Bangladesh Tenders - 6 April 2022 (Page 1 of 2)

217 tenders published in Bangladesh on 6 April 2022.

Tender Impulse is your trusted global tender website and tender aggregator, offering access to tens of thousands of tenders from over 190 countries. On this page, explore all government tenders, business tenders, and e-tenders published in Bangladesh on 6 April 2022, across industries like Infrastructure and construction, Healthcare & Medical, Furniture & Furnishings, Education & Training, Energy, Government & Community Services, Industrial Machinery & Equipment, Defence, Transportation & Mobility, GIS/GPS, Environment & Waste Management, Management Consultancy, Electrical Equipment & Lighting, Food & Beverages, Office Equipment & Stationery, Laboratory & Scientific Instruments, Telecom, IT-Software, Meters.

This is page 1 of 2 for tenders published in Bangladesh on 6 April 2022.

Why Choose Tender Impulse for Bangladesh?

  • Access