEITRIM 88KV DOUBLE CIRCUIT & 12 CORE OPGW 20/06/2016
656 CONSTRUCTION OF MASA-NGWEDI (SECTION C) 765KV & 400KV TRANSMISSION LINES 20/06/2016
657 Construction of the Masa-Ngwedi (Section C) 765kV and 400kV Transmission Lines 20/06/2016
658 Supply materials and construction works for the project of anti-overload works for Dong Hai 1, Phu Van Namm 1, Thong Nhat 3, Hung Thang 2, Tan Tien 1, Hai Son 2 substations and improving LV gridline in Hai Quang commune, Hai Hau district. 20/06/2016
659 Construction and supply equipment for the project of construction LV, MV gridline and substation to supply power for Nhan Tam, Nhan Nghia hamlets in Xuyen Moc district. 20/06/2016
660 Construction Improvements lines and distribution networks Bugambilias 2016 20/06/2016
661 Construction MV grid connection Long Thanh – Cam My 20/06/2016
662 110-330 kV overhead lines in the emergency reserve materials 20/06/2016
663 Construction of the Masa-Ngwedi (Section C) 765kV and 400kV Transmission Lines 20/06/2016
664 Works on the establishment of the overhead line system for the power system 1 AC 15 kV 16.7 Hz including equipment of existing and newly be erected stations 17/06/2016
665 Bid for construction MV & LV grid and transformer station for households in Tan Uyen town. 2016. 17/06/2016
666 Reconstruction of the grid MV and LV station Chopin and construction of cable line street lighting Street. Chopin in Tomaszow Lubelski. 17/06/2016
667 Construction of medium voltage line 17/06/2016
668 Supply materials and construction MV gridline and substation for anti-overload works 16/06/2016
669 Supply materials and construction MV gridline and substation for anti-overload works 16/06/2016
670 OFFER FOR SELECTION OF CONTRACTOR SCOPE HIGH VOLTAGE LINES TO 33kV FOR THE ENACTMENT OF DISTRIBUTION TNB. 16/06/2016
671 Bhamshela Electrical power supply lines 15/06/2016
672 Bid for construction gridline 22kV to supply power for An Phuoc industrial zone on road No 4 14/06/2016
673 Bid for construction gridline 22kV to supply power for An Phuoc industrial zone on road No 7. 14/06/2016
674 Bid for construction gridline 22kV to supply power for An Phuoc industrial zone on road No 5 and road No 10. 14/06/2016
675 The right to conclude the framework agreements to perform the full range of design, survey, construction and installation work on the general construction and power grid facilities by branches of PJSC "Lenenergo" 14/06/2016
676 154 kV Power Transmission Line Protection Wire on, changing to 70 mm² OPGW 14/06/2016
677 completing gridline in Thua Thien Hue province 14/06/2016
678 Construction gridline in Huong Thuy town 14/06/2016
679 the right to conclude the Agreement to perform works on the construction of 10 kV for external power supply of 10 kV transmission line of 10 / 0.4 kV of "eco-products" 14/06/2016
680 Procurement of transmission line. 13/06/2016
681 Bid for supply electric cable for anti-overload works of gridline 0.4kV. 13/06/2016
682 Bid for construction gridline and substation for the head office of Binh Duong Social Insurance. 11/06/2016
683 Installation of a new 230kv transmission line 10/06/2016
684 Zone Salvatierra.- Works 2016 - Construction of medium voltage line 1C - 3 10/06/2016
685 Construction float cable grid on Phu Dien street. 09/06/2016
686 Construction float cable grid on Phuc Dien street 09/06/2016
687 ADAPTATION OF TOWERS AND INSTALLATION OF TRANSMISSION LINE DRIVER OF 69 KV SHEEP-Cachama DISTRICT SAN 09/06/2016
688 Expansion of the electric power distribution to benefit the towns of General Ortiz Avila, Villamadero and Xbacab, in the municipality of Champoton, in Campeche state, Convention CDI-CFE-GOB. EDO. 2016 09/06/2016
689 SARAWAK ENERGY BERHAD
RECTIFICATION WORKS OF SELECTED TOWER SITES OF
OYA – SALIM 132kV TRANSMISSION LINE
08/06/2016
690 Bid for construction LV, MV gridline and substation 50kVA-22/0.4kV for the head office of Dak Peur border gate customs branch. 08/06/2016
691 Construction of 1 + 000 km of medium voltage line 3F-4H PC, PT, ACSR 1/0 and M. T. withdrawal line recovery of agricultural irrigation rates lag 9 054860300161 08/06/2016
692 Area Regional Salamanca - Construction of medium voltage line 0 + 600 km, PC, 3F ACSR 1/0, for the recovery of NPLs in-ph 9 in the area of Salamanca Agency center 08/06/2016
693 Construction gridline 22kV, substation and gridline 0.4kV to supply power 07/06/2016
694 Bid for package 7: construction, installation grid and feeder for stretching circuit of two grid 220kV O Mon – Soc Trang. 06/06/2016
695 (Nr.4466) 35 kV overhead line Ariogala - Raseiniai replacement of 35 kV cable line of work, the work of the project preparation 06/06/2016
696 Bid for supply material ( except for A part) and construction for electric energy loss reduction of gridline in Quang Ninh district 06/06/2016
697 construction grid 110kv for supply power for cool-rolled steel and galvanized plate factory 06/06/2016
698 Tender For Design, Manufacture, Supply, Erection, Testing And Commissioning Of Turbine Generator System With All Auxiliaries Including Switch Yard And Transmision Line... 04/06/2016
699 Swissgrid is the national grid company and is responsible for the safe, reliable and economic operation of the Swiss high-voltage grid in the framework of its statutory mandate and as the transmission network owner. 03/06/2016
700 CLEARANCE AND ERADICATION OF VEGETATION IN CLOSE PROXIMITY TO LV AND MV OVERHEAD LINES AND SUBSTATIONS UP TO AND INCLUDING 11000V DURING A TWENTY FOUR MONTH PERIOD 03/06/2016
701 construction float cable grid on Ho Tung Mau road, Bac Tu Liem district. 03/06/2016
702 Construction of 33kv Rural Electrification Projects in karamoja Region. 02/06/2016
703 Lithuanian Grand Duke Kestutis Motorised Infantry Battalion power grid reconstruction design and project supervision services contracts. 02/06/2016
704 Acquisition of equipment with mounting and installation for modernization of the Metro-DF System Line Data Transmission 1. 02/06/2016
705 PRO.&HM/DD2/DPC/CZ/2016/09 :- Construction of 33 kV Double Circuit LYNX Tower Line from Dekatana Gantry to Balummahara Stage –II (5.14 km)
(The contractors those who are having ICTAD Grade C-6 or above in Building construction category are eligible to apply for this work)
01/06/2016
706 Construction gridline in Phu Vang district. Funding source: commercial loan and depreciation capital. 01/06/2016
707 Contractor Selection Offers To Work Online Coverage Of High-Voltage Not Exceeding Perak 33kV Distribution Division. 31/05/2016
708 service contracts at the bottom of S1 type towers and T3 / T4 in 230 kV Transmission Line (LDMR601) of the Regional Transmission of Maranhao. 31/05/2016
709 Supervision Engineer forthe Construction of 66/33/22kV Transmission and Distribution Network in Monrovia and Bomi/Grand Cape MountCounties 30/05/2016
710 supply high frequency transmission material ( wave transmission pipe, circuit switch , switch head). 30/05/2016
711 Lot 1: improving and developing LV gridline in Thanh Binh district. +Lot 2: improving and developing MV & LV gridline in Hong Ngu town. +Lot 3: improving and developing MV & LV gridline in Tan Hong district . +Lot 4: improving and developing MV & LV gridline Hong Ngu district Funding source: investment and construction capital . 30/05/2016
712 UPGRADE OF 22KV LINK LINE FEEDING LOWER QEBE & NEW RES VILLAGES 27/05/2016
713 Development of a final detailed plan (plot plan) for a new overhead line of 400 kV of s / s "Plovdiv" up to s / s "Maritza East". 27/05/2016
714 Development of a final detailed plan (plot plan) for a new overhead line of 400 kV of s / s "Maritsa East" until s / s "Burgas". 27/05/2016
715 0.4-10 kV overhead lines slope treatment works Kaunas region (Jonava, Kaišiadorys, Jurbarkas Kaunas, Kaunas distr., Prienai, Grand Forks) 26/05/2016
716 Supply of High-voltage power lines and substations puuvarmuus. 25/05/2016
717 Construction and supply equipment for LV, MV gridline and substation 25/05/2016
718 Diverter flight of birds for outdoor air MV lines for the project LIFE13 NAT / SK / 001272 energy in the country.
24/05/2016
719 Building power transmission lines and communication lines (code DK 016: 2010 - 42.22.2; code DK 021: 2015 - 72710000-0) Services on creation and development of local-area networks Presidential Administration of Ukraine 24/05/2016
720 Bid for package 2: supply goods and construction for repairing grid 110kv 171, 172 A5.20 ND Cam Pha – E5.27 Van Don. 24/05/2016
721 Bid for package 02: supply goods and construction for grid 110kv double circuit 175, 176 T500 Quang Ninh – Mong Duong and shunts. Funding source: big repair 23/05/2016
722 Bid for construction grid 35kv of feeder 375 E21.2 Muong cha – Muong Lay. 23/05/2016
723 EXTENSION TO LINES AND NETWORKS DISTRIBUTION OF ELECTRICITY medium and low voltage in the geographical area level ATIZAPAN 23/05/2016
724 Bid for package `1: construction and installation equipment for Mv & LV grid, transformer station in Vung Tau city. F 23/05/2016
725 demolishing and arranging float cable grid on Xuan Dinh street , lane 207 from house No 02 to Xuan Dinh football ground. 21/05/2016
726 The subject of public procurement is the realization of the construction of a new double supply 110 kV overhead line in the section st. no. 205A (near Prídolí district of Ceský Krumlov.) TR Kaplice portal to a length of about 15.2 km. Construction of the new leadership will require intervention into the existing line 2 x 110 kV Young-Lipno, in the section st. no. 202 - E lake. During construction will supply selected machines, equipment and material self-assured authority. Supplies which are not part of the tender and that the implementation of the contract ensures the sponsor are: poles (steel construction) phase conductors KZL, ZL, insulators, clamping material including vibration dampers. 20/05/2016
727 Prequalification - EU tenders - renovation of overhead lines and omgalvanisering. 20/05/2016
728 Hägersten, towards underground cables of 0.4 kV overhead line. 20/05/2016
729 Civil works that includes the 400kV terrace extension, construction of foundations, transformer plinth, and associated works, drainage, and new fencing. 20/05/2016
730 Maintenance of forest gap subtransmission lines of 115 Kv. 20/05/2016
731 acquisition of reinforced concrete poles, conical trunk, for various transmission lines and substations scattered throughout the Campi of the Federal University of Rio Grande do Sul. 20/05/2016
732 Supply and electricity transmission and distribution of Mc2 18/05/2016
733 RAEC-18/16: Extension of OH lines 18/05/2016
734 Reconstruction of power supply of 220 V DC in the engine HE Rijeka and 110 V DC in HE Lots Group 1. Reconstruction of power supply of 220 V DC in the engine HE River Group 2. Reconstruction of power supply of 110 V DC in HE Lots 18/05/2016
735 SEPS Completion 110Kv Transmission Lines in One Lot 18/05/2016
736 Supply and electricity transmission and distribution. 17/05/2016
737 Single awarded framework agreement - supply and electricity transmission and distribution sites for top 36 kva of Istres. 17/05/2016
738 ÇAYELI - Kaptanpasa (DOKAP) HIGHWAY KM 2 + 000 - 9 + 000 STRUCTURES AND ELECTRIC TRANSMISSION LINE BREAK AWAY WORKS DONE WORK 17/05/2016
739 Construction of the new power line 63kV Borny Viaud. 17/05/2016
740 Installation, Testing And Commissioning Of The Grid Connect System For 'Rural Electrification Scheme (RES)' Project In Gaza (Kg Matang 36, Kg. Selama, Perak) 17/05/2016
741 Construction grid 110kv for supply power for cement crushing station 16/05/2016
742 Construction temporary grid for anti – overload of grid 176 E1.4 Ha Dong – E1.5 Thuong Dinh. 16/05/2016
743 Bid for supply equipment and materials and installation gridline 110kV double-circuit under the project of demolishing T-connecting points and completing chart of substation 110kV in Ninh Binh province. 16/05/2016
744 Power transmission line SMR SMR. 16/05/2016
745 150-kV Manno - Mendrisio, modernization of the line 150 kV Vezia-Scairolo. 13/05/2016
746 Supply, electricity transmission and distribution and associated services for the town of Cusset. 13/05/2016
747 Acquisition of low voltage electricity to the premises of the institution and public lighting services for Alexandria 12/05/2016
748 Lot T12 - stations Clichy Saint-Ouen, Mairie de Saint-Ouen, tunnels and ancillary works: low voltage electrical work. 12/05/2016
749 ANNUAL CONTRACT FOR 11 & 33 KV LINE MAINTENANCE FOR SOUTHERN REGION 12/05/2016
750 Bid for supply materials and construction LV gridline behind substations in 2016. 12/05/2016
751 DCO-HIGH VOLTAGE LINE CONSTRUCTION IN 115 KV BOTELLO-VILLA JIMENEZ 12/05/2016
752 Installation, Testing And Commissioning Of The Grid Connect System For 'Rural Electrification Scheme (RES)' Project In Gaza (RPS Pasik, Nenggiri, Gua Musang, Kelantan). 12/05/2016
753 OFFER FOR SELECTION OF CONTRACTOR SCOPE HIGH VOLTAGE LINES UP TO 11kVFOR THE ENACTMENT OF DISTRIBUTION TNB. 12/05/2016
754 The Ethiopian Electric Utility, Universal Electric Access Program invites eligible bidders for supply of transmission line and substations construction, test & commissioning 11/05/2016
755 The Ethiopian Electric Utility, Universal Electric Access Program invites eligible bidders for supply of transmission line and substations construction, test & commissioning 11/05/2016
756 Open tender for the construction of power grid 0.4 kV cable line of road lighting in the streets of 1 Maja and Transport in Slubice 11/05/2016
757 installation work "Development of electrical distribution networks of 10 kV in Karasai area" development of design estimates / SMR "Development of electrical distribution networks of 10 kV in Karasai area" development of design estimates 11/05/2016
758 Building main investigation as part of the plan approval procedure of the 380 kV power line construction project central axis section: Audorf-Flensburg.
10/05/2016
759 SVA Jaroslaw: Construction of transformer station with the delivery, installation and commissioning and reconstruction of power lines SN and the supply, installation and commissioning of the unit - Modernization of technical equipment in Deblin 10/05/2016
760 Construction of New Line. 10/05/2016
761 SUPPLY & INSTALL 250 CONNECTIONS OF MV, LV & HOUSE CONNECTIONS WITH PREPAID METERS IN MVELABUSHA WARD 8 10/05/2016
762 Supply and electricity transmission and distribution to delivery points, achieving the associated balance of responsibility for benefits and services.
09/05/2016
763 Electrification, on hta works bt: studies, construction of overhead lines, underground pipelines, public distribution substations MV-BT, low voltage connections 09/05/2016
764 Bid for construction grid 22kV for supply power at An Phuoc industrial zone of technical infrastructure at An Phuoc industrial zone. 09/05/2016
765 Purchase, installation and commissioning plant with transmission equipment service. 09/05/2016
766 supply materials and construction for the project of improving LV gridline in Nghia Phu, Nghia Hung communes, Nam Truc district. 09/05/2016
767 supply materials and construction for the project of improving LV gridline in My Trung and My Tan communes, My Loc district. 09/05/2016
768 Supply materials and construction for the project of improving LV gridline in Giao Long and Giao Hai communes, Giao Thuy district. 09/05/2016
769 Improving grid of Bom Tam Thuan branch, Bom Thanh Da branch of feeder 373 – E10.6, 09/05/2016
770 Construction of 33kv and 11kv Rural Electrification Projects 06/05/2016
771 Transmission line for towns to Vert-en-Drouais, St-Remy-sur-Avre Nonancourt, St-Lubin-des-Joncherets.
06/05/2016
772 Regret Letter CORP 3158-An Integrated Secondary Plant solution for Transmission Substations comprised of Protection Schemes, Telecontrol and Substation Automation equipment. 06/05/2016
773 Stadtwerke Saarbrücken GmbH writes the supply of electricity in the network of Deutsche Bahn AG for its subsidiary Saarbahn GmbH, full power as delivery without power usage billing. The annual quantities relating to the supply of electricity to power the locomotives and generated and fed back in the electrical braking, the traction unit quantity of electricity that is adequately compensated separately. 05/05/2016
774 Electricity distribution Stadtwerke Saarbrücken GmbH writes for itself and its subsidiaries for the supply of electrical energy from, full power as all-inclusive delivery with network usage accounting and full power without grid usage billing. 05/05/2016
775 Construction of cable lines 10 kV power md. III-4-1 w / m Kotovskogo in Odesa.; Cable line from Substation 110 / 10kV "Suvorov" to Polish "Light 2" / TA-84 with the installation of Poland "main thing" 05/05/2016
776 Electricity Distribution 05/05/2016
777 Construction distribution gridline and TBA Muong Ut Xuan, Muong Tan Hanh 2, Muong Tan Hanh 3, Nha Thi, Binh Hoa, Phu An 1, Phu Tho 2, Cau Dinh, UB Vinh Thanh, Chau Thanh district, An Giang province. 05/05/2016
778 35 kV overhead line Ariogala-Raseiniai replacement of 35 kV cable line of work, the work of the project preparation 05/05/2016
779 design, supply and installation of transmission line and distribution project 04/05/2016
780 Supply Of THREE POLE MOULDED CASE CIRCUIT BREAKERS 04/05/2016
781 electricity transmission 04/05/2016
782 79106 Freiburg, Hugstetter Str 53, University Hospital Freiburg. New construction of the Interdisciplinary Tumor Center Freiburg (ITZ), low and medium voltage up to 36 kV (low voltage systems).
03/05/2016
783 Supply and installation of power lines, lighting and information technology systems with all related system components including the complete wiring.
03/05/2016
784 Framework agreement for project management for carrying out the burial of public electricity distribution networks work on the territory of SIPPEREC. 02/05/2016
785 Aerial imaging of Elenia's overhead line network in Finland. Elenia's overhead line network includes 15 000 km of 20 kV lines and 15 000 pole-mounted transformers, 300 km of 45 kV lines, 1 100 km of 110 kV lines and 140 substations.
The whole overhead line network (20 kV, 45 kV and 110 kV), pole-mounted transformers and primary substations of Elenia shall be imaged between 2017 and 2020. Also, laser scanning (LiDAR) data of the whole network and line corridors shall be obtained. Images and data obtained will be used mainly for condition monitoring purposes and network maintenance planning.
02/05/2016
786 System Integration and Software Development Tactical Power and
Transmission
02/05/2016
787 SEPS Completion 110kV Transmission Lines in One Lot 30/04/2016
788 The acquisition of steel poles for overhead lines.
29/04/2016
789 Power Distribution Enhancement Investment Program
28/04/2016
790 Supply and electricity transmission and distribution and related services. 28/04/2016
791 Installation services of electricity distribution and control equipment 28/04/2016
792 Bid for construction MV grid 22kV 3 phase circuit 1 from post T94A double circuit of Duc Hoa – Lien Thon of route 475, 480 Ben Luc to post T15B/45 of route 473 Duc Hoa, XDM circuit 2 from T15B/45 of route 473 Duc Hoa to post T90 of route 475 Duc Hoa in Duc Hoa district, Long An province. 28/04/2016
793 Prequalification Paraguayan companies FOR EXECUTION OF WORK OF IMPROVEMENT ELECTRIC DISTRIBUTION SYSTEM (HHP1? HHP4) TYPE OF CONTRACT UNDER OPEN 28/04/2016
794 3a)Construction of 33kV overhead lines from the existing 132kV Opuyo – Moroto Transmission line totaling to 465.06 km, LV overhead lines totaling to 338.89 km using pre-stressed concrete poles and 5,400 last mile connections

3b)Construction of 33kV Overhead lines from the Proposed 132kV Mirama – Kabale Transmission line totaling to 531.08 km, LV overhead lines totaling to 584.54 km and 14,250 last mile connections.

132kV Mirama - Kabale Electricity Transmission Line and Distribution Project
28/04/2016
795 5kV Substation Grounding Mitigation 28/04/2016
796 Electricity. 27/04/2016
797 Purchases of electricity will be implemented indicating the distribution parameters resulting from the audit of power 27/04/2016
798 Public electricity distribution networks work in overhead or underground art;
- Civil Works of electronic communications networks.
27/04/2016
799 Demolition of overhead low voltage of 0.4 kV overhead lines with connections, demolition of the overhead lighting and the construction of the cable network LV - 0.4 kV with connections. Demolition and construction of street lighting network for the Defenders of Westerplatte in the framework of the task Reconstruction of streets Westerplatte / Paderewski. 27/04/2016
800 (No. 3745) of 0.4 kV overhead line L-100 of the CT Rn-203 Reconstruction of 0.4 kV KL, Šilutes r., Šyša k. 27/04/2016
801 Low Voltage and electrical installation.
26/04/2016
802 Power supply to the premises fed medium voltage (MV), special low voltage (BTE), standard low voltage (BTN) and public lighting (IP) in the city of Obidos 26/04/2016
803 Supply and electricity transmission and distribution and related services. 26/04/2016
804 The present contract is the supply of electricity, including comprehensive service, ie. Consisting of providing the service or transmission or distribution of electricity and supply of electricity for the following collection points Employer: 25/04/2016
805 Construction gridline and substation in Tuy Hoa city and Dong Hoa district. 25/04/2016
806 Construction gridline and substation in Krong Buk district, Dak Lak province. 25/04/2016
807 Construction gridline and substation in Dak R’lap, Tuy Duc, Dak Song districts and Gia Nghia town. 25/04/2016
808 Construction of electric lines and substation 25/04/2016
809 Selection of a contractor to perform work on the reconstruction of overhead 10 kV overhead line on the PC 217 + 73 218 + 10 PCs on the project overhaul "The road N-343 st.Vysoko-Litovsk Horse- chi-Kamenetz 19 km, zh393 - km 22.036 " 25/04/2016
810 Electricity distribution in BTN, BTE and MT. 24/04/2016
811 CLEARING sub transmission lines 22/04/2016
812 Supply of 25 KV AC Disconnectors for Overhead Line Equipment.
21/04/2016
813 Supply and electricity transmission and distribution to the sites of the Community of Communes Pays Grésivaudan powered by low voltage (power greater than 36 kVA. 20/04/2016
814 High and low voltage systems: The power supply is planned from the low voltage grid of Stadtwerke Schorndorf. The power consumption for the entire building is approximately 285 kVA. School buildings and kitchen / canteen are supplied via separate house connections. The supply communications technology of the new building is done as a fiber optic connection to the municipal network. Components of the tender are: emergency lighting, three periods, low voltage distribution for general power supply (NSHV AV). 19/04/2016
815 330 kV overhead lines LNr.355 Valmiera-Plavinas lightning cable replacement in 2016.
19/04/2016
816 Power supply low voltage for Euskal Trenbide Sarea. 18/04/2016
817 Procurement of electricity and accompanying services 18/04/2016
818 Construction gridline and substation in Tan Son, An Nhon town and Quy Nhon city. 18/04/2016
819 Construction gridline and substation in Phu Cat district. 18/04/2016
820 Construction gridline and substation in Buon Ma Thuot city. Funding source: loans from KfW. 18/04/2016
821 Construction gridline and substation in Pleiku city. Funding source: loans from KfW. 18/04/2016
822 Construction gridline and substation in Ea H’leo, Krong Nang, M’Drak, Ea Kar districts. 18/04/2016
823 Consisting of the supply of electricity 14/04/2016
824 Extension of the tram network Nice - underground section - railway and overhead contact line (SA06, SA07 to the back of the station Station Port Lympia). 14/04/2016
825 Providing technical support to standardization for the distribution of energy, smart grids and control order on behalf of EDF R & D.
14/04/2016
826 CFC 230 electricity. 13/04/2016
827 Framework agreement for the supply and delivery of electricity 13/04/2016
828 Supply and electricity transmission and distribution 13/04/2016
829 Mission management support and monitoring of the work of the renovation of the low voltage electrical distribution in industrial buildings 12/04/2016
830 Preparing a catenary system. 12/04/2016
831 Harnessing violated dimensions of overhead line 110 kV "Izvor" VL 110 kV "Rubin" and overhead line 110 kV "Bikovo-Karavelovo." 11/04/2016
832 Supply voltage equipment for DV 2 x 110 kV Dravograd - guided by the following lots:
Lot A: Conductors, insulators and suspension equipment,
Lot B: OPGW and optical cable system.
11/04/2016
833 Bid for supply materials and construction MV gridline and substations in Tu Ky district in 2016 (phase 1). 11/04/2016
834 Bid for supply materials and construction MV gridline and substations in Gia Loc district in 2016 (phase 1). 11/04/2016
835 For Civil Works, Erection, Testing And Commissioning at 220/132 kV Grid Stations Lalian and Nowshera.
Lot-I : 220/132kV Grid station Lalian
Lot-II : 220/132kV Grid station Nowshera
06/04/2016
836 Construction of Pile Pole Foundation of 132 kv D/C T/Line F/F 132 kv Grid Station 06/04/2016
837 The contract is for the execution of modernization works on overhead power line built in the dimensions of 220 kV relationship Morzyczyn - Reclaw, is currently working on a voltage of 110 kV. The goal is to run the line at a voltage of 220 kV lines and adjusting for temperature phase conductors +40 ° C, while maintaining the distance of the phase conductors to the ground and objects crossed accordance with the requirements of the Polish Standard PN-E-5100-1: 1998 "Elektroenergetyczne overhead lines. Design and construction of "supply and 0.5 m in relation to the requirements of this standard.
05/04/2016
838 Lot 1 - The Kurdistan region's 35 kV Hashimkhanli y / st from 1 to 35 kV circuit EVHX's reconstruction stage 2 - 220/110/10 kV "Salyan" feeding 110 kV from SS 1 circuit "Bilasuvar 1" EVHX construction
04/04/2016
839 Power supply installations over 10 kW Power City of Mieres. 04/04/2016
840 Supply and electricity transmission and distribution. 04/04/2016
841 Installation of 33Kv Interlink Between New DREEZ Grid Station and Several Primary substation 04/04/2016
842 Call for qualification of candidates for creating turnkey 10 kV (concrete) network compact stations: New (assembly, supply) in accordance with DIN EN 62271 Part 202, DIN VDE 0671 part 202 and according to the technical implementing regulations that are placed the Interessenbekundern available. The qualification system is of the Vattenfall Europe Power Service GmbH (Berlin) and the Vattenfall Netzservice Hamburg operated GmbH together.
It was first announced on 08.23.1995 in the EU Official Journal of the No. 95 / S159-85344 / DE and then announced every year.
A renewed expressions of interest is unnecessary for the companies who have expressed this interest already due to previous releases and are involved in the process.
The notice is for information on the existence of a qualification system (according to sector regulation-SektVO 2009 § 24, para. 8).
03/04/2016
843 The ‘Monrovia consolidation of electricity transmission and distribution project’ aims to improve the operation and reliability of electricity transmission and distribution in Monrovia and to increase access to electricity. This tender for service contracts related to the ‘Monrovia consolidation of electricity transmission and distribution project’ is composed of 3 lots:
lot 1: a 3-year technical assistance for support to the Ministry of Lands, Mines and Energy (MLME) — Bureau of Electricity and Renewable Energy (‘Support to BERE’);
lot 2: supervision contract for the works contracts pertaining to the construction/installation of:
— reinforcement of the 66 kV transmission networks by rehabilitating a 66 kV double circuit overhead line (OHL),
— replacing a single circuit 66 kV OHL with a double circuit OHL,
— reconstructing/refurbishing a 66/22 kV substation in Monrovia,
— network extensions at 22 kV and LV (low voltage) and consumer connections totalling 45 980 customers,
— connection of 23 large consumers with an approximated total power of 18 050 kVA,
— limited capacity-building component for staff of the Liberia Electricity Corporation;
lot 3: technical audit of the works and supervision contracts as outlined under lot 2.
The works contract is intended to be composed of 1 or more contracts for the reinforcement of the transmission network supplying power to the Monrovia area and the distribution works (extensions and connections of 45 980 customers and 23 large consumers).
03/04/2016
844 Harnessing violated dimensions of overhead line 110 kV overhead line and Busmantsi to 110 kV Crocus - Violet. 01/04/2016
845 Bid for package 2: construction LV gridline and substation in Long Xuyen city. 01/04/2016
846 for construction gridline 22kV to supply power for Mui Chua port in Thuy Co hamlet, Tien Lang commune, Tien Yen district. 01/04/2016
847 Procurement subject of this procurement procedure is the replacement armored generating lines at 14.4 kV, in accordance with the technical specifications set out in Part C. DZN and cost of Part B in indicating the name, quantity and other requirements necessary to complete the offer.
31/03/2016
848 KP1/9AA-2/OT/51-NM/15-16: Rerouting of UEB 132kv double circuit transmission line 31/03/2016
849 Construction LV gridline 0.4kV and lighting system section 2 (from southern Cua Dong temple to Thu Phu bridge). 31/03/2016
850 DD4/P&D/NCB/2016/018/D:-


