Construction services for boiler 4 burner replacements and fuel train piping upgrade

This tender is from the country of Canada in Americas region. The tender was published by UNIVERSITY OF ALBERTA on 05 Apr 2025 for Request for Proposal Construction services for boiler 4 burner replacements and fuel train piping upgrade 1 0 THE OPPORTUNITY 1 1 The University of Alberta is inviting Contractors with proven experience successfully completing Work on construction projects to submit a Proposal for Boiler 4 Burner Replacements and Fuel Train Piping Upgrade 1 2 The University is acting as the Consultant as defined in the General Conditions of Construction 1 3 Proponents are advised to carefully read the Instructions to Proponents and all sections of this Request for Proposal RFP Note that Schedule 2 Proponent Information Submissions lists all of the Schedules and Submittals that are to be submitted with the Proposal 1 4 In the event of a conflict or inconsistency including without limitation any term condition meaning attachment or deliverable contained in the Construction Documents prepared by the Consultant which is inconsistent or in conflict the Agreement including General Conditions of Construction General Conditions of Insurance CCIP Supplementary General Conditions General Requirements etc the provisions of the Agreement shall prevail and govern 2 0 OVERVIEW OF THE PROJECT AND THE WORK 2 1 General Overview - The University of Alberta Heating Plant facility is an integral part of the University s District Energy System DES providing steam electricity demineralized water and compressed air to the greater north campus area including the University Hospital and Cross Cancer Institute This project involves the demolition of the existing boiler 4 burners piping structural and instrumentation and electrical components followed by the installation of new low NOx burners structural supports burner platform piping and electrical and instrumentation infrastructure to support the installation of the new Burner Management System BMS for the boiler 2 2 Project Work Overview Demolition and disposal of existing piping systems burners burner platform instrumentation and electrical components and cabinets associated with the existing burner installation for boiler 4 Engineered design fabrication and installation of adapters spacers required to install the new burners into the existing wind-box Engineered design fabrication and installation of new burner structural platform Installation of six new low NOx burners supplied by the owner Fabrication Installation and testing of piping systems consisting of natural gas steam propane fuel oil and instrument air to support the new burner installation Supply and installation of all pipe insulation and cladding Fabrication supply and installation of required piping supports manual valves gauges control valves strainers and instruments Adjustment to existing windbox baffling and or installation of new windbox baffling will be required Preliminary details for costing purposes will be added to the RFP the week of April 14 2025 Detailed design documentation will be provided in May 2025 Installation of electrical and control wiring including cable tray and junction boxes to support the installation of the new boiler burner management system is required The electrical and instrumentation design is currently in progress preliminary details for costing purposes will be added to the RFP the week of April 14 2025 Detailed design documentation will be provided in June 2025 Electrical scope will include but not be limited to the following o Remove all field wiring conduit and tray that is no longer supporting instruments and controls wiring o Supply and install instrument mounting for any instruments that are not supplied with adequate mounting o Supply and install wiring and junction boxes to connect all instruments and controls listed in the attached instrument index cable schedule wiring diagrams instrument and controls layout drawings Existing tray is very old and not recommended for reuse Removing unused tray after wiring is demolished is desirable if possible Existing conduit should be removed if unused as well o Supply and install all power connections for new Boiler 4 BMS Delta V cabinet including but not limited to UPS power standard power grounding o Supply and install multimode fibre communications connections for new Boiler 4 BMS Delta V cabinet This shall include all required fiber cable patch panels terminations and testing of fiber cables o Complete point to point checks on all install wires cables o Supply and install cable tags and equipment for all new and modified cables conduits enclosures and junction boxes o Supply and install wire tags heat shrink for all new and modified wires o Red line drawings sign and date redlines 2 3 Changes to the Construction Work Package Despite section 2 1 3 4 mechanical scope of the CWP supply of the control valves is not required Control valves regulators instrumentation equipment will be supplied by the University of Alberta Heating Plant Despite section 2 2 2 work excluded of the CWP installation of electrical and control wiring including cable tray and junction boxes to support the installation of the new boiler burner management system is required Despite section 2 1 5 1 instrumentation scope of the CWP wiring and or instrument air runs to and from individual instrumentation equipment is required Despite section 2 2 3 work excluded of the CWP fabrication and installation of all instrument air hook ups is required Additional orifice flange connection for FIC-4001B and thermowell connection for TT-4080B on the fuel gas main piping updated on the P ID but not updated in the CWP documentation Additional 1 flange connections for XV-4014 on the pilot fuel gas main piping updated on the P ID but not updated in the CWP documentation 2 3 Contractor Project Requirements Function as Prime Contractor for the project Complete all work detailed in the construction work package CWP including the supply of all materials and equipment as specified Perform all planning and execution of the work necessary to complete the demolition and construction in accordance with the CWP including any necessary revisions Field verify all detailed drawings and dimensions prior to commencing construction and installation Complete as-built drawings as required Protect existing installations adjacent to the work area from damage Coordinate all work with the owner including other contractors onsite Remove and dispose of waste and surplus material as required by the owner Laydown will be available within the Stack 2 gated compound See attached reference document See Construction Documents provided with this RFP for further information. The last date to submit your bid for this tender was 24 Apr 2025. This tender is for the companies specializing in Construction materials and similar sectors.