Surveying of 33kV LYNX Double Circuit Tower Lines
1. Matugama GSS to Bentota PSS (14km)
2. Embilipitiya GSS to Weniwelara Gantry (11km)
31/03/2016
851 Design, construction and commissioning of overhead lines 30/03/2016
852 Reinforcement of the 66 kV transmission networks by rehabilitating a 66 kV double circuit overhead line (OHL),
Replacing a single circuit 66 kV OHL with a double circuit OHL,
29/03/2016
853 Construction gridline 220kV connecting Dak Nong aluminium electrolysis factory. 29/03/2016
854 Construction grid 220kv connectings Nho Que 1 hydropower factory. 29/03/2016
855 Construction 3-phase MV gridline and substation 160kVA to supply power for culture and sport centre; substation 50kVA to supply power for Viet Thang Commune People’s Committee; one-phase MV gridline, LV gridline to supply power for Tan Hung Tay commune, Phu Tan district. 29/03/2016
856 Strengthening capacity and improving LV gridline of substations of Vien An Dong 10, Tan An Tay 45+97, Tan An 7, Vien An 10; construction one-phase LV, MV gridline of Lang Tron – Cay Phuoc, Ngon Bien Nhan in Vien An Dong commune, Ngoc Hien district. Funding source: investment & construction capital. 29/03/2016
857 Construction of 110 kV facilities in TS 110_20 kV Medulin 29/03/2016
858 This contract is part of the project of passenger information center of the RER B line. This lot concerns the low voltage electricity stations on RER B. 29/03/2016
859 Bid for construction LV, MV gridline and substation 3P-630kVA to supply power for workshop No 32. 29/03/2016
860 Design, Supply, Installation and Commissioning of Marsyangdi-Kathmandu 220 kV Transmission Line 28/03/2016
861 Execution of the transformer station with the delivery, installation and commissioning and reconstruction of power lines SN and the supply, installation and commissioning of the unit - Modernization of technical equipment in Deblin. 25/03/2016
862 Bid for construction LV gridline on Go Cong canal. Funding source: state budget. 25/03/2016
863 Construction grid 110kv circuit 2 Dong Anh – Van Tri of section at Dong Anh ecology tourist area in Hanoi. 24/03/2016
864 Bid for replacing one-phase automatic switching equipment of feeder gridline 220kV of distribution yard of Hoa Binh Hydropower Plant (feeder 271, 273, 274, 275, 276). 24/03/2016
865 Construction feeder and grid 110kv for the project of Thac Mo hydropower factory. Funding source: basic depreciation. 23/03/2016
866 Design ,supply and installation of transmission line 22/03/2016
867 for developing gridline in trough area in My Phuoc commune, Hon Dat district, Kien Giang province. 22/03/2016
868 Bid for package 2: construction 0.8km of gridline 35kV and 3 substations under the project of installation Recloser for MV gridline in 2015. 22/03/2016
869 Electricity procurement. 21/03/2016
870 Construction and installation equipment for grounding MV grid at Cat Bi international airport. F 21/03/2016
871 Construction and installation equipment for MV gridline 22kV for construction Phu My 3 industrial zone in Tan Thanh district, Ba Ria Vung Tau province. 21/03/2016
872 Supply and delivery of electricity and the production of associated services for sites of sanitation municipal association of Denaisis.
18/03/2016
873 Transmission Line Package for LILO of 400kV D/C Bhadla – Bikaner 18/03/2016
874 Electricity supply to all delegations of the Mutual Accident Canarias for a period of two years.
18/03/2016
875 Maintenance and repair services of electricity works. 18/03/2016
876 Framework Agreement for the supply of electricity of the city's attractions and the CCAS de Mougins - power sites underwritten than 36kva (revival of the framework agreement nofs15 / 45) - control group. 17/03/2016
877 Development of 225kV Line No. 25-72 at the support No. 67 and rehabilitations works HT The Northern Transport Directorate 17/03/2016
878 Scope: Installing approx 7 miles of 25 KV underground distribution. Involved is the installation of
underground electric primary cables from connection point to the substation, including trenching,
boring, and other excavations. The project also includes the installation furnished equipment, including
padmount transformers, padmount switches, and sectionalizing equipment. Other work includes
installing overhead poles and dead ends, guying assemblies, 25 kV risers, and removal of the existing
overhead line.
17/03/2016
879 Construction of 11 KV, 11/0.4 KV, 0.4 KV New Line and Installation of 11.0.4 KV New 250 KVA Transformer. 16/03/2016
880 Renovation / Rehabilitation of 33 KV Ext Line & Installation of 11/0.4 KV New 250 KVA Transformer. 16/03/2016
881 Reconstruction of RU-10 kV at SS 110/35/10 kV "Solomenskaya" of equipment supply 15/03/2016
882 Request for Contractor Qualification - KPC Powerhouse Decommissioning, Phase 1 15/03/2016
883 Staffanstorp municipality fastigheter AB, staffanstorp hus AB and staffanstorp municipality (the requester), invite you to bid in respect of electricity supplies. 14/03/2016
884 Electricity supply at low voltage.
14/03/2016
885 Diverter flight of birds for outdoor air MV lines. 14/03/2016
886 Construction of overhead distribution line 14/03/2016
887 Construction/Shifting of 33/11 KV Line under Gazipur PBS 14/03/2016
888 The new medium voltage overhead lines will be built 1.2 km, 3.2 km medium-voltage cables and low-voltage network as well as 8 km of CSS 4 pcs. 14/03/2016
889 Enlistment of Contractor for Construction, Repair & Maintenance of 33KV, 11 KVm 11/0.4 KV & 0.4 KV Line and Supply & Transportation of Goods. 14/03/2016
890 Construction, supply, installation material and equipment for grid and feeder, transmission gridline for the project of Dak Mi 3 hydropower in Quang Nam province. 10/03/2016
891 Completing and developing gridline of LV station in district 6, Binh Tan district 2015. 10/03/2016
892 The supply of electricity for the needs of the Institute for Sport Jesenice for the period from 2016 to 2019. 09/03/2016
893 ELECTRIFICATION IN MV / LV SUBDIVISION SITE HOST 1ST AND 2ND TRANCHE A Ezzhiliga 09/03/2016
894 Supply, installation and commissioning of electrical equipment for lines medium voltage, low voltage network, street lighting and connections - implementation of medium and low voltage work of sixty (60) communities in Congo Brazzaville 08/03/2016
895 Construction LV grid 0,4kv at Northern Huong river area. 08/03/2016
896 Demolition of overhead low voltage of 0.4 kV with connections overhead line lighting and the construction of the cable network LV - 0.4 kV with connections.Demolition and construction of the street lighting network Paderewski and the Defenders of Westerplatte within the task Reconstruction of streets Westerplatte / Paderewski. 08/03/2016
897 Electricity Supply Interior Ministry subordinated institutions for 2 years.
07/03/2016
898 Supply and delivery of electricity to the HEA ins. 07/03/2016
899 Construction and improving LV, MV gridline and substation in Bac Lieu city, Vinh Loi, Phuoc Long, Hong Dan districts. 07/03/2016
900 SUPPLY, DELIVERY, INSTALLATION, COMMISSIONING AND
MAINTENANCE OF SMART GRID SYSTEM (PHASE 2 AND PHASE 3) TO PUBLIC BUILDING AROUND
MOGALE CITY.
07/03/2016
901 Post Romanel - new construction 380 kV - technical installation works. 04/03/2016
902 Post Romanel - new construction 380 kV - work envelope. 04/03/2016
903 Construction MV gridline and substation to anti-overload works of gridline in Viet Yen district. Funding source: commercial loan and depreciation capital. 04/03/2016
904 Construction MV gridline to anti-overload works of gridline in Bac Giang city, Tan Yen, Yen The, Lang Giang districts. Funding source: commercial loan and depreciation capital. 04/03/2016
905 Construction power station and installation gridline for the project of installation 2 cranes at Vung Ang port in Ha Tinh province 04/03/2016
906 Construction LV grid in Thanh Tri district year 2016 phase 1. 04/03/2016
907 Upgrading line 60 KV No. 342 "Laayoune - Foum El Wad 03/03/2016
908 Supply of electricity of 5 delivery points 03/03/2016
909 Low and medium voltage systems 03/03/2016
910 Supply equipment, materials and construction gridline and substation to anti-overload works in Mai Son, Song Ma, Sop Cop, Thuan Chau, Quynh Nhai, Muong La districts, Son La city. 03/03/2016
911 Supply equipment, materials and construction gridline and substation to anti-overload works in Moc Chau, Yen Chau, Phu Yen, Bac Yen districts. 03/03/2016
912 Purchase of Straight Joints for Cable 33 KV. XLPE 300 mm2 - Ground Cables and Overhead Line Maintenance Department – Electricity Transmission Networks 03/03/2016
913 supply equipment for the project of installation capacitors on LV gridline in eastern Quang Ninh province in 2016. 01/03/2016
914 Supply,delivery, installation, testing and commissioning of 11kv transmission line 01/03/2016
915 Disconnectors and switches for MV overhead network 01/03/2016
916 Construction and installation material , equipment for TBA 110kv Giong Trom and grid connecting in Ben Tre province 29/02/2016
917 Construction and installation material, equipment for grid 110kv Ngai Giao - Cam My in Ba Ria Vung Tau province 29/02/2016
918 Construction and installation material, equipment for TBA 110kv Hoa Thanh and grid connecting in Tay Ninh province 29/02/2016
919 NV electrical connection to the power grid, and 0.4 - 10 kV Electrical network reconstruction 29/02/2016
920 NV electrical connection to the power grid, and 0.4 - 10 kV electrical network design objects reconstruction projects and maintenance services in Utena district.sav., Ukmerge. sav., Madona district. sav. 29/02/2016
921 Farmstead electrical connection to the power grid Eiliokiškiu k., Maišiagala sen., Vilniaus r. weeks. works 29/02/2016
922 0.4 kV OJ L-300 of the CT-329 Vl reconstruction of 0.4 kV KL Vilnius district., K Kyviškes. works 29/02/2016
923 0.4 kV OJ L-300 of the CT-329 Vl reconstruction of 0.4 kV KL Vilnius district., K Kyviškes. works 29/02/2016
924 Supply of electricity meter and current transformers 29/02/2016
925 Construction gridline and substation for anti-overload works in Tien Lu, Phu Cu districts and Hung Yen city 27/02/2016
926 Construction gridline and substation for anti-overload works in Khoai Chau and Yen My districts 27/02/2016
927 Construction gridline and substation for anti-overload works in Van Lam, Van Giang, My Hao districts 27/02/2016
928 Construction gridline and substation for anti-overload works in Tien Lu, Phu Cu districts and Hung Yen city 27/02/2016
929 Construction gridline and substation for anti-overload works in Kim Dong and An Thi districts 27/02/2016
930 construction and installation equipment for the project of MV grid at Cai Mep – Thi Vai port phase 2. 26/02/2016
931 Reconstruction of 35 kV transmission line "Berezan-cakes" 26/02/2016
932 Supply of Dischargers RVS-35 kV, 110 kV RVS, RVO-10 U1 26/02/2016
933 Demolishing and arranging grid, communication cable on Hang Mam - Hang Bac - Hang Bo - Bat Dan streets in Hoan Kiem district 26/02/2016
934 Improving and arranging grid, power cable on Hang Mam - Hang BAc - Hang Bo - Bat Dan streets, Hoan Kiem district. 26/02/2016
935 Laying of overhead power lines 25/02/2016
936 Expansion of the power grid facilities of 110kV Kleszczów - order no. ZP.271.4.2016 25/02/2016
937 33 KV line ebong 11KV. Shasongasa, Amtoli, A-feeder, Gomti, Judgecourt, kandirpar ebong Ranir Bazar ar Overhead line re nikotbarti brikher shakha-proshakha karton kaj 25/02/2016
938 - In connection with the commissioning of the new 400 kV line Lonny, Seuil, Vesle late August 2016, a light towers markup system is required to ensure compliance of this line (aviation regulations of 7.7.2010) 25/02/2016
939 Construction of energy-efficient power grid LED street lighting in towns Municipalities Maków Podhalanski: Juszczyn, proteins, Grzechynia, Kojszówka and Zarnówka. 25/02/2016
940 (1144) MTT 10kV, 10kV and 0,4kV KL new construction Vilkija k., Kaunas district. works 25/02/2016
941 20kV transmission line route external borders marking and tagging of trees / surveying the protective 25/02/2016
942 Apartment residents. home electrical connection to the power grid and power grid opening, Kaunas g. 16, Vilnius, Vilnius.sav., works 24/02/2016
943 Apartment residents. home electrical connection to the power grid and power grid opening, Kaunas g. 16, Vilnius, Vilnius.sav., works 24/02/2016
944 construction of transmission lines (incl. supply of steel towers and testing and commissioning) Reference No (as per Procurement Plan): PLCL2-W04 1 23/02/2016
945 Opening up the building with electrical supply lines 23/02/2016
946 Delivery of Full supply of electricity within the framework of the electricity sales contract the following sub-bid round:
1st Part One: vuz Office profiled and time-line purchase of electricity consumption sites;.
23/02/2016
947 TENDER FOR THE SURVEY WORK OF TRANSMISSION LINE THROUGH TOTAL STATION INCLUDING ALIGNMENT OF LINE ROUTE. 23/02/2016
948 Measures to upgrade and modernization of the plant's underground line M2 and related construction design detail, regarding supply systems and electric drive - CIG 22/02/2016
949 Supply, electricity transmission and distribution and related services on behalf of SEMPARISEINE. 22/02/2016
950 Supply of electricity in low and medium voltage to the Gran Sasso Acqua SpA. 22/02/2016
951 Supply equipment and materials and construction anti-overload works for gridline in Phu Phong, An Nhon, Hoai Nhon, Hoai An districts 22/02/2016
952 Supply equipment and materials and construction anti-overload works for gridline in Phu My district 22/02/2016
953 Construction and improving MV gridline and substations to supply power for Chu Prong Rubber One Member Co Ltd. 22/02/2016
954 2016/4 MISCELLANEOUS Neighborhoods WATER NETWORK REHABILITATION AND NEW NETWORKS AND TRANSMISSION LINE CONSTRUCTION (ORHANGAZI - IZNIK)construction worker 4734 Public Procurement Law will be awarded by open tender procedure According to Article 19 . information related to the tender are listed below. 19/02/2016
955 Perform maintenance, testing, calibration and repairs on all high voltage equipment, components, transformers, switchgear, and transfer switches ranging above 600 volts for the department of corrections and rehabilitation (CDCR), institutions/facilities 18/02/2016
956 Implementation of the electricity grid MV and LV power of the Multi-Hospital Independent Public Healthcare Centre in Nowa Sol 18/02/2016
957 Construction of pipelines, communication lines and power (Technical re-equipment of 04 and 10 kV using SIP) 17/02/2016
958 Improving gridline in Bac Lieu province 17/02/2016
959 Construction gridline 22kV to create loop between Kim Dong and Yen My 110kV substations 17/02/2016
960 Upgrading a 110 kV overhead line route with four systems on 26 poles, as well as the option for an additional 18 posts and an optional fiber optic connection 17/02/2016
961 Reconstruction of 0.4 kV overhead line L-600 from the TR-48 17/02/2016
962 Low and medium voltage systems up to 36 kV (DIN 18 382); A.0423.127292, KS, Goethestraße 41, conversion courts.
16/02/2016
963 low-voltage equipment 16/02/2016
964 Work on the construction and reconstruction of power lines 0,4 and 6-10kV 16/02/2016
965 "Selection of electricity supplier and balance group coordinator for the needs of" Water and Sewerage "EOOD. Stara Zagora."
15/02/2016
966 The object of the procedure is to award a contract for the establishment of public-private partnership for the installation, financing and operation of the cogeneration plant for production of electricity and thermal energy for heating and technical steam which is realized as a public service, which will be built on Land owned by the Republic Maedonija located within the Complex Clinics Mother Teresa Skopje 15/02/2016
967 Supply of metered electricity 15/02/2016
968 This notice concerns the low voltage electrical work in the line extension project 11 of the Paris metro. 15/02/2016
969 Reconstruction of 0.4 kV overhead line L-300 from the TR-48 15/02/2016
970 Achievement In All State Body Of An Electric Generating Station On the El-Oued Aerodrome 14/02/2016
971 14)Complete set for lighting tower unit – re invited – ground cables and overhead line maintenance department – Electricity Transmission Networks 14/02/2016
972 Construction of 33KV Line and Transportation work 13/02/2016
973 Enlistment of Contractor for Construction of 33KV Line and Transportation work. 13/02/2016
974 Supply and Installation of Low Voltage and Medium Voltage LV Lines and Service Connections in the Northern District 12/02/2016
975 Studies for environmental protection in the reconstruction of the 110 kV power line 12/02/2016
976 Power supply — delivery of electricity from renewable energy sources for the Agency's new premises in the property Neue Direktion Köln (NDK), 12/02/2016
977 Providing services cutting branches and vegetation on the routes of distribution overhead lines for the group areas GROUP 1 Elektroslavonija Osijek, GROUP 2 Elektra Slavonski Brod, GROUP 3 Elektra Pozega, GROUP 4 Elektra Vinkovci, GROUP 5 Elektra Virovitica 12/02/2016
978 Review And Update Of Feasibility Study Of The 220 KV Masaka Mwanza Transmission Line Project 12/02/2016
979 Supply of Electricity. 12/02/2016
980 Re-connect four 60 kv transmission line 12/02/2016
981 Supply of Symbols for the labeling of 35 kV and 10 kV power line crossings in the inland waterways and Mounting 11/02/2016
982 132KV Transmission line.

10/02/2016
983 Supply of electricity accounting for the formation of the exchange fund PJSC "IDGC of the North Caucasus" (Organizer, Customer) (48007) 10/02/2016
984 Acquisition 400 kV power transmission line from Alytus to EN / PL section (263 m) from the support No. 149 10/02/2016
985 TRANSMISSION LINES AND CABLES 09/02/2016
986 Supply of electricity with a total estimated volume of 9696.82 09/02/2016
987 Ruoveden municipality, Ruovesi Apartments Ltd and real estate company Pusunrinne C electricity supply, which manifests itself in greater detail in the attached contract notice in the tender documents.
09/02/2016
988 Electrification MV / LV and Extension of the low voltage network in the Rural Communes and Ezzhiliga Laghoualem (PROVINCE OF KHEMISSET) 09/02/2016
989 Construction of new Distribution lines 09/02/2016
990 Installation of site grading,equipment & foundations,conduit,ground-grid,substation structures and bussing,
interconnect wiring,fencing ,and yard aggregate.
09/02/2016
991 110 kV overhead line Šeškine - VE3 I, 09/02/2016
992 Fabrication and supply of all type of transmission line towers, including River crossing towers (wherever applicable) and Earth wire, Hardware Fittings and Conductor & Earth wire Accessories, OPGW & associated fittings & accessories as per Employer’s design/drawings, survey, casting of foundations of towers, erection of towers, stringing, testing and commissioning of the erected transmission lines 08/02/2016
993 Purchase of electricity for the needs of "Public Transport" JSC, city 08/02/2016
994 BD.1.1-1 ISO: 2013. Modernization of 330 kV "Chernigov". Replacement TS-330 B-330-1 Slavutich (inv.?86170) Chernihiv region, Chernihiv region. 08/02/2016
995 Supply,delivery, erection, stringing, testing/commissioning and hand over of single circuit sub transmission line 08/02/2016
996 Prior information notice forThe new main switchboard and power lines 05/02/2016
997 Supply delivery installation /Erection:Transmission line. ARO-BK-2072/73-01
design supply & construction'Delivery installation/Erection:substation. ARO-2072/073-JHAKALE.SS-01
05/02/2016
998 construction gridline and substation in communes in Muong Khuong, Sa Pa Van Ban, Bat Xat districts and Lao Cai city. 05/02/2016
999 construction gridline and substation in communes in Bao Thang, Bao Yen, Bac Ha, Si Ma Cai districts. 05/02/2016
1000 construction gridline and substation in communes and wards in Mong Cai city, Tien Yen, Van Don districts, Quang Long and Quang Phong communes in Hai Ha district, Quang An, Tan Binh, Dai Binh communes in Dam Ha district. 05/02/2016
1001 construction gridline and substation in communes and wards in Uong Bi city, Ba Che, Hoanh Bo, Dong Trieu, Binh Lieu districts 05/02/2016
1002 construction and improving gridline in Ha Long city 05/02/2016
1003 construction gridline in communes in Nghia Hung, Nam Truc districts 05/02/2016
1004 construction gridline in communes in Nghia Hung, Nam Truc districts 05/02/2016
1005 construction gridline in communes in Nghia Hung, Nam Truc districts 05/02/2016
1006 construction gridline in communes in Nghia Hung, Nam Truc districts 05/02/2016
1007 construction grid and transformer station in communes, Luong Son and Tan Lac districts. 05/02/2016
1008 construction grid and transformer station in communes, Da Bac, Ky Son districts, Hoa Binh province. 05/02/2016
1009 construction grid and transformer station in communes, Kim Boi district, Lac Thuy district 05/02/2016
1010 construction grid and transformer station in communes, Lac Son and Mai Chau districts. 05/02/2016
1011 construction grid and transformer station in communes, Pho Yen district, Phu Luong, Dinh Hoa, Dai Tu districts, Thai Nguyen province 05/02/2016
1012 construction gridline and substations under the project of anti-overload works of LV, MV gridline in Tu Son town and Yen Phong district 05/02/2016
1013 construction 28 MV gridline and substations and LV gridline under the project of anti-overload works in Bac Ninh city and installation internal transmission network for operation building of Bac Ninh Power Co. 05/02/2016
1014 construction gridline and substation in Bac Ninh city, Tu Son town and Yen Phong district. 05/02/2016
1015 construction LV grid of transformer stations in Cau Giay district phase 1 year 2016 05/02/2016
1016 Construction gridline to supply power for Thac Bac area on Hoang Thi road 05/02/2016
1017 PROVIDE ENGINEERING SERVICE ON an "on-call" basis in support of authority Transmission and Substation facilities. 04/02/2016
1018 construction LV, MV gridline and substation in Nam Han commune in Sin Ho district 04/02/2016
1019 construction LV, MV gridline and substation in Ban Giang, Ho Thau, Giang Ma communes in Tam Duong district. 04/02/2016
1020 construction LV, MV gridline and substation in Pu Sam Cap commune in Sin Ho district 04/02/2016
1021 construction LV, MV gridline and substation in Lang Mo, Phin Ho communes in Sin Ho district. 04/02/2016
1022 construction LV, MV gridline and substation in Ban Bo, Sung Phai, Son Binh, Tam Duong township, Binh Lu communes in Tam Duong district. 04/02/2016
1023 construction LV, MV gridline and substation in Ta Phin, Sa De Phin, Phang Xo Lin communes in Sin Ho district. 04/02/2016
1024 construction LV, MV gridline and substation in Hong Thu commune in Sin Ho district 04/02/2016
1025 Design, Supply, Installation and Commissioning of New Khimti- Barhabise 220/400 kV Transmission Line 04/02/2016
1026 The brief scope under Tower Package TW05-Transmission Line Tower Package for 765kV D/C Bikaner - Moga Transmission line (Part-I); TW06-Transmission Line Tower Package for 765kV D/C Bikaner - Moga Transmission line (Part-II); TW07- Transmission Line Tower Package for 765kV D/C Bikaner 03/02/2016
1027 construction gridline and substation in communes in Kim Dong, An Thi, Khoai Chau districts. 03/02/2016
1028 construction gridline and substation in communes in Tien Lu, Phu Cu districts and Hung Yen city 03/02/2016
1029 construction gridline and substation in communes in Yen My, My Hao, Van Lam, Van Giang districts. 03/02/2016
1030 Survey Works of Proposed 220kVTransmission Line 03/02/2016
1031 supply equipment and materials and construction MV gridline and substation in Ai Quoc, Thach khoi wards and An Chau, Tan Hung communes in Hai Duong city 03/02/2016
1032 supply equipment and materials and construction MV gridline and substation in Thanh Binh, Tan Binh, Binh Han, Quang Trung, Hai Tan, Le Thanh Nghi wards in Hai Duong city 03/02/2016
1033 Construction work of electricity line. 03/02/2016
1034 GRID extension project in KIGANDA 03/02/2016
1035 Purchase and sale of electric power Székesfehérvár city's public lighting network (active elements) to supply energy, space and lighting purposes, within the framework of the electricity purchase contract without scheduling obligation 02/02/2016
1036 Framework agreement for the supply of electrical energy; The power requirement of the University Hospital Leipzig amounts annually to approximately 45 GWh. The aim of the procurement project is the conclusion of framework contracts for the supply of electric energy in the form of solid procurement timetables in a balancing group in the context of an open procedure. 02/02/2016
1037 Civil works for the establishment of the electricity distribution company building 02/02/2016
1038 construction LV grid and transformer station for households in hamlet 2C in Ea H'leo commune, Ea H'leo district. 02/02/2016
1039 Replace and Upgrade the main electrical power distribution equipment 02/02/2016
1040 Supply of electricity and natural gas to FREMAP 01/02/2016
1041 Supply of electricity and natural gas to FREMAP 01/02/2016
1042 construction grid 110kv Song Chung – Song Chay 01/02/2016
1043 supply switching equipment and accessories for LV, MV gridline 01/02/2016
1044 construction LV, MV gridline and substation to supply power in area LK2 in An Van Duong new urban area. 01/02/2016
1045 construction LV, MV gridline and substation to supply power in area LK2 in An Van Duong new urban area. 01/02/2016
1046 supply commodities and construction for the project of improving LV gridline of building CT4A at Xa La urban area. 01/02/2016
1047 Rehabilitation contractors to tender transmission lines 400/132 KV
01/02/2016
1048 Implementation process of the electricity grid medium voltage to the process of project) 196 (apartment building) a first stage (the neighborhood 31/01/2016
1049 construction and installation equipment for the project of construction 7 substations to anti-overload for gridline in Kim Bang district. 30/01/2016
1050 CONSTRUCTION OF THE KUNENE – OMATANDO 400KV TRANSMISSION LINE 29/01/2016
1051 construction and installation equipment for moving gridline for the project of upgrading and enlarging Doan Nguyen Tuan road 29/01/2016
1052 construction and supply equipment for LV, MV gridline and substation to supply power for 5 Tong area in Hoa Binh commune. 29/01/2016
1053 -Replacement of gas, water and electric lines. 28/01/2016
1054 "Specialized consultancy services for works / services in the 110-750 KV overhead lines" for 43,560 consulting hours for a period of 36 months from the date of entry into force of the contract for all services contained in the specifications. 27/01/2016
1055 Servicing of High Voltage Power Line Systems 27/01/2016
1056 Delivery and installation of feeder lines, distribution lines and secondary lines. 26/01/2016
1057 Electrical line operation 26/01/2016
1058 Grid station and Transmission Line 26/01/2016
1059 132 KV GRID LINE STATION AND TRANSMISSION LINE 26/01/2016
1060 Construction of 11/33 kv line and up-grading of 33 kv line and construction of substation 26/01/2016
1061 construction anti-overload works for gridline in Cao Ky, Ban Ang, Cam Leng communes in Cho Moi district. 26/01/2016
1062 Enlistment of Contractor for Construction of 33KV, 11KV Line and Installation, Operation, Repair & Maintenance of 33/11KV Power Transformer, ACR, Isolator. 26/01/2016
1063 Ajmer - Bikaner Transmission line 25/01/2016
1064 Technical re-10kV transmission line pr.Yablunytsya Verkhovyna district 25/01/2016
1065 Technical re-10kV transmission line from the substation pr.Voronenka 110/35 / 10kV "Vorokhta" (of two-) 25/01/2016
1066 Technical re-transmission line from 10 kV Substation Nadezhda pr.Dolyna 25/01/2016
1067 supply equipment and construction 8,303 metres of gridline 22kV to reduce loss of MV gridline in Kon Tum province in 2016. 25/01/2016
1068 improving and upgrading grid 110kv Chem – Ha Dong of feeder 171 – 172 E6 – E4 of pillar 36 – 37 for land clearance for the project of construction road from Le Duc Tho road to Xuan Phuong urban area ( end point to road 70). 25/01/2016
1069 construction and insurance service for construction LV gridline for supply power for Vietnam Buddhism Academy in HCM city phase 1 25/01/2016
1070 improving gridline 22kV of branch Binh Duong 3, Binh Duong 5, Bom Van Xuan, Van Xuan of feeder 475 of Vinh Tuong 110kV substation. 25/01/2016
1071 supply equipment and construction gridline 35kV, underground cable 35kV, substation 400kVA 35/0.4kV and gridline 0.4kV and meters for the project of anti-overload works for gridline in Bac Ha township, Bac Ha district 25/01/2016
1072 supply equipment and construction gridline 10(22)kV, substation 400kVA 35/0.4kV and gridline 0.4kV and meters for the project of anti-overload works for gridline in Pho Rang township, Bao Yen district 25/01/2016
1073 Construction of electric line 25/01/2016
1074 Installation of specialty electrical low-voltage security system ("LVSS") equipment 25/01/2016
1075 Southern Region Distribution Substations and 11 kV UGC, the activities to be implemented under the Compact Program include the expansion and rehabilitation of the Distribution networks at 66kV, 33kV and 11kV overhead lines 22/01/2016
1076 Transmission And Distribution Of Electricity 21/01/2016
1077 Construction and reconstruction of power grids 0.4-110 kV. 21/01/2016
1078 Electrical line operation and maintenance 21/01/2016
1079 SUPPLY OF METER LOW VOLTAGE FOR CUSTOMERS 21/01/2016
1080 Design,Supply,installation and commissioning of new transmission line 20/01/2016
1081 Dayet Aoua: Development Of The Mv 22 Kv Line Ifrane - Sais (Province Ifrane). 20/01/2016
1082 Structural Steel Supply of Transmission Line 750KV as notice 19/01/2016
1083 Replacement of the existing emergency power synchronization with new equipment. Notes: A mandatory pre bid meeting will be held on 12/30/15, 9:00 AM at Cape Breton Regional Hospital 1482 George Street Sydney, Nova Scotia B1P 1P3. A mandatory second site visit and bidders’ briefing has been scheduled on January 8, 2016 at 9:00 AM at Cape Breton Regional Hospital, Engineering Services Department, Level 1, Room 1338, 1482 George Street, Sydney, Nova Scotia B1P 1P3. Those general contract bidders that attended the first visit/meeting will not be required to attend the second visit/meeting 19/01/2016
1084 Purchase of Suspension Tower (S2 33KV Uni-Circuit (Panthar) and Purchase of Suspension Tower (S2 33KV Uni-Circuit (Wolf) – Electricity Transmission Networks 19/01/2016
1085 construction gridline in communes, Cam Xuyen, Can Loc districts, Hong Linh town, Ha Tinh city 18/01/2016
1086 Supply, delivery and installation of towers and other equipment for 10 kV and 35kV transmission line Vrutok-Vrben 18/01/2016
1087 engineering company contracting for the provision of services to support the management and supervision of projects, regarding the civil works and electromechanical assembly of 69 kV distribution lines and substations of 138 and 69 kv in Acre 18/01/2016
1088 New transmission line and
Construction of transformer
18/01/2016
1089 construction grid and transformer station for BTS DBN330 station in Phu Cai village, Ang Cang commune, Muong Ang district, Dien Bien province 18/01/2016
1090 40.048 Km 33KV line construction/up-gradation 17/01/2016
1091 construction grid and TBA 110kv Tan Quang in Hung Yen province 15/01/2016
1092 Company Contracts for the provision of extension services and improved overhead distribution networks in medium and low voltage up to 34.5 kV, with partial supply of materials 15/01/2016
1093 Provide time and materials contract for the performance of as and when required transmission and distribution line 15/01/2016
1094 Extension of the tram network Nice - power supply traction equipment, high voltage (HV), low voltage (BT). 14/01/2016
1095 construction gridline from column 98 to Cau Rao section column of feeder 372 – E2.15 and construction underground cable 24kv in Duong Kinh district 14/01/2016
1096 supply equipment and construction gridline 35kV, substation 400kVA 35/0.4kV and gridline 0.4kV and meters for the project of anti-overload works for gridline in Si Ma Cai district 14/01/2016
1097 Completion of two (2) photovoltaic micropower connected to low voltage grid to the Center of Science and Technology of the Onee-Branch Electricity Electricity 13/01/2016
1098 HO-PIA15-011 - Supply, Delivery, Erection/Installation of Extension of the Mobo-Aroroy 69 kV T/L Project 13/01/2016
1099 Supply and electricity transmission and distribution services and associated delivery points for supplying buildings, a contract power> 36 kVA as part of a group of commands. 12/01/2016
1100 Construction of new Distribution line at Madarjpur & Gopalgang PBS 12/01/2016
1101 supply consulting service for detailed technical design, construction drawings design and estimates the whole project of anti-overload works for LV, MV gridline and substations in Quan Ba, Yen Minh, Dong Van, Meo Vac districts. 12/01/2016
1102 (12763) NV - Farmstead electrical connection to the power grid Antanaicio k., Jauniunai sen., Širvintos. sav., works contract 12/01/2016
1103 constructing a new high voltage overhead and underground distribution system including a new primary meter system 12/01/2016
1104 Procurement of two sets of vaccum circuit breaker 11/01/2016
1105 renovation of the electrical high voltage and low voltage installations for the building ponant 1, located at 5 rue Leblanc, paris 15th. 11/01/2016
1106 Supply and installation of low voltage and medium voltage lines 11/01/2016
1107 Construction of Electric line. 11/01/2016
1108 Construction of overhead distribution line in faridpur PBS of khulna zone. 11/01/2016
1109 Procurement of design, supply and installation of Chakaria-Matarbari 132kv Single circuit transmission line on double circuit toweer on turnkey basis 10/01/2016
1110 SBB intend the overhead line of the 132 kV UL Vezia Scairolo by the AB clamping Portal Crespera in the municipality of Breganzona (Lugano) up to UW new Vezia in the municipality of Vezia with cable systems consisting of 2 loops in a subterranean, walk-in cable channel, to replace. Of the cable duct to the UW Vezia, the cables pass under the motorway in HDPE pipes. 08/01/2016
1111 Rehabilitation of overhead lines 08/01/2016
1112 Purchases of electricity in the 24 months for PIWet_PIB in Pulawy and the Department of Foot and Mouth Disease PIWet-PIB in Zdunska Wola. 08/01/2016
1113 construction, supply equipment and materials for Kien Thuy branch under the project of improving gridline 10kV of An Thai 35/10kVA substation 08/01/2016
1114 construction, supply equipment and materials for An Thai branch under the project of improving gridline 10kV of An Thai 35/10kVA substation 08/01/2016
1115 construction grid 22kv double circuit from 110kv Hung Hoa – Cua Lo 08/01/2016
1116 supply equipment and materials for the project of improving gridline 10kV of An Thai 35/10kVA substation. 08/01/2016
1117 Design, Supply, Installation, Testing & Commissioning of 500Kv Double Circuit Bundle Transmission Line Starting from Port Qasim. 07/01/2016
1118 Supply of electricity for the property of the data processing center Mecklenburg-Vorpommern GmbH. 07/01/2016
1119 Supply of electricity for the property of self-operation sewage the city Hohen Neuendorf. 07/01/2016
1120 Supply of electricity. 07/01/2016
1121 The provisions of this framework agreement concerning the supply of electricity and lacheminement for three museum buildings Confluence (Confluence Museum, ACCA, Museum), the mission of balance responsible and associated services. 07/01/2016
1122 Supply of disconnectors for medium voltage (MV) 07/01/2016
1123 Consultancy service for construction and supervision and project management for ERT III grid project 07/01/2016
1124 supply equipment for gridline to the head office of Nam Chua commune, Nam Nhu commune, residential area in Na Hy 1 hamlet, Nam Po district. 07/01/2016
1125 Jackson Park Electrical Service and Distribution Improvement 06/01/2016
1126 Construction of High voltage transmission lines 400kv and 132kv lines 06/01/2016
1127 Replace electrical distribution system general and electrical primes 05/01/2016
1128 Kaunas city 10 kV distribution points SP-24, SP-259 and Kaunas city 10 kV distribution point SP-985 reconstruction works, supply of equipment, training and employment project staff coaching services 05/01/2016
1129 construction grid and TBA 110kv Tang Loong 3 05/01/2016
1130 Construction of 0.85 miles of new, 12kv three phase underground distribution line and 2 miles of 7.2kv single phase 05/01/2016
1131 construction gridline in communes in Binh Giang, Cam Giang districts 05/01/2016
1132 the electricity transmission and distribution network by: (i) reducing the number and duration of failures, faults and outages; (ii) reducing losses; (iii) reducing network operating and maintenance costs; (iv) upgrading the network management system; and (v) preparing the grid for future additional generation capacity. 05/01/2016
1133 "Repair of 110 kV overhead line" Buchino "in the section of the Central Republic to st. ? 55 (58 single).". 04/01/2016
1134 Framework agreement concerning the centralized supply of electricity in centres of SNS-O (OB6/2015). 04/01/2016
1135 construction work involving the connection to the power grid center DVOR / DME Szymany 04/01/2016
1136 Supply of electrical materials in Positions: 1. Electrical low voltage. 2. Electrical medium voltage .. 04/01/2016
1137 supply switching equipment for the project of strengthening MV gridline. 04/01/2016
1138 construction and supply equipment for gridline to the head office of Nam Chua commune, Nam Nhu commune, residential area in Na Hy 1 hamlet, Nam Po district 04/01/2016
1139 construction and supply equipment for gridline to the head office of Nam Chua commune, Nam Nhu commune, residential area in Na Hy 1 hamlet, Nam Po district 04/01/2016
1140 Procurement of Goods for 20/0.4 kV Transmission Line and Substation Equipment for Gereshk, Helmand Province 03/01/2016
1141 Medium and low voltage electrification of 38 VILLAGES under the PERG IV (Provinces of BERKANE, DRIOUCH, JERADA, AND NADOR TAOURIRT) 03/01/2016
1142 Supply of goods contract: transmission line and substation equipment such as switch gear ,conductors ,circuit breakers, transformer. 03/01/2016
1143 technical re-equipment protection and automatic transmission line 110 kV "Chernyakhiv" PL-110 kV "Mezhyrichka" and SV-110 kV 110/10 kV "Radomyshl" 02/01/2016
1144 LKH Leoben Hochsteiermark / LKH Leoben 2020 - Radiotherapy LINAC 1 wt 76/77 high and low voltage systems..
31/12/2015
1145 Power medium voltage and power protection technology 31/12/2015
1146 construction LV gridline in 5 hamlets in Bau Lam commune 31/12/2015
1147 construction MV grid and transformer station for the project of Cai Mep – Thi Vai port road of section 8 ( Km17+271,13 – Km18+100). 31/12/2015
1148 Construction of OHD new renovation /11kv/33kv linesat different PBS;s IN Rajshahi division. 31/12/2015
1149 Enhancement of Capacity of Grid Substations and Transmission Lines for Rural Electrification Under the Rural Electricity Transmission and Distribution 30/12/2015
1150 construction and supply equipment for gridline 110kV under the project of Xim Vang 2 hydropower plant 30/12/2015
1151 construction and improving gridline from column 35 to column 105 of feeder 371 – E2.14 in Duong Kinh district 30/12/2015
1152 improving gridline in Le Loi, Bac Son communes, An Duong township in An Duong district 30/12/2015
1153 construction gridline from column 98 to Cau Rao section column of feeder 372 – E2.15 and construction underground cable 24kv in Duong Kinh district 30/12/2015
1154 Electricity purchased. 29/12/2015
1155 Parts of electrical distribution and controlling devices (panel ASCHSU GPA (included)), under the Civil Code 016-2010 - 27.12.4 29/12/2015
1156 Construction of 11KV new line 29/12/2015
1157 Electrical line construction material 28/12/2015
1158 Electrical Line Construction Materials 28/12/2015
1159 construction grid and TBA in Dong Hung and Hung Ha districts 28/12/2015
1160 construction grid and transformer station in Thai Thuy , Quynh Phu and Tien Hai 2 districts 28/12/2015
1161 construction supplementary works, water supply and drainage system, LV power system for Nam Ban 2 hydropower plant 28/12/2015
1162 construction grid and TBA in wards, communes, Thai Binh city and Vu Thu, Kien Xuong and Tien Hai district. 28/12/2015
1163 construction LV gridline in 4 hamlets in Bau Lam commune 28/12/2015
1164 Construction of 11KV Distribution line/up-gradation line 28/12/2015
1165 Construction of new distribution line 28/12/2015
1166 Electrical power supply. 28/12/2015
1167 Repair/Replace Circuit 7 Electric Distribution Lines.
24/12/2015
1168 Supply and installation MV grid, transformer station for the project of operation building of units of EVN SPC 24/12/2015
1169 construction grid and transformer station in Ba Vi district phase 1 year 2016 24/12/2015
1170 Common engineering services for corrective maintenance at the medium-voltage grid, with replacement of approximately 100 m three-phase network and corrective maintenance at the substation with replacement of the three-phase transformer of 30 KVA power, on Station research? Paulo Morelli days? ? ESPAM, located in Station Bom Jesus, Gleba 32? Km. 100 of Highway BR 230 (Trans)? Municipality of Medicilândia-PA. 24/12/2015
1171 CONSTRUCTION PROJECT LINKS 225 KV EHV Kounoune - CROW'S FEET 23/12/2015
1172 Procurement of Goods for Re-Construction of New Chilaw - Bolawatte 132 kV double circuit transmission line, and Re-Construction of Badulla – Medagama 132 kV double circuit transmission line 23/12/2015
1173 Procurement of Goods for Re-Construction of New Chilaw - Bolawatte 132kV double circuit transmission line, and Re-Construction of Badulla – Medagama 132 kV double circuit transmission line 23/12/2015
1174 Emergency Power Distribution At RFOTC 22/12/2015
1175 supply and installation overhead gridline 6V from Mong Duong station to distribution station 6kV at mouth +16 and +20 22/12/2015
1176 Maintenance and repairs of c-type store at 132 k v grid station 22/12/2015
1177 construction transformer station and MV grid for the project of fresh water system in Lien Phuong, Van Tao, Ha hoi, Hong Van, Thu phu communes, Thuong Tin district, Hanoi 22/12/2015
1178 Extension of the electricity grid in Douar El HAJJAJ for connecting an electrical wells 21/12/2015
1179 Construction and Augmentation of Electric lines and sub-station 21/12/2015
1180 Delivery of wire ropes for a 110 kV double lines in the Western lower Austria. 21/12/2015
1181 Delivery of wire ropes for a 110 kV double lines in the Western lower Austria. 21/12/2015
1182 Transmission network LitPol 330/400/10 kV and NordBalt 330/400/20/10 kV converter stations cooling systems for maintenance and repairs 21/12/2015
1183 Supply and transmission / distribution of thermal energy for the needs of the District Sports and Recreation District Prague-East in Warsaw 21/12/2015
1184 Upgrading of Power Lines at Motorpool Compound 21/12/2015
1185 Supply and erection of low and medium voltage network 20/12/2015
1186 Rehabilitation of the medium and low voltage distribution work. 19/12/2015
1187 Supply and erection of two 11 kv medium voltage electricity distributors 19/12/2015
1188 Maintenance and high voltage and low voltage installation of the chd candélie 18/12/2015
1189 Maintenance and high voltage and low voltage installation of the chd candélie 18/12/2015
1190 Installation of Solar Energy System electric Power Supply for Hostal 18/12/2015
1191 Service agreement and exploitation of electrical installations HV / LV Rungis with the obligation to résulat. 18/12/2015
1192 SUPPLY
OF 66kV, 33kV, 132 kV AND 220kV LINES ARRESTORS
18/12/2015
1193 Testing and commissioning of Transmission line 18/12/2015
1194 Low Voltage and Medium Voltage Installations 17/12/2015
1195 construction LV grid of transformer stations year 2015 in power management teams 5, 6, 7, 8 17/12/2015
1196 Lukang 1008kHz sub-station transmission lines and poles demolition application 3-phase 220V power meter procurement case 17/12/2015
1197 Investment Opportunities Study of Electric Power Production in Improving Value of Domestic Component (DCL) to Support Development of Electric Power Infrastructure 16/12/2015
1198 Provide engineering services to prepare construction documents for a 115 KV transmission line in
private easement and public right of way along existing roads between an existing substation and a new
substation site.
16/12/2015
1199 Administrative buildings electrical connection to the power grid Viršuliškiu g. 26, Vilnius. works 16/12/2015
1200 REQUEST FOR EXPRESSION OF INTEREST FOR LAGOS AND OGUN STATE TRANSMISSION LINES AND ASSOCIATED SUBSTATION : ENGAGEMENT OF CONSULTANT FOR THE ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT, RESETTLEMENT ACTION PLAN AND LINE ROUTE STUDIES 15/12/2015
1201 Reconstruction of electric power 15/12/2015
1202 Works in cell station 400/220/110 kV line from 110 kV Iernut related (CIC 1) Sanpaul - Winters (design) 15/12/2015
1203 132/33 Kv GIS Substations 15/12/2015
1204 Lot 1: Design,manufacture,supply,installation,testing and commissioning of substation
Lot 4 : Survey, design,supply,erection,testing and commissioning of overhead transmission line
15/12/2015
1205 improving and upgrading LV grid phase 1 year 2016 15/12/2015
1206 Engineering Company Contracting For The Provision Of Services In Electricity Distribution Networks In Medium And Low Voltage, In The Form Of Productivity Per Unit Of Services (Us) In The Concession Area Of Eletrobras Amazon Distribution, In Urban And Rural Areas Of The Amazon State, With Routine In The City Of Manaus. 15/12/2015
1207 Survey, design,supply erection,testing and commissioning of overhead transmission line 15/12/2015
1208 Supply and transmission / distribution of thermal energy to the building of School No. 61 in Warsaw, located at ul.Wiktorski 30/32 in the period 01.01.2016 r. - 31.12.2016. 15/12/2015
1209 Supply and transmission, distribution of thermal energy to the building of the Primary School no. 26 st. Copper 8, 00-814 Warsaw 15/12/2015
1210 Stadtwerke Strausberg GmbH has been commissioned as a concessionaire with the operation of low and medium voltage local network in the urban area of the city Strausberg. She is also the owner of the electricity distribution network in the territory of the city of Strausberg. Stadtwerke Strausberg GmbH intends to use the technical management of the power system for a period of 10 years plus. Forgiving option to extend to a plant manager. 14/12/2015
1211 moving gridline 110kV of feeder 177E11.1 (Thai Binh - Kien Xuong) and 172E3.3 (Long Boi – Tien Hai) 14/12/2015
1212 Supply of electricity accounting for the formation of the exchange fund PJSC "IDGC of the North Caucasus" 14/12/2015
1213 Supply of electric power to the primary school of the city of Osijek 14/12/2015
1214 Supply and installation of 33kV and 11kv Distribution line 14/12/2015
1215 Supply And Installation Of 33kv And 11kv Distribution Lines,
Capacitor Banks, Electrification Of Peri Urban Areas And 11kv
Underground Cables
14/12/2015
1216 Construction of 25.435 KM OHD line 14/12/2015
1217 construction grid 12,7kv and transformer station one phase – 15KVA for supply power at Viettel DNI936 broadcasting station. 14/12/2015
1218 Preparation of preliminary designs for development of mini grid power generation plant 14/12/2015
1219 construction supplementary works of Thanh Hoa HV gridline branch of transformer station 110kv Nui Mot 14/12/2015
1220 supply accessories including: + Lot 01: supply cosse and wires + Lot 02: supply LV gridline accessories + Lot 03: supply MV gridline accessories + Lot 04: supply accessories + Lot 05: supply lead seal + Lot 06: supply bolts 14/12/2015
1221 Construction LV, MV gridline and substation in Nam Po district 12/12/2015
1222 Construction LV, MV gridline and substation in Muong Nhe district 12/12/2015
1223 Development of project-estimate the establishment of an easement of 110 kV transmission line. 11/12/2015
1224 Printing of Stickers, Permits, Labels, and Licenses 11/12/2015
1225 construction , test and adjust grid and TBA 110kv for the project of grid and TBA 110kv Doan Hung 11/12/2015
1226 installation LV, MV gridline and substation III – 160kVA for customs procedure team in complex area 11/12/2015
1227 Design Services and Design Services During Construction for
the Power/Distribution Improvements
10/12/2015
1228 Achieving an energy audit on install? DISCLOSURES use of electricity occur? Taking Transelectrica SA, and analyzing balance sheets? Of the energy on the perimeter network? Network electricity transmission of electricity, to provide services public electricity transmission. 10/12/2015
1229 Panel, Power Distribution 10/12/2015
1230 UPGRADING OF OVERHEAD POWER LINES AND SUBSTATION 10/12/2015
1231 Recruitment company to perform preventive and corrective maintenance, improvement and reform in overhead distribution lines, energized in urban and rural areas, the voltage up to 34.5kV in Acre in productivity regime 10/12/2015
1232 Improving LV gridline in Thuy Trieu commune, Thuy Nguyen district 10/12/2015
1233 Improving LV gridline in An Lu commune, Thuy Nguyen district 10/12/2015
1234 construction gridline 22kV, substation 160kVA-22/0.4kV and gridline 0.4kV to supply power for Mangrove Nursery 10/12/2015
1235 38.492 km 33kv line construction/up-gradation 10/12/2015
1236 Supply and transmission / distribution of thermal energy for the needs of the District Sports and Recreation District Prague-East in Warsaw 10/12/2015
1237 Toplopocinkuvani "L" profiles for 110 kV and 400 kV power line 09/12/2015
1238 Supply of electricity and provision of electricity distribution services for the Municipality and the City of Warta, subordinate facilities and infrastructure and municipal units 09/12/2015
1239 (No. 12034) 0.4 kV overhead line L-200 from St-623 reconstruction of the 0.4 kV CL, Šilutes r., SYLIAN k. works 09/12/2015
1240 Site Electric distribution system. 09/12/2015
1241 construction and maintenance of high voltage transmission and distribution facilities 08/12/2015
1242 Hoover-Mead Transmission Line in Clark County. 08/12/2015
1243 Construction of transmission lines 08/12/2015
1244 Lowering in double circuit 225 KV line "GLALCHA-CIMAR" on the station 225/22 KV NCS. 08/12/2015
1245 Procured the construction of a new 110/22 kV R-Fifejdy in Ostrava.
08/12/2015
1246 supply, electricity transmission and distribution and related services to various delivery points of the city of Vitry-le-François. 08/12/2015
1247 Supply, electricity transmission and distribution and related services to various delivery points within the Community. 08/12/2015
1248 Supply, Delivery, Installation, Testing and Commissioning of 33 KV Line from Tulsipur-Dudhraksh 08/12/2015
1249 Construction LV, MV gridline and substations in Than Uyen. 07/12/2015
1250 construction LV, MV gridline and substations in Muong Te, Nam Nhun districts 07/12/2015
1251 Connection to the grid work of hydrological stations and Zrarda Had Kourt Reserved for national SMEs 07/12/2015
1252 Supply of low voltage circuit breakers and contact terminals for the needs of "Energo-Pro Grid" AD. 07/12/2015
1253 Construction of 11 kv New line & 33/11 KV Sub-station. 07/12/2015
1254 Construction of 25.452 KM of OHD Line 07/12/2015
1255 Construction of 25.267 KM of OHD Line 07/12/2015
1256 construction LV grid phase 1 for the project of construction technical infrastructure of residential area TDC2 in area A - An Van Duong urban area 07/12/2015
1257 Supply and transmission / distribution of thermal energy to the building of School No. 124 in Warsaw 01-922 ul. Conrad 6 07/12/2015
1258 Cutting Works, Electricity Supply Resumption And Quotes For User Agent 1 phase and 3 phase In the Division, TNB Penang. 07/12/2015
1259 Supply and electricity transmission and distribution. 04/12/2015
1260 Supply and Electricity transmission and distribution (single contract) for the Villa Mediterranean building, delivery point with a contracted power exceeding 36 kva. 04/12/2015
1261 Electricity Distribution Network 04/12/2015
1262 "ISO B.D.1.1-1: 2013 750 kV transmission line capacity for issuing Rivne and Khmelnytsky nuclear power plant, 750 kV Rivne NPP - Kyiv with the expansion of 750 kV" Kiev "and measures 750 kV. Fiber-optic communication line on the route of the line 330 kV Rivne NPP - Grabow - Exactly - Khmelnitsky NPP (NSC ?5) (inv. ? new) " 04/12/2015
1263 "ISO B.D.1.1-1: 2013 750 kV transmission line capacity for issuing Rivne and Khmelnytsky nuclear power plant, 750 kV Rivne NPP - Kyiv with the expansion of 750 kV" Kiev "and measures 750 kV. Line-operational service for radio transmission line 750 kV (NSC ?7) (inv. ? new) " 04/12/2015
1264 TEN YEAR TRANSMISSION DEVELOPMENT MASTER PLAN:
04/12/2015
1265 Supply and delivery of low voltage distribution, measuring and cubicles 04/12/2015
1266 Supply of electricity and distribution services for the Municipality Patnów and its subordinate units 04/12/2015
1267 Supply and delivery of electricity and related services. 03/12/2015
1268 INVITATION FOR BIDS (IFB) FOR BUILDING
A NEW SUBSTATION AT MONIKO, LUGAZI
ON A TURNKEY BASIS
03/12/2015
1269 construction gridline and feeder under the sub-project of Quang Ngai – Quy Nhon 220kV (Phuoc An) 03/12/2015
1270 PD(NTDND&EIP)/PM1/Line Survey - Package 1/2015/01 _ Survey works of Proposed 400kV, 220kV, 132kV Transmission Line Routes - Package 1 03/12/2015
1271 Survey works of Proposed 400Kv, 220kv, 132kv Transmission Lines Routes - Package 1 03/12/2015
1272 4kV kV OJ L-100 of the R VS-405 reconstruction Gudeliu k., Zujunu sen., Vilnius district. works 03/12/2015
1273 Transmission Line 03/12/2015
1274 Construction and reconstruction of power grids 0.4-110 kV 02/12/2015
1275 Construction of 11KV Express Line. 02/12/2015
1276 construction 579m of gridline 10(22)kV; 956m of gridline 35kV; one substation 320kVA-10(22)/0.4kV; 2 substations 320kVA-35/0.4kV; improving 3.6km of gridline 400V behind substations of Dong Tinh 4, Dong Tinh 9 to supply power for anti-overload in Tam Duong district. 02/12/2015
1277 Construction of a new 110 kV OHL from the s / s "Chernozem" until s / s "Sandstone" (VL 110 kV "Teres").
01/12/2015
1278 Working in low voltage overhead network of Wiener Networks GmbH. 01/12/2015
1279 Power supply with destination to 1.511 points of supply of the community of Madrid. 01/12/2015
1280 PROCUREMENT OF 132KV TRANSMISSION LINE TOWERS FOR SOLAR AND WIND POWER PROJECTS UNDER NTDC'S OWN RESOURCES 01/12/2015
1281 Procure material for 132kV D/C transmission lines for power evacuation from wind power project 01/12/2015
1282 Supply and delivery of electricity to the needs of the institution the sunflowers, in fixed-price sites. 00/12/2015
1283 Delivery and supply of electricity. 00/12/2015
1284 The supply of electricity to the objects of the University Hospital Clinic. 00/12/2015
1285 The subject of the contract is the supply of electricity energy known as the successive use of the traction power distribution and the provision of services to the needs of business under the seat. 00/12/2015
1286 Circuit Breaker 30/11/2015
1287 Supply market and electricity transmission and distribution and related services.
30/11/2015
1288 The provision of Live work maintenance services on the MV network(11kV-33kV) and associated projects for various zones within the Limpopo Operating Unit 30/11/2015
1289 Supply of Electrical Line & Substation Construction Materials. 30/11/2015
1290 Hiring company specializing in the performance of services needed for repair of overhead lines of existing medium voltage power input substation Bananal? to Base Marines from Governor's Island by the regime enterprise lump sum 30/11/2015
1291 Typical power grid facilities design services and installation work 30/11/2015
1292 construction MV gridline and anti-overload substation in Nguyen Giap and Thanh An communes, Tu Ky district 30/11/2015
1293 construction MV gridline and anti-overload substation in Nguyen Giap and Thanh An communes, Tu Ky district. 30/11/2015
1294 The establishment of 220 kV voltage lines To unload generated from solar power station area Npan generating capacity of about 900 m.Watt 30/11/2015
1295 construction LV, MV gridline and substation 3P-750kVA 22/0.4kV for workshop No 35 30/11/2015
1296 construction and supply equipment and materials for 5 MV gridlines, 05 distribution substations, feeder 0.4kV in An Thi district 30/11/2015
1297 Construction of 25.176 KM 33 OHD Line 30/11/2015
1298 nstruction of 10.022 KM 33 KV Source Line 30/11/2015
1299 Construction of 10.776 KM 33 KV Source Line 30/11/2015
1300 demolishing from VTA341 to A358 of Vung Ang – Ba Don – Dong Hoi 220kV gridline 28/11/2015
1301 Supply and delivery of electrical energy 27/11/2015
1302 Repair of overhead line 110 kV "Peony". 27/11/2015
1303 Repair of VL 110 kV "Prespa 27/11/2015
1304 Line 132 / 380kV Châtelard-Bâtiaz. Civil Works Section 1. 27/11/2015
1305 Sub-contracting processing passengers and their baggage for security purposes 27/11/2015
1306 120MW SHORT-TERM ELECTRICITY SUPPLY IN NAMIBIA 27/11/2015
1307 Supply and electricity transmission and distribution. 27/11/2015
1308 Supply equipment and construction MV gridline in Si Ma Cai district (feeder 376 E20.1) – Muong Khuong (feeder 373 E20.2); Bat Xat (feeder 374 E20.2) – Sa Pa (feeder 374 E20.2). 27/11/2015
1309 supply commodities and construction gridline 35kV to supply power for Bao Minh industrial zone 27/11/2015
1310 supply commodities and construction gridline 22kV and substations of Cong Cong 1, 3; Truc Thanh 2, Truc Hung 1, 2; Truc Tuan 1, Hai Ninh 2 and Cong Cong 5 in Truc Ninh district 27/11/2015
1311 Supply, installation and commissioning of: Lot 1, 400kV Lines; and Lot 2, 132 Lines. 26/11/2015
1312 improving gridline of feeder 972 from 10kV to 22kV, TG Ha Bi 26/11/2015
1313 supply gridline default alarm system 26/11/2015
1314 Supply and electricity transmission and distribution. 25/11/2015
1315 Procurement of 750 kV transmission line capacity for issuing Rivne and Khmelnytsky nuclear power plant, 750 kV Rivne NPP - Kyiv with the expansion of 750 kV" Kiev "and measures 750 kV. ROS in. Sarny (NSC ?2) (inv. Number new) " 25/11/2015
1316 Procurement of 750 kV transmission line capacity for issuing Rivne and Khmelnytsky nuclear power plant, 750 kV Rivne NPP - Kyiv with the expansion of 750 kV" Kiev "and measures 750 kV. Repair ekspluatatsinyy point in m. Novograd Volyn (NSC ?4) (inv. Number new) 25/11/2015
1317 Design and construction of an underground line of 13.2kV for the expansion works of the International Airport of Tocumen, SA 25/11/2015
1318 C1 Services to be Provided Under Framework Contracts.

SRVCS/01 :- Surveying and Design of Electricity Power Lines.
25/11/2015
1319 Partial Electrical Upgrade to Dyersville Maintenance Facility 25/11/2015
1320 Const of 26 310 KM 11KV line under Narsindi PBS-2 25/11/2015
1321 Industrial building electrical connection to the power grid RAM. 7 25/11/2015
1322 Overhead and underground distribution system 25/11/2015
1323 Distribution of electricity. 24/11/2015
1324 Construction of transmission line and bays (inc!. supply and installation of telecommunication equipment; testing & commissioning) Reference No. (as per Procurement Plan):CLCL-W13 1. 24/11/2015
1325 Supply of electricity and provision of electricity distribution services to the needs of local government units purchasing group from the district Ostroleka and their organizational units, represented in proceedings before the District Ostrolecki 24/11/2015
1326 Brantley To Airside 69Kv Transmission Line Relocation Phase 3. 24/11/2015
1327 8 nos 132 Kv circuit breaker 24/11/2015
1328 The acquisition of a switchboard for the services of the General Secretariat of the Province of Oued Ed-Dahab 24/11/2015
1329 Construction and rebuild of the Brantly-Airside 69kv transmission line with 15kv distribution 24/11/2015
1330 Construction of 30.02 km electric distribution lines & conversion of 1.11 km line at sylhet pbs-1. 24/11/2015
1331 Overhauling grid 35KV An Tien - Hoa Lac - MD ( grid 376E10.2). 24/11/2015
1332 Tainan 105 annual traffic segment sporadic transmission line overhead line equipment engineering plot points 24/11/2015
1333 Transmission and distribution of electricity 23/11/2015
1334 Transmission Line Construction 23/11/2015
1335 Supply and delivery of electric power 23/11/2015
1336 upgrading MV gridline under the project of feeder 22kVv of Dong Hoa 110/22kV substation. 23/11/2015
1337 Transmission network LitPol 330/400/10 kV converter substations and transmission network NordBalt 330/400/20/10 kV converter substations metrological verification and calibration services 23/11/2015
1338 upgrading gridline 110kV crossing conveyor under the project of Lep My – port km6 transporting system 23/11/2015
1339 Construction of New Distribution Line at Bagerhat PBS. 22/11/2015
1340 Construction of transmission line and bays (incl. supply and installation of telecommunication equipment; testing & commissioning) 20/11/2015
1341 Renovation of the electrical distribution station F on Toulouse Blagnac Airport 20/11/2015
1342 Service-stop supply of electricity and provision of electricity distribution services to the helipad at the Medici 20/11/2015
1343 Delivery of the estimated amount of 3 600 MWh of electricity to the Hall Ergo Arena, located on the border of Gdansk and Sopot in the framework of a comprehensive agreement. Installed power 6.5 MWh.
19/11/2015
1344 Modernization of 400/220 kV Joachimów.
19/11/2015
1345 Supply and delivery of electricity for inter buildings 19/11/2015
1346 Supply of electricity to high environmental value. 19/11/2015
1347 installation materials and testing in Quan Tru area under the project of improving gridline 6kV behind Kien An 110kV substation. 19/11/2015
1348 construction and supply material and equipment for the project of construction grid 22kv between feeder 471E1.31 and feeder 473E1.31. Funding source 19/11/2015
1349 Removal of existing overhead power and communications distribution system feeding buildings
164, 165, 170 and 190 and connected site lighting.
19/11/2015
1350 Supply and installation of installations of secondary equipment for the switchyard 110 kV substation Blue. 18/11/2015
1351 Electricity supply in medium and low voltage in the city of Cordoba 18/11/2015
1352 Energy Production Tampere Oy designs up to 40 MWth kaukojäähdytystehoisen the construction of the MV Kauppi of the box body (district cooling network design temperatures: 8/16 ° C). Cold energy source for the plant would be used at the bottom of the adjacent Lake Näsijärvi water. The need for cooling capacity increases over the use of refrigeration machines to produce the required cooling energy (produced water coolers lowest temperature of 6 ° C). District cooling is produced by the Department of four (4) free cooling lake water kaukojäähdytyslämmönvaihtimella and 5-6. Llavedenjäähdyttimellä (vedenjäähdytinyksiköiden designed nimellisjäähdytysteho 2-6 MW / unit)
in connection with Kaupinoja surface water treatment plant discharged into the planned cooling body of free-cooling, and the total flow amount of condensation water has been agreed up to 700 l / s ( free cooling chillers and condensing is coupled in series).
The lake water temperature varies according to season and weather conditions, the long-term, so that in winter the temperature is approx. 4 ° C, and the water has warmed up ylimmilleen approx. 14 ° C. The plant is designed for automatic unmanned operation in mind.
The district cooling plant will be located in the vicinity of the nature park and the addition next to the plant located in the surface water treatment plant, which supplied drinking water from the City of Tampere in water distribution.
This acquisition consists of the 20 kV switchgear, distribution transformers and distribution centers. On a connected load of about 8 MVA.
18/11/2015
1353 35 kV overhead line Ariogal - Raseiniai Reconstruction project preparation and project supervision services Purchase 18/11/2015
1354 Construction and installation equipment for LV power system for supply power for house area for selling in Me Tri ward 18/11/2015
1355 Kohtla-Jarve area of low voltage overhead line reconstruction, II1008 18/11/2015
1356 Electricity 18/11/2015
1357 1) The contract is the provision by the Contractor of services liquidation of failure on linear objects
of power PSE (area managed operationally by agencies PSE SA in Warsaw,
Radom and Katowice), within the scope specified in Part II, Terms of Reference.
2) Object of the contract includes the following facilities:
The area is managed operationally by PSE SA Branch in Warsaw:
a) the power lines supported by ZES Ostroleka,
b) power lines supported by ZES Fever,
c) power lines supported by ZES Plock,
d) power lines supported by ZES Janow,
e) lines Power supported by ZES Mory
f) power lines supported by ZES Rogowiec.
The area is managed operationally by PSE SA Branch in Radom:
a) the power lines supported by ZES Polaniec,
b) power lines supported by ZES Rzeszow,
c) power lines supported by ZES Lublin,
d) power lines supported by ZES Radom,
e) power lines supported by ZES Kielce.
The area is managed operationally by PSE SA Branch in Katowice:
a) the power lines supported by ZES Bujakow,
b) power lines supported by ZES Byczyna
c) the power lines supported by ZES Dobrzen,
d) power lines supported by ZES Joachimów,
e) power lines supported by ZES Lagisza,
f) power lines supported by ZES Wanda
g) power lines supported by ZES Wielopole.
3) Object of the contract covers m.in .:
a) performing stand-by brigade service contractors to timely implement the subject matter hereof
(standby conditions to be met by the Contractor to the timely implementation of the subject of the Agreement are
set out in Chapter I of Part II, § 5 of the ToR).
b) execution of inspection contingency linear power facilities,
c) disaster recovery occurring at linear power facilities covered by this
Agreement.
Implementation of the services referred to in paragraph 3) b) - c) is executed based on orders given
one-off and an agreed timetable.
17/11/2015
1358 Zaporizhzhya NPP. Reconstruction of GRP-750 kV transmission line to connect the 750-kV "Zaporizhzhya NPP - Kakhovska" BVS-2. Ventilation and air conditioning. Construction and commissioning 17/11/2015
1359 Workers at the south area of high expressway traffic control facilities and road-side power transmission system maintenance work (105) 17/11/2015
1360 Market for the supply and delivery of electricity on production and water distribution installations Union - Years 2016 to 2018 16/11/2015
1361 Framework agreement for the supply, the electricity transmission and distribution and associated services for a group of municipalities. 16/11/2015
1362 Reconstruction of 0.38 kV transmission line from TP-31 (L2) and of the TA-325 (L2, L3) on the street 16/11/2015
1363 Reconstruction of 10-0.4 kV transmission line and transfer KTP-325 (L1, L3 of the output and L2) on the street. Franko, Lenin, Green, Gagarin in the village. Farms Vinnitsa Vinnytsya region 16/11/2015
1364 Reconstruction of transmission lines 10-0,38 kW from TP-165 and loading SCHTP 10 / 0.4 kV Street. Lenin Str. Collective farm in the village. Ksaverovka Vinnitsa district (code 287.10), including IPT-0,38kV l = 3,279km, PL-10 kV l = 0,020km, SCHTP 1sht.h100kVA 16/11/2015
1365 supply of electricity and its delivery on the network in order to provide for the electricity needs of the dole SICTOM zone Quantities (supplies and services), nature and wide (work) 16/11/2015
1366 Construction of New Distribution lines at Barisal PBS 16/11/2015
1367 Gridline and substation 16/11/2015
1368 Construction and supply equipment for LV, MV gridline and substation 16/11/2015
1369 Moving MV gridline 10kV, 35kV out of Dong Van 3 industrial zone, Duy Tien district 16/11/2015
1370 construction, supply material , insurance service for the project of repairing grid 110kv Thu Duc - Vikimco - Xa Lo and Thu Duc - An Khanh - tower work. Funding source 16/11/2015
1371 Replacement of Power Distribution Equipment 16/11/2015
1372 Electric Distribution System Upgrades 16/11/2015
1373 Caruna ask for requests to participate Seitenoikea-Deer Danger construction of 110 kV transmission line and substation Deer Hazards.
Caruna build Seitenoikea-Deer Danger of 110 kV power transmission line and substation Deer Danger called the region of Kainuu. The project is located in areas Ristijärvi, Hyrynsalmen and Suomussalmi municipalities. The delivery is part of 2016 and during the whole year 2017.
13/11/2015
1374 Supply And Electricity Transmission And Distribution. 12/11/2015
1375 SWITCH, RADIO FREQUENCY TRANSMISSION LINE 12/11/2015
1376 supply circuit breakers 12/11/2015
1377 Extension & renovation of 11kV, 11/0.4kV, 0.4kV line & Installation of distribution X-former of different 11Kv feeder. 12/11/2015
1378 Supply material, equipment, construction and insurance service for grounding MV & LV gridline 12/11/2015
1379 Extension & renovation of 11kV, 11/0.4kV, 0.4kV line & Installation of distribution X-former of different 11Kv feeder. 12/11/2015
1380 Construction LV gridline, substation for Dak Lak General Hospital 12/11/2015
1381 for upgrading gridline 10kV of feeder 971, 972 TG 35/10kV Gia Tan to 22kV. 12/11/2015
1382 Necessary to provide fr adjustment, preventive maintenance,test, celebration and inspection services for the electrical distribution system 12/11/2015
1383 Lot number 1 "Reconstruction of KL-6 kW kom.?1 CP-28-TP-140 com. ?5, CL-6 kV CP-28 TP-140 kom.?15- kom.?6 "; Lot number 2 "Reconstruction of 6 kV transmission line L-com from 5-29. 35/6 kV Substation ?14 «?5» to com. 35/6 kV Substation ?10 «?29» (with a branch from support ?36 to the switching point B-5-1), m. Dnipropetrovsk region, Yellow Waters 11/11/2015
1384 Transmission network LitPol 330/400/10 kV converter substation maintenance and repairs 11/11/2015
1385 Design, supply, erection, testing and equipment of 230 kv double circuit transmission line on turnkey basis 10/11/2015
1386 Supply And Delivery Of Electrical Energy To The Community Of Communes Pays De Sierentz For Buildings With A Power Greater Than 36kva In Yellow And Green Fee 10/11/2015
1387 DESIGN, SUPPLY, ERECTION ,TESTING AND COMMISSIONING OF BHERAMARA- ISHURDI 230KV DOUBLE CIRCUIT TRANSMISSION LINE ON TURNKEY BASIS UNDER CAPACITY UPGRADATION (500MW) OF THE EXISTING BANGLADESH (BHERAMARA)-INDIA(BAHRAMPUR) GRID INTERCONNECTION PROJECT. 10/11/2015
1388 Commercial and technical management of the electricity distribution network in Putzbrunn 10/11/2015
1389 Construction power supply system in Tam Thang industrial zone phase 10/11/2015
1390 Shifting of out electric lines (11Kv, 33kv) of Sikalbaha 33/11 sub-station under distribution division - Patiya 10/11/2015
1391 Railway Power Line UW St. Johann - KW Uttendorf LtgNr.117, renewal, reinforcement of cond plant / seed, Maststell- and cable wor 10/11/2015
1392 An electrical distribution network (20 kV and 0.4 kV), the construction unit price year contract, the southern region. 10/11/2015
1393 Construction LV grid of 4 TBA Dong Cong, Vuon Hong. 10/11/2015
1394 (No. 11418) Kaunas city 10 kV distribution points SP-24, SP-259 and Kaunas city 10 kV distribution point SP-985 Reconstruction 10/11/2015
1395 Network expansion Nice tramway - train tracks and overhead contact line (surface and maintenance center Nikaïa). 09/11/2015
1396 Electrification of villages without electricity transfer project run city of Iranshahr - Dlgan 09/11/2015
1397 Supply materials and improving gridline 09/11/2015
1398 Supply materials and improving gridline 09/11/2015
1399 Construction of 66 KV Turkwell. Kalimungork -Lokichar line 09/11/2015
1400 Enregiya supply of electricity at low voltage CC imbalances for the needs of the Smolyan District Court 09/11/2015
1401 Improving gridline in Duc Xuan ward, Dang Kiem area, Bac Kan city 09/11/2015
1402 Improving gridline 35kV of Bac Kan – Cho Don (Phuong Vien – Ra Ban). 09/11/2015
1403 Improving gridline in Khuoi Hen residential area, Khuoi Un hamlet 09/11/2015
1404 Improving LV gridline in Tien Lang township 09/11/2015
1405 Circuit breaker 09/11/2015
1406 Designing phase electricity 09/11/2015
1407 Design, Supply, Installation, Testing & Commissioning of 33 11k/v Sub-stations and Source End Feeder Bays 08/11/2015
1408 Prepare all engineering and design documents required to retire the wooden 230 kv- H frame transmission lines and construct a 230 kv double circuit steel monopole line 06/11/2015
1409 Supply Supervision Service For Construction Feeder 475, 477 E2.14 06/11/2015
1410 Supply supervision service for construction MV gridline 22kV. 06/11/2015
1411 ARC-210 Receiver Transmitter/Control, Radio Set 06/11/2015
1412 Electrification of villages without electricity transfer project run city of Zahedan - Khash - Mirjaveh 06/11/2015
1413 Installation of about 7km of underground line from lake substation 06/11/2015
1414 Partial rehabilitation of power. Excavator SRs 2000" - Ref. ? 110/2014 on - PPL 05/11/2015
1415 C35 / 0000279823 - delivery terminal blocks, controllers, circuit breakers and equipment ABB terminal for the railway rolling stock 05/11/2015
1416 The conclusion of a comprehensive agreement on the sale and distribution of electricity for 2016. 05/11/2015
1417 Supply Consulting Service For Detailed Technical Design, Construction Drawings Design And Estimates The Whole Project Of Improving And Developing Lv, Mv Gridline In Quang Binh Province 05/11/2015
1418 Pre-qualification for the construction of Yorba substation 12kv switchgear and control building upgrade project 05/11/2015
1419 Electricity connections work on ERDF regional office Alps. 05/11/2015
1420 Provide enginering services to perform power system studies on its 66 Kv transmission system. 05/11/2015
1421 PAINT WORK IN THE TOWER 500 KV TRANSMISSION LINES TO ROCK HILL YONG PENG IN EAST RANGE OF CIVIL AVIATION (T / NO 71 - T / NO 80) UNDER THE CARE UNIT ONLINE, State Office Manager (SUMATRA II - Kluang), DEPARTMENT OF MAINTENANCE ASSETS, TRANSMISSION 04/11/2015
1422 Engineering company specialized Hiring for execution by the contract unit price scheme for construction of rural distribution line, class 15 KV in the town of Tyre? PA 04/11/2015
1423 Transmission Line Relocation Project – 115kV YS33/XH46 and VH1/VS27 Rebuild 04/11/2015
1424 Shifting of Out Going Electric Lines (11KV, 33KV). 04/11/2015
1425 Low Voltage Electricity 03/11/2015
1426 Design, Supply, Erection, Testing & Commissioning of Ishurdirooper 132kv Double Circuit Transmission Line on Turnkey Basis. 03/11/2015
1427 Remote racking system to remove and insert circuit breakers for switchgears 03/11/2015
1428 J--CIRCUIT BREAKER 02/11/2015
1429 Repairing grid 110kV Vinh Yen – Vinh Tuong 02/11/2015
1430 Bid for supply equipment for installation capacitor at main conductor of Phuc Dien 110kV substation (E8.15); Dai An 110kV substation (E8.11) 02/11/2015
1431 Circuit breaker 02/11/2015
1432 Circuit Breaker 02/11/2015
1433 (11405) 0.4-10 kV overhead line route for cleaning Kaunas region works 02/11/2015
1434 Extension & renovation of 11kV, 11/0.4kV, 0.4kV line & installation of distribution X-former of different 11Kv feeder 01/11/2015
1435 Replace roadway illum assembly (LED) install circuit breaker 30/10/2015
1436 Sup/16000 :- Overhead power line materials and accessories. 30/10/2015
1437 Whole project of construction Xuan Ha – Lien Tri 110kV gridline. 30/10/2015
1438 Development of design documentation including the obtaining of appropriate licenses, approvals and agreements on reconstruction and modernization of electric power lines, measuring systems and transformer stations MV.
30/10/2015
1439 Circuit breaker 29/10/2015
1440 Upgrading 132kV Transmission Lines Papan To Pengkalan. 29/10/2015
1441 40.742 Km 33 KV Line Construction/Up-gradation at Narsingdi PBS-1 29/10/2015
1442 Construction of an electricity distribution center for low voltage, for suitability of electrical installations Materials Division (AMR) of the Aeronautics and Space Institute - IAE. 29/10/2015
1443 34.838 Km 33 KV Line Construction / Up-gradation 29/10/2015
1444 Upgrading 132kV Transmission Lines Papan To Pengkalan. 29/10/2015
1445 Manufacture and supply of aluminum-steel cables 29/10/2015
1446 Relocation of 04-No. 220kv Transmission Lines. 28/10/2015
1447 Construction Gridline 22kv And Substation 1600kva For Long Xuyen Administration Centre 28/10/2015
1448 supply blast-proof circuit breaker and winch 28/10/2015
1449 External sectional disconnectors 27/10/2015
1450 Consulting Services for Engineering of the Construction of 220 kV Chilime - Trishuli Transmission System 27/10/2015
1451 26kv/4kv Substation Rebuild. The rebuild consists of three 4.16 kv power transformers associated masonry firewalls 27/10/2015
1452 Construction of Overhead electricity distribution 11 kv & 33 kv line under geographical area of Comilia PBS-3. 27/10/2015
1453 construction power supply system in residential area 27/10/2015
1454 construction grid 110kv for the project of grid 110kv for supply power at Mo Lao station 27/10/2015
1455 40.824 KM 33 KV Line Construction / Upgradation. 27/10/2015
1456 22.852 KM 33 Kv Line Construction / Upgradation 27/10/2015
1457 33.443 km Construction / Upgradation 33 KV Line. 27/10/2015
1458 20.39 km 33 KV Line Construction / Up-gradation 27/10/2015
1459 Circuit breaker 26/10/2015
1460 Sise Ts -Separatoare High Voltage - Resizing Electrical Distribution Plan Investment Transilvania Sud 26/10/2015
1461 Cost Of Construction Work For The Project Of Moving Electric Post Of Lv Grid For The Project Of Enlarging La Son –Nam Dong Road From Km0 – Km4 26/10/2015
1462 Supply Materials, Equipment And Anti-Overload Works Of Mv Gridline In Le Thuy District. 26/10/2015
1463 Improving and grounding gridline 22kV of feeder 472-E74 of Thanh Phuong branch from the first point to pillar No 1. 24/10/2015
1464 3. Transmission Lines and Cables: 110 kV Single circuit line Rahoveci - Theranda, 110 kV Double circuit line and cables Fushë Kosovë, 220 kV Double circuit line Drenasi 2, 110 kV Double circuit cable line Mitrovica and 110 kV Double circuit cable line Pristina 23/10/2015
1465 OOO «UMS» Ave A.Temura, 24, Tashkent, 100000, announces an open request for proposals for the provision of services for the transfer of electrical networks and el.oborudovaniya base stations located in residential buildings 23/10/2015
1466 National Grid Interconnector Holdings Limited and Energinet.dk jointly refered to as the Contracting Entity are developing a new HVDC power cable between Great Britain and Denmark known as VIKING Link. The Contracting Entity is currently tendering a cable route survey extending across the North Sea between the 2 countries.
The cable route survey will include geophysical survey, geotechnical investigations, cable-crossing investigations with ROV and Benthic investigations.
The Contracting Entity hereby invites Tenderers to submit a response to pre-qualify for the Client Representative Services related to the cable route survey. The Client Representative Services will include offshore representation on marine vessels as well as onshore support with logistic management and technical consultancy related to the marine operations. The objectives of the tendered Client Representative Services are to provide offshore representation on the marine vessels on behalf of the Contracting Entity to monitor progress and performance of the surveyor in terms of Safety, Health, Environment and Quality, breakdown of time, accept/disagree on standby for weather/break-down, technical performance of vessel and measurement systems as well as performance of the crew.
The Contracting Entity intends to award the work to maximum 2 Tenderer(s).
23/10/2015
1467 Bid for construction power works phase 2 in 2015 23/10/2015
1468 Package 1: supply materials and improving distribution gridline in Tuy Phong district 23/10/2015
1469 supply 3-phase circuit breaker 3-pole 100A 23/10/2015
1470 Transmission Construction For Atkins - Briarcrest 69 KV Rebuild (Phase 1) 22/10/2015
1471 construction work for upgrading capacity of transformer station of Hanoi police and transformer station of Department of Police No 2 22/10/2015
1472 Up gradation of Rural Electrification System 22/10/2015
1473 Transmission Construction For Atkins - Briarcrest 69 KV Rebuild 22/10/2015
1474 Teardown, inspection and maintenance of draw out type circuit breakers in service 22/10/2015
1475 Supply of Miniature Circuit Breakers 21/10/2015
1476 Supply of Miniature Circuit Breakers 21/10/2015
1477 Comilla-Bibiyana 230 Kv Transmission Line LILO (Line In Line Out) To Shahjibazar 330 Mw Combined Cycle Power Plant 21/10/2015
1478 Purchase, install and commission a new electrical distribution system for college's campus. 21/10/2015
1479 Investigation, Circuit Identification, Maintenance & Repair of Power Distribution Systems-South 20/10/2015
1480 Investigation, Circuit Identification, Maintenance & Repair of Power Distribution Systems- North 20/10/2015
1481 Design, supply & commissioning of ishurdi roopur 132kv double circuit transmission line on turnkey basis 20/10/2015
1482 10 kV overhead line Lyduvenai-Taurage (SAX installation) repairs 20/10/2015
1483 Supply of low voltage switchboards to Krakow.
20/10/2015
1484 Vantaa Energy Electricity Networks Ltd network license area, the tasks of 0.4 kV electrical connection network construction and työmaasähköistykset. 20/10/2015
1485 Vantaa Energy Electricity Networks Ltd network license area Tasks 0.4 and 20 kV network construction.
20/10/2015
1486 Bid for construction anti-overload works for gridline 20/10/2015
1487 construction substation No 01 and lighting gridline on road RD-01 in Pho Noi Textile and Garment Industrial Zone. 20/10/2015
1488 (10984) 35 kV overhead line Ariogal - Raseiniai Reconstruction project preparation and project supervision services Purchase 20/10/2015
1489 Construction Lv, Mv Gridline And Substation To Supply Power Phieng Bung 19/10/2015
1490 Supply Material, Equipment, Construction Power System And Insurance Service For Grounding Mv & Lv Gridline On Road Cutting Le Duan Road 19/10/2015
1491 Supply Equipment And Construction Mv Gridline And Substation In Ai Quoc Ward, Hai Duong City. 19/10/2015
1492 Construction and supply equipment for the project of construction gridline and substation to supply power for residential area in Quang Phu 19/10/2015
1493 Construction Gridline In Chua Ta A Hamlet, Tia Dinh Commune. 19/10/2015
1494 Construction gridline in Pha So A hamlet, Xa Dung commune. 19/10/2015
1495 Construction, supply material, equipment and insurance service for complete and development LV gridline in Tan Phu district 19/10/2015
1496 Construction of Electric lines at different PBS`s & Sub-station at Sylhet PBS-2 in Sylhet Zone of BREB. 19/10/2015
1497 Engineering firm to assist in with improvements at the substation which may include but not limited to construction services. substation has two 67/12.2 Kv transformers both rated 15/25MVA with 15KV feeds to the switch house 19/10/2015
1498 Transmission network of Klaipeda 330/110/10 kV, Tent 330/110/10 kV and Bitenai 330/110/10 kV equipment repair and maintenance 19/10/2015
1499 Moving LV, MV gridline and substation of package 4a (from km0 to km2+341.74) under the project of upgrading Phan Dinh Phung road in Bao Loc city. 16/10/2015
1500 Panel, Power Distribution 16/10/2015
1501 Delivery of three dome breakers incl. Project planning and works inspection. 15/10/2015
1502 Construction LV, MV gridline and substation under the project of construction component No 1, Bac Lam Dong defence economic area. 15/10/2015
1503 Power lines renewal work HTA - starting ZI Les Barres / Town Naintré.
15/10/2015
1504 Testing of 12kv and 4kv circuit breakers 15/10/2015
1505 Supply, delivery, installation/Erection, Commissioning & Testing and Handover of 11/0.4/0.23 kv Distribution Line in Langtang. 14/10/2015
1506 Substation Replacement Project 14/10/2015
1507 Moving, Construction, Installation Gridline 35kv, Underground Cable 22kv And Interruption Station For Construction Dong Bac Sport Centre 14/10/2015
1508 Construction Gridline 22kv From Substation 180a (Northern Dak Bla Bridge) To Tien Dung Company 14/10/2015
1509 Installation of two new electrical service entrance circuit breakers and associated conduit wire and accessories 14/10/2015
1510 Circuit breaker 13/10/2015
1511 Construction Gridline 22kv To Supply Power For Phu Ha Industrial Zone 13/10/2015
1512 Counterfeit Labelled Moulded Case Circuit Breaker Study 13/10/2015
1513 Transmission of data in real time for the production of heat and electricity from power generation facilities" Sofia "to the electricity system operator 13/10/2015
1514 Construction of VLI-0,38 kV from the support of the projected 0.38 kV KTP-6 / 0,4 kV (number 1501) for the power supply of garden houses Ouch 12/10/2015
1515 Thuy Tram 1 substation to anti-overload for Thuy Tram substation in Tuy Loc commune 12/10/2015
1516 Construction Son Tinh 4 Substation To Anti-Overload For Son Tinh 2 Substation In Son Tinh Commune 12/10/2015
1517 Construction and Supply material for grounding gridline on Tran Hung Dao road. 12/10/2015
1518 Electricity distribution and control apparatus purchase 12/10/2015
1519 Switch Subassembly 09/10/2015
1520 C/BREAKER:MCB;QF- 3;C1;5kA
SpecificationMAGNETIC CIRCUIT BREAKER QF-3 - CURVE: 1; KA RATING: 5kA; AMPERAGE: 60A. Quantity 20
09/10/2015
1521 Purchase on-site substation construction maintenance services on an as needed basis 09/10/2015
1522 bid price registration more advantageous for the acquisition of three-phase automatic circuit reclosers with multifunction relays for distribution network and substations at voltages of 15 kV, equipped with voltage transformers to control power, as conditions, quantities and requirements set out in the Terms of Reference No. 01/2015-DICOD / DDIS / CEA, attached. 08/10/2015
1523 pole circuit breaker 72.5 kV and spare 08/10/2015
1524 Construction LV Gridline In Tien Cuong Commune And Substation Of Quy Cao Farm In Tien Lang District. 08/10/2015
1525 Enlistment of Contractor for Construction of Electrical Overhead Line, Civil Construction Renovation & Rehabilitation/ Transportation of Materials 06/10/2015
1526 Transmission network LitPol 330/400/10 kV converter substation maintenance and repair services technical specifications 05/10/2015
1527 Supply of 11kv circuit breaker 2500a HVX type 04/10/2015
1528 Circuit breaker 01/10/2015
1529 Hong Kong air circuit breaker substation procurement including installation Tranche B 01/10/2015
1530 The performance of the service and buttons stand located around power lines nN on area of TAURON Distribution S.A. branch in Jelenia Góra. A detailed description of the subject of the contract is specified in the model Agreement annexed No 11 to the SIWZ. 00/10/2015
1531 1. The buyer is a group 3 entities, comprising: 00/10/2015
1532 The subject of the contract is the supply of electricity in the estimated amount of 730 5 600 kWh (order basic and supplementary) for the purposes of the hospital Provincial SPZOZ in Zielona Góra. 00/10/2015
1533 The subject of the contract is the supply of electricity energy known as the successive use of the traction power distribution and the provision of services to the needs of business under the seat. 00/10/2015
1534 Prior Information Notice for Construction of 110 kV line Jabana–Mount Kigali–Gahanga, extension and upgrade of Mount Kigali substation, construction of Gahanga substation and upgrade of Birembo substation 30/09/2015
1535 SUPPLY OF CIRCUIT BREAKERS TO REPLACE L.V FUSES FOR DISTRIBUTION TRANSFORMERS IN RUVUMA REGION 30/09/2015
1536 2 ea shall better switches model 30/09/2015
1537 supply magnetic starter, blast-proof circuit breaker 30/09/2015
1538 Supply and delivery of electric energy and related services. 25/09/2015
1539 Purchase of 80ea generic electric supply 40Amp Circuit breakers 24/09/2015
1540 Provide four 12.47 Kv circuit breakers for substation 23/09/2015
1541 Provision of technical services for replacement with supply of material and replace the circuit breaker air AT12 1200A MCA series 2 of the Tanker Almirante Gastão Motta (NTAltGMotta), which is broken by the breaker Terasaki AR model 212S 22/09/2015
1542 132 kv circuit breaker 22/09/2015
1543 Purchase of five lithium niobate electro-optic modular switches 21/09/2015
1544 Switch, Sensitive 21/09/2015
1545 1EA Reactor circuit breaker 17/09/2015
1546 Circuit breaker 16/09/2015
1547 Replace 600 volt air breakers 16/09/2015
1548 Market for the supply of disconnectors HTB and the study and commissioning 14/09/2015
1549 2000a Low Voltage Power Circuit Breakers 14/09/2015
1550 Switch Assembly 14/09/2015
1551 Switch, Sensitive 14/09/2015
1552 Circuit breaker 14/09/2015
1553 Circuit Breaker 14/09/2015
1554 Oil Circuit breaker replacement project 11/09/2015
1555 Circuit breaker overhaul 09/09/2015
1556 Supply & deliver 20amp circuit breaker danrail mount x15A 04/09/2015
1557 Replacement of Mark Wilmer Pumping Plant Circuit breaker compressed air systems 02/09/2015
1558 Automatic Transfer Switch Replacement & Repairs 01/09/2015
1559 Prior Information Notice for Metal construction of transmission lines 31/08/2015
1560 Air Circuit breaker maintenance program 27/08/2015
1561 Switch, Proximity 27/08/2015
1562 Supply and delivery of circuit breakers miniature SP and N32A (without enclosure) 26/08/2015
1563 Power systems Capacitor Switches 25/08/2015
1564 Supply of circuit breakers for That Al Sawari school. 23/08/2015
1565 Supply of circuit breakers for That Al Sawari school 23/08/2015
1566 Replacement of the circuit breaker 300-11 20/08/2015
1567 Electrical improvements for lift station, VFD panel switch and circuit breaker work 20/08/2015
1568 SUPPLY ONE (1) UNIT 132KV CIRCUIT BREAKER INCLUSIVE OF MANPOWER, MACHINERIES, TOOLS & EQUIPMENTS FOR DISMANTLING WORK OLD UNIT 132KV CIRCUIT BREAKER, INSTALL THE NEW UNIT, TESTING AND COMMISIONING AT BATANG BENAR FEEDER STATION 20/08/2015
1569 Right to sign the agreement to supply gas-insulated circuit breakers at 330 kV for external power supply during the construction of the power unit ?1 Kursk NPP-2 preparatory period. 17/08/2015
1570 Procurement of 6.6 kv Circuit breaker 13/08/2015
1571 CIRCUIT BREAKER 13/08/2015
1572 59CIRCUIT BREAKER 13/08/2015
1573 Aquisio of secionadores (02 batches). 13/08/2015
1574 The associated electrical power supply for the town Borovany, its allowance organizations and society Borovany Services Ltd. 12/08/2015
1575 480 volt circuit brekaers 11/08/2015
1576 Associated power supplies for VSB-TUO for the years 2016-2017. 10/08/2015
1577 Island Falls Switching Station Phase 3 Electrical Site Works 10/08/2015
1578 Supply of High voltage circuit breaker 09/08/2015
1579 Prices registration with a view to possible acquisition of molded case circuit breakers for elética substation for the Hospital das Clinicas, UFPE. 07/08/2015
1580 1 ea of switchgear breakers 07/08/2015
1581 WORKS OF SUPPLY 1 UNIT "DIGITAL CIRCUIT BREAKER ANALYSER" SUBSTATION UNIT FOR UNDER STATE OVERSIGHT OFFICE MANAGER 06/08/2015
1582 WORKS OF SUPPLY 1 UNIT "DIGITAL CIRCUIT BREAKER ANALYSER" substation UNIT FOR UNDER STATE OVERSIGHT OFFICE MANAGER (MUST & Perlis) 06/08/2015
1583 Supply of circuit breakers up to 1000V for the needs of production departments of the branch of JSC "IDGC North-West" "Arkhenergo" 06/08/2015
1584 Supply of disconnectors 6-110kV branch of PJSC "IDGC of Volga" - "Samara 05/08/2015
1585 Installation of a new base model DS416 circuit breaker 05/08/2015
1586 ATS Switches 05/08/2015
1587 Supply of (b) circuit breakers, single phase switches. 04/08/2015
1588 Furnish labor, materials and equipment to repair circuit breaker 04/08/2015
1589 Base Supply breaker 20 KV with synthetic insulator and fuse holder.
03/08/2015
1590 SUPPLY OF CIRCUIT BREAKERS UP TO 1000V AND 1000V CIRCUIT BREAKERS FOR THE NEEDS OF PJSC "IDGC OF CENTER 03/08/2015
1591 Supply Of Circuit Breakers Up To 1000V And 1000V Contact-Breakers For The Needs Of PJSC IDGC Of Center 03/08/2015
1592 Circuit Breaker, NSN 03/08/2015
1593 Supply installation testing and commissioning of 7 nos 132 kv circuit breakers 03/08/2015
1594 Replacing of Turbine air circuit breakers 1600A at Blackheath reservoir 03/08/2015
1595 Repair of circuit breakers 110 KV in the phase 1 in Shuaibiyah stations 02/08/2015
1596 TeslaN may require for TenneT Air insulated disconnectors and earthing switches for its high voltage infrastructure in the Dutch Region Zeeland.
01/08/2015
1597 1. The supply of electricity to the sampling points belonging to the Undertaking of municipal services SP. z o.o. Order includes delivery and the purchase of electricity. 00/08/2015
1598 Qualification system with call for competition for Supply of 20/24 kV vacuum circuit breaker for installation in switching stations and substations. 31/07/2015
1599 Prior Information Notice for Design, installation, commissioning and performance test run commissioning II than the outer parts of the carburizing for new power unit supercritical 910 MW in PKE SA Branch Power Plant III Jaworznie. 30/07/2015
1600 Supply And Guaranteed Electric Power Required For Routing The Continuous Feeding And Without Any Alteration Of The Needs For The 32 Pumping Stations The Carpentras Canal Asa Contracted Power Over 36 Kva And 12 Kva Contracts Less Than 36 Present On The Perimeter Of The Association 30/07/2015
1601 Supply Voltage Cables Khan 30/07/2015
1602 Supply of disconnectors 30/07/2015
1603 MOULDED CASE CIRCUIT BREAKER WITH ELECTRONIC TRIP UNIT 3 POLE 30/07/2015
1604 Supply and delivery of Moulded Case Circuit Breakers 30/07/2015
1605 Supply of circuit breakers AV2M20SV 30/07/2015
1606 Supply of circuit breakers VA 50-45 30/07/2015
1607 Supply of Circuit Breaker & Electrical Materials 30/07/2015
1608 Supply contract Mercabilbao electricity. 29/07/2015
1609 DD2/P&D/ICB/2015/025/D :- Supply & Delivery of Moulded Case Circuit Breakers 29/07/2015
1610 Circuit Breakers, Type HSH – DC High Speed Type 4KAF-4KAT-16KAT 29/07/2015
1611 The right to conclude contracts for the supply of disconnectors (including fuse disconnecting switches) and switches 6-20 kV for technological connection of 4 square meters. and replenish the emergency reserve in 2015, the branch of OJSC "MRSK Ural" - "Sverdlovenergo 29/07/2015
1612 Acts of preventive maintenance and grave breaches of the cells high voltage 275 kV & 132 kV station Al-Zour South to generate electric power and water distillation 28/07/2015
1613 Klinikum Itzehoe - New medical and service center 2nd phase. 28/07/2015
1614 TeslaN may require for TenneT Air insulated Circuit breakers for its high voltage infrastructure in the Dutch Region Zeeland.
28/07/2015
1615 Supply of and longitudinal links to Toslink the subject of high-pressure 132 KV 28/07/2015
1616 Supply of 6 kV transformer substation 93. 28/07/2015
1617 Supply of disconnectors Low Voltage Under Load. 28/07/2015
1618 Station service circuit breakers 480v for jones fork powerhouse. 28/07/2015
1619 Supply of 69kv circuit breakers for substation. 28/07/2015
1620 Supply of Circuit Breaker DC 175A 28/07/2015
1621 Purchase of 15 Kv Circuit Breakers for Substation Upgrades. 28/07/2015
1622 Circuit Breakers AMP Slow Acting Single 28/07/2015
1623 The municipality of Mäntsälä and the Mäntsälä Rental Properties in electricity supply. Occurs in more detail in the attached tender documents. 27/07/2015
1624 CIRCUIT BREAKER 27/07/2015
1625 Purchase and future potential of thermo-magnetic circuit breakers at prices Registration System 27/07/2015
1626 Supply of circuit breakers 27/07/2015
1627 Change the main circuit breakers (Phase 4) in King Khalid 27/07/2015
1628 Power supply for the points which owns the City of Ondarroa. 24/07/2015
1629 Procrement of (220 kV Circuit Breakers) 24/07/2015
1630 Design And Survey Work On The Construction And Modernization Of Nuclear Power Plants On The Theme: "Development Of Working Documents For The Construction Of The Substation 110/6 Kv Leningrad Npp-2 And External 110 Kv Network For Its Connection" 24/07/2015
1631 Supply of gas insulated circuit breakers 110 kV Substation Beketovo Ltd. 24/07/2015
1632 Supply of vacuum circuit breakers for the needs of PJSC "IDGC of Volga" - "Samara Distribution Networks 24/07/2015
1633 Geothermal power plants with associated facilities 23/07/2015
1634 Jones Fork Generator Circuit Breaker 23/07/2015
1635 Supply of 110 kV gas-insulated circuit breakers at Substation Beketovo OOO BSK 15-003569 23/07/2015
1636 Supply and Delivery of Circuit Breakers 23/07/2015
1637 Supply of Control unit circuit breaker. 23/07/2015
1638 Supply of electricity and related services. 22/07/2015
1639 Equipment and spare parts for disconnectors 22/07/2015
1640 Supply of circuit breakers Plugable. Supply of circuit breakers Plugable 8 - 2 to 6 for Auvergne- DR DR Rhones Alpes Burgundy. 22/07/2015
1641 Reconstruction of 110 kV Overhead line (OHL): 21/07/2015
1642 Framework agreement for the delivery and supply of electricity for sites whose subscribed power exceeds 36 kva. 21/07/2015
1643 Supply and installation of electricity to reserve a room key servers Generator Measurement area 21/07/2015
1644 Purchase of 15 kV Circuit Breakers for Substation Upgrades. Contract shall be for Three(3)years. 21/07/2015
1645 Supply of electricity in the tender specified amounts GoO (Guarantee of Origin) to NS and / or other business units during the period 2016. The parties that make use of the agreement include NS, Nedtrain and ProRail and other customers (including Retail businesses). A complete and exhaustive list is in the tender documents. 20/07/2015
1646 Purchase of electricity within the meaning of the Act of 10 April 1997 - Energy Law (ie Dz. U. of 2012. No. 1059, as amended. D.) Under the joint procurement conducted pursuant to Art. 16 paragraph. 1 of the Act of 29 January 2004 - Public Procurement Law 20/07/2015
1647 Conducting a series of power lines shielded flat cable type "IEDEP", including in particular the supply of raw materials, manufacturing lines, dimensional control, preparing the recipe, the quality booklet 20/07/2015
1648 AOR0615JCL Realization and delivery of power lines, type "IEDEP". Realization `a series of power lines shielded flat cable type" IEDEP "including l`approvisionnement including raw material, production lines, dimensional control, preparing the recipe, the quality booklet, the containerization transport and delivery to the site of CEA / The Ripault, together with any associated documentation 20/07/2015
1649 Repair support insulators on the equipment ZRU-110kV and 110kV switchyard 20/07/2015
1650 Supply and Delivery of Electrical Wires, Circuit Breakers, Epoxy Primer and QDE white to be used in Municipal Compound 20/07/2015
1651 Supply of Circuit Breaker 20/07/2015
1652 Supply of 16 each X Miniature circuit breaker 6A 2 each X Miniature circuit breaker 16A 2 each X Miniature circuit breaker 25A 2 each X Miniature circuit breaker 16 A . 2 each X Miniature circuit breaker 25A 20/07/2015
1653 Supply of electricity, partly as a full supply of points of consumption and partly as scheduled supply in a balancing group of the client. 17/07/2015
1654 Purchase Of Services To Perform Testing Of High Voltage Equipment Townsville Hospital And Health Service (THHS) Is Seeking Offers From Suitably Qualified And Experienced Organisations For Provision Of Preventative And Corrective Maintenance Services To The Townsville Hospital (TTH) High Voltage (11KV) Site Infrastructure 17/07/2015
1655 59CIRCUIT BREAKER SUB 17/07/2015
1656 110 kV circuit breakers type MKP-110-630 (Buying) 17/07/2015
1657 Circuit Breaker Tripole 17/07/2015
1658 Supply and installation of equipment for the rehabilitation of the electrical substation conversion (SSE) Rogoredo M3 16/07/2015
1659 Supply of green electricity for the city of Heiligenhaus; Delivery over 3 years with option to extend by 1 year, unless the contract is terminated by either party in accordance with the prescribed notice. The electricity supply contract expires at the latest after a period of 5 years: 16/07/2015
1660 In a first step the building G + H are canceled. Before each demolition installations are described to depend and to fold. Temporaries must be created. During the construction phase of the new building (building A) (building D) is in the inventory realized the new heating system and creates the new main supply lines (heating / plumbing / ventilation / electrical).
16/07/2015
1661 Framework agreement for supply of electric energy network. 16/07/2015
1662 Procrement of electricity distribution services. 16/07/2015
1663 Supply and electricity transmission and distribution power subscriptions> 36 kva common commands grouping of Saint Martin D'Heres, the Pont-de-Claix, Fountain, Sassenage, Champ-sur-Drac, Seyssins, Seyssinet-Pariset, The Sird , The Sirlysag, Échirolles, the trade union committee of Moulins de Villancourt, communal social action centers of Saint-Martin-d'Hères, Échirolles, and Fontaine Seyssinet-Pariset. Coordinator: City of Saint-Martin-d'Hères.
16/07/2015
1664 Power supply at the University of Murcia through indexed to the pool price. 16/07/2015
1665 Supply of circuit breakers for the needs of JSC "Fortum" in 2015. 16/07/2015
1666 New administration building of the ILB, construction work Electrical installation / power. 15/07/2015
1667 Supply of Westinghouse Circuit breaker 15/07/2015
1668 598-15-3-8723-2211-DSII MAIN CIRCUIT BREAKER 15/07/2015
1669 Supply of Westinghouse Circuit breaker 15/07/2015
1670 TC/AJ/PT-116/06/2015 :- CIRCUIT BREAKER 15/07/2015
1671 59--598-15-3-8723-2211-DSII MAIN CIRCUIT BREAKER 15/07/2015
1672 Design , Supply, Construction, Installation, Testing and Commissioning of 110kV/30kV, 20MVA RULINDO Substation and 110/30kV, 10MVA GIFURWE Substation 14/07/2015
1673 Supply of electricity to the municipal utilities of the municipalities of Castello di Godego, Loria, Resana, Riese Pio X, Vedelago. 14/07/2015
1674 Material and equipment for the construction of the electricity distribution network. 14/07/2015
1675 Supply and Maintenance of Uninterrupted Power Supply. 14/07/2015
1676 Supply and Delivery of One (1) Lot of Switches and Transceivers 14/07/2015
1677 Supply, installation & commissioning of 132 KV SF6 Circuit Breaker, 11 KV VCB Panel complete with accessories & Transformer differential Relays for Kurram Garhi Power Station Bannu. 14/07/2015
1678 Supply and Delivery of 1 Unit Molded Case Circuit Breaker 14/07/2015
1679 Supply and Delivery of Circuit Breakers. 14/07/2015
1680 Supply of vacuum circuit breakers 14/07/2015
1681 Supply of Electricity. 13/07/2015
1682 Contrataçà the Company for Construction of £ Subestaçà the Elà © tric Power & Distribution Network £ o, with supply of material and medium £ o out-of-work in UTFPR - Cà ¢ MPU Guarapuava as specs and designs on notice 13/07/2015
1683 Repair and Maintenence of 11kv, 11/0.4 KV, 0.4 KV Overhead Line & Distribution Transformer under NOCS 13/07/2015
1684 Supply, Installation, Testing and Commissioning of 7(Seven) Nos. of 132 kV Circuit Breakers and Associated Materials 13/07/2015
1685 PROCUREMENT OF CIRCUIT BREAKER 13/07/2015
1686 ACQUISITION OF ELECTRICAL CONNECTORS AND ACCESSORIES FOR SWITCHES 13/07/2015
1687 ELECTRICAL SOLENOID AND CIRCUIT BREAKER 13/07/2015
1688 Procurement of Grass cutting of 132KV & 33KV switch yard area. 12/07/2015
1689 Supply and electricity transmission and distribution to delivery points with contracted power is greater than 36 kVA. 10/07/2015
1690 Supply Of Circuit Breakers A3736 10/07/2015
1691 Supply of Fuses and Circuit Breakers. 10/07/2015
1692 Supply, delivery of electricity and associated services for the departmental buildings and member colleges command group, whose electrical power is greater than 36 kva. 09/07/2015
1693 Renovation/ Up-gradation/ replacement of different sub-station at Hazrat Shahjalal International Airport (S.H- Supply, installation, testing & commissioning of HT Switchgear, LT Switchgear, PFI Plant and Transformer for CAAB HQ Sub-station incl. related works at HSIA) Package# GD02 (100) CAAB/ EM-II/ (DEV)/ 2014-2015 09/07/2015
1694 Neutral grounding works of T-1 and T-2 transformer of Fenchuganj 132 kV Grid Substation under GMD, PGCB, Sreemongal 09/07/2015
1695 Replacement of Two Main Circuit Breakers. 09/07/2015
1696 Construction of 15 / 0.4 kV, 15 kV transmission line ? 15-09, 0.4 kV near the village. Novo-Moscow Ltd 09/07/2015
1697 Construction of 15 / 0.4 kV, 15 kV transmission line ? 15-09, insulated 0 4 kV near the village. Novo-Moscow Ltd 09/07/2015
1698 Post Chandoline, new 220kV sub station - combined GIS and SAS 08/07/2015
1699 Supply of electricity to the Chamber of Commerce and Industry of Pays de la Loire and its associated entities. 08/07/2015
1700 106/2015 :- Extend Power Supply to Different Locations 08/07/2015
1701 108/2015 :- Conversion of 11KV & 415V O/H Line to U/G Cables for safety Purpose 08/07/2015
1702 112/2015 :- Supply of Diatribution Package Substation 1000 KVA & 10 No.500 KVA 08/07/2015
1703 Power Systems Design Services In Electricity 08/07/2015
1704 Civil Works For Various Substation 33/11kV Transformer Yard Extension 08/07/2015
1705 Survey of 11kv Feeders by Overhead Lines or Underground Cables in Wilayat LIWA and SHINAS 08/07/2015
1706 PROCUREMENT OF LOW VOLTAGE BREAKER 08/07/2015
1707 Circuit Breaker, 440v, 1250mps 3pole 3phase 08/07/2015
1708 Supply of electricity for the Technical University of Dortmund for the years 2016 and 2017th
07/07/2015
1709 Reconstruction of ORU 110 / 35kV 07/07/2015
1710 Right to sign the agreement to supply disconnectors 07/07/2015
1711 Install and Wre two Pressure Switches in the RO Feedwater XConnect System 07/07/2015
1712 The right to enter into an Agreement for design and survey work on the construction and modernization of nuclear power plants on the theme: "Development and changes in the design and estimate documentation of the first stage of construction of Leningrad NPP-2 in 2015. At the request of the Directorate for Construction of Leningrad NPP-2 06/07/2015
1713 Procurement of Circuit breakers 06/07/2015
1714 Distribution Automation Box MV-D.
An assembly of components (i.e. RTU, Modem, I/O-modules etc.) integrated in an enclosure, meant for remote monitoring and control functionality of MV-D secondary Substations. Within Enexis, MV-D substations are Secondary substations consisting of a single MV-busbar system (RMU) with multiple (1 to 5) MV feeders, situated directly above the LV network. Within the MV/LV Secondary Substations, LV transformer monitoring and short-circuit indicator reading is part of the scope.
03/07/2015
1715 Overhaul of 110 kV circuit breaker of 110/10 kV OP-2 03/07/2015
1716 Supply And Delivery Of Circuit Breakers For A Period Not Exceeding 6 Months 03/07/2015
1717 Preparation of detailed design for the project: "Replacement of portals in 220 kV switchyard of s / s" switchyard Maritsa East 2 "and exercising author supervision during construction 02/07/2015
1718 Supply of package substation for electricity distribution networks 02/07/2015
1719 Supply of circuit breakers 02/07/2015
1720 Open tender for the construction, installation and commissioning work on the device RTP (1 pc.), TP (2 pcs.) For the supply of power equipment located at: Moscow region 01/07/2015
1721 Construction of 10 kV cable lines and transformer substations to improve the reliability of power supply of the central part of the city of Yoshkar-Ola for the needs of "Marienergo" JSC "IDGC of Center and Volga Region" Lot ? 1. Construction of 10 kV cable lines and transformer substations to improve the reliability of power supply of the central part Yoshkar-Ola 01/07/2015
1722 ACQUISITION OF CIRCUIT BREAKERS 01/07/2015
1723 Prior Information Notice for Acquisition, restoration of 20 receiving stations Multilateration system P3D-AS station for a new type of P3D-AS. Multilateration system P3D-AS is part of the A-SMGCS at LKPR. Part of the receiving stations of P3D-AS is an antenna, receiver, optical transmitter, power supply including UPS. The receiving station system P3D-AS are located in the airport complex Vaclav Havel in Prague. The purpose of the system is to provide position information and identification of the targets, which are equipped with a Mode "S". This information is then a supervisory system ASMGCS presented to air traffic controllers at a TWR Prague. 30/06/2015
1724 Qualification system with call for competition for Installation of high-voltage power lines in the area - Loop notice. 30/06/2015
1725 Implementation of development projects and the construction and modernization of the electricity distribution network in the region Rey 30/06/2015
1726 Construction of medium voltage cable connectors substation and substation Lug 3 29/06/2015
1727 Supply of electricity and related services to companies managing public services. 29/06/2015
1728 Construction, Electrical Installation, Commissioning Works On Grid Connection Of The Branch Of Jsc "Idgc Of The South" - "Volgogradenergo": "Power Supply Facility" Well Number 1 "Olkhovskaya" Spring Field ", Located In The Volgograd Region, Ilovlinsky District, Logovsky Res" 26/06/2015
1729 ScotRail Driver Advisory System (DAS) 26/06/2015
1730 Consultancy Services to Develop an Independent Power Producer (IPP) Framework for Government of Malawi (GoM) 26/06/2015
1731 Replacing the SN-15kV cables at the University of Warmia - Mazury in Olsztyn 26/06/2015
1732 Designing and installation of 0.4 kV overhead line and transformer substation booster TPrn 0.4 kV on the street.Kalashnikov 25/06/2015
1733 Delivery Of Overhead Power Lines 24/06/2015
1734 Edam Substation - New and Peebles and Swift Current Switching Station 23/06/2015
1735 Construction of 10 kV with installation of 10 / 0.4 kV, construction of 0.4 kV from the newly built transformer substation to the border of the land of re Ust-Donetsk SNT "Sunny Beach" (Fish NG) "; 22/06/2015
1736 95/2015 :- Conversion of 11KV & 415V O/H Line to U/G Cable at Wilayat 22/06/2015
1737 Maintenance of the power grid substations in Yazd province (series A and B) (a stage -1,405,254) 22/06/2015
1738 103/2015 :- Supply of Package SubStation 25 Nos. (1000KVA) - (10 Nos.) (500 KVA) For Extension Work at North Governorate 22/06/2015
1739 Purchase of equipment and installation of monitoring systems 11 and 20 kV feeders for the distribution of 53 posts 21/06/2015
1740 Purchase of electric power of 665 kW to power plants 21/06/2015
1741 Electricity supply in the supply points fed high and low voltage for the years 2016 and 2017. 19/06/2015
1742 Aorora - Polanco 138 kv substation project - Remaining Works 18/06/2015
1743 RFB 02339 FM 482 Phase 3. Project consists of single phase to three-phase overhead distribution upgrade generally from Sahm Pass to Hubertus Rd. on FM 482. Linear distance of construction is 7,200ft, and project will include installation of poles, wires, transformers, and other miscellaneous hardware. Multiple crossings over TxDOT ROW and one crossing over railroad ROW are included within the work scope. Project is majority constructed on private property, with easements secured by NBU. Project resides within the City of Schertz. 17/06/2015
1744 Construction of the branch line to 110 kV Substation" Penayskaya "from one of the circuits of 110 kV" Cyril East and taps at 110 kV "proletarians" from two circuits of 110 kV "Cyril East" 15/06/2015
1745 Project Repair and medium voltage overhead lines, overhaul board and card distribution substation north of Kermanshah to turnkey power of the air (including equipment and materials Vdstmzd) (internal funds) 13/06/2015
1746 Delivery of materials and equipment for reconstruction of the MV" Line Power Station 1 to PT Sulecinek, LPN 15kV line relationship Kusieta-Julie-Koniecpol 6 kV line LPN Town Sl.-Kaleta, LPN 6 kV line Kaleta-Herba 12/06/2015
1747 Purchase and installation Feeder Electric & Board 12/06/2015
1748 Power Supply 12/06/2015
1749 11/ 0.4 K.V. Line Construction Works and Supply and Installation of Transformer 11/06/2015
1750 Supply, Installation, testing and Commissioning of 400KVA Electrical Substation. 10/06/2015
1751 Item No 22 :- Construction of LT Power Line to the Faculty of Social Sciences (including Step
down Transformer and Feeder/Pillar)
08/06/2015
1752 Construction and reconstruction of 9 objects for connection of power devices up to 15 kW for grid connection of preferential agreements (15 kW) Sochi FES" (shortfall in income 06/06/2015
1753 Construction And Installation Work On The Upgrade Of 35 Kv Substation Catherine With The Installation Section Switch For The Needs Of Jsc "Idgc Of Center" (Branch "Tambovenergo"). 06/06/2015
1754 Supply and Extension of LV Single-Phase Lines and Service Cables in Part of Samburu, Nyandarua,
Nakuru & Narok Counties
05/06/2015
1755 Step 1 Preparation of documentation for Construction of double-track line 110 kV Pelplin - LWN Malbork / Suztum and construction of double-track line between GPZ Pelplin - LWN Subkowy / Lignowy OBMLW / 34/14003, Phase 2 double-track construction of the 110 kV Pelplin - LWN Malbork / Suztum and the construction of double track between GPZ Pelplin - LWN Subkowy / Lignowy OBMLW / 34/14003 03/06/2015
1756 Construction of 400/110 kV substation Baczyna with the introduction of the 400 kV Krajnik - Plewiska 03/06/2015
1757 Construction of One Transmission Line To 69 Kv 02/06/2015
1758 Reconstruction of 220 kV Krajnik - Glinka. 02/06/2015
1759 The framework agreement relates to the work of ordinary and extraordinary maintenance, expansion and ancillary services, including interventions as a result of failure, networks and electrical distribution installations in medium and low voltage and public lighting systems.
Processes that make up the intervention
01/06/2015
1760 Construction of 15 kV transmission line from the HV 15-214 (inv. ? 5115270), construction of 15 / 0.4 kV, construction of power lines 0.4 kV in Sec. Valiant Bagrationovsky District "; - "Construction of VLI 0,4 kV from the TP 16-14 (inv. ? 5143071), reconstruction of 0.4 kV overhead line from Transformer 16-14 (inv. ? 5113809) Guards in the area, p. Smooth" 01/06/2015
1761 Design, construction, supply, installation, testing & commissioning of OETC substations in Muscat governorate
Power & Water
01/06/2015
1762 Construction of HT/LT Lines in Basdilwa VDC 28/05/2015
1763 Lp1044-2014 Construction of 500 kV Transmission Line Yacyreta - Ayolas - Villa Hayes 27/05/2015
1764 Supply and electricity transmission and distribution in 2015 - subscribed powers greater than 36 kva. 27/05/2015
1765 80/2015 :- Supply of Package Substation (15 Nos.) (1000KVA) (500KVA) for Extension Works 27/05/2015
1766 83/2015 :- Survey of 11Kv/Lt Feeders by Overhead Lines or Underground Cables in Willayat Liwa & Shinas 27/05/2015
1767 Reconstruction of 35/10 kV Substation "Maslovskaya" and 110 kV Substation ?44 with the installation of 10 MVA transformer and switchgear 6 kV for the needs of "MRSK Center" (branch "Voronezhenergo") 27/05/2015
1768 Access to networks and electricity supply to the building office and auxiliary facilities of the Constitutional Court 25/05/2015
1769 Open procedure 7959/2015. Primary station jack. Construction of a new axis of transformation 220/22 kV. Execution of civil works - supply and installation electrical equipment to 220 kV. 25/05/2015
1770 Proposal for setting up of above transmission project on Build, Own Operate & Maintain basisi 25/05/2015
1771 63/2015 :- 33kv new feeder from sohar induatrial area grid ststion to feed faq 25/05/2015
1772 Nominated Sub-Contract for Works Supply, Installation, Testing and Commissioning Installation System ELV (Extra Low Voltage) To: Proposed additions and changes Upgrade Stadium and Kuala Lumpur, Jalan Jacob Latif Over 52,901 Part Lot Land majority government, Reuters Kuala Lumpur , Kuala Lumpur Federal Territory of Kuala Lumpur. 25/05/2015
1773 Tripura for Packages TRI-DMS/1 associated with NER Power System Improvement Project under NER Power System Improvement Project 22/05/2015
1774 4.9.9 :- Overhead Line Construction - Tower (20kV to 99kV) -

22/05/2015
1775 4.5.18 :- Substation Design & Construction - Distribution -

22/05/2015
1776 4.9.8 :- Overhead Line Construction - Tower (20kV to 99kV) - Overhead Line Tower Construction - 20kV

22/05/2015
1777 4.4.27 :- Power Station - Conventional Thermal Power Plants - Conventional Thermal Power Plants Construction

22/05/2015
1778 Extension 2X132kV OHL Bay At PMU Gelap And Associated Works At The PMU PMU Genting Highlands, Pahang. 21/05/2015
1779 CEB/TCP/DGM/CBAAKGS/2015/02 :- Erection of Breaker Switch Capacitor Banks & Associated Plant & Equipment at Grid Stations at Aniyakanda 21/05/2015
1780 Reconstruction of PS-110/10 kV "Hnatkiv" And turn 20/05/2015
1781 Reconstruction of the SS-35/10 kV "Shpikov" second turn 20/05/2015
1782 SAMALAJU 1 – SAMALAJU 2 275kV TRANSMISSION LINE PROJECT 20/05/2015
1783 Civil and installation works for the development of electrical distribution networks in the Gaza Strip System 19/05/2015
1784 Construction of 1 x 400kV line (To be
initially operated at 330kV), approximately
300km, Triple bison line linking Orange Groove 330kV
Substation and Triangle Substation and
Construction of Triangle 2 x 175MVA, 330/132kV
Substation and associated works and
equipment
together with upgrade works at Orange
Grove
and Tokwe Substation
19/05/2015
1785 Installation of voltage transformers and driving device for CLP in Pitesti Sud station 19/05/2015
1786 Construction and renovation of four 110 kV substation in the fields Hannover sticks and delivery and commissioning of a phase shifting transformer (PST) in 2 lots. 18/05/2015
1787 Construction of a transformer station and electricity distribution outside the mosque laarassi to the city of Nador - Nador Province 18/05/2015
1788 Check Grounding of 25 Nos. of H.T Poles including foundations 18/05/2015
1789 Design and reconstruction of power engineering equipment to the station Warsaw Rembertów within the project "Modernization of the railway line E75 Rail Baltica Warsaw Bialystok - border with Lithuania, stage I, section Warsaw Rembertów-Zielonka-Fat (Sadowne)" OPI & E 7.1-22. 18/05/2015
1790 Construction of the power supply station of the National Guard camp in Dammam 17/05/2015
1791 Work on upgrading substations Quantity: 3 lots
15/05/2015
1792 The works involve the installation or removal of overhead networks (implementation supports HV and LV / pose arms, accessories and drivers / reversals and adjustments drivers / removal and removal of conductors / Dismantling and removal of arms, anchors, guy wires / removal and reinforcement unrecovered EDF materials / media files 15/05/2015
1793 Turnkey Contract for Survey, Design, Supply, Installation and Commissioning of 33kv Double Circuit River Crossing Transmission Lines Inlcluding Civil Constructions with Towers at Jalalnagar Mosque


14/05/2015
1794 Transmission Tower Structural Members 14/05/2015
1795 Etce / b05-2015-1020 servicing of breach of step by transmission lines of central system. 13/05/2015
1796 Works/01 :- Construction of High Voltage lines 13/05/2015
1797 Package NPC and NPC-110kV.YB3-G01-G02-110kV.YB3 Line project and 110kV substation Yen Binh 3 13/05/2015
1798 Provn of External Electric supply with 1*250 KVA Transformer for Extension of simulator and CBT Complex 13/05/2015
1799 Selection of Transmission Service Provider on Build 12/05/2015
1800 Construction of New/renovation of Distribution Lines (33/11/4 Kv) & 33/11 Kv, Sub-Station at barisal 12/05/2015
1801 Construction 110kV and 110kV substations - Project: Substation 110kV Phu Binh and shunts - in the form of public bidding in the country 12/05/2015
1802 Construction Work For Power Plant 12/05/2015
1803 20 kV transmission line runs Cleaning AS "Distribution Network" Eastern Region, Western Region and Northern Region. 11/05/2015
1804 Creating an internal network MV 20 kV on the Production Centre Cattenom Nuclear Power 11/05/2015
1805 Scottish Hydro Electric Power Distribution (SHEPD) owns and operates the electricity network in the north of Scotland. This includes a discrete network for the Shetland Islands, which is currently not connected to the mainland electricity network, and as a result SHEPD acts as System Operator for the Shetland Islands. Of the 2 main electricity generators, Lerwick Power Station, in its current state, is nearing the end of its operational life and supply from Sullom Voe Power Station is not certain beyond 2017. The GB electricity and gas market regulator Ofgem has required SHEPD to conduct an open competitive tender process for a longer term energy solution for Shetland. 08/05/2015
1806 The project Grip on Underground Infrastructure (SHY) is a national project and covers approximately 130 locations. THROW 10 kV aims to update the existing data and drawing files relating to underground utilities 08/05/2015
1807 Construction of 11-KV Switch Room at the Variuos Grid Stations 08/05/2015
1808 Quotation for conversion work long line insulation in online 132kv chuping - rock black under custody of state office manager (sabah & perlis), department of assets maintenance, transmission, tnb. 07/05/2015
1809 Civil works for laying and laying of pipelines, communication and power lines, including interrelated auxiliary activities 07/05/2015
1810 Rehabilitation of building elements outside the repair station and hydrophobization their surfaces; Fire walls rehabilitation of power transformers in terms of finishes; replacement of existing insulation 110 kV outdoor station Pipera insulated composite; recalculation protection areas and replacing paratraznetelor. 07/05/2015
1811 Construction, installation and commissioning works on obektuSevero-East POfiliala JSC "IDGC of Volga" - "Saratov": "Construction of 10 kV overhead line, 10 / 0.4 kV, 0.4 kV transformer substation in objects. Podsosenki Balakovo district of Saratov region 07/05/2015
1812 Development of technical documentation and construction and installation works and supply of equipment for the 3 "Yantarenergo": 1. "Construction of 1 kV cable line from Transformer 2 to SPN, SPN with the installation on the street. Kaliningrad in Chernyahovsk "2." Construction of 15 / 0.4 kV, 15 kV insulated overhead line from 15 kV ? 15-485, 0.4 kV in Sec. Kalynivka Chernyakhovskogo area "3." Construction of VLI 0 4 kV TK 36/2009 in Chernyahovsk COT Flora - Stage 2 ". 07/05/2015
1813 Construction Highway 473 lines 110kV substation 22kV Luc Ngan 07/05/2015
1814 Engineering, Procurement, Construction, Commissioning, Training And Testing New Plant-Soda 34.5 Kv Substation. 06/05/2015
1815 Supply of 6* dia Transmission line Ch. (00-1 + 185) 06/05/2015
1816 Overhaul of 0.4 kV overhead line in Kaliningrad

06/05/2015
1817 Tbmt package hm2-xl1: provided, training, hdpe pipe installation stay up to 220 kv underground in brain and re-establishment tran road surface. 06/05/2015
1818 Works on dry networks (electricity Hta / Bta, transformer station, France Telecom, street lighting) for the development of the ZAC Lahitolle in Bourges. 06/05/2015
1819 Supply of KTPV substation or equivalent 05/05/2015
1820 Supply Erection Testing and Commissioning of MonglaKhulna (South) 230KV Double Circuit Transmission Line Using Four Circuit Towers 05/05/2015
1821 Construction of Overhead Distribution Lines under the geographical area of Dhaka. 05/05/2015
1822 Works on modernization of relay protection and automation devices of 110 kV Substation 110 kV reconstruction of FGC for the needs of JSC "IDGC of Centre and Volga region" branch "Nizhnovenergo 05/05/2015
1823 Supply, Delivery, Installation, Test and Commissioning of Distribution Protection Relay intended for Irawan 69KV Substation 05/05/2015
1824 Construction of overhead electrical distribution line under Jessore 05/05/2015
1825 Replace Transformer Station Bldg 105, USAG Bavaria, Grafenwoehr Military Community 04/05/2015
1826 Replace Transformer Station Bldg 105, USAG Bavaria, Grafenwoehr Military Community 04/05/2015
1827 Reconstruction of 110 kV Shares-Moravice 04/05/2015
1828 11kv interlink & section point at wilayat shinas north batinah governorate 04/05/2015
1829 Procurement of Plant Design, Supply and Installation of Package 3: 132/33kV Substations at Bhaluka, Mymensingh, Baroirhat and Ramganj on Turnkey Basis 04/05/2015
1830 Qualification system for aerial work Medium Voltage 6-15 kV in Wallonia 02/05/2015
1831 ROBESON HALL ELECTRICAL DISTRIBUTION UPGRADE 01/05/2015
1832 Qualification system without call for competition for DONG Energy Thermal Power's biomass conversion of primarily — but not exclusively — Avedøre Power Station unit 1 and Studstrup Power Station unit 3 from coal firing to 100 % wood pellet operation, while keeping the option of burning coal when this is found appropriate. 30/04/2015
1833 Secondary equipment with the installation of 220 kV plant in Pehlin 30/04/2015
1834 Qualification system with call for competition for Design, manufacture, supply and construction of substations or plant components in substations and overhead lines in the high and very high voltage. The extended hereby advertised examination system and updates the test system from 28.11.2012 Designation 2012 / S 229-377588. Werden 30/04/2015
1835 Provision of services to upgrade electrical power installations at UNON, Gigiri, Nairobi 30/04/2015
1836 DON PEDRO RESERVOIR CROSSING 115kV AND 230kV TRANSMISSION LINES 30/04/2015
1837 Construction of 10 kV overhead line from Pole ?41 10kV overhead 10kV substation ?3 Kujbyshevo-1 to the projected 10 / 0.4 30/04/2015
1838 Permissive, Design And Working Documentation, Construction, Installation, Commissioning) On The Grid Connection In The Area Of The Rostov Region "(6 Units) 30/04/2015
1839 Construction works of the post 90/30/15 kV Champdeniers 30/04/2015
1840 Construction of new 33/11 kv Sub-Stations, and 11 Kv Lines, 33 k terminal bay for railways 30/04/2015
1841 Electricity transmission services 29/04/2015
1842 Electrical Engineering: high and low voltage installation, lighting, power system, transformers and medium voltage switchgear, communications and information technology systems. 29/04/2015
1843 Construction work on the expansion of the substation 132kV '' St. Nicholas' in Famagusta 29/04/2015
1844 Construction to expand the substation 132kV '' St. Nicholas' in Famagusta 29/04/2015
1845 44/2014-15:- UPS Batteries

46/2014-15:- UPS 1 Kva for Computers

47/2014-15:- UPS 10 Kva for Servers
29/04/2015
1846 Upgrading Of Dcs Systems (phase-iv) In Kahramaa Primary Substations 29/04/2015
1847 Supply, installation, connection and commissioning of a diesel-powered emergency power plant in sound enclosure, installation in a confined space including control cabinet for the emergency generator with control and monitoring equipment cable system with connection of the generator, all operating and control facilities and the charger with batteries. 28/04/2015
1848 Rehabilitation & Remedial Measure of 220KV (Double Circuit) Tower Foundation In Salt / Saline Water Logged Range Guddu-uch-Sibbi Transmission Line. tower No. T-250 To 268 & T-270 To T-278.
28/04/2015
1849 Construction and installation work on the project "Reconstruction of 110 kV overhead line" Tyurlema-Svijazhsk "branch of JSC" IDGC of Volga "-" Chuvashenergo " 28/04/2015
1850 Repair of VL 110 kV "Visegrad-Granichar" in the section from pillar to pillar ? 143 ? 177. 27/04/2015
1851 Construction of 10kV transmission line to the electric company" East-Siberian trunk pipelines "in Sec. October, Boguchansky District 27/04/2015
1852 Provision of services for the construction of the electricity network, the network coverage of the building ?1 Electropanel project "Modernization of the port Posiet 27/04/2015
1853 Construction of medium-voltage lines, substations and supply 1000KVA, installation set 600KVA generator backup (continuous power) / 680KVA (maximum capacity) 27/04/2015
1854 Construction of 33/11 Kv, 10MVA Kabirhat Sub-Station at Noakhali PBS 26/04/2015
1855 Construction And Installation Of Substation 110 / 10kv In Turkmenbashi 25/04/2015
1856 Maintenance of Overhead Pole and Wayleave Lines in Mukim Serasa and Mukim Mentiri, Muara 25/04/2015
1857 Construction of Tower / Pole Foundations for in / out 132 KV Transmission Line 24/04/2015
1858 Construction of Covered Linkways to Downtown Line 3 (DTL3) and Tuas West Extension (TWE) Stations 23/04/2015
1859 Installation And Commissioning Of Overhead 33kV 3 × 150mm² Aerial Bundle Cable (ABC) From PMU Bukit Merah Bukit Merah To PPU, For TNB Distribution, Perak. 23/04/2015
1860 DATP 1 "Substation 220 / 110kV high technology, phase 1" 23/04/2015
1861 Implementation of the project "Development of the cable line 10 kV from the RP" Health Center "to the transformer substation 10 / 04kV (TA-516)" 23/04/2015
1862 Conversion of low-voltage power grid and reconstruction of telecommunication overhead colliding with the planned redevelopment of the street Zalesickiej in Piotrkow, in the framework of the investment task .: RIM-191 P Street Zalesickiej Expansion - Phase II. 2. Reconstruction of overhead power lines and cables in the streets Zawila, Dove in the framework of the Project. RIM-190g construction and Pigeon Zawila street with weapons in Piotrkow 23/04/2015
1863 1MW Class 105/140 GHz transmission line support production and installation of electronic heating equipment systems 23/04/2015
1864 Erdene team at Bayan 6 and 0.4 kV overhead line construction 23/04/2015
1865 HPPP 220kV Transmission Line (SHT-HDT X2) Installation Works 22/04/2015
1866 Construction of 22.801 KM Overhead 11/23KV Line Under 22/04/2015
1867 Reconstruction Of 110 Kv Substation Pole Number 42 With The Replacement Of 25 Mva Transformer With 40 Mva For The Needs Of Jsc "Idgc Of Center" (Branch "Voronezhenergo"). 22/04/2015
1868 Extraordinary maintenance of electrical substations MV / LV distribution network and low voltage in the City of Turin - CIG 6145892684. 21/04/2015
1869 Procurement of 10 million tons of coal utilization project a subquality engineering Jiuquan Prudential building 110KV substation construction EPC enclosed electric equipment 21/04/2015
1870 Works under the project "Preparation of the construction site and installation of two 16 MVA transformers 35/10 kV" Bogashevo "in the Tomsk region" 21/04/2015
1871 Intelligent traffic police command center outside business premises 10KV high voltage power distribution project (second). 21/04/2015
1872 Contract To Perform Work On Cables, Fire-Retardant Treatment Of Substations Of Tumenenergo Surgut Electric Networks 21/04/2015
1873 The proposed works comprise the construction of a new Substation at Gosford South and a Sectioning Hut at Wyoming to replace the existing Gosford Substation. The Substation is proposed to be a 2 x 5MW rectifier 66kV substation to provide support to the 1500V traction power supply in the area. 20/04/2015
1874 Construction of Tower Foundations, Transmission Lines at 132 KV S/C Transmission Lines Turbat 20/04/2015
1875 Construction of 11 KV Overhead Lines on Engineering Procurement & Construction 20/04/2015
1876 Construction of 32.351 KM DHD line under geographical area of Rangpur 19/04/2015
1877 Procurement of Plant Design, Supply and Installation of Package 6: Hathazari-Sikalbaha 230kV Transmission Line and Hathazari-Rampur 230kV Transmission Line on Turnkey Basis 19/04/2015
1878 Up-Gradation of 300KVA Transformer with 500KVA Transformer 18/04/2015
1879 Purchasing Program Line Connections concerns selection and award of framework agreements serving Design and Realization of Line Connections (including foundations, masts, conductor assembly, project facilities). 17/04/2015
1880 Delivery of complete transformer substations of 6-10 kV for the branch of JSC "IDGC of Volga" - "Saratov" 17/04/2015
1881 Design and survey work, construction and installation for the reconstruction of linear cells ?44,63,33,16 at 110/10/6 kV Substation ?149 «Myasnovo" for grid connection of electrical equipment "Renaissance" for the needs of "Tulenergo" of " IDCs (Reconstruction of equipment) 17/04/2015
1882 Survey, Construction Smrpo Power Line 10 Kv 10 Kv Ztpp ?324 «School" Of 10 Kv Transmission Line "City 2" From The Linear Cell "City 2" 2 Sksh 10 Kv Substation "Venev" And 10 Kv Transmission Line Transmission Line 10 Kv "Bundurina" - An Offshoot Of The 10 Kv Transmission Line "Kotelnaya- 1" From The Linear 17/04/2015
1883 Electric Substation And Generating Stations Battery Maintenance And Battery Load Testing 16/04/2015
1884 Emergency recovery works on the SS 35 - 110 kV for the needs of "Kalugaenergo" JSC "IDGC of Centre and Volga Region" 15/04/2015
1885 Reconstruction of power supply system Kiengopskogo N / m 15/04/2015
1886 Works on the reconstruction of 0.4 kV overhead lines Quantity: 2 lots
15/04/2015
1887 Supply of over head transmission lines 14/04/2015
1888 EPCOR also owns and operates high voltage substations and transmission lines and distributes electricity through a network of feeders and distribution lines to more than 300,000 residential andcommercial customers in the City of Edmonton. 14/04/2015
1889 Auxiliary Power 10/04/2015
1890 Works Repair Tower, Conductor And Accessories Transmission Tower No. 140 Broken Bracelet 275kV Line Up To Bukit Batu (GPTH-BBTU) Under The Line Up Care Unit, Office of the State Manager (Johor II - Kluang), Asset Maintenance Department, Transmission Division, TNB. 09/04/2015
1891 Installation, Testing And Commissioning Of High Tension (11kV) And Low Voltage (LV) Distribution System And Accessories From SSU Chenai To Kg. Jong, For TNB Distribution, Kuala Kangsar, Perak. 09/04/2015
1892 Execution of works on the project: "Construction of 10 kV transmission line for grid connection under construction DOW 280 seats in the 530 block of Stavropol on the street. Tulip 25 "for the needs of JSC" IDGC of the North Caucasus "-" Stavropolenergo "- Western Electric. 09/04/2015
1893 Repair Works at the American Employee’s Association (AEEA) Substation (Circuit Breaker & ATS) 08/04/2015
1894 Construction of the KL-10 kV RP-29-TP-322 of Volga 07/04/2015
1895 Remodel and Design, Construction and Completion of Building Distribution Sub Main (PPU) 33 / 11kV Kubu Gajah, During, Perak. 07/04/2015
1896 Construction activities with supply of equipment for the project of "Yantarenergo": ": Construction of 6 / 0.4 kV, 2 of 6 kV to the place of crosscuts 6 kV number 171 insulated 0 4 kV on the street. Chkalov Chernyahovsk. " 07/04/2015
1897 Construction Work For Substations 07/04/2015
1898 Construction of a tap at Substation "Zubovo" of 110 kV overhead Ufa district LLC "Bascom Engineering" 15-003455 07/04/2015
1899 Electrical Distribution Line Upgrade at John H. Kerr Powerhouse, Boydton, Virginia, USACE Wilmington District 06/04/2015
1900 Repair, Maintenance & Cleaning of 20 nos Electrical Sub-Statiosn 06/04/2015
1901 Reconstruction of 110 kV Substation for" Raguli "of automation in the cell line 110 kV Raguli-Sunrise (L-157) (installation of emergency control devices such as ALARA", a branch of JSC "IDGC of the North Caucasus" - "Stavropolenergo" - SES (Organizer, Customer) 06/04/2015
1902 Execution of works on the project: "Upgrade of 10 kV F-344 110/10 kV" Exemption "of the Soviet district" for the needs of JSC "IDGC of the North Caucasus" - "Stavropolenergo" - WPP (Organizer, Customer). 06/04/2015
1903 Request for proposals for construction and electrical works on the project: "Construction of 6 kV transmission line, of a 6 / 0.4 kV 400 kVA and 0.4 kV LEP- in the neighborhood Meadow, Kansk." 06/04/2015
1904 Construction And Installation Work on the grid connection of the branch of "kubanenergo" sochi electrical networks: "construction of the sld-10 kv, 10 kv cable with the installation of transformer substation 10 / 0.4 kv 160 kva transformer for connection of power devices (service station), ooo "indiana", located at: krasnodar, krasnodar, birch c / o street. Tselinogradskaya, 2/3 "(standardized rate) 05/04/2015
1905 6 kV at the well platform ?17 Kharampur field (South deposit), 6 kV overhead line on a well pad ?57 Kharampur field (South deposit), 6 kV overhead line on a well pad ?78V Kharampur field 03/04/2015
1906 truction and installation work on the project: "Reconstruction of 0.4 kV and replacement of TP in Sec. Rysaevo" for the needs of "VES" branch of JSC "IDGC of Volga" - "Orenburgenergo". 03/04/2015
1907 20 PCS auxiliary power unit (APU) 03/04/2015
1908 Power Unit,Diesel 03/04/2015
1909 Construction work for electricity power lines 02/04/2015
1910 Supply, installation & servicing for connection & mainline extension 02/04/2015
1911 PROPOSED SG. MAAW 132/33kV SUBSTATION - CIVIL WORKS 01/04/2015
1912 JLN14UPGD Firm Capacity Upgrade at John Lawson Substation
01/04/2015
1913 The right to enter into an Agreement for demolition, construction, installation and commissioning works on the project: "Two-chain 110 kV overhead lines: 1-branch chain of 110 kV overhead Zyukay-Kuzma at 110/10 kV Subbotniki; Chain 2-branch from 110 kV overhead Vereshagino-Kuzma at 110/10 kV Saturday "production department 31/03/2015
1914 Construction Of Power Distribution Line Along Olandang And Sitio Macantal & Bentad 31/03/2015
1915 Construction, installation and commissioning work on the project of Central Production Department of JSC "IDGC of Volga" - "Saratov" "Reconstruction of 110/10 kV Substation" Leninist "including replacement of 10kV cells ? 1002,1009,1018; 10 kV cable "Leninskaya- RP Feeder item" ?1,2; RP 10 kV "Feeder item" " 30/03/2015
1916 Silent Flo High Flow Hydraulic Power Unit 30/03/2015
1917 Qiandao Lake clean engineering and distribution facilities 10KV distribution new construction 29/03/2015
1918 Works to install composite cross provided by the department of the line 132 kv kulai, johor to central line for unit to, the state office manager (johor ii - kluang), department of assets maintenance, transmission, tnb. 26/03/2015
1919 Supply Of Auxiliary Power Units (Apus) For Mr-90 Cars 25/03/2015
1920 Maintenance of power lines and high-medium voltage transformer RCT VTS centers. 08/02/2015
1921 The supply of electricity with the force taking over guarantees for a derogation for the Slovak Hydro-Meteorological Institute in jednotarife. Electricity – the estimated amount: — the estimated total annual subscription: 2 218 MWh — estimated the total removal for 4 years: Estimated cost excluding VAT: MWh. 8 872 1 129 046 EUR 01/01/1900
1922 The contract will supply electricity to the sampling collector, including taking responsibility for deviation of deviations and the security services, distribution of electricity through the zúčtovateľovi to the distribution system operator and the transmission system operator to the Subscriber in the quality of the sampling corresponding to the technical conditions of the operator of the distribution network for compliance with the laws in force, the technical conditions and the operational policy of the operator of the distribution network for the contract period for each sampling point. Further information will be given in the tender documents. Estimated cost excluding VAT: EUR 605.32 1 587 01/01/1900
1923 The subject of the contract will supply electricity for the first choice group entities, formed on the basis of the mandate to the President of the city of Lubin for lighting streets, squares and public roads. The entities in the group are buying the final recipients of electricity (in accordance with article 3, point 13 (a) of the law of 10.4.1997 energy law). Estimated cost excluding VAT: Range: between 4 0000 0000 and 5 0000 0000 PLN LotsThis contract is divided into lots: no 01/01/1900
1924 Supply of regulating electricity for the Icelandic grid. 01/01/1900
1925 The supply of electricity with the force taking over guarantees for a derogation for K13-Kosice cultural centers in jednotarife. Electric energy: estimated amount: Estimated total annual subscription: 1 082 MWh. Estimated total removal for 2 years: 2 164 Estimated cost excluding VAT: 363 MWh. 000 EUR 01/01/1900
1926 Design, manufacturing, testing, delivery (including transport) by 36-kV medium voltage power switch cells for installation indoors. 00/00/0000
1927 The market has for object the provision and delivery of electricity as well as supplies of services related to champagne on seine sites identified in the CCP. 00/00/0000
1928 Framework agreement for the supply of electricity from the sites of the city and the CCAS de Mougins - sites of greater than 36 KVA power. 00/00/0000
1929 Continuous supply contract electricity in medium voltage, low voltage, low voltage, normal and special lighting, to the year 2016. 00/00/0000
1930 The supply of electricity. 00/00/0000
1931 See CCTP. 00/00/0000
1932 . The subject of the present proceedings for the award of the contract is the supply of electricity, which includes a comprehensive service in the supply of transmission services or the distribution of electricity and electricity sales in a period of 12 months for the following of collectors of the customer: 00/00/0000
1933 Electric power supply buildings and public facilities of the municipality of Sanxenxo and its autonomous agency, Terra de Sanxenxo. 00/00/0000
1934 Supply of electric power in low-voltage installations and premises of the Town Hall of the village of wit with power exceeding 10 KW. 00/00/0000
1935 For the purchase of electricity. 00/00/0000
1936 Recruitment of the electricity supply for the points of consumption in high and low voltage of the official Chamber of Commerce, industry, services and navigation of Valencia. 00/00/0000
1937 The subject of the contract is the supply of electricity and energy distribution services. 00/00/0000
1938 DCC is an intensive energy user of electricity. Further investment in on-site generation is expected to progressively reduce the proportion of imported electricity, however, there will remain an ongoing requirement to import/purchase electricity for the foreseeable future. 00/00/0000
1939 Benefits delivery and supply of electricity and gas. 00/00/0000
1940 The performance of the service and buttons stand located around power lines nN on area of Tauron Distribution S.A., branch office in wałbrzych. 00/00/0000
1941 Electricity supply to the facilities supplied in medium voltage (MT), low voltage (BTE) and low voltage (BTN) the City Council of Sabugal. 00/00/0000
1942 Electric power supply for the year 2017 at certain points of demand managed by Acuamed. 00/00/0000
1943 Supply of electric power to the various points of consumption which holds the Town Hall in Zalla. 00/00/0000
1944 1. Subject of the contract is the supply of electricity and to ensure the provision of distribution services of electricity for the operation of the buildings, premises, facilities, municipal equipment and to power street lamps in the Municipality Lubaczów in the period from 1.1.2016 to 31.12.2016. 00/00/0000
1945 Lappeenranta University of technology, request a quote for a fixed-price for the delivery of electricity supply, as defined in the request for quotation. The number of locations has five pieces, and the actual use of these 12 months tunneittainen have been presented in the invitation to tender. Use of electric energy is about 6 500 MWh per year. 00/00/0000
1946 The subject of the contract is the execution of the service.: Successive purchase electricity for the purpose of Public health care Establishment Independent Hospital Wielospecjalistycznego in Nowa Sól. 00/00/0000
1947 Single contract for the supply and delivery of electricity for our 2 sites in accordance with the end of tariffs regulated "green rates". 00/00/0000
1948 Providing low-voltage electricity, the estimated quantity of 1 620 in MWh for the period 1.1.2016-31.12.2017. 00/00/0000
1949 In the context of the opening up to competition of the electricity supply, the grouping of command wanted to develop a device allowing him to select a number of economic operators who will be later handed over to compete when it has to enter into contracts to supply electricity to ensure food for the sites of these members. 00/00/0000
1950 The object of the contract is the supply of electricity in the Gorenja vas-Poljane, where environmental aspects are taken into account for a period of 3 years from signature of the contract. 00/00/0000
1951 This contract has for object the provision and delivery of active electricity warranty necessary to feed continuously from 3 buildings (the Proyes nautical complex, halle covered-rink, camping at the top of the Bluches) and a plant for the production of "artificial snow", as well as responsibility for balance with related services. 00/00/0000
1952 Electricity supply in medium voltage, low voltage and low voltage normal at the Santa Casa da Misericórdia de Lisboa. 00/00/0000
1953 Delivery of electrical energy from renewable sources for the property of the contracting authority in accordance with specifications 00/00/0000
1954 Supply of electric energy for the real estate of the principal in accordance with specifications. 00/00/0000
1955 1. Subject of the contract is that of the successive delivery of the brand new poles and precast concrete products to the overhead line electrification and nn. 00/00/0000
1956 Recruitment batch supply of electric power in low and medium voltage of the A Coruña City Council that encourages the production of electricity from renewable energy sources and high-efficiency cogeneration. 00/00/0000
1957 The consultation is part of the project of desaturation and renovation of the Chateau Rouge (line 4) station. It concerns the work of low-voltage exchanges, wharves and docks access room / courtroom exchanges / station road. 00/00/0000
1958 Electricity supplies. Unmetered Street Lighting Electricity Supply. 00/00/0000
1959 Supply and delivery of electricity to the use of the buildings of the slaughterhouses of Montauban (SEAM) operating company 00/00/0000
1960 The subject of this public procurement procedure is electricity, on the basis of need, and enunciated in all things in accordance with the technical specifications and other requirements in the documentation naznačenima conditions for competition. 00/00/0000
1961 Framework agreement on the provision and delivery of electricity. 00/00/0000
1962 Delivery of electricity for street lighting the municipality of Schwielowsee and the properties. 00/00/0000
1963 Delivery of active high-voltage electricity to KC "valchi DOL" and "Polish KC Senovets" and an active medium voltage electricity for KC "Kardam" KC "Provadia," KC "Lozenets" KC "strandja" KC "Ihtiman" KC "Petrich" and "PGH Chiren" property of bulgartransgaz EAD, providing service on the forecasting of consumption, as well as the preparation of schedules by the Coordinator of the group, balancing their submission, if necessary correction of submitted schedules responsibility for balancing and all activities related to the participation in the free electricity market of the contracting authority. Detailed information is given in the contract documents. 00/00/0000
1964 A public contract for the planned investment, the planned repairs and ensuring the removal of critical state of the fittings, clamps and couplings for the project to ensure safe and reliable operation of the equipment the distribution system. The result of the HORSE will be the contracting supply fittings, clamps and couplings for the project with the selected candidates. 00/00/0000
1965 20 kv electrical works on implementation of DISTRIBUTION AUTOMATION SYSTEM for ELECTRICAL ENERGY SAD-PA-PT-PCT-Electrical Distribution South Transylvania FDEE stage III. The estimated value of public procurement contract of works has been calculated taking into account the provisions of what is thought from the General Estimate for this investment objective. Total estimated value without VAT is-41 431 231 RON, and consists of the value of the tender (VB) 40 013 355 € (PT, DE, DTAC) 466 599 RON and the total value of the miscellaneous expenses and unexpected (2.35%) rate (CDN = I% VBOx2 where VBO = + VB) 951 277 USD. 00/00/0000
1966 Supply of electric energy for the tenements and street lights of Office of Niepars and the Office family member communities. 00/00/0000
1967 Supply of electric energy for the property and the street lighting of the town of Preetz and the deck socket of the waste water purpose Association Preetz city and country. 00/00/0000
1968 The supply of spare parts for apparatus, connection and low and medium voltage protection for Coal Company Branches S.A. in 2016. (no asortymentowej group 312-11). 00/00/0000
1969 Moyle Interconnector Limited, a subsidiary of Mutual Energy Limited, owns and operates the Moyle Interconnector, a HVDC link between the electricity transmission systems in Northern Ireland and Scotland. The current Long Term Maintenance Agreement is due to expire in November 2016 and Moyle Interconnector Limited wish to appoint a maintenance contractor who will ensure that the interconnector Converter Stations and associated equipment will continue to meet high availability performance targets on a cost effective basis. 00/00/0000
1970 Moyle Interconnector Limited, a subsidiary of Mutual Energy Limited, owns and operates the Moyle Interconnector, a HVDC link between the electricity transmission systems in Northern Ireland and Scotland. The current Long Term Maintenance Agreement is due to expire in November 2016 and Moyle Interconnector Limited wish to appoint a maintenance contractor who will ensure that the interconnector Converter Stations and associated equipment will continue to meet high availability performance targets on a cost effective basis. 00/00/0000
1971 Delivery of active electrical energy high voltage 110 KV for WWTP – village bojuritsa, to balancing group, at freely negotiated prices as a privileged user. 00/00/0000
1972 Construction and finishing works, as well as the manufacture, supply and installation of steel constructions for the 110 kV GIS through here with the result lines for 110/20 kV FROM RTP Pekre. 00/00/0000
1973 Contracting for the supply of electric power at Intermutual Hospital in the Basque country. 00/00/0000
1974 The supply of electricity and the provision of distribution services on the territory of the municipality of Wyszków. 00/00/0000
1975 Delivery of active electrical energy high, medium and low voltage at freely negotiated prices pursuant to the Energy Act and inclusion in the balancing group of objects of "sofiyska Voda" ad and cover their nebalansi. 00/00/0000
1976 This contract is subject: delivery of electric power NET and the choice of co-ordinator of the balancing group for sites submitted for management of the Council of Ministers and for the award of supply of electric power at freely negotiated prices according to art. 100, art. 101, art. 102 and art. 103 of the law on energy (EA) and the rules for trading electricity for powering the objects of the Council of Ministers, low and medium voltage network. 00/00/0000
1977 1. Subject of the contract is the supply of electricity in the period from 1.3.2016 to 30.6.2018 to the premises and facilities and for the purposes of road lighting. 00/00/0000
1978 The contract has as its object the establishment of a framework agreement with a single economic operator, for each lot of race, for the supply of electrical equipment for the needs of ELECTRICITY DISTRIBUTION Corp. 00/00/0000
1979 The purpose of this order is the recovery of the retaining wall, as well as strengthen the Foundation of post No 10 of 110 kV OHL Armira. Implementation will be through Engineering (design, delivery and performance). This order will be made conditional on 2 stages: 00/00/0000
1980 The subject of the contract is the supply and transmission/distribution of heat energy for the participants of the SGZ in total estimated size (during the term of the agreement). 19 863.74 GJ (+/-15%) of the tariff in the following groups: 00/00/0000
1981 "The supply of electrical energy — low voltage for the needs of TP" Batak "DGS. 00/00/0000
1982 The subject-matter of the contract, as described in the special conditions of contract is the supply of electricity (low voltage and medium voltage MT BT) at points of delivery specified in annex 1 of the specification itself, according to the profile of consumption, the subdivisions between MT and BT and apportionments peak hours indicated in annex 2, thanks for supplying both national and import source , referring to an estimated 16 995 019 alleged aggregate quantity kWh throughout the contract period, wholly coming (100%) from renewable energy sources. 00/00/0000
1983 Construction and delivery of materials to a new 132 kV power line Kvitfossen-Solbjørn, Section Kleppstad-Fygle. 00/00/0000
1984 Construction and delivery of materials to a new 132 kV power line Kvitfossen-Solbjørn, Section Kleppstad-Fygle. 00/00/0000
1985 Electric power supply. 00/00/0000
1986 Objective: 00/00/0000
1987 Supply of electricity for the STEP equipped with a yellow tariff. 00/00/0000
1988 Supply of electric energy for the properties of the waste water purpose Association Darß. 00/00/0000
1989 Framework agreement for the supply of energy. 00/00/0000
1990 -object: facilities > 36 kVA electrical power supply,. 00/00/0000
1991 Supplied by lots of electrical energy in medium voltage, low voltage and the supply of natural gas to the city of Badajoz, pursuant to the economic-administrative and technical requirements specifications. 00/00/0000
1992 The subject of the contract is the provision of a regular supply of electricity to the customer, including management fees related to the sampling connection to the distribution network (i.e. taking responsibility for deviation of deviations and the security services, distribution of electricity through the zúčtovateľovi to the distribution system operator and the transmission system operator to the collection places the customer) for a period of 12 months. 00/00/0000
1993 Caruna Oy request requests to kilpailutukseen construction of the electricity distribution network of the KVR-(20/0.4 kV) Carunan in the North-East of the country and in the North of the country to the network. 00/00/0000
1994 The subject procurement is: electric power lines and cables. 00/00/0000
1995 Supply electric energy to 2 RLM with together 859 977 kWh p.a. and 54 SLP delivery points along 654 729 kWh p. a. 00/00/0000
1996 Comprehensive electricity supply and service distribution or transmission of electricity to the Provincial Hospital in Composite Płock. 00/00/0000
1997 Market for the supply of electricity and services to various residences. 00/00/0000
1998 The supply of electricity, according to the announcement of the withdrawal foreseen for the individual demand of the city on the Maribor d.d. as the eligible customer, J.P. plumbing for a period of 2 years. 00/00/0000
1999 Delivery apparatus, connection and low and medium voltage protection for branches of the Carbon Company S.A. in 2016. (no asortymentowej group 312-9). 00/00/0000
2000 Public procurement "electricity", total = 5831 MWh/yr of which: medium voltage 5056 MWh/year and low voltage 775 MWh/year. 00/00/0000
2001 This consultation is to supply of electricity on 13 settlements of Procilia and certain of its subsidiaries. 00/00/0000
2002 Work and electricity access/intercom on 13 residences Aquitanis control. 00/00/0000
2003 The contract is divided into 3 lots, has as its object the conclusion of conventions, pursuant to art. 1, comma 4, of regional law No 33/2007, for the supply of electricity, as described in the tender documents and in Annex B, in favour of the institutions and Administrations, established in the territory of Lombardy under art. 1, paragraph 455 of l. n. 296/2006, as called for by art. 1, paragraph 3 of regional law No 33/2007. 00/00/0000
2004 Steel DEM 400 kV towers. 00/00/0000
2005 "Specialized consulting services for works/services in the overhead power lines 110-750 KV" for 43 560 hours of consulting, for 36 months from the date of entry into force of the contract, to all the services included in the contract documents. 00/00/0000
2006 Supply of electricity and related services for consumer units (sampling points) of ATAC Civitanova SpA unipersonale. 00/00/0000
2007 Electric power supply for the municipality of Almonte in low and medium voltage installations. 00/00/0000
2008 Supply of electric energy for the real estate of the Klinikum Bremerhaven Reinkenheide gGmbH. 00/00/0000
2009 Supply of electric energy for the real estate of the Klinikum Bremerhaven Reinkenheide gGmbH. 00/00/0000
2010 Supply of electric energy for the tenements and street lighting the city of Rathenow. 00/00/0000
2011 Work of reform of the electrical installation of low-voltage in the building headquarters addresses provincial of the Treasury General of the Security Social and the National Institute of Social Security in Cantabria. 00/00/0000
2012 1. Subject of the contract is the supply and distribution of electricity – in total: 2 760 900 kWh, divided into 5 tasks – for the purposes of the Provincial Hospital. St. Padre Pio. Supply and distribution will take place under the conditions laid down in the Act-energy law of 10.4.1997 (OJ No 89 of the 2006 item 625, as amended), the implementing rules for the same Act, and, in particular, the regulation of the Minister of economy of 4.5.2007 on detailed conditions for the operation of the power system (OJ No 93 item. 623, as amended), the tariff for electricity contractors, the tariff for electricity distribution services of the relevant distribution system operator (OSD) Manual Movement and operation of a distribution network (IRiESD), and generally applicable laws. Measuring systems-billing located on the customer fulfil the conditions and functions and measuring properties of billing separately for supplies and separately for the distribution of electricity. 00/00/0000
2013 The purchase of electricity. 00/00/0000
2014 Supply of electric energy for the real estate of the municipality of floh-Seligenthal. 00/00/0000
2015 The order is for choosing a supplier of active NET electric power and assuming responsibilities for nebalansite medium voltage of 11 (eleven) number of sites located on the territory of the city. Sofia, Sofia-Sliven region and area. 00/00/0000
2016 The regulated prices of electricity for the subscribed power in excess of 36 KVA will be removed at the 31.12.2015 in accordance with article L.337 - 9 of the code of energy, as well as to the provisions of section 25 of Act No. 2014344 of the 17.3.2014 relative to consumption. 00/00/0000
2017 The regulated prices of electricity for the subscribed power in excess of 36 KVA will be removed at the 31.12.2015 in accordance with article L.337 - 9 of the code of energy, as well as to the provisions of section 25 of Act No. 2014344 of the 17.3.2014 relative to consumption. 00/00/0000
2018 The regulated prices of electricity for the subscribed power in excess of 36 KVA will be removed at the 31.12.2015 in accordance with article L.337 - 9 of the code of energy, as well as to the provisions of section 25 of Act No. 2014344 of the 17.3.2014 relative to consumption. 00/00/0000
2019 The regulated prices of electricity for the subscribed power in excess of 36 KVA will be removed at the 31.12.2015 in accordance with article L.337 - 9 of the code of energy, as well as to the provisions of section 25 of Act No. 2014344 of the 17.3.2014 relative to consumption. 00/00/0000
2020 Electricity purchase Alūksne district municipal needs. 00/00/0000
2021 The customer intends the award of the following deliverables on lots divided: 00/00/0000
2022 The object of this contract is the supply of electricity for the purposes of technological facilities and administrative PWiK SP. z o.o. in Gorzow in the number of primary law the maximum quantity option. 00/00/0000
2023 The object of the contract is the supply of electric energy to buildings of the Assembly of the Republic. 00/00/0000
2024 Electricity purchase Salaspils district municipal needs. 00/00/0000
2025 Purchase of metered electricity. 00/00/0000
2026 Cable BT various sections and HV cables sections. 00/00/0000
2027 Common procurement and supply of electricity for the needs of the County and the schools. 00/00/0000
2028 Caruna Ltd invites applications for participation in the crane power lines – Jylhävaara and Jylhävaara-Jylhävaaran and Pole Pole building, as well as the risk of danger to the construction of electrical drives 00/00/0000
2029 Elektrilevi LLC-Central and low-voltage power supply design work of exercise – the drawing up of the building design documentation; coordination of the project with interested parties; carrying out the actions necessary to regularise the use of the land (except for the notarial contracts). 00/00/0000
2030 Electric power supply. 00/00/0000
2031 Supply of electricity. 00/00/0000
2032 Lot 1: network area Stadtwerke Fürstenfeldbruck - delivery of approximately 660 000 kWh per year of electricity with 50% from renewable energy sources (RES) in acceptance places of community and VG Mammendorf. 00/00/0000
2033 Aster Communities Electricity contract for nHH supplies. 00/00/0000
2034 Framework agreement multi attribute for the supply and delivery of electricity and associated services. 00/00/0000
2035 Low voltage electricity. 00/00/0000
2036 1.1.2016, rate regulated electricity will disappear for all the sites which the contracted power exceeds 36 kva, i.e. for the so-called rates "Yellow" and "green". For their own electricity needs, public entities and in particular local authorities and their public institutions must resort to the procedures laid down by the code of public contracts for the selection of their providers on the energy market. Future contracts with electricity suppliers are unique contracts, i.e. contracts involving electricity supply, access and use of the networks. The framework agreement and its subsequent market procedure is concluded without commitment amounts or quantities in accordance with article 76 VIII of the code of public contracts. Indicatively, the forecast quantities for delivery points (Pdl) are those contained in annexes to the C.C.T.P. More PDL contained in these annexes, other PDL which are not in service at the time of the award of the framework agreement may be attached to the perimeter of the holder being a subsequent contract, under the conditions defined in the C.C.A.P. The PDL can also be detached from the perimeter of the proprietor running from the subsequent market due a legitimate but still unknown reason at the time of this consultation (demolition, sale or transfer to third party, final cessation of activity of the site, definitive change of energy...). 00/00/0000
2037 -supply and delivery of electricity, 00/00/0000
2038 The electricity supply to the high, medium and low voltage at 8 points (specified in specifications). 00/00/0000
2039 The subject of the contract is the supply of electricity and natural gas for the general health insurance company, a.s. (hereinafter referred to as VÅ¡ZP) for a period of 21 months. 00/00/0000
2040 Supply of electricity and related services for the municipal buildings of Mayenne. 00/00/0000
2041 Supply of electric power – low voltage and the choice of co-ordinator of the balancing group for the purposes of the TSU of ÛCDP town of Smolyan. 00/00/0000
2042 Supply of electricity and related services for the municipal buildings of Mayenne. 00/00/0000
2043 Murcia City Council electrical power supply. 00/00/0000
2044 The subject of the contract is the purchase of electricity in the amount of approximately:-26 103.60 MWh (megawatogodzin) and the total contractual capacity-2 958 MW (megawatt) for teaching, student houses and other objects at the University of Szczecin in the Pomeranian + Jarocin-greater Poland Voivodeship. 00/00/0000
2045 Purchase of Elenia Ltd (Business ID: 2445423-4) of the electricity market in accordance with article 30 of the law 588/2013, the purchase of electricity, including, among other things, the loss of the network and the acquisition of omakäyttösähkön: 00/00/0000
2046 Supply of electricity to the Group companies ACAM and ACAM GAS SpA — CIG 6531348EDC. 00/00/0000
2047 Purchases of electricity for the city, for Kutina and budgetary users of the city. 00/00/0000
2048 Assembly work for the major overhaul 220 kV LTG. Weissenbach - Ernsthofen. The 220 kV line white enbach - Ernsthofen reaches a length of 84.4 km and already 66 years old. A plant-related condition assessment taking into account the expected service of life of the pipe and the results of the year prescribed systematic investigations of the conductor cables (cable removed, samples) confirm a need for extensive rehabilitation. 00/00/0000
2049 Removing existing selector installation, new power installation, new low-voltage installation. 00/00/0000
2050 "The supply of electrical energy MV and LV at freely negotiated prices for the needs of the Academica 2011" and the choice of co-ordinator of the balancing group ". 00/00/0000
2051 The object of this contract is the purchase of electricity, in accordance with the provisions of the Act of 10 April 1997 energy law by the customer to his collectors. 00/00/0000
2052 The subject of the contract is the purchase of electricity for objects that are supported by the General Directorate for national roads and motorways Division in Poznan. 00/00/0000
2053 The object of the present contract includes: 00/00/0000
2054 The subject of the contract is the supply of electricity, which includes its sales to Regional Water Management Board objects in Warsaw in the total amount estimated by the customer within a period of 12 months of ca 5 447 MWh, for a total of 108 points, located in the province: Masovia, Kuyavian-Pomeranian, Warmian-Masurian Voivodeship, Poland, Lodz, Lublin,,. 00/00/0000
2055 Electric power supply buildings, facilities and public lighting of more than 10 Kw. 00/00/0000
2056 Services within the framework of the technical operation of the network of the electricity distribution network in the area of public utilities Greve Mills GmbH. 00/00/0000
2057 Market 2016/007 - supply and delivery of electrical energy for the needs of the services of the city of Vernon and the CCAS in Vernon. 00/00/0000
2058 HH electricity energy contract renewal for Newcastle International Airport — with a contract renewal date of October 2016. Suppliers will be requested to provide 12, 24 and 36 month contracts. 00/00/0000
2059 Framework agreement on 4 years for supplying electric energy including transport, distribution, service and market management system, contribution for high-efficiency cogeneration, the value of green certificates, the amount of excise duty and the Radio and TV fee. 00/00/0000
2060 Delivery of high-voltage electricity supply (132 kV) for a total amount of EUR 4 173 800 24 months, administered by an eligible item in the manner and under the conditions laid down in the special conditions. 00/00/0000
2061 Hiring of the electric power supply of high and low voltage for the centers of the participating mutual (UMIVALE and EGARSAT). 00/00/0000
2062 Maintenance of generators, inverters and equipment electrical high and low voltage. 00/00/0000
2063 Electrical installation works relating to modernization of the electric power supply in the blocks of flats in the counties of Brasov, Harghita, Mures. The estimated value for each batch of public procurement contract of works has been calculated taking into account the provisions of what is thought from the General Estimate for this investment objective. Total estimated value without VAT-is: 1 Lot = 11 807 597 RON, and consists of the value of the tender (VB) design of leys, 11,665,690 (PT,) 25 000 GBP and the total value of the miscellaneous expenses and unexpected (1%) (CDN = VBOx1%, where the VBO = + VB) 116 907 Lei; lot 2 = 25 374 392 GBP, and consists of the value of the tender (VB) 25 073 160 RON (PT,) 50 000 GBP and the total value of the miscellaneous expenses and unexpected (in percentage of 1%) (CDN = VBOx1%, where the VBO = + VB) 251 232 RON; lot 3 = 13 467 037 RON, and consists of the value of the tender (VB) 13 308 700 GBP design (PT,) 25 000 GBP and the total value of the miscellaneous expenses and unexpected (1%) (CDN = VBOx1%, where the VBO = + VB) 133 337 USD. 00/00/0000
2064 Niederspannungsinstallationsanlagen. 00/00/0000
2065 Delivery of high-voltage electricity supply (132 kV) for a total amount of EUR 4 173 800 24 months, administered by an eligible item in the manner and under the conditions laid down in the special conditions. 00/00/0000
2066 Supply of electric energy for the tenements and street lighting of Office Darß Fischland and the Office family member communities. 00/00/0000
2067 Delivery of electrical energy from renewable sources for the tenements and street lighting in the town of Falcon Lake. 00/00/0000
2068 Electricity supply and price assurance of electricity to Vimmerby municipality. 00/00/0000
2069 Electricity supply and price assurance of electricity to Vimmerby municipality. 00/00/0000
2070 Electricity supply and price assurance of electricity to Vimmerby municipality. 00/00/0000
2071 Supply of electricity from renewable energy sources (RES) from the 1.4.2016 the acceptance places of the District of forchheim in Bavaria. 00/00/0000
2072 Supply of electricity from renewable energy sources (RES) from the 1.4.2016 the acceptance places of the District of forchheim in Bavaria. 00/00/0000
2073 Supply of electricity from renewable energy sources (RES) from the 1.4.2016 the acceptance places of the District of forchheim in Bavaria. 00/00/0000
2074 Supply of electricity from renewable energy sources (RES) from the 1.4.2016 the acceptance places of the District of forchheim in Bavaria. 00/00/0000
2075 1. Subject of the contract is the purchase of electricity for the selected objects that are on the Board of the provincial Command of the police in Rzeszow. 00/00/0000
2076 1. Subject of the contract is the purchase of electricity for the selected objects that are on the Board of the provincial Command of the police in Rzeszow. 00/00/0000
2077 Supply of electricity from renewable energy sources (RES) from the 1.4.2016 the acceptance places of the District of forchheim in Bavaria. 00/00/0000
2078 "The supply of electric energy for the needs of the municipality of Stara Zagora" 00/00/0000
2079 The object of this contract is the selection of a contractor for the supply of electricity. 00/00/0000
2080 The object of this contract is the selection of a contractor for the supply of electricity. 00/00/0000
2081 "The supply of electric energy for the needs of the municipality of Stara Zagora" 00/00/0000
2082 The object of this contract is the selection of a contractor for the supply of electricity. 00/00/0000
2083 Supply of electricity on medium-voltage and gas. 00/00/0000
2084 Supply of electricity on medium-voltage and gas. 00/00/0000
2085 Supply of electricity on medium-voltage and gas. 00/00/0000
2086 Supply of electricity on medium-voltage and gas. 00/00/0000
2087 The subject of the contract is the purchase of electricity for 104 points in the collection of the municipality of Dziwnów, and its organizational units for street lamps and other objects with a total volume of demand during the period covered by the contract (24 m-ce) 5 168 928 kWh (+/-20%). 00/00/0000
2088 "The supply of electric energy for the needs of the municipality of Stara Zagora" 00/00/0000
2089 This consultation is to the award of a contract for the supply and delivery of electricity and services associated to the Sempariseine delivery points. The CCTP and its annex are available to candidates details relating to these benefits and the list of delivery points covered by this market. Informational, the Sempariseine has at the time of the launch of this consultation of 16 existing contracts (15 on permanent electricity supply requirements) and 1 on a temporary need. The market will be processed at unit prices. The market price will result in the application of the quantities actually executed the unit price of the unit price without amounts schedule minimum nor maximum. 00/00/0000
2090 Supply of electricity on medium-voltage and gas. 00/00/0000
2091 Whale Center of Budapest cultural and commercial, of the supply period in Budapest: 18.2.2016. 00/00/0000
2092 "The supply of electric energy for the needs of the municipality of Stara Zagora" 00/00/0000
2093 Construction of tracks and foundations work for 220 kV overhead line. This includes laying tracks for accessing the line and installation and construction of foundations for the line. 00/00/0000
2094 Construction of tracks and foundations work for 220 kV overhead line. This includes laying tracks for accessing the line and installation and construction of foundations for the line. 00/00/0000
2095 Construction of tracks and foundations work for 220 kV overhead line. This includes laying tracks for accessing the line and installation and construction of foundations for the line. 00/00/0000
2096 This is an invitation to tender for the supply of electricity to 4 University of Ulster sites with an aggregated annual usage of approximately 14.5 GWh. 00/00/0000
2097 Short description of the contract or purchase(s) 00/00/0000
2098 Short description of the contract or purchase(s) 00/00/0000
2099 Short description of the contract or purchase(s) 00/00/0000
2100 Short description of the contract or purchase(s) 00/00/0000
2101 Preparation of a project to repair the existing route of 110 KV OHL "Nitrogen-dragon from subst" Dobrudja "by subst" agropolychim "and implementation of supervision during the implementation of the CMP. The project must contain the following project areas: 00/00/0000
2102 Electricity supply in BTN. 00/00/0000
2103 Supply of electrical energy consumption points for low and high voltage of the municipality of Torre-Pacheco. 00/00/0000
2104 Procurement of supply of gas and electricity in 2019 in the CHU Saint-Pierre, CHU Brugmann, the QFCUH, the Bordet Institute and Iris South hospital. 00/00/0000
2105 The subject of excess public supply contracts with the name "central purchasing of electricity and natural gas for the statutory city of Prostejov 2017-2018" is the physical delivery of electricity and natural gas to the consumption points entities – the Central contracting authority, of the city of Prostějov and pověřujících, subsidized organizations, established the city of Prostějovem. Public order is divided into 2 parts in accordance with section 98 of the Act, as follows: 00/00/0000
2106 Following a procedure initiated on 21/09/2015 and amended 10/15/2015, made unsuccessful due to the irregularity of the whole of the tenders received, a new consultation is launched. This consultation concerns the supply and routing of electricity so that services related to delivery of the basin of Pompey points. 00/00/0000
2107 Preparation of a project for "building a new 110 KV OHTL from subst" Varna North to subst "Kavarna" (Batovo-kichevo), including the elaboration of a project for "building a new 110 kV OHL of benchmark No. 1 (R1)-new razklonitelen post, situated in meždust″lbie St. No 17-St. No 18 of 110 kV OHL "Nectar", to linear portal of subst "Kavarna" project with the following parts: – "Electromechanical"; -"Surveying"; -"Geology"; -"Health and safety plan"; -"Building construction"; -"Fire safety"; -"Organization and traffic safety"; -"Waste management plan"; -"Intersection of routes of the national road network and the elaboration of a project on" reconstruction of the fan in front of the subst "Varna West" on the accession of the new VL 110 kV "Kichevo" with the following project areas: 00/00/0000
2108 Power purchase agreement for consumer connection points in the case of the Hungarian electricity network is continuously available for the purchase of electricity, according to the terms of the free market 1.4.2016., 12:00 31.12.2017., 24:00 hours, for a period of a full supply of electricity within the framework of the commercial contract, which does not include the statement of costs. 00/00/0000
2109 Delivery of active NET electric power medium voltage and the choice of co-ordinator of the standard balancing group, for the needs of the House of culture "Boris Hristov"-g. Plovdiv. In my capacity as coordinator of the standard balancing group, the contractor will provide forecasting consumption of DK "Boris Hristov"-g. And will carry out planning and negotiation of specific quantities of goods, in accordance with the rules for electricity trading (RET). The contracting authority shall, by DK "Boris Hristov", would be an indirect member of the standard balancing group of the contractor. Place of delivery: the House of culture of DK "Boris Hristov"-g. Plovdiv, UL. "Gladstone" No. 15. Customer number: 1,000,104,091 – 4,119,308, etc. 00/00/0000
2110 Power purchase agreement for the purchase of electrical energy in a competitive market, as well as the electrical energy in 2007. LXXXVI per year. Act (hereinafter referred to as casts.) of section 63 (1) the contracting authority based on the network access and network connection, power purchase contracts combined (including the minimal set of necessary contracts to be concluded by the Office of the National Assembly for the benefit of). The conclusion of the contract., the electrical energy in 2007. LXXXVI per year. report on the implementation of certain provisions of law No 273/2007. (X. 19.) Gov. in the light of the relevant legislation and regulation. 00/00/0000
2111 Electricity purchases in Latvian prisons. 00/00/0000
2112 Establishment of a Framework for the supply of electricity to 2 meters (1 Half Hourly and 1 Non Half Hourly) with a combined annual consumption of approximately 12 GWhs. It is envisaged that this will comprise a 36 month contract with an option to extend by 12 months. 1 times — this option will be at the sole discretion of Chesterfield Royal Hospital NHS Foundation Trust. Only suppliers holding the relevant Ofgem supply licenses will be eligible for receipt of the tender documentation, copies may be required as evidence of eligibility prior to documentation being sent out. 00/00/0000
2113 Supply of electric energy for the tenements of district Grevenbroich GmbH. 00/00/0000
2114 Supply and delivery of electricity and ancillary services. 00/00/0000
2115 Rejlers Consulting AS shall, on behalf of the contracting authority Trollfjord Kraft AS, procure the following: 00/00/0000
2116 The municipality currently has 6 sites with subscribed demand greater than 36 kVa. They break down into 2 green and 4 fares yellow; data consumption of these sites and technical characteristics are given in annex 1 of the CCATP. 00/00/0000
2117 Subject: Supply and delivery of natural gas and electricity and related services for different sites of the community of Communes of Cattenom and surroundings 00/00/0000
2118 Delivery of electrical energy from 2017 in the medium voltage range and in the field of low-voltage in 42 different acceptance places. 00/00/0000
2119 Supply of electric energy for the real estate and the municipality of Röhrmoos street lighting. 00/00/0000
2120 Electric power supply. 00/00/0000
2121 Framework contract ropes and wires for overhead contact line systems according to Deutsche Bahn AG rule drawings. 00/00/0000
2122 This contract is to supply of electricity with guarantees of origin and the realization of the provision of services associated with this provision under a single contract on behalf of a group. 00/00/0000
2123 Supply electric power points to hire by the Ilustre Ayuntamiento del Rosario in regime of free market of electricity. 00/00/0000
2124 Composite insulators are intended for the construction of new electric wiring as well as for the repair and maintenance of external lines with a nominal voltage of 22 kV. 00/00/0000
2125 Electricity supply. 00/00/0000
2126 Small-and medium-voltage air line fittings. 00/00/0000
2127 The purchase of ozolnieki municipality Ektroenerģij municipality and its institutions and departments for two years at a fixed price. 00/00/0000
2128 The subject of the contract is the supply of electricity to the sampling collector, including taking responsibility for deviation of deviations and the security services, distribution of electricity through the zúčtovateľovi to the distribution system operator and the transmission system operator to the Subscriber in the quality of the sampling corresponding to the technical conditions of the operator of the distribution network for compliance with the laws in force, the technical conditions and the operational policy of the operator of the distribution network for the contract period for each sampling point. More information is provided in the tender documents. 00/00/0000
2129 The object of the contract is the purchase of electricity at low normal stress to the delivery points identified in the contract documents. 00/00/0000
2130 Conclusion of a contract for electricity incl. power use in the period 1.7.2016 to 31.12.2019. 00/00/0000
2131 Framework agreement for the supply of electricity to the premises supplied in medium voltage and low voltage special. 00/00/0000
2132 Tender of delivery of electricity for the town of Brilon; Tender for the period 1.1.2017 to 31.12.2021; 00/00/0000
2133 This condultation is to the conclusion of a framework agreement for the supply and delivery of electricity supplying the town of Crolles delivery points. A subsequent contract will be awarded on the basis of this framework agreement. 00/00/0000
2134 (F) removing electrical equipment and low-voltage lines, as well as manufacture of floor wall bushings in the context of a fire safety education, dismantling of approximately 5 000 m low-voltage cables and 5 000 m remote login /-wiring, removing about 40 electric / small distribution, removal of approx. 550 stock lights, of which store 300 stock lamps for reuse, installation of approx. 500 LED long field lights including related digital lighting control, installation of approx. 200 LED recessed lighting , Installation of approximately 320 installation equipment, installation of approx. 15 electrical under switchboards as wall / and State distribution, low-voltage main distribution conversion and extension of existing, installation of approx. 4 500 m cable carrying system for wall and ceiling mounting, installation of approximately 1 200 m cable tray systems, installation of approximately 15 000 m low-voltage installation cable, approx. 500 m telecommunications cable, approx. 700 m cable duct, installation of approx. 24 data distribution cabinets, installation of approximately 1 800 m fiber optic data lines , Installation of approximately 45 000 m of copper data cables, supply and installation of approximately 1 100 data junction box, delivery of approximately 130 audio speakers, installation of approx. 60 Beamerdeckenhalterungen, delivery and installation of about 30 sqm switching waiting for floor, disassembling and Assembly of restorations with approx. 2 000 m rubber hose, 750 kg disassembly cable, approx. 650 kg disassembly of switchgear and installation equipment. 00/00/0000
2135 This contract consists of a single batch has for object the provision and delivery of electricity to the needs of the sites of the commune of Corbeil-essonnes. 00/00/0000
2136 Performance measurement for the measurement, alignment and documentation of high voltage overhead transmission lines in particular line being measurement, profile shots, creating profile plan, location, mast lists and crossing documents. 00/00/0000
2137 Missions relating to on-and new construction of the receiving stations for electric power distribution. (0.4-145 kV) This includes, among other things. earthworks, construction work, electrical work etc. All calls will be made in the form of turnkey projects in ABT06 but in different partnership. 00/00/0000
2138 Works in the field of the construction of the double track line 110 kV cable-jednotorowej cable line of Czosnów, Łomianki 15 kV, complete fiber on the basis of the documentation that has been developed with the final decision approving the project and granting building permits with the development of technical documentation and implementation on the basis of the work in the GPP Łomianki and linear system temperature measurement system. 00/00/0000
2139 Coordination of security services in work and technical audits of safety, construction and maintenance in electric power distribution networks in high, medium and low voltage lighting, counts, transformation stations, substations and posts. 00/00/0000
2140 Framework agreement for the supply of overhead line conductors. 00/00/0000
2141 Elia has been appointed as transmission grid operator, in accordance with the law of 29.4.1999 concerning the liberalisation of the electricity market and supervises the safety, the reliability and efficiency of the transmission grid. 00/00/0000
2142 Supply of electric power for HV and LV of the port authority of the Bay of Algeciras. 00/00/0000
2143 Elia has been appointed as transmission grid operator, in accordance with the law of 29.4.1999 related to the liberalisation of the electricity market and supervises the safety, the reliability and efficiency of the transmission grid. Elia must therefore ensure the provision of the required ancillary services. 00/00/0000
2144 Framework Agreement for the Supply of Various Low Voltage Cables — Enemalta. 00/00/0000
2145 Power lines and gaasitrasside raamhange regular surveys. 00/00/0000
2146 Planning services to the alignment-technical, technical approval and environmental professional construction of the 110 kV overhead line 107/108 from Monkey World According to Westendorf. 00/00/0000
 Sector Description 

 Procurement News 
  •  This provides for control of surface transportation and better utilization of roads and networks. NextTraffic
  •  The statement quoted Mr Robert Dickerman, the Chief Executive Officer of EEDC, as expressing hope that the use of meters would boost revenue collection and reduce lost of energy.
  •  Speed Identity has supplied 35 biometric data capture stations and 200 fingerprint readers to Moldova as a result of an EU-supervised tender aiming to increase security and quality of the country’s passports.

    According to Speed Identity, as part of the EU programme, countries with high volumes of people entering the EU, receive support in project management, know-how and financing by the EU in establishing reliable, high-security ID documents for travel. Moldova’s new ePassports now include digital, ICAO-compliant facial photos and fingerprints, as well as a number of other document security features to prevent forgery and the creation of false identities.
    Speed Identity says its Speed Identity SCL1000 (Speed Capture Light station), is a proven all integrated solution for instant live capture of facial photos, fingerprints and digital signatures. It has been in use with national authorities in Luxembourg and Sweden since 2008, in both mobile and fix-mount applications. The Speed Capture API has enabled the systems integrator to easily develop a customized enrolment workflow application controlling all features of the capture system, from data acquisition and photographic illumination, to data quality control and file output.
    “This is an important project where Speed Identity, being the expert partner, contributes in upgrading a non-EU country to comply with EU and ICAO regulations for travel document security. Normally such projects require a period of fine-tuning the system after implementation, but we have confirmations from the end user that the deployment phase went very smoothly,” says Magnus Löfgren, CEO at Speed Identity.

    Source: http://www.securitydocumentworld.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Regulating body armour won’t stick, said retailers.

    Starting June 15, Albertans who own or want body armour need a legitimate reason under the Body Armour Control Act, or a permit from the Solicitor General and Public Security office.

    Officers will soon be able to charge people wearing bullet or stab-resistant vests, along with seizing the armour if they don’t have a permit. And those people can expect to pay a fine up to $10,000, along with serving six months in the clink.

    “Police now have another resource in their fight against gangs in our communities,” said Jonathan Denis, Alberta’s Solicitor General and Minister of Public Safety.

    “This initiative doesn’t penalize those with a legitimate reason to wear body armour, such as police or security personnel.”

    Albertans with professions in policing, security or safety are exempt from the act, while everyone else needs to explain themselves to the solicitor general and public security office.

    A body armour permit costs $50 per year and takes five days to process. Citizens have to pass a criminal background check in order to get a permit.

    Gordon McGowan, president of rearmament distributor MilArm in downtown Edmonton, thinks the act is “a knee-jerk reaction to a nonexistent problem.”

    Body armour vests are just an Internet search away from anyone who wishes to hide their purchase from the government, McGowan said.

    “If I have a reason to own body armour and I want it, why is it up to the government to determine if my reason is legitimate or not?” McGowan asked.

    Milarms carries around a dozen VestFriend stab-resistant vests and McGowan said they sell only a few each month. Their most common body armour buying customers are nightclub owners looking to equip their bouncers and doormen.

    He has a strict store policy not to sell body armour to civilians, which keeps the gang-bangers from inquiring said McGowan.

    Source: BY MATT DYKSTRA, http://www.edmontonsun.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  AMMAN -- An armoured vehicles manufacturing plant was inaugurated at the Zarqa Free Zone on Tuesday. The JD2 million Jordanian and Russian investment will provide regional countries, particularly the Iraqi market, with bullet resistant cars, generating around JD24 million in production annually, according to plant Executive Director Ahmad Suleiman.

    Built on a 3,200 dunums of land, the factory will employ 100 workers from the local community and exploit 80 per cent of the national resources, said Nasser Shreidah, chairman of the Jordanian Free Zones Corporation. He added that the plant, the first of its kind in the region, will provide the regional market with highly developed bulletproof vehicles according to European standards.

    Source: http://www.zawya.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  New legislation to guard against the use of body armour and fortified vehicles by gang members goes into affect this weekend. People who either have or sell the armour must now have proper licenses or permits. However licensed security guards, and corrections officers are exempt. Anyone driving or owning a vehicle that has been adapted to resist bullets or explosives must also have a special permit. All armoured vehicles must also be inspected. Failure to comply results in fines in the thousands of dollars, and possible incarceration.

    Source: http://www.cjob.com,

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Visiongain’s analysis indicates that the global military body armour and personal protective gear market will be worth $1.07bn in 2012. The Military Body Armour & Personal Protective Gear Market 2012-2022 report finds that spending on military protective gear and body armour, despite pressure in the form of defence cuts from many predominant military nations, will remain central to defence budgets worldwide.

    The visiongain author of The Military Body Armour & Personal Protective Gear Market 2012-2022 report commented that: “Spending by militaries worldwide on body armour will remain a fundamental aspect of defence budgets for years to come, as despite budgetary pressures affecting many Western nations at present, an underlying desire and responsibility to provide the best protection to military personnel will spur demand for new and advanced equipment”.


    The report contains 100 tables, charts and figures that quantify and forecast the military body armour & personal protective gear market. Visiongain provides forecasts for the period 2012-2022 in terms of value (US$) for the military body armour & personal protective gear market 2012-2022, as well as for 3 submarkets and 12 leading national military body armour & personal protective gear markets. The report provides profiles of 20 leading companies operating within the market, and includes 3 interviews with experts in the field military body armour, providing specialist insight alongside visiongain analysis.

    The Military Body Armour & Personal Protective Gear Market 2012-2022 report will be of value to current and future potential investors in the field of body armour, as well as companies and research centres who wish to broaden their knowledge of the military body armour & personal protective gear market.

    For sample pages and further information concerning the visiongain report The Military Body Armour & Personal Protective Gear Market 2012-2022 please visit: www.visiongain.com/Report/794/The-Military-Body-Armour-Pe...

    For an executive summary of this report or to order it today please email:
    Sara Peerun at sara.peerun@visiongainglobal.com
    Tel: +44 (0) 20 7336 6100


    Source: http://www.openpr.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  OSWEGO — Aging police vehicles are slated for discussion during tonight’s Administrative Services Committee meeting, as Oswego’s police chief submitted five requests to bolster the department’s fleet, which would include the addition of an armored surplus military vehicle.

    Oswego Police Chief Tory DeCaire is asking councilors to approve the purchase of a 2012 Chevy Tahoe and a 2012 Chevy Impala. The vehicles would be purchased at or below New York state contract pricing and the funds would come from the police department’s existing budget allotment for vehicles and equipment.

    Also up for discussion is the additional purchase of a 2012 Chevy Tahoe as part of the “Operation Stonegarden” grant administered through the U.S. Border Patrol. According to the Department of Homeland Security website, Operation Stonegarden accepted competitive proposals for $46.6 million available in 2012. The purpose of the grant money is to enhance “cooperation and coordination among local, tribal, territorial, state and federal law enforcement agencies in a joint mission to secure U.S. borders along routes of ingress from international borders,” including Canada and Mexico as well as international water borders.

    Along with the updated traditional fleet vehicles, DeCaire is also seeking to acquire a used “up-armored” surplus military vehicle. Administrative Services Committee Chairman Ron Kaplewicz, R-7th Ward, said he looked forward to hearing about this unusual vehicle. “I’m sure the chief will tell us what it’s all about,” the chairman said.

    DeCaire noted in his request that there is no cost for the surplus military vehicle, as it will remain the property of the U.S. Department of Defense. He noted there would, however, be some cost associated with shipping the vehicle. The committee agenda described the “up-armored” addition to the fleet as useful to the police department in quality-of-life enforcement and outreach programs, as well as being available for use in the event of an armed emergency situation.

    Rounding out the department’s vehicle requests, the police chief would also like to accept a used 1998 Ford pickup truck as a result of a civil forfeiture. If the department of public works deems the vehicle safe, police plan to use it during investigative work. If the vehicle is deemed unsafe, it will be turned over to the DPW for disposal at auction or other approved means.

    During last year’s budget negotiations on Aug. 2, DeCaire informed council members that his request of $84,000 for equipment, which included three new police vehicles, had been reduced to $32,000 in the mayor’s proposed 2012 budget. That would be enough to buy only one new fully equipped police vehicle. The police chief noted that his department used to have a car replacement policy, with two new vehicles included in the budget each year to replace those in the fleet that had acquired high mileage and other maintenance problems from constant use.

    “Then we were told, ‘No cars,’ and we got behind the eight ball,” he told councilors at the time. “To maintain our cycle, we need two vehicles.”

    Councilors Mike Myers, R-2nd Ward, and Shawn Walker, R-4th Ward, looked for ways the city budget could accommodate the police department’s needs. City Chamberlain Deb Coad noted before the finalized budget that there were a few key items that had changed since she and former Mayor Randy Bateman had put the initial proposal together and she re-examined it to see if there was possible funding for an additional vehicle. As a result, additional funds were delegated to the police department, increasing the equipment line to $58,000 in the final adopted budget.

    Even though Crown Victorias would no longer be produced, DeCaire believed at the time that there should be enough of these police vehicles to supply his department through 2012.
    Other committee matters up for discussion will include the request to forward a zone change request at 253 W. Utica St. from an R-2 residential to a B-1 neighborhood business district; a request from the city’s purchasing agent to forward to the Common Council a resolution to accept the lowest bid submitted by WD Malone Trucking & Excavating Inc. in the amount of $1,341,736.00, for the Sanitary Sewer Rehabilitation project, Area 1-Turrill Street Basin; a discussion by the city’s fire chief regarding “special details” for the city’s ambulance service; and a proposal from the DPW commissioner for a life jacket loaner program.

    Committee meetings are held in the council chambers on the second floor of City Hall and begin at 7 p.m.

    Source: By JANET REBEOR-DEXTER, http://palltimes.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  RR Donnelley isn’t a name you see very often in TechCrunch, but companies don’t survive for nearly 150 years without having one eye trained on the future. With 2011 revenues at an estimated $10.6 billion, the company is one of the world’s largest commercial printers. The printing giant has been stepping up its digital investments of late, and today announced that it has invested $2.5 million in Real Value Corporation, the makers of iPad shopping app, CoffeeTable.

    The Series A investment is the first tranche of a larger investment by RR Donnelley and includes an exclusive marketing relationship between the two companies. CoffeeTable will be using the infusion of institutional capital to launch new personalization and engagement features and hire developers.

    For those unfamiliar, CoffeeTable is a free shopping app for the iPad that aggregates hundreds of retail catalogs to allow users to browse their products on the go, online or offline. CoffeeTable gives shoppers the ability to make purchases from their iPad through secure in-app checkout, while in turn giving retailers a suite of benchmark data and catalog analytics tools that they can use to boost their multi-channel marketing efforts.

    As RR Donnelley is one of the largest printers of retail catalogs in the world, it can now leverage its existing relationship with retailers to help bring CoffeeTable access to a wide range of content from the companies whose products it aggregates, while, in turn, giving those major retailers an additional point of access into the tablet market.

    CoffeeTable’s app allows users to browse full-screen images of products, with zoom functionality, adding products to a shopping cart, both online and offline. Users can subscribe to their favorite brands and have the latest catalogs delivered to their iPad from retailers that include Crate & Barrel, Lands’ End, West Elm, etc. Beyond offering quick checkout across all catalogs through its “Express Checkout,” CoffeeTable also offers giveaways, seasonal pop-up shops, and flash deals which are applied at check out.

    Catalogs are collectively a $270 billion industry, and while individual retailers may offer their own tablet shopping apps, CoffeeTable brings them all together in one place, presumably offering a better shopping experience for the end user. Together, the two companies seem to be looking to establish an Amazon for retail catalogs, and with further development of analytics tools, retailers will be able to get a better sense of the mobile purchasing behavior of consumers — something many of them are lacking.

    Source: http://techcrunch.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  A new blast defence mechanism could double vehicle protection against mine explosions without additional armour, according to its inventor.

    The active belly plate system developed by Advanced Blast & Ballistic Systems (ABBS) exerts a force against the floor of the vehicle to reduce floor deformation and help stop the vehicle from being thrown into the air.

    The technology, which has been taken to proof-of-concept stage, works by exploiting the short delay between a mine going off and the explosion hitting the underside of the vehicle, using this time to counteract the force of the mine.

    ‘Originally I was dealing with the global acceleration, which is the vehicle jumping in the air, and that on its own can kill you,’ Roger Sloman, managing director of ABBS and inventor of the system, told The Engineer.

    ‘And then I thought that if you put the force down a column in the vehicle onto the belly plate, you can keep the floor down as well, which is even more important. So it’s a very simple concept of actively opposing the force of the mine.’

    Because it deals with global acceleration, the technology should protect lighter cars as well as armoured vehicles. ‘You don’t carry around huge amounts of mass to counteract the blast,’ said Sloman. ‘You can double the mine blast capability of a system, at least.’

    The system detects the shockwaves of a blast, which travel at the speed of sound and arrive around 20 milliseconds before the mass of the explosion, providing enough time for the belly plate to react.

    ABBS received £116,000 from the Ministry of Defence’s Centre for Defence Enterprise to develop the technology and is now seeking funding to build a commercial prototype of the device.

    Sloman said it could be further developed to provide specific forces to match each explosion. ‘Either you can set everything off or you can analyse the strength of the shockwave and get an estimate of the size of the mine and where it is and therefore you can tune the response.’

    Source: By Stephen Harris, http://www.theengineer.co.uk

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  A liquid body armour is being developed by BAE Systems (a global defence company) that hardens on impact. The liquid is made up of "freely suspended" particles that "lock" together when disturbed. The benefits include its lightness, flexibility and a reduced injury risk compared to alternatives such as Kevlar.

    Self-sculpting smart sand

    Researchers at the Distributed Robotics Laboratory of MIT are developing robotic cubes that will work like smart self-sculpting sand. In one experiment, one-centimetre-squared cubes contained a microprocessor cabable of storing 32 kilobytes with tiny magnets on the edges that could enable the formation of complex 3D shapes.
    Via BBC.

    Make your own robot

    Another MIT initiative may allow people with no specialised training to become robotics engineers thanks to the ubiquitous technology of 3D printing. If a bespoke robot is required, any individual could download a blueprint, tweak it to suit their need and print a rudimentary robot that will be fully functional within 24 hours.

    Source: http://www.nzherald.co.nz

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  MEPs in Strasbourg have questioned the European Commission (EC) about the security of biometric passports following reports of problems with the documents in a number of countries including France and the Netherlands.
    Back in 2008, the European Parliament (EP) identified weak points in the system including problems with the reliability of fingerprints taken from children and the elderly; error rates; lack of experience of the technologies being used; and the risk of fraud at various stages of document deployment. As a result, the EP asked the EC to commission studies into these areas, which are expected to conclude later this year.
    According to the EP, between 500,000 and 1 million of France’s 6.5 million biometric passports in circulation are estimated to be false, having been obtained using counterfeit documents.
    In the Netherlands, an examination of 448 cases by local the authorities in Roermund found that 21% of the fingerprints were non-verifiable and therefore useless.
    As a result, MEPs invited EC representatives to a plenary session on 19 April 2012 to respond to their questions about the effectiveness of biometric passports. They have also asked if it will now consider re-evaluating the rules governing the issue of ePassports in the EU.

    Source: http://www.securitydocumentworld.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The U.S. Government Printing Office (GPO) has produced 75 million electronic passports at its secure production facilities in Washington, D.C. and Stennis Space Center in Mississippi.

    The electronic, or e-passport program, launched in 2005 and includes an integrated, secure chip and antenna incorporating numerous security features. GPO and the Department of State developed the U.S. e-passport in response to the requirements for Visa Waiver Program countries in the 2002 Enhanced Border Security and Visa Entry Reform Act.

    The Department of State loads personal information, including the traveler’s photograph, digitally onto the chip in each passport. This is the same data that is visually displayed on the photo page of the e-Passport. No personal data is handled by GPO or its suppliers.

    “We appreciate GPO’s continued support of the Department and our efforts to modernize the U.S. passport. Passport issuance, a function of the Department’s Bureau of Consular Affairs, is our most visible domestic public service program,” said Michael D. Kirby, principal deputy assistant Secretary of State for Consular Affairs.