*The deadline for this tender has passed.

Tender Organisation:

UNIVERSITY OF ALBERTA

Tender Service:

Worldwide

Tender Region:

Tender Country:

Tender CPV:

44110000 : Construction materials

Tender Document Type:

Tender Notice

Tender Description:

Request for Proposal Construction services for boiler 4 burner replacements and fuel train piping upgrade 1 0 THE OPPORTUNITY 1 1 The University of Alberta is inviting Contractors with proven experience successfully completing Work on construction projects to submit a Proposal for Boiler 4 Burner Replacements and Fuel Train Piping Upgrade 1 2 The University is acting as the Consultant as defined in the General Conditions of Construction 1 3 Proponents are advised to carefully read the Instructions to Proponents and all sections of this Request for Proposal RFP Note that Schedule 2 Proponent Information Submissions lists all of the Schedules and Submittals that are to be submitted with the Proposal 1 4 In the event of a conflict or inconsistency including without limitation any term condition meaning attachment or deliverable contained in the Construction Documents prepared by the Consultant which is inconsistent or in conflict the Agreement including General Conditions of Construction General Conditions of Insurance CCIP Supplementary General Conditions General Requirements etc the provisions of the Agreement shall prevail and govern 2 0 OVERVIEW OF THE PROJECT AND THE WORK 2 1 General Overview - The University of Alberta Heating Plant facility is an integral part of the University s District Energy System DES providing steam electricity demineralized water and compressed air to the greater north campus area including the University Hospital and Cross Cancer Institute This project involves the demolition of the existing boiler 4 burners piping structural and instrumentation and electrical components followed by the installation of new low NOx burners structural supports burner platform piping and electrical and instrumentation infrastructure to support the installation of the new Burner Management System BMS for the boiler 2 2 Project Work Overview Demolition and disposal of existing piping systems burners burner platform instrumentation and electrical components and cabinets associated with the existing burner installation for boiler 4 Engineered design fabrication and installation of adapters spacers required to install the new burners into the existing wind-box Engineered design fabrication and installation of new burner structural platform Installation of six new low NOx burners supplied by the owner Fabrication Installation and testing of piping systems consisting of natural gas steam propane fuel oil and instrument air to support the new burner installation Supply and installation of all pipe insulation and cladding Fabrication supply and installation of required piping supports manual valves gauges control valves strainers and instruments Adjustment to existing windbox baffling and or installation of new windbox baffling will be required Preliminary details for costing purposes will be added to the RFP the week of April 14 2025 Detailed design documentation will be provided in May 2025 Installation of electrical and control wiring including cable tray and junction boxes to support the installation of the new boiler burner management system is required The electrical and instrumentation design is currently in progress preliminary details for costing purposes will be added to the RFP the week of April 14 2025 Detailed design documentation will be provided in June 2025 Electrical scope will include but not be limited to the following o Remove all field wiring conduit and tray that is no longer supporting instruments and controls wiring o Supply and install instrument mounting for any instruments that are not supplied with adequate mounting o Supply and install wiring and junction boxes to connect all instruments and controls listed in the attached instrument index cable schedule wiring diagrams instrument and controls layout drawings Existing tray is very old and not recommended for reuse Removing unused tray after wiring is demolished is desirable if possible Existing conduit should be removed if unused as well o Supply and install all power connections for new Boiler 4 BMS Delta V cabinet including but not limited to UPS power standard power grounding o Supply and install multimode fibre communications connections for new Boiler 4 BMS Delta V cabinet This shall include all required fiber cable patch panels terminations and testing of fiber cables o Complete point to point checks on all install wires cables o Supply and install cable tags and equipment for all new and modified cables conduits enclosures and junction boxes o Supply and install wire tags heat shrink for all new and modified wires o Red line drawings sign and date redlines 2 3 Changes to the Construction Work Package Despite section 2 1 3 4 mechanical scope of the CWP supply of the control valves is not required Control valves regulators instrumentation equipment will be supplied by the University of Alberta Heating Plant Despite section 2 2 2 work excluded of the CWP installation of electrical and control wiring including cable tray and junction boxes to support the installation of the new boiler burner management system is required Despite section 2 1 5 1 instrumentation scope of the CWP wiring and or instrument air runs to and from individual instrumentation equipment is required Despite section 2 2 3 work excluded of the CWP fabrication and installation of all instrument air hook ups is required Additional orifice flange connection for FIC-4001B and thermowell connection for TT-4080B on the fuel gas main piping updated on the P ID but not updated in the CWP documentation Additional 1 flange connections for XV-4014 on the pilot fuel gas main piping updated on the P ID but not updated in the CWP documentation 2 3 Contractor Project Requirements Function as Prime Contractor for the project Complete all work detailed in the construction work package CWP including the supply of all materials and equipment as specified Perform all planning and execution of the work necessary to complete the demolition and construction in accordance with the CWP including any necessary revisions Field verify all detailed drawings and dimensions prior to commencing construction and installation Complete as-built drawings as required Protect existing installations adjacent to the work area from damage Coordinate all work with the owner including other contractors onsite Remove and dispose of waste and surplus material as required by the owner Laydown will be available within the Stack 2 gated compound See attached reference document See Construction Documents provided with this RFP for further information