    Source: http://www.contactlessnews.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  China’s Ministry of Public Security announced that after three years of preparations, the authorities countrywide will start issuing electronic ordinary passports from May 15 onwards.
    Photos

    View photos
    Related Articles

    China to pilot emissions trading system
    China standardises social security cards
    Sri Lanka to launch e-passport services

    Related Categories

    CENTRAL GOVERNMENT
    GOVERNMENT SECURITY

    From this Section

    NEWS

    The e-passport will contain an electronic chip, which stores personal information of the holder, including name, data of birth, photo, fingerprint and signature.

    The Ministry says that the e-passports are compliant with standards released by ICAO (International Civil Aviation Organisation), ensuring security and privacy of the personal information of holders.

    The application process will largely remain the same, with two additional steps to collect the applicant’s fingerprint information and signature. Citizens who are under 16 years old or whose fingerprints are missing are exempted from the fingerprint collection process, according the Ministry.

    The new e-passports will have a refined design, with images representing the 31 provincial level jurisdictions, Hong Kong & Macau Special Administrative Regions, as well as Tiananmen, the Great Wall and the Temple of Heaven.

    The Ministry says that more than 10 million passports were issued countrywide last year. And this figure is expected to rise by 20 per cent this year.

    Since 2004, more than 90 countries and territories have started issuing e-passports. And China started issuing electronic official & diplomatic passports last year.

    Source: FutureGov- Asia
  •  MONEY printer De La Rue has cashed in on strong demand for banknotes and passports but stayed quiet over talk it was stockpiling new Greek drachmas.
    The group, which produces more than 150 national currencies, stamps, driving licences and cash sorting equipment, printed 6.4 billion banknotes last year, 8 per cent more than the previous year.
    The start of production on a UK Government deal to produce passports also contributed to a 73 per cent rise in annual profits to £57.7million on revenues up 14 per cent to £528million.
    The firm has won contracts from countries such as South Sudan, which introduced a new currency following independence.
    But it stayed tight-lipped on talk that it had drawn up draft plans to print a new Greek currency should Athens quit the euro.
    De La Rue said last year that the eurozone’s problems could create opportunities.
    Chief ­executive Tim Cobbold said: “It’s always our policy not to comment on matters like that.”
    The group, the profits of which in 2011 tumbled after paper production issues with major ­customer the Reserve Bank of India, has begun a shake-up to boost ­profits to more than £100million next year.
    It said it made good progress, achieving efficiency improvements that contributed about £8million to operating profit.
    A new banknote sorter, which can handle up to 2,000 notes a minute, drove a 14 per cent rise in revenue in the cash processing gear arm.
    But lower customer demand led to falling profits and flat revenues at its security product division, which makes holograms for sports tickets and other valuable printed items.
    De La Rue said orders rose 14 per cent to £248million and it was on track to hit annual hopes. Cobbold said: “The face value of cash in ­circulation is growing, particularly in countries where populations and affluence are rising.”
    The shares fell 32½p to 976½p.

    Source: By Philip Waller, http://www.express.co.uk

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  India’s electronic passport project has hit a roadblock as the Amsterdam-based company Gelmalto, selected for supplying chips came under scanner for its alleged role in smart card rollout in Pakistan.

    The Ministry of External Affairs has sought a fresh security clearance from the Ministry of Home Affairs for Gemalto, which was selected to supply chips for the pilot project in 2008. The MNC was reported to be impementing smart card project in Pakistan.

    The Ministry of Home Affairs asked the Department of Economic Affairs under the Ministry of Finance to obtain a self-disclosure report from Gemalto, detailing its businesses in Pakistan. It is also understood to have engaged intelligence agencies to assess if Gemalto’s business in Pakistan could pose a security threat to India in case it is allowed to continue supplying chips for the project.

    Gemalto, however, claimed that the company had never participated in any government project in Pakistan. “We have never had any government projects with Pakistan,” a spokesperson of the company stated in response to queries from Deccan Herald.
    The Gemalto spokesperson said the company did serve governments of over 50 countries with its secure document and e-government solutions.

    Gemalto was known as Axalto before the latter merged with Gemplus on June 2, 2006. Axalto, however, had in August 2005 announced to have supplied high-end EMV (Europay-Mastercard-Visa) chip to Pakistan’s United Bank Limited.

    As the UBL had pioneered EMV rollout in Pakistan, Axalto had provided the bank with a package that included data preparation, cards supply and personalisation solution.

    Gemalto was in September 2008 selected to supply its “Sealys eTravel” solution to India Security Press for the e-passport pilot project, aimed at issuing tamper-proof and secure travel documents to diplomats and officials. The Sealys eTravel package included contact-less communications component of the electronic passports made by the India Security Press. It also included advanced secure operating system and microprocessor that stores and protects the holder’s digital identity as well as the communications antenna.

    The MEA had plans to start issuing e-passports to ordinary citizens in the second phase. But it recently said that the project had to be deferred as it had to seek “fresh security clearance from the MHA in respect of a technically qualified bidder (Gemalto)”.

    Gemalto did not give a specific reply to a query from Deccan Herald on whether the company had submitted the self-disclosure report to the Indian Government. However, in a consolidated response to a set of queries, its spokesperson said the company maintained the policy of customer confidentiality and did not comment on the details of its customers’ operations and processes.

    Notably, in a recent report, the Parliamentary Standing Committee on External Affairs had expressed “concern over the doubtful background” of Gemalto.

    Source: http://www.deccanherald.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  With big government contracts up for grabs, we take a look at six of the vehicles vying for military money.
    In service since 1984, the Humvee isn’t getting any younger. Right now the United States military is in possession of nearly 18,500 of them, all of which are set to be replaced by an as-of-yet-to-be-determined successor in 2015. Enter the suppliers and contractors who are all vying for a piece of the government pie. And who can blame them? With $5 billion being awarded across three winning companies – each liable to receive up to $65 million for preproduction engineering, manufacturing, and development – the race to supply the military with its next Joint Light Tactical Vehicle is underway.
    Of course, whenever government contract money is at stake rest assured there are multiple players in line gunning for it. And with the United States government preparing to dish out billions in contract cash in order to replace the iconic military Humvee, competition is fierce.
    Last month, AM General, makers of the original Humvee, unveiled its Blast-Resistant Vehicle-Off Road (BRV-O) in Detroit, but they aren’t the only ones aiming to win those government greenbacks. Stiff opposition from Oshkosh Defense, Lockheed Martin, and BAE Systems, among others, all of which are vying for one of three contracts on the line.
    Given that these hardcore military machines are truly a sight to behold, here is a quick rundown of the six vehicles battling it out.

    BRV-O:
    Makers of the original Humvee, AM General’s BRV-O is somewhat of a latecomer to the party. Shown for the first time last month in Detroit, the BRV-O features a six-cylinder, 3.2-liter turbocharged engine which is said to churn out 300 horsepower and 500 pound-feet of torque.
    Inside, the BRV-O ‘s crew capsule features energy-absorbing seats, shaped underbody, and modular armor for maximum protection. Of course, added armor can quickly pack on the pounds, reducing overall vehicular mobility. AM General seems to have addressed these issues thanks in large part to an increased payload that provides a margin for added armor, as well as a unique self-leveling suspension aimed at increasing the BRV-O’s tactical maneuverability.

    Eagle:
    A joint effort between General Dynamics Land Systems and AM General, The Eagle may not appear as shiny and bleeding edge as some of its counterparts, but that may just provide it with the advantage it needs to allow the Eagle to soar over the competition. In fact, military buffs will no doubt already be familiar with the Eagle, seeing as how it’s a repurposed version of the Eagle IV, which General Dynamics European Land systems has supplied to the German military since 2008.
    The Eagle isn’t as new, but it is tried and tested; and, perhaps more importantly, it’s relatively cheap at less than $260,000 a pop.

    Lockheed JLTV:
    With utility in mind, the JLVT — a collaborative endeavor consisting of multiple companies including Meritor Defense, L-3 Combat Propulsion Systems, Vehma International of America, with Lockheed Martin at the helm — has been designed from the ground up to be one of more versatile and cost effective entries into the U.S. Army and Marine Corps JLTV competition.
    Already a winning bidder for the first phase of JLTV development, Lockheed was forced into making several modifications to its design by reducing the amount of exotic (read: expensive) materials such as titanium after the Pentagon’s requirements changed for the second phase of the competition.

    Saratoga:
    Launched in October of 2011, Navistar Defense’s Saratoga is yet another entry into the U.S. military’s Joint Light Tactical Vehicle program. Originally designed to target a gap in the light tactical vehicle market, the Saratoga provides a tactical salvo of components aimed at improved mission effectiveness, including metallic or composite add-on armor, and is capable of withstanding arms fire, mine blasts, and IEDs.
    Under the armored hood the Saratoga features a fire-breathing V8 capable of pumping out 340 horsepower and 660 pound-feet of torque.

    Valanx:
    Aside from sporting the coolest name of the bunch, BAE Systems’ Valanx also happens to feature a Ford Power Stroke 6.7-liter turbocharged diesel engine, which BAE indicates gives it a leg up against the competition by providing the best fuel economy, horsepower, and torque of any engine in its class.
    Truck enthusiasts out there will immediately be familiar with the Power Stroke. It’s the same engine Ford uses in its F-Series Super Duty trucks. Previously, the Valanx utilized a Navistar engine in favor of its current mill, but made the switch to the more powerful Ford engine, which is capable of producing an impressive 400 horsepower and 800 pound-feet of torque.
    Other specifics regarding the powertrain remain undisclosed, so we’re not entirely sure whether the engine specs in the Valanx will exactly match up with that of a 2012 F-250 Super Duty.

    L-ATV:
    While the Valanx may score points with its tough-as-nails name and rather futuristic mobile-command-on-wheels design, it is the Oshkosh Defense’s L-ATV that wins us over with its rugged looks and take-no-prisoners attitude.
    Built independently and from the ground up, the Light Combat Tactical All-Terrain Vehicle will make use of Oshkosh’s Tak-4i intelligent suspension system already used in more than 20,000 vehicles. And because fuel economy is a growing concern, Oshkosh offers its ProPulse hybrid diesel-electric drive train.
    According to Oshkosh, the L-ATV features a scalable and advanced crew protection system which can provide dynamic defense capabilities depending on operational and battlefield needs.

    Source: BY AMIR ILIAIFAR, http://www.digitaltrends.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  OGDEN — After being questioned about their use of new license plate recognition technology, the Ogden Police Department put the equipment on display.

    The OPD gave a demonstration to local media Wednesday on how and why they use Automated License Plate Recognition, a new technology that provides continuous and high-speed monitoring of traffic areas.

    Ogden has one ALPR-fitted vehicle, which costs about $50,000 and features four cameras mounted on top of the police car, with a special computer inside. The department has had the vehicle for about one year.

    OPD crime analyst Dave Weloth said the technology can be used in data-mining efforts related to crime scene investigation, criminal travel patterns, hot spots and for other intelligence purposes.

    Weloth said that, among other things, the system can immediately alert officers of wanted individuals, assist in stolen vehicle recovery and assist in Amber alerts.

    Master Officer Tim Shelstead said he has found three stolen vehicles in the past year as a result of having the technology.

    “My job would be greatly hindered without it,” Shelstead said.

    But the Utah Chapter of the American Civil Liberties Union said it is concerned with how information associated with the technology is used, stored and protected.

    In late May, the OPD was one of three Utah law enforcement agencies targeted by the Utah ACLU with records requests seeking information about the technology.

    The ACLU also sent requests to the Utah Highway Patrol and the Iron County Sheriff’s Office.

    A copy of the records request to the OPD shows that the ACLU is seeking information on exactly what type of data is obtained with the technology, who within the OPD can access that data, what procedures those outside of the department must go through to obtain the data and how long data is stored.

    Ogden Police Chief Mike Ashment said he understands the ACLU’s concern about the possible misuse of citizen information, but proper safeguards are in place to make sure that doesn’t happen.

    “We implement the same policies we do with everything else,” he said. “This is no different than any other tool we use that involves information on people or their vehicle.”

    Ashment said the technology fits in with the department’s overall approach of using technology to be more effective and efficient in solving crimes.

    “We are tasked with ensuring the safety of the community,” he said. “This is another tool to help us do our jobs better and more efficiently.”

    Source: By Mitch Shaw, http://www.standard.net

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Iowa City parking officers may soon hear an alarm if they pass vehicles parked illegally or harboring unpaid tickets using an expensive technology that’s the envy of many law enforcement officials.

    The city’s Transportation Services Department is looking for vendors and has set aside $154,000 in its budget for a License Plate Recognition system, which works by mounting a high-definition camera on top of a vehicle that takes photos of license plates and runs them through a scofflaw database. Such software still is rare in Iowa but is picking up steam as it becomes more affordable and accessible.

    The idea is to make parking enforcement more efficient, said Mark Rummel, associate director of Transportation Services. Rather than checking each vehicle in a parking lot or row of meters individually, the software would automatically scan nearby vehicles and sound an alarm if it detects a violation.

    I think just the time it’s going to save us is going to be huge,” he said. “It’s a pretty vast area that we try and cover.”

    Police departments in Iowa, including Des Moines and Cedar Rapids, have looked into such software, but most say it’s too expensive.

    “We couldn’t afford it right now,” said Sgt. Cristy Hamblin, spokeswoman for the Cedar Rapids Police Department.

    Officials with the Iowa City Police Department didn’t return calls for comment, but Assistant to the City Manager Geoff Fruin said LPR technology hasn’t been discussed for the ICPD.

    Johnson County Sheriff Lonny Pulkrabek said LPR would be ideal for recovering stolen vehicles or catching barred drivers, but it ultimately is too expensive to be worth it.

    “As you’re going through downtown Lone Tree, to be running every license plate you go by, I could see where that could be useful,” he said.

    Private vendors must submit their proposals to the city by July 12, and the City Council will need to approve the contract. Rummel said he hopes to have the software up and running by late fall at the earliest. It would be installed in one of the department’s Ford Connects but could be put in more in the future, he said.

    The Transportation Services Department only has access to parking violations, permits and meter records, Rummel said, so the software wouldn’t be able to tell whether a vehicle is stolen or whether there’s a warrant for the owner’s arrest, at least not without access to those databases. It would detect whether vehicles have more than $50 in citations that are more than 10 days old, he said.

    University of Iowa Parking and Transportation Director Dave Ricketts said that depending on the cost, his department would be interested in using the software as well.

    “We’ve got 16,000 parking spaces,” he said. “Yes, it would help.”

    LPR technology has become much more reliable and less expensive over the past 10 years, Ricketts said.

    “LPR is definitely going to be in our future,” he said. “How we use it is unclear yet, whether it’s enforcement, cashiering or security, but we’re headed that way.”

    The Polk County Sheriff’s Department installed an LPR system in one of its patrol cars last summer that can check for things such as arrest warrants, stolen vehicles and missing persons, Sgt. Jana Rooker said. The department received a nearly $26,000 Department of Justice grant to pay for the software.

    Rather than having the officer type license plate numbers into their computers while driving, the software automatically scans plates and sounds an alarm if it detects a warrant or violation, she said.

    “So as the officer is driving down the road, almost every vehicle it encounters on the road, that license plate can be checked within a matter of seconds with this software,” Rooker said.

    But not everyone is excited at the sound of that.

    Ben Stone, executive director of the American Civil Liberties Union of Iowa, said he’s concerned about the government’s ability to store the data it collects through LPR software. Steps must be taken now while LPR use is in its early stages to ensure data that’s collected is destroyed, Stone said.

    “As databases become interconnected and synced, more and more and more of this kind of surveillance technology can create the ability of the government to instantly create a dossier, a profile of what people are doing,” he said.

    Source: By Tara Bannow, http://www.press-citizen.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Infineon Technologies announced it is supplying the security chips for Malaysia’s new national electronic identity cards. Known as MyKad, the smart card features Infineon’s SLE 78 security controller with Integrity Guard security technology, combined with SOLID FLASH for fast deployment capability. ??

    MyKad is a multi-application national electronic identity card, including biometric identification, which will enable the implementation of additional functions such as driver license, health, ATM, e-signature and eGovernment services. In the past years, Malaysia issued approximately 2 million new identity cards each year.

    Identity cards are used for many years and are subject to intense wear. This is why they must meet specific high requirements. In particular, the bearer’s personal data should be secured during the entire life of the card. ??

    ?The Infineon SOLID FLASH product provides flexibility by using non-volatile memory technologies. The security certified flash product enables a faster reaction to market changes through short lead times and flexible product usage and offers advantages in logistics, development and throughout the certification process.

    A full range of SOLID FLASH products are Common Criteria certified by the Federal Office for Security in Information Technology in Germany as well as type approved by EMVCo making it the choice for many applications while keeping flexibility for upcoming changes. ??

    MyKad also uses Infineon’s Integrity Guard security technology. For identification documents with high demands on security, it offers long lasting security with encrypted Dual CPU-core. With this technology, data is encrypted along the entire data path during processing. The security controller core has two processing units, constantly checking each other’s correct function by utilizing error detection.

    Infineon’s SLE 78 product family with Integrity Guard is used in eGovernment applications, such as the electronic health card, the electronic identification card and in residence permits with biometric data

    Source: http://www.secureidnews.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  May sound strange nevertheless true. The armoured car business is booming in the drug-hit Mexico, which, after Sunday election, voted back to power the Institutional Revolutionary Party after 12 years. This party had the unique history of ruling Mexico for over 70 long years between 1929 and 2000.

    The purchase of armoured car has been necessitated by the fact that the country has lost 55,000 people in the last six years in drug-related violence.

    To keep themselves safe (from various drug cartels) while travelling many people are opting to buy armoured cars. They consider their vehicles as safe havens.

    Media reports from Mexico suggests that the sale of armoured cars in the last four years have increased by 1000 per cent.

    A middle-size SUV outfitted with armour is bullet-resistant and can withstand 15 to 20 rounds of bullets fired from a handgun. They are also called “family tanks” and became a top issue in the recently held election.

    Enrique Pena Nieto, who finally won the presidential election, had said during the campaign that he wants to focus on curbing violence in the streets and less on catching drug cartel leaders and blocking the flow of drugs into the United States. The US wants most of the Latin American countries, where the drug mafia rules the roost, to intensify their battle against the drug mafia.

    Countries like Peru in South America, which saw decline in the drug cartel, has witnessed their re-emergence recently.

    President-elect 45-year old Enrique Pena Nieto had promised to reinvigorate the economy and reduce rampant drug violence. He will take office in December for a six-year term and thus will restore the party that dominated Mexican politics for most of the past century, at times ruthlessly.

    But against he general prediction of a big victory he ended up only 5.4 percentage points ahead of his leftist rival, Andres Manuel Lopez Obrador.

    Pena Nieto got 37.6 percent support compared to 32.2 percent for Lopez Obrador and 25.4 percent for ruling party candidate Josefina Vazquez Mota.

    The ruling National Action Party (PAN) suffered a crushing defeat as it failed to curb the fierce violence of a drug war that has killed 55,000 people and battered Mexico’s image.

    Having run Mexico as a virtual one-party state for most of the 20th century, the PRI was ousted in an election 12 years ago. It finished third place in the 2006 presidential election.

    But Pena Nieto, a former governor of the state of Mexico (2005-11), restored the party’s pride.

    Not only has he promised to lift economic growth to about six percent a year and create jobs but also draw the heat out of a drug war that has killed more than 55,000 people since late 2006. His main reform proposals include allowing more private investment in Mexico’s state-run oil industry.

    Source: http://nvonews.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Xtek has announced that it has completed construction of its first large scale XTclave body armour production plant.

    According to the company the new plant is capable of manufacturing more than 1000 high tech body armour plates per day, and will enable the Australian company to supply defence and law enforcement agencies around the world.

    The company has spent the last five years working towards construction of its commercial scale manufacturing plant, after building its initial small prototype plant in 2008.

    XTek says "the ability of this technology to consistently produce advanced technical composites, such as precision, void free, structural carbon fibre reinforced laminates, capable of withstanding extreme thermal loading is significant.

    "It is believed that this could have considerable utility in areas such as aerospace and aviation industries, in which small numbers of high value products are routinely manufactured according to exacting standards."

    Source: http://www.myfen.com.au

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  BANGALORE: From July, including the first Sunday, the regional passport office (RPO), in Bangalore will accept passport application manually at its office in Koramangala.

    "Beginning with the Passport Mela scheduled on June 30 and July 1, the applicants for passport can directly approach the counters at RPO and the passports issued at RPO will have all security precautions, though the applications are accepted manually," said a spokesperson of Ministry of External Affairs ( MEA).

    Biometrics: The ministry will commence incorporating the biometrics as required in countries abroad from 2013. "The passports with biometrics will be introduced from next year and the ministry is trying to install required technical back up by then. For the present the passports will not have bio-metrics as per international standards," the spokesperson said.

    The ministry also held discussions with the employees representatives of RPOs across the country and has reached for an understanding to re-schedule of working hours in view of seven day working day for RPOs to overcome the large quantity of pending applications before the various RPOs.

    "We have convinced the employees of RPOs about the fatigue factor they had to face because of the long working hours, that include the week-end holidays. Once we stabilize the pending numbers of passport applications through the exercise we will revert back to five-days a week schedule. We hope that the pending applications can be cleared by July 7 and July 8, the last two days for Passport Mela," the he said.

    Source: http://articles.timesofindia.indiatimes.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  HID Global says it has shipped more than 150 million high-technology eID solutions to governments for citizen IDs around the world.
    The firm has marked this milestone at a ceremony in Ireland, where it has a high-security eID credential facility producing products for access and identification-related applications such as ePassports and contactless swipe ID/access cards.
    “We are proud to be a key provider of secure contactless technology to governments for eIDs worldwide,” says Anthony Ball, senior vice president, Identity and Access Management (IAM), HID Global. “More than 150 million people worldwide, almost a third of all citizens using high-security ePassports and identity credentials, carry our technology with them. We are exporting technology and know-how to every continent, and our local workforce and the entire community can be very proud of this milestone, as well as our contribution to a critical aspect of the world’s security.”
    HID Global says it has shipped more than 100 million components used in ePassports in 30 countries, which comprises approximately 28% of the world’s market. According to the International Civil Aviation Organization (ICAO), as of December 2011, a total of 355 million ePassports had been issued globally. The vast majority of EU countries, as well as numerous states outside of Europe, are now issuing machine-readable ePassports. The company has also shipped more than 50 million microchip-based inlays used in eIDs in 22 countries. Other notable achievements include providing tens of millions of units for a variety of European ePassports.
    Set up 15 years ago, the Ireland facility was acquired in 2007 by HID Global. According to the company, it has expanded the operation and made it into one of the country’s most advanced secure technology facilities to accommodate the growing global trend toward eIDs and ePassports. Now one of Connemara Gaeltacht’s largest employers, the operation is dedicated to eGovernment product research, development and manufacturing, and includes a world competence centre for HID Global’s high technology RFID-enabled components.
    “HID Global is at the centre of an important global trend,” says Craig Sandness, vice president of sales at the firm’s Government ID Solutions division. “Governments worldwide are shifting to eIDs to dramatically improve the security, privacy, convenience and confident authentication needed in border and access control, and other important identification-related applications such as national IDs, driving licences, electronic voting and health care. As a leading high-security ePassport and eID component producer, we are able to provide the complete assembly of these critical components from one source.”

    Source: http://www.securitydocumentworld.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The International Armoring Corporation (IAC) was founded by Mark Burton in Ogden, Utah, in 1993. He initially planned to manufacture 24 vehicles, but ended up with more than 225 in the first year in business. Since then more than 8,000 vehicles have rolled out of the IAC facilities. Although at the beginning the company provided heavy-duty armored vehicles only for security companies and military contractors, the emergence of the civilian armored-vehicle market made IAC focus on conventional vehicles too.
    IAC offers a lightweight, flexible, bullet-resistant material, which is a blend of synthetic fiber laminates called Armormax, which weighs only 3.9 pounds per square foot. For $65,000 to $85,000 IAC can transform any car into an armor-plated automotive fantasy. The most popular choices are large luxury sedans and suburban-type SUVs, but IAC has also transformed smaller cars such as Toyota Camrys, Maybachs and Aston Martins.
    Burton estimates that around 20% of his customers seek protected transportation to mitigate a known threat or have been targeted for attack in the past, and around 50% just seek an insurance against random acts of violence, such as carjackings.

    Source: http://www.inautonews.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  William Whyte once boasted in an interview with a Toronto newspaper that his armour-plated vehicles were “pretty awesome machines” and that his customers included a good friend of Arnold Schwarzenegger.

    But when the Canadian man entered into a multi-million-dollar contract to supply the U.S. Defense Department with 32 armoured gun trucks to protect VIPs in Iraq, he only delivered seven — and none of them met the bullet- and blast-protecting requirements, according to a federal grand jury indictment handed down this week in Virginia.

    Federal prosecutors announced late Thursday that Whyte, 67, president of Ontario-based Armet Armored Vehicles, and his company have been charged with three counts of major fraud against the United States, seven counts of wire fraud and three counts of false, fictitious and fraudulent claims.

    The charges have not been proven in court and in a statement emailed to Postmedia News, Whyte, who is not in custody, said he was “shocked at the allegations against me, which I totally deny.” He also said he was prepared to meet with U.S. prosecutors.

    John Lichtenstein, Whyte’s lawyer in Roanoke, Va., said Friday there was nothing he could say about the case.

    Armet, based in King City, Ont., has been armouring vehicles for more than 30 years and has manufacturing sites in Bradford, Ont., Danville, Va., and Tangiers, Morocco, according to a detailed company profile on Industry Canada’s website, which was updated in late 2011.

    The company has an “impeccable worldwide standing” and counts as its clients heads of state, diplomats, government agencies, multinational corporations, police forces and “discriminating individuals worldwide,” the profile states. Its government clients include departments in Canada, the U.S., United Arab Emirates, Europe and Russia.

    Officials with Public Works and Government Services Canada said Friday they were searching to see what, if any, contracts the government may have had with Armet.

    According to the indictment, the U.S. Joint Contracting Command in Baghdad awarded Armet a $4.7 million contract in April 2006 for 24 armoured gun trucks.

    A few months later, a $1.5 million contract was awarded to Armet to build eight more trucks.

    The vehicles were to be used to transport Iraqi VIPs through “hostile and dangerous” environments.

    According to the indictment, the first 24 vehicles were to be delivered by July 31, 2006, but Armet failed to meet the deadline.

    By October 2006, only four trucks had been delivered.

    The following month, Armet, citing cash-flow problems, sought an advance payment of $1 million, the indictment says. The U.S. military agreed to pay the company $824,531.

    But instead of using that money to build more trucks, the money was diverted for “other business and personal expenditures,” the indictment alleges.

    By early 2008, the company had delivered a total of seven vehicles, six of which were accepted by the U.S. military.

    There were other problems.

    The contracts required that the vehicles be bulletproof and that their undercarriages be able to withstand explosions. Armet had promised that the floors of the vehicles could withstand various assaults, including blasts from two U.S. M67 anti-personnel grenades.

    But none of the trucks delivered met the required specifications, according to the indictment.

    The vehicles were also supposed to be equipped with special tires that could withstand punctures. The first five vehicles did not have such tires.

    “(The defendants) knew that all of the armoured gun trucks they had provided were defective and would not protect the officials that they were intended to protect,” the indictment states.

    The U.S. military ended its contracts with Armet in March 2008.

    On Friday, Armet’s website, www.aavi.com, redirected visitors to the website of another company, Terradyne Armored Vehicles, based in Newmarket, Ont.

    In an emailed statement, Terradyne president Durward Smith said: “I can tell you that we have no affiliation with Armet nor its owner. A vehicle design was purchased from them with a temporary redirect of the website to capture any potential business as our understanding is that Armet is no longer making armoured vehicles.”

    Whyte, an ex-York Regional Police officer, has a connection to an infamous heist at an armoured car company 20 years ago.

    In November 1992, armed and masked robbers targeted National Armored Ltd. in Concord, Ont., and made off with more than $8 million in cash and cheques from a vault.

    Whyte managed the armoured carrier company at the time.

    Source: By Douglas Quan, http://o.canada.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  JD Leipold of U.S. Army public affairs has this article on female body armour:

    Today, both male and female Soldiers wear body armor that has been designed for men. But the Army plans to field to women next summer a new type of body armor, designed for them, that will be shorter in the torso with more customized adjustments specific to the female form.

    Until that happens, the 14 percent of the Army who are women will continue to wear one of the 11 sizes of the Improved Outer Tactical Vest, or IOTV, that are worn by their male counterparts.

    Following anthropomorphic sizing and fitting studies overseas, and also at Fort Bragg, N.C., West Point, N.Y., and Fort Campbell, Ky., between 2009 and 2011, Program Executive Office, or PEO, Soldier started developing female body armor prototypes that addressed the physical differences between the sexes.

    Lt. Col. Frank J. Lozano, the product manager for Soldier Protective Equipment, said one thing his shop realized quickly from the studies was that women generally have narrower shoulders than males. The shoulder area on the new IOTV design was brought in closer to the neck by adding more fabric and opening the area around the armpits.

    The change translates to increased range of motion in the shoulders and upper arms and also allows weapons to be seated in the shoulder weld. The extra material and adjustment straps also allows darting to be incorporated much as it is on a woman’s blouse which will give a more secure and customized fit.

    “Most females tend to have a narrow or thinner waist as it relates to the chest area, so we pulled the waist area in,” Lozano said, adding that it’s not always a one-to-one relationship. “Some women will want more room in the waist area so we allowed for adjustability in the cummerbund in the back which can be pulled in tighter or let out more than on the standard IOTV.”

    PEO Soldier also realized through its multiple studies that the typical torso length for women was for the most part shorter than that of men. The female IOTV will be shorter at the bottom. Lozano said the new design will keep the IOTV from rubbing on the hips, which can cause chafing while walking.

    Female Soldiers had also advised PEO Soldier that the standard IOTV, with its longer torso, causes the front armor plate to press into their thighs when they are seated. This cuts off blood flow to their legs. The female version of the IOTV, with its shortened torso, will address this issue. Additionally, a new exterior plate pocket will allow the armor plate to be inserted from the side in a more diagonal fashion.

    Though not part of the female version of the IOTV design, the Army is also looking for ways to develop armor plating that better conforms to the human body.

    “The challenge right now is that when you bring in those complex curvatures, the plate loses some of its strength,” Lozano said. “We’re working with some armor manufacturers to invest in a manufacturing capability that finds the right chemistry to develop the soft and hard armor necessary to have a complex curved plate at a light weight that still defeats the threats.”

    Developments in protective plate design will make ballistic protection more comfortable and form-fitting for both female and male Soldiers, but that’s a way off.

    Lozano said in the September-October timeframe PEO Soldier will begin fielding 100 prototypes to female engagement teams from the 101st Airborne Division to evaluate.

    “There are 30 females who we’ll provide with spares and repair parts,” he said. “We’ll hold some in reserve in case other females get added to the teams. They’ll do user evaluations, then provide feedback to us that we’ll wrap into the final iteration of the design and look to field to a brigade combat team by next summer.”

    Source: http://blogs.ottawacitizen.com
  •  KATHMANDU: The government is planning to introduce the smart card concept in the transport sector after a gap of two years. The Department of Transport Management has decided to introduce smart cards for driving licences and bill books from the current fiscal year.

    The department will call a global tender for the smart card soon, said director general of the department Chandraman Shrestha. “We have regenerated the concept following a directive from the Ministry of Physical Planning, Works and Transport Management,” he said. The ministry has decided to introduce smart cards in mid-July to reform the transport sector.

    Earlier, in 2010, minister for labour and transport management Mohamed Aftab Alam had tried to introduce smart cards for licences and bill books. However, the process was halted after the Commission for the Investigation of Abuse of Authority suspected irregularities in the process.

    Minister Aftab had formed a committee in the ministry to carry out the bidding process breaching the area of the department. According to law, the department should have started the bidding process. The commission found discrepancies in the process.

    According to Shrestha, the tender process will start in three months and implementation of the smart cards will begin at the end of the current fiscal year. “We are serious about implementing it,” he said, adding that smart cards can be effective in controlling the use of fake driving licences and bill books.

    The Asian Development Bank is providing financial support for the initiative.

    Similarly, the department is also planning to introduce embossed number plates for vehicles. The introduction of embossed number plates will help control criminal activities. “Embossed number plates can’t be changed easily, so it will reduce the use of vehicles in crimes,” he said.

    Former director general of the department Saradchandra Paudel had envisioned the concept three years back. “We have been conducting a feasibility study,” he said, adding it will be implemented this year once the study shows a positive result. Tender will be called soon, he added.

    Nearly 1.4 million vehicles are registered in the country including more than 850,000 motorcycles. The policy will affect vehicles plying across the country. The department is planning to implement the smart card from Bagmati zone where about 50 per cent vehicles are registered.

    Meanwhile, the department has completed building digital record of driving licences and bill books in all its 14 zonal offices. The process was started about a decade back. Similarly, the department has introduced e-billing system for collecting transport revenue — licence or vehicle registration and for renewing them.

    Source: http://www.thehimalayantimes.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  ALEXANDRIA, VA.—Prosecutors indicted a South Korean company and five of its employees on Thursday for stealing the recipe for making Kevlar body armour from the DuPont Co.

    The indictment in U.S. District Court in Alexandria alleges that Kolon Industries engaged in a seven-year conspiracy to steal secrets on the manufacturing process for Kevlar and a similar product called Twaron produced by a large Japanese chemical company, Teijin Limited.

    Kolon would hire current and former DuPont employees as “consultants” who would provide confidential information about Kevlar, including its polymerization process and details of the manufacturing process, according to the indictment. Kevlar is made at a factory in Richmond.

    Kolon used those secrets to improve its process for making Heracron, a product that competes with Kevlar, according to the indictment.

    Several longtime DuPont employees are identified as unindicted co-conspirators in the indictment who received payments of up to $143,000 (U.S.) to engage in the scheme, according to court records. One of the former employees, Michael Mitchell, has already been sentenced to 18 months in prison for his role in the scheme.

    Last year in Richmond, a civil jury awarded DuPont a $920 million (U.S.) judgment against Kolon, which is appealing the verdict and also fighting an injunction that would bar it from selling Heracron in the U.S. for 20 years.

    Source: http://www.thestar.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The Imprimerie Nationale, the official supplier and printer to the French government, has chosen Datacard Group to provide systems for France’s e-passport program.

    Datacard will install Datacard PB6500 passport issuance systems. These automated, inline high-volume passport production systems will be able to issue up to 25,000 passports a day.

    The system’s configuration includes automated leafing, inline inkjet printing, smart card encoding, laser perforation and enhanced lamination of secure thin-film overlays. The system’s universal interface comes through Datacard’s Syntera customization suite software to act as a bridge to link the PB6500 passport systems.

    With the system Imprimerie Nationale has been able to cut passport delivery time from six days to two.

    Source: http://www.contactlessnews.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The ePassport is the culmination of a sustained process of development of technical specifications for machine readable travel documents (MRTD). It introduces a new dimension to aviation security in that, within the conventional machine readable passport with its machine readable zone, an additional layer of verification of information contained in an electronic chip is placed, which verifies the information in the passport’s machine readable zone by the use of a special reader. Much research has gone into the areas of the technology and verification in the development of the ePassport.

    ver 104 States are currently producing and using ePassports and there are approximately 400 million in circulation. This accounts for 33per cent of all passports used globally. The additional feature that the ePassport carries in the conventional machine readable passport is a chip containing biometric and biographic information which have to be validated accurately, efficiently and quickly while retaining the security and integrity of the information. Ideally, an ePassport should be issued in accordance with the technical specifications approved by the International Civil Aviation Organization (ICAO) . However, this does not happen in all cases of issuance of ePassports. This lapse could seriously compromise global security. The nuances of this threat are described and discussed in this article against their legal background.

    At a recent Symposium on machine readable travel documents, biometrics and security standards.held at ICAO on 10 to 12 October 2012, experts addressed ICAO machine readable travel documents (MRTD) standards and specifications, identity management best practices and related border security issues. Sri Lanka, an issuer of machine readable passports, was represented at this Symposium. Foremost among these discussions was the ePassport, which is defined by ICAO as a passport which has a contactless integrated circuit (IC) chip within which is stored data from the machine readable passport page, a biometric measure of the passport and a security object to protect the public key infrastructure (PKI) cryptographic technology, and which conforms to the specifications of Doc 9303 part 1 . The ICAO Facilitation Manual defines the ePassport as a machine readable passport that has a contactless integrated circuit embedded in it and the capability of being used for biometric identification of the machine readable passport holder in accordance with the Standards specified in the relevant part of ICAO document 9303 (Machine Readable Travel Documents) . ePassports are easily recognised by the international ePassport symbol on the front cover .

    Biometric Identification

    It is important to note that the operative terms in the definition of the ePassport are “biometric identification” and “public key infrastructure (PKI) cryptographic technology”. Biometric technology involves a measurable, physical characteristic or personal behavioral trait used to recognize the identity, or verify the claimed identity of a person. Biometric identification has been defined as “a generic term used to describe automated means of recognizing a living person through the measurement of distinguishing physiological or behavioural traits” .

    Biometrics target the distinguishing physiological or behavioral traits of the individual by measuring them and placing them in an automated repository such as machine encoded representations created by computer software algorithms that could make comparisons with the actual features. Physiological biometrics that have been found to successfully accommodate this scientific process are facial recognition, fingerprinting and iris-recognition which have been selected by ICAO as being the most appropriate. The biometric identification process is fourfold: firstly involving the capture or acquisition of the biometric sample; secondly extracting or converting the raw biometric sample obtained into an intermediate form; and thirdly creating templates of the intermediate data is converted into a template for storage; and finally the comparison stage where the information offered by the travel document with that which is stored in the reference template.