Tender Bidding Type:

Publish Date: 05 Apr 2025

Deadline Date: 24 Apr 2025

  • 1 week to go
  • 15 Days to go
  • More than 15 days to go

Get A Callback Within 24 Hours

Fill form below to get callback from Tender Experts.

770336

Explore More Construction materials Tenders in Canada, Americas, and Worldwide

Looking for more tenders like this one in Construction materials? With over 70 million global procurement opportunities and new tenders added daily, Tender Impulse is your gateway to international and local contracting success. Whether you're targeting the Infrastructure and construction sector in Canada, or expanding across regions, we provide live, accurate, and relevant updates every day.

Our platform sources tenders from:

  • National and local government portals
  • International development and funding agencies
  • Municipal corporations and state authorities
  • NGOs, education ministries, and public-private partnerships

Daily Tender Updates Across 200+ Countries

Every day, we add hundreds of new RFPs, RFQs, EOIs, and contract awards across multiple sectors and geographies. This tender from Canada is just a sample of what's available right now.

Tender Impulse covers:

  • Public procurement tenders
  • International development projects
  • Local municipal bids
  • Private and PPP contracts
  • Framework agreements and supply tenders

Search Smarter with CPV and Industry Matching

Each listing is categorized using CPV codes like 44110000, enabling precise filtering. Search by:

  • Tender type: RFP, RFQ, EOI, GPN, Contract Awards
  • Location: Canada, Americas, or global
  • Industry: Infrastructure and construction
  • Deadline and issue date
  • Issuing organization or funding agency

Opportunities in Every Industry and Region

While you're viewing a tender in Canada, Tender Impulse offers access to tenders across:

  • Asia, Europe, Africa, the Americas, and Oceania
  • Defence, Energy, Healthcare, Construction, Education, IT, Agriculture, and more
  • All CPV categories—from consultancy to infrastructure

Tools to Help You Succeed

Tender Impulse provides more than listings:

  • Custom email alerts by CPV and location
  • Downloadable bid documents and submission support
  • Registration guidance and compliance tools
  • Translation support for non-English tenders
  • Proposal writing tips and examples

Stay Ahead with Real-Time Updates

Thousands of new tenders are added daily-across countries, sectors, and CPV codes. With Tender Impulse, you gain strategic insight, timely alerts, and a competitive edge.

Start your free trial to unlock tenders customized to your Infrastructure and construction, Canada, and Construction materials categories.

Tender by Region

Tender by Sector

Tender by Country