    Biometric identification gets into gear each time an MRTD holder (traveler) enters or exists the territory of a State and when the State verifies his identity against the images or templates created at the time his travel document was issued. This measure not only ensures that the holder of the document is the legitimate claimant to that document and to whom it was issued, but also enhances the efficacy of any advance passenger information (API) system used by the State to pre-determine the arrivals to its territory. Furthermore, matching biometric data presented in the form of the traveler with the data contained in the template accurately ascertains as to whether the travel document has been tampered with or not. A three way check, which matches the traveler’s biometrics with those stored in the template carried in the document and a central database, is an even more efficacious way of determining the genuineness of a travel document. The final and most efficient biometric check is when a four way determine is effected, were the digitized photograph is visually matched (non electronically) with the three way check described above . In this context, it is always recommended that the traveler’s facial image (conventional photograph) should be incorporated in the travel document along with the biometric templates in order to ensure that his identity could be verified at locations where there is no direct access to a central database or where the biometric identification process has not entered into the legal process of that location.

    Public Key Infrastructure (PKI) Cryptographic Technology

    PKI Cryptographic technology uses a brand new technique known as quantum cryptography, designed to eliminate the terrifying vulnerabilities that arise in the way digitally stored data are exposed to fraudulent use. This new technique uses polarized photons instead of electronic signals to transmit information along cables. Photons are tiny particles of light that are so sensitive that when intercepted, they immediately become corrupted. This renders the message unintelligible and alerts both the sender and recipient to the fraudulent or spying attempt. The public key directory - designed and proposed to be used by customs and immigration authorities who check biometric details in an electronic passport, is based on cryptography - and is already a viable tool being actively considered by the aviation community as a fail-safe method for ensuring the accuracy and integrity of passport information.

    In order to assure inspecting authorities (receiving States) that they would know when the authenticity and integrity of the biometric data stored in the MRTD, which they inspect, are compromised and tampered with, the Public Key Infrastructure (PKI) scheme was developed by the TAG/MRTD, which has been pioneering work on the MRTD for over a decade . The scheme is not calculated to prescribe global implementation of public key encryption, but rather acts as a facilitator enabling States to make choices in areas such as active or passive authentication, anti-skimming and access control and automated border crossing, among other facilitative methods. The establishment of a public key directory, through means of public key cryptology and in a PKI environment, is consistent with ICAO’s ultimate aim and vision for the application of biometric technology on the fundamental postulate that there must be a primary interoperable form of biometric technology for use at border control with facilities for verification, as well as by carriers and the issuers of documents. This initial premise is inevitably followed by the assumption that biometric technologies used by document issuers must have certain specifications, particularly for purposes of identification, verification and the creation of watch lists. It is also ICAO’s vision that States, to the extent possible, are protected against changing infrastructure and changing suppliers, and that a technology, once put in place, must be operable or at least retrievable for a period of ten years.

    The ePassport

    The story of the passport- the precursor of the ePassport – starts with the birth of an individual and his birth certificate, which records the event of birth and time and place thereof. The Civil Registry is able, with this document to primarily establish the identity of the person at birth and inform his country of his details for purposes of maintaining census and vital statistics. The passport, which uses this information, gives a person a name and natonality that is required for him to travel internationally. The passport is a basic document in the transport by air of persons. Its use therefore is of fundamental importance as a travel document, not only because it reflects the importance of the sovereignty of a State and the nationality of its citizens but also because it stands for the inviolability of relations between States that are linked through air transport.

    The key consideration of an ePassport is Global Interoperability — the crucial need to specify a system for biometrics deployment that is universally interoperable. a Logical Data Structure (LDS) for ePassports required for global interoperability. It defines the specifications for the standardized organization of data recorded to a contactless integrated circuit capacity expansion technology of an MRP when selected by an issuing State or organization so that the data is accessible by receiving States. This requires the identification of all mandatory and optional Data Elements and a prescriptive ordering and/or grouping of Data Elements that must be followed to achieve global interoperability for reading of details (Data Elements) recorded in the capacity expansion technology optionally included on an MRP (ePassport). The other considerations are Uniformity — the need to minimize via specific standard setting, to the extent practical, the different solution variations that may potentially be deployed by member States; Technical reliability — the need to provide guidelines and parameters to ensure member States deploy technologies that have been proven to provide a high level of confidence from an identity confirmation viewpoint; and that States reading data encoded by other States can be sure that the data supplied to them is of sufficient quality and integrity to enable accurate verification in their own systems; Practicality — the need to ensure that specifications can be operationalized and implemented by States without their having to introduce a plethora of disparate systems and equipment to ensure they meet all possible variations and interpretations of the standards; and Durability — the requirement that the systems introduced will last the maximum 10-year life of a travel document, and that future updates will be backward compatible.

    The major components of a biometric system are: Capture — acquisition of a raw biometric sample; Extract — conversion of the raw biometric sample data to an intermediate form; Create template — conversion of the intermediate data into a template for storage; and Compare — comparison with the information in a stored reference template.

    In terms of security and privacy of the stored data, both the issuing and any receiving States need to be satisfied that the data stored on the IC has not been altered since it was recorded at the time of issue of the document. In addition, the privacy laws or practice of the issuing State may require that the data cannot be accessed except by an authorized person or organization. Accordingly ICAO has developed specifications in Section IV regarding the application and usage of modern encryption techniques, particularly interoperable public key infrastructure (PKI) schemes, to be used by States with their machine readable travel documents as made in accordance with the specifications set out in Doc 9303. The intent is primarily to augment security through automated means of authentication of MRPs and their legitimate holders internationally. In addition, ways and means are recommended to implement international ePassport authentication and to provide a path to the use of ePassports to facilitate biometric or e-commerce applications.

    Conclusion

    The foremost necessity is to establish a strong security culture in every State. For this, there must be a clear definition of State responsibility and accountability brought to bear by a close and unbreakable link between government and industry stakeholders. A security culture would make States aware of their rights and duties, and, more importantly, enable States to assert them. Those who belong to a security culture also know which conduct would compromise security and they are quick to educate and caution those who, out of ignorance, forgetfulness, or personal weakness, partake in insecure conduct. An ePassport must necessarily be the result of efficient and fail-safe organizational arrangements. It should be tested at border control by trained professionals.

    eGovernment and eID are the bare essentials for State security. The digital economy has also brought much facilitation that helps the world move to paperless processes which result in greater economy and streamlined processes. However, there must essentially be global harmonization in this process. In this regard ICAO has made remarkable progress in advancing its MRTD programme to the level it is at now. If harmonization means ensuring consistency between global practices, standardization means compliance with international Standards. There is no room for doubt that both harmonization and globalization are needed in this context.

    Source: by Dr. Ruwantissa Abeyratne, http://www.srilankaguardian.org

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The Conservative government’s fervour for Canadian history will play out on the pages of your new passport, soon to be unveiled after nine years of delays and cost overruns.

    After a multimillion-dollar advertising campaign for the War of 1812 and the announcement that they plan to rename the Canadian Museum of Civilization in Ottawa as the Canadian Museum of History, the Tories are set to unveil new designs for Canada’s electronic passport that focus on key historical moments, HuffPost has learned.

    Bureaucrats at first recommended the government adopt images of fauna and flora to grace the inside pages of the new travel document, similar to the United Kingdom’s passport. The Conservatives chose instead to follow the example of the U.S. passport, which features images of the Declaration of Independence and Mount Rushmore, and focus on history.

    “It will be something that Canadians can be proud to carry,” said Rick Roth, a spokesman for Foreign Affairs Minister John Baird. Roth refused to elaborate on the design sketches that will be part of the new electronic passport, which will be issued for five- and 10-year time periods.


    What would you like to see in the passport design? Share your comments
    The implementation of Canada’s ePassport, which includes an electronic chip with facial recognition information, has been delayed for nine years. A pilot program for diplomats and public office holders was planned for 2005 but did not get under way until 2009. The national roll-out was put on the back burner until the 2008 budget announced ePassports would be ready in 2011. Then it was 2012. Now, they should be ready in 2013.
    Canada is the last G7 country to implement the international standards established by the International Civil Aviation Organization (ICAO) in 2003. All of Canada’s key allies and more than 95 countries, including Pakistan, Sudan and Tajikistan, have pushed ahead with the technology.

    Source: By Althia.Raj, http://www.huffingtonpost.ca

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Zimbabwe is exploring the implementation of ePassports before the end of the year, according to the country’s Home Affairs co-minister Theresa Makone.
    ePassports, also known as “biometric passports” contain an electronic chip that is encoded with surname, given name, date of birth, place of birth and gender information. It also includes a digital picture of the bearer’s face. Signatures are not reproduced on the chip.
    The Zimbabwe government believes that the introduction and mass production of the new travel document will reduce the price of the document. Currently, an ordinary Zimbabwean passport costs US$50 while other regional countries charge less than US$30.
    Makone said that a new digitalized document would curb counterfeit documents and would also allow the country to match the rapidly adopted international ePassport standard.
    The deployment of the ePassport also coincides with the Foreign Ministry’s new digitalized passport application processes, which allow residents to obtain passport applications online.
    Despite the online availability of ePassport applications, applicants will still need to go to the passport office to complete their applications in person, and will also require a national ID card in order to submit their application.

    Source: By Stephen Mayhew, http://www.biometricupdate.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  
    Trüb has signed a new agreement to continue to provide electronic and secure polycarbonate data pages for Republic of Lithuania ePassports.
    According to the firm, the electronic data page is attached to the ePassport booklet through a patented and robust page binding element, and is designed for a lifespan of 10 years. Issuance of passports with an electronic polycarbonate data page started in January 2008. The chip stores personal data, a facial image and two fingerprints of the document holder.
    The latest contract builds upon a 2008 agreement which engaged Trüb to supply highly secure polycarbonate data pages with embedded chip to the Lithuanian Personalisation Center of Identity Documents.
    The data pages are integrated into the Lithuanian passport booklets by UAB Garsu Pasaulis and then personalized by the Personalisation Center of Identy Documents, which is part of the country’s Ministry of Internal Affairs.
    “It is widely recognised that the Lithuanian biometric passports are a valuable indicator of the country’s distinctive attitude to security-oriented innovation,” said a Ministry of Internal Affairs official.
    ePassports, also known as “biometric passports” contain an electronic chip that is encoded with surname, given name, date of birth, place of birth and gender information. It also includes a digital picture of the bearer’s face. Signatures are not reproduced on the chip.

    Source: By Stephen Mayhew, http://www.biometricupdate.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Morpho has won another international call for tenders from the Finnish National Police Board to supply the country’s new ePassports, as part of a consortium including Oberthur Technologies. The consortium has been providing Finland with secure ePassports since 2006.
    Within the consortium Morpho provides the passport booklet which includes a set of new and improved security features on its polycarbonate data page. The data page also contains an integrated microchip which stores the holder’s personal details and biometric data (fingerprints and facial image). Morpho also supplies its ICAO PKI system and its personalization solution.
    With enhanced physical and electronic security features, Finland’s new passport will provide greater protection against identity theft and fraud, and enable fast, secure identification of passport holders.
    Finland began issuing its new ePassports at the end of August 2012.

    Source: http://www.planetbiometrics.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Cash-strapped New York has tentatively chosen the highest bidder to produce driver’s licenses under a disputed contract that would provide only black-and-white photos and end up costing the state nearly $38 million more than the current contract if it’s approved.

    According to court papers reviewed by The Associated Press, the losing vendors, including the company that has produced New York licenses with color photos for 16 years, are protesting the $88.5 million award to a Canadian company.

    The award to CBN Secure Technology Inc. of Ottawa is also being reviewed by the state comptroller.

    CBN is part of the Canadian Bank Note company that prints Canadian money, passports and driver’s licenses worldwide. Company officials did not respond to repeated requests for comment.

    The DMV tentatively awarded the contract to the high bidder 10 months after New York advised the current vendor, De La Rue North America Inc., that because of “significant budgetary constraints” the state would have to reduce the cost of the contract, according to the court filings. As a result, De La Rue submitted a bid 10 percent lower for the new, eight-year contract, which ended up being nearly $38 million less than CBN’s bid.

    De La Rue, based in England, and Massachusetts-based MorphoTrustUSA, another unsuccessful bidder, want a rebid.

    They claim CBN offered a black-and-white “polycarbonate” card they say is less secure than their color-picture IDs on cards made of “Teslin.” The losing bidders say they also weren’t informed the state wanted a black-and-white polycarbonate card and that CBN received an illegal advantage. De La Rue and MorphoTrustUSA said they could have offered a bid on that type which could save taxpayers’ money.

    The lawsuit also claims the state had required a color image ID, a requirement they claim CBN violated.

    The driver’s license contract is rebid under the federal “Real ID” measure from the Department of Homeland Security to make licenses more secure and more states are expected to face similar contract decisions.

    The state Department of Motor Vehicles won’t comment until the comptroller’s review concludes and the contract award is final. State records show cost was valued at just 20 percent of the evaluation of bids, with a 30 percent emphasis on security. Other categories included production and quality control, the production site and data security, the imaging device and experience and expertise, according to the record.

    Trade publications note the CBN technology and black-and-white photos are well-regarded for security in driver’s licenses and other documents.

    The losing companies claim poor judgment and mishandling of the bid is apparently to blame for the state’s decision.

    “Polycarbonate and Teslin are both highly secure materials suitable for drivers’ licenses,” said MorphoTrust Vice President and General Counsel Scott Boylan. “The key differences are value and flexibility. Polycarbonate is far more expensive than Teslin while providing no additional security benefit. Teslin cards also can accommodate color photos, which enable more security features, whereas polycarbonates cannot.”

    CBN “failed a mandatory technical requirement which related to the ability to provide color text for the cards, a mandatory requirement,” stated De La Rue in its lawsuit.

    State records show the DMV criteria for the bid, however, appear to not require a color image ID, according to a court filing.

    The state comptroller’s office is now evaluating the bids.

    “While I can’t comment on specific contracts, our impartial review of bid protests is essential to protect New Yorkers from millions of dollars in unnecessary costs,” said Kate Gurnett, spokeswoman for state Comptroller Thomas DiNapoli.

    “Our bid exactly met the requirements of the (Request for Proposal) and at significantly less cost to the New York taxpayer,” said De La Rue spokesman Rob Hutchison

    CBN and De La Rue are close competitors with a long history of providing secure documents including driver’s licenses. CBN also holds government contracts to print postage stamps, passports and visas that must be counterfeit-proof.

    State records show no campaign contributions from its top officers to any New York officials. CBN, founded in 1897, also has a lottery systems division for gaming run by governments, but has no contracts with New York where Gov. Andrew Cuomo is trying to expand gambling.

    Source: http://libn.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  A UK-based military hardware manufacturer will open a Sh3.5 billion plant in Mombasa to capture the growing arms race in Eastern Africa as well as target peace-keeping missions.

    Osprea Logistics has started construction of the plant following approval from the Kenya Investments Authority to assemble armoured cars and military trucks under the Mamba brand — which is commonly used by Africa Union peacekeepers, private contractors in Iraq and several African countries.

    This will be the first armoured vehicle manufacturer in the region and the company is targeting regional governments and peacekeeping missions in Congo, Sudan and Somalia, which are emerging as a fertile markets for military hardware.

    “Osprea plans its first-year production of Mamba Mk5’s to be over 100 vehicles, which can translate to work for over 200 people,” said Salih Brandt, the chairman of Osprea Logistics in an email response to the Business Daily.

    “Kenya is strategically located and offers great access to the rest of Africa compared to South Africa where Osprera’s other manufacturing plant is.”

    Mamba is a South-African made armoured personnel carrier that offers protection against small arms fire and land mines.

    Powered by a Mercedes Benz engine, it is suited for a rough terrain and can carry up to 10 passengers plus the driver.

    This has made it a favourite for military operations in remote zones and it became the face of the Iraq war following increased use by private security contractors.

    Rising threats of terrorism, cross-border raids and internal conflicts in East Africa have seen countries increase their military budgets.

    Kenya, Uganda and Tanzania have together increased their defense spending to Sh87 billion last year from Sh59 billion in 2007, according to data from the Stockholm International Peace Research Institute (Sipri), an independent research organisation.

    The data shows that Kenya’s spending at Sh45.8 billion was far much higher than that of Uganda, which had a budget of Sh21 billion, and Tanzania whose budget stood at Sh22 billion.

    Kenya, last year, ordered 67 US-made heavy truck diesel engines from South Africa, 37 of which have so far been delivered at an undisclosed cost.

    Uganda also showed the highest number of military equipment imports among EAC member countries.

    Burundi depicted one of the highest military budgets on the continent according to Sipri making the region a good market for an arms manufacturer.
    The region’s defense forces buy their armoured cars and trucks mainly from Russia and South Africa.

    “There is a tangible move world-wide towards ‘smart investing’ in defence budgets, with an emphasis on domestic procurement and industry in order to capture a dual benefit of domestic investing as well as platform efficiency,” says Mr Brandt.

    Source: By RAWLINGS OTINI, http://www.businessdailyafrica.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The Smart Card Alliance has released its second annual E-Yearbook, highlighting the events that happened in the North and Latin American smart card industry throughout 2012.

    This year’s review contains industry briefs, perspectives, insights and company profiles covering a wide range of markets and technologies. It also contains an expanded section on the EMV Migration Forum, information about the new Mobile and NFC Council, highlights of September’s Transportation Council meeting and reprints of white papers and position documents produced by the SCA throughout the year.

    The E-Yearbook is available at the SCA’s website. The SCA will send printed copies to members and have them available at Alliance conference events

    Source: http://www.contactlessnews.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The UAE Central Bank and the Emirates Identity Authority have met to consider enhancing co-operation in regards to using the smart ID card and activating its applications in the financial sector.
    The two agencies discussed creating a joint committee to draft a strategic co-operation agreement that includes a number of initiatives aimed at promoting the culture of digital ID and knowledge-based economy, as well as enabling the UAE Central Bank to upgrade the performance of the financial sector while protecting the identity of consumers with the advanced features of the Emirates ID card.
    According to a report in The Emirates News Agency, the UAE Central Bank clarified that its draft strategic and operational plan includes an initiative for creating an e-wallet system using the ID card that would ultimately replace cash for the management and operation of the UAE Central Bank.
    Emirates ID says it’s ready to provide maximum support to ensure the success of all the development projects and initiatives that are implemented or planned to be implemented, as a part of the government’s initiative to engage in a knowledge-based economy in a manner that serves the top interest of the UAE.
    As reported previously in BiometricUpdate.com, official transactions related to Emirates ID cards were disrupted for nearly two days following a technical glitch with its online e-form system.
    In 2009, Emirates ID developed a plan which contributed to doubling the number of population register and therefore, the fingerprints of individuals over the past three years by six times.

    Source: By Adam Vrankulj, http://www.biometricupdate.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The Egyptian government has recently approved a new smart card system for subsidized fuels, originally proposed by the ministries of finance and petroleum.
    The program, designed to ensure that those in most need of these subsidizes are indeed those who receive it, would charge the ministries of petroleum and mineral resources with implementing and overseeing the new smart card program for the National Bank of Egypt and Ahly banks.
    In this process, contracts were awarded to both government banks without a bidding process, in order to quickly implement the new laws to take hold in April, Daily News Egypt reports.
    Logistically, daily transfers will be made to companies producing petroleum products and will be represented in the difference in price for fully and partially subsidized fuel for the amount consumed through the smart card program. A database of beneficiaries will also be created.
    Many distribution programs like this take off without a hitch, but there are also those that encounter resistance along the way.
    Reported in BiometricUpdate.com, a system in India has been implemented which sees the production and distribution of biometric food ration cards, though members of an indigenous group have demanded the withdrawal of the cards, citing irregularities and complications in obtaining food.

    Source: By Adam Vrankulj, http://www.biometricupdate.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Gemalto is providing the Royal Oman Police with an electronic passport solution for the Sultanate. Applicants will be issued with secure travel documents in line with Oman’s goal to provide enhanced services and protection to its citizens, using digital security technologies. ??

    The solution includes Gemalto’s ICAO compliant Sealys e-passport documents and a full Coesys solution suite to enroll citizens, personalize and issue secure documents. The multi-year contract also covers training, support and maintenance services.

    Major Royal Oman Police offices will be equipped with fixed and mobile stations to register e-passport applicants with personal information and biometric data. Each e-passport will feature secure embedded software and a contactless microprocessor which will contain the holder’s digital fingerprints and. The solution will facilitate Omani travelers immigration control, and speed up the passport application and document issuance process. ??

    In the public sector, Gemalto is contributing to more than 80 government programs worldwide, supporting for example e-passport initiatives in Côte d’Ivoire, Denmark, Estonia, France, Korea, Norway, Malta, Morocco, Portugal, Singapore, Sweden and the U.S.

    Source: http://www.secureidnews.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Libya has taken delivery of 49 armoured support vehicles from Jordan. Some 120 of the UAE-designed and built NIMRs, in two variants, have already been in service with the Libyan army .

    The spokesman for the Libyan General Staff. Ali Shiekhi was quoted by Chinese news agency Xinhua today as saying that the new NIMRs had been supplied as a result of an agreement made last year, between the Ministry of Defence and Jordan. The new armoured vehicles are to be deployed immediately on border patrol duties.

    More than 500 NIMRs have been sold, mostly in Jordan, Lebanon, Libya and the UAE, and the firm says that it has a further 1,800 orders. The composite ceramic-armoured NIMRs, which come in four and six-wheel variants and a range of configurations, are according to the manufacturers, the first such military vehicles to be designed specifically to operate in extreme desert conditions. NIMR Automotive which conceived and makes the armoured vehicle, is a part of the UAE’s Tawazun conglomerate, which specialises in defence equipment. Algeria was last year seeking to establish a local plant to build and assemble NIMRs.

    Source: http://www.libyaherald.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  ABI Research forecasts 8.6 billion smart cards will ship in 2013, spanning all smart card markets. Of the total shipments, 16% are forecasted to use a contactless interface but that will rise to 30% by 2018.

    Government ID, transportation and ticketing, and payment cards continue strong double-digit growth in contactless adoption. Single-wire protocol SIM card volumes continue to strengthen, and are expected to break the 500 million mark in 2018.

    “The increase in contactless adoption is not limited to a selection of markets, although it’s the banking and government verticals which are adopting contactless technology at a quicker rate, with the SIM market close behind,” comments Phil Sealy, research analyst at ABI.

    Over the next three years ABI Research expects to see a shift in the penetration ratio of pure contactless and dual interface shipments. In 2013, ABI Research forecasts 59% of all contactless deployments will utilize a pure contactless interface, reducing to 38% in 2018.

    The increase in dual interface adoption is apparent across multiple markets. IC vendors NXP, Infineon, and STMicroelectronics are positioned to offer the best combination of convenience and high-end security over multiple applications. Additionally, the increase in dual interface adoption will deliver greater margins benefiting IC and smart card vendors alike.

    “ABI Research tracks new services and credentials regionally, including governments issuing new national ID and social welfare cards, mobile network operators with SIM-based NFC payment services and wallets, and banks jumping to next-generation dual interface EMV cards,” Sealy states. “As a result ABI Research forecasts that dual interface shipments will exceed the 1 billion mark in 2015.”

    Source: http://www.secureidnews.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The National Health Insurance Scheme (NHIS) will this year introduce biometric identity cards which will be issued instantly at the point of registration to subscribers.

    It would also start work on piloting electronic claims (E-claims) processing and host an extended stakeholder review of the capitation pilot in the Ashanti Region to inform its improvement and the subsequent nationwide rollout of this provider payment method.

    The Chief Executive of the National Health Insurance Authority (NHIA), Mr Sylvester A. Mensah, disclosed this when he addressed members of the core management team of the NHIS and some key stakeholders at a management retreat held at Elmina in the Central Region.

    Mr Mensah noted that although remarkable progress had been made in meeting targets, there was the need to consolidate those achievements and make the scheme more efficient, adding that 2013 would be a busy year for the authority.

    He said the NHIA intended to establish three more claims processing centres in the Northern, Central and Ashanti regions, to complement the centre in Accra. This, he maintains, would complete efficiency measures into claims management nationwide.

    Among other numerous initiatives, Mr Mensah disclosed that the scheme would be re-branded consistent with the new law, new vision and mission and operational architecture of the NHIS, adding that the financial manual of the NHIA would also be reviewed to place greater responsibility on the centre to prevent the abuse and fraud occurring at the regional and scheme levels.

    Others are: a permanent and joint clinical and claims audit team would be established to undertake forensic claims audit across the country all-year round to track isolated cases of connivance between schemes and providers.

    Mr Mensah mentioned that subscriber satisfaction was a key performance indicator for the NHIA, therefore, a subscribers’ handbook detailing the benefit package, medicines and subscriber rights and obligations would be compiled and made available to all subscribers at the point of registration and membership renewal.

    In order to further educate the public on the operations of the scheme, Mr Mensah said a quarterly NHIS policy dialogue forum to be beamed live on television stations would be instituted.

    Also, the NHIS medicines list/pricing would be reviewed to reflect market realities.

    He further said the authority would begin modernising and transiting from an ICT concept, “which places more emphasis on infrastructure, to a management information system (MIS) which places premium on generating information for management decision-making”.

    Among a litany of achievements recorded in 2012, he cited the passage of the new law, NHIA 2012, Act 852, the upward review of provider Tariffs by 26 per cent, creation of the condition to accommodate family planning in the NHIS benefit package, development of a consolidated premium account, the pilot of capitation in the Ashanti Region, the establishment of an operational call centre and functional clinical audit division.

    Mr Mensah told the management team that “posterity will not forgive us if, in nurturing this infant institution, it slips into structural, operational, and financial inefficiency”.

    The President of the Ghana Medical Association (GMA), Dr Kwabena Opoku-Adusei, who was present at the event, pledged his association’s commitment to the NHIS.

    He gave an assurance that the GMA would continue to be a strong ally of the NHIS and would collaborate with the authority on the rollout of capitation across the country, if all their concerns were addressed.

    He said the GMA would continue to constructively criticise the NHIA to ensure that the scheme stands the test of time.

    Other participants and contributors included a former Health Minister, Dr Richard Anane, under whose watch the law which established the NHIS was passed in 2003 (Act 650), and other foreign delegations.

    Source: http://graphic.com.gh

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  New research from ABI Research forecasts 8.6 billion smart cards to be shipped worldwide in 2013; a combined number spanning all smart card markets. Of the total forecasted shipments, 16 percent are expected to use a contactless interface.
    ABI attributes most of this growth to the increase in adoption of Government ID, transportation and ticketing and payment card systems. In 2013, ABI forecasts 59% of all contactless deployments will utilize a pure contactless interface, reducing to 38% in 2018.
    According to the company, “The increase in dual interface adoption is apparents across multiple markets. IC vendors, NXP, Infineon and STMicroelectronics are positioned to offer the best combination of convenience and high-end security over multiple applications. Additionally, the increase in dual interface adoption will deliver greater margins benefiting IC and smart card vendors alike.”
    ABI’s Market Data report focuses on the collection of primary data from leading manufacturers of smart cards and secure ICs. The data includes the installed base and annual shipments of smart cards and secure ICs by technology and interface type, by region and vertical markets.
    “The increase in contactless adoption is not limited to a selection of markets, although it’s the banking and government verticals which are adopting contactless technology at a quicker rate, with the SIM market close behind,” Phil Sealy ABI Research analyst said. “ABI Research tracks new services and credentials regionally, including governments issuing new national ID and social welfare cards, MNOs with SIM-based NFC payment services and wallets, and banks jumping to next-generation dual interface EMV cards. As a result, ABI Research forecasts that dual interface shipments will exceed the 1 billion mark in 2015.”
    Last year, in a Biometrics Research Note, Rawlson King forecasted that the market for electronic identity cards – for which smart cards are often used – will reach US$5.2 billion by 2015.
    Smart cards often carry biometric data of the card holder and are finding their way into many workflow processes, identity programs among a long list of uses.
    BluStor is an emerging player in the smart card market, currently developing a smart card with an 8GB capacity, to enable the downloading of apps and to verify identity absent of a data connection. BiometricUpdate.com recently had a chance to talk shop with CEO Finis Conner about how BluStor came to be, his ambitions as chief executive as well as what the future holds for his company.

    Source: By Adam Vrankulj, http://www.biometricupdate.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Papua New Guinea’s Defence Minister, Fabian Pok, says a two-million US dollar military aid grant from China will be spent on armoured cars, troop carriers and uniforms.
    The grant follows Dr Pok’s talks with his Chinese counterpart General Liang Guanglie in Beijing last month and meetings there with exporters of military ware.
    The visit comes as PNG plans a five fold increase in troops over the next decade.
    Dr Pok says PNG will also ask China to help maintain swimming pools and gymnasiums at PNG’s military barracks.
    “They want to be seen as not being too involved in our military issues here. China is also trying to export things like uniforms and armoured cars and all these things. So it’s also in the business interests of not the Chinese military but people who are building these things to market their products to countries like Papua New Guinea.”

    Source: http://www.rnzi.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Frost & Sullivan has released new analysis stating that the global border control and biometrics market will see increased growth due to international cooperation. However, this growth may not be realized unless privacy issues are resolved and organizations are able to measure ROI.

    The analysis, “Global Border Control and Biometrics Market Assessment,” covers the security, military, government and law enforcement sectors of the industry. It found that the market’s 2012 revenues were $5.8 billion, and it anticipates that the market will earn $15.8 billion in 2021.

    Frost found that one of the main drivers in this market growth stemmed from agencies and organizations working together on an international level to collaborate on travel security, which has led to more implementation of electronic documents and readers.

    Western markets have been at the forefront of this trend, with many countries having e-passports and testing eGates. Many pilot projects are taking place in Europe, with facial recognition technology being the preferred biometric modality. Russia is also looking into the use of biometrics as an identifier.

    Eastern markets, such as China and India, are just starting to incorporate e-passports and eGates into their travel processing systems.

    While the opportunity for growth is good, Frost does caution that budget cuts and privacy concerns could have a detrimental effect on plans to invest in biometric technology; however, cheaper technology and public education could mitigate those possibilities.

    Source: http://www.secureidnews.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  For many years now, IT professionals have become more and more active in discussions about physical access control systems and there has been an active debate about the need for convergence between physical and logical access. IT managers use electronic means to secure logical assets; security managers use physical access control methods to secure facilities. On the surface, it would seem that both departments would benefit greatly from collaboration since both of their problems boil down to permitting access to the right people.

    With such an obvious synergy and benefit to taking a more holistic view of enterprise security, why hasn’t this yet happened? What are the real barriers preventing companies from moving in this direction?

    Perhaps one of the answers lies with the fact that we’ve been more focused on the “what” than the “who.” If organizations are really going to make a meaningful impact on protecting their assets, whether physical or virtual, it’s most important to focus on the “who”—and coordinating that task between IT and security is becoming important.



    Who was that (really)?

    Although privileges are assigned to people, it’s not always clear who is entering a password or who is carrying an RFID card. The risk of not knowing “who” varies from asset to asset. Is it enough to be the holder of a swipe card to enter a parking garage? Probably. How about to access a medical record? Absolutely not!

    It is in this context that biometrics is playing a larger role in securing facilities and assets of all kinds. With the introduction of multispectral imaging, biometrics has become reliable enough to deal with the fundamental issue of knowing “who” to a much higher degree of confidence.

    In fact, by linking physical identity to a myriad of digital identities, converged identity and access management solutions become much more powerful. There is no meaningful access management without first establishing the “who” in transactions. Who is accessing my facility? Who is punching the time clock? Who is withdrawing funds from that ATM? The question is always, “Who?”

    Thus, while access and authorization have always been granted to individual people, knowing a password or having a key is only superficially related to the authorized person—and neither can establish who exactly that is. Only biometric technology can do that.



    It’s more than just about security

    We’ve all seen it: business grinds to a halt after the deployment of a new security system. Designing an authentication solution that is both secure and convenient—that’s where the value is for the customer.

    Convenience in an authentication solution is ease-of-use, accessibility, speed and all of the other things that become important to an organization after the primary objective—security—is met. Staffing help desks to reset passwords or reissue swipe cards while the employee is standing by is not an efficient use of resources. Nurses on a hospital floor cannot waste valuable seconds fumbling with the numbers and special characters in a password when accessing medical supplies.

    A biometric solution can lower risks, reduce costs and improve efficiencies. It can meet regulatory requirements, provide an audit trail and facilitate transactions, all without getting in the way of business. Today, biometric solutions authenticate people requiring access to secure facilities, sensitive records, government services and controlled substances. The possibilities and benefits are real if the biometric is chosen carefully.

    Security integrators are already aware that biometric technologies and scanners are not created equal. Some optical sensors work very well when the finger is clean and prepped with lotion. Is that convenient? Other sensors work perfectly—on the third or tenth try, while a line forms behind the user. These situations are the cases that cause security managers to abandon an application.

    On the other hand, multispectral imaging is capable of overcoming the myriad of fingerprint capture problems that conventional imaging systems have in less-than-ideal conditions. The high performance delivered by multispectral biometrics affects more than security, it allows authentication to recede into the background while authorized people go about their business. That’s no compromise, that’s convenience!



    What about customers?

    Because biometrics can be so quick and easy to use, they are ideal for customer-facing applications. Today, financial institutions around the world are embracing multispectral fingerprint biometrics for authenticating customer transactions. In addition to enhancing transaction security, banks are able to provide additional convenience for their customers because there is no need for training; customers just present their finger at the ATM.

    Biometric patient authentication is becoming important for reducing medical errors and for minimizing fraudulent access to healthcare. Government and private insurance programs around the world rely on multispectral fingerprint biometrics to prevent fraudulent use of the policy. Officials at one government program report that the biometric deployment actually facilitates faster access to medical service by authorized patients while saving costs.

    Theme park access is a customer-facing application where convenience plays a special role. To prevent ticket fraud, one major international theme park wanted to be able to link each ticket to a specific customer. However, because the overriding goal was to create a positive environment for paying customers, there couldn’t be even the illusion of a barrier between a customer and the park. The transaction had to be quick and intuitive for anyone to use. It’s significant to note that this biometric solution did not require identification of the customer, assuring the privacy of guests. Multispectral fingerprint authentication was chosen for its reliability and convenience. As a result, the solution reduced transaction time, enhanced customer experience and reduced ticket fraud.

    This scenario is being repeated in other commercial customer-facing situations, such as membership-only fitness clubs, large sporting events, nightclubs and other places where it’s important to maintain convenience for the customer, even during an authentication transaction.



    Deploy an enterprise-wide

    authentication solution

    IT managers have their hands full. Threats are coming from every direction and on top of it all employees want to use their own devices. Users hate security solutions that simply get in the way of them doing their jobs. Multifactor authentication is becoming a must, but the difficulty of managing point solutions is increasing risk, not reducing it. And the smartest smartcard still cannot assure the organization that the person holding is it the person it was issued to. They need to know “who.”

    Security integrators know “who.” They’ve been integrating biometrics at the door for some time now. Perhaps it’s time to walk across the hall and have a conversation with the IT manager about integrating biometrics into an enterprise-wide authentication solution.

    Source: By BY PHIL SCARFO, http://www.securityinfowatch.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  Brigadier-General Kwame Opoku-Adusei, the General Officer Commanding the Northern Command of the Ghana Army, on Tuesday said the government has purchased 34 armoured reconnaissance vehicles to argument the logistics of Ghanaian peacekeepers.

    The armoured vehicles are to facilitate the migration of Ghanaian peacekeepers from the “Dry Lease” to the “Wet Lease system,” Brig-Gen. Opoku-Adusei stated during Ghanbatt 77’s Medals Presentation Parade at Lebanon.

    He said the military high command had outlined plans to provide logistical support for the migration of the Ghanaian contingent on peacekeeping duties in Lebanon (Ghanbatt) from the “Dry Lease” to the “Wet Lease” system to enable it to be self-sufficient.

    A Ghana Armed Forces statement issued in Accra and signed by Lieutenant Commander M. A. Larbi and copied to the Ghana News Agency (GNA) said the Commander of the Northern Command commended the Ghanbatt 77.

    “I am personally satisfied with what I have seen and heard about your performance during my visit to the Ghanbatt Area of responsibility and I urge you all to continue with the good work”.

    Brig Gen Opoku-Adusei, who was the head of a six-member military delegation to Lebanon, used the occasion to update troops on current developments in the country as well as within the Ghana Armed Forces.

    The Commander and his team also paid a courtesy call on United Nations Interim Force in Lebanon (UNIFIL) Deputy Force Commander, Brig Gen Patrick Phelan, who expressed appreciation for the performance of Ghanaian troops.

    The Commanding officer of Ghanbatt 77, Lt Col Francis Anemana, assured the delegation that Ghanbatt is poised in executing its assigned tasks successfully despite the challenges.

    Chief Military Personnel Officer, Col Reginald Yemo Odoi, thanked the government of Ghana for the high profile delegation to the Medals Day Parade and described Ghanbatt 77 as a wonderful battalion which executed its task with high professionalism to the admiration of UNIFIL High Command.

    Source: http://www.ghanaweb.com

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.
  •  The Government of the Macau Special Administrative Region of the People’s Republic of China has awarded a contract for the manufacture and development of smart ID cards for its residents.

    The new generation of ID cards will be purely contactless, and will store personal data and biometric information such as fingerprints on a digital chip embedded in the card. The IDs can be used as conventional IDs, providing sophisticated visual and electronic proof of identity, but will also allow citizens to carry out transactions with the government electronically, saving time and effort.

    The contactless system will also provide faster data transfer rates while card reading, useful especially for the large number of people who use their IDs in regular travel between Macau, Hong Kong, and China, as the processing time for travellers will significantly reduce. The new national ID card will also support contactless electronic signatures.

    A security protocol developed by Germany’s Federal Office for Information Security will be used to ensure the security of data on the cards and during contactless transactions. Named PACE (Password Authenticated Connection Establishment), the protocol will create a secure connection between the chip in the card and a card reader, and encrypt data before the transfer.

    The contract for the manufacture and delivery of the cards was awarded to Munich-based technology company, Giesecke & Devrient. In addition to development and manufacture of the cards, G&D will develop the required smartcard applications and modify the existing infrastructure according to the needs of the new technology.

    The government will also receive an advanced operation system platform for smartcards, which will be ready to support additional features in the future, such as contactless payment. The new set of ID cards is expected to be introduced in October 2013.

    Source: By Sumedha Jalote, http://www.futuregov.asia/

    Disclaimer: The above news is at the sole discretion of Tender Impulse subsribers only and in no ways intends to bring commercial benefits to Tender Impulse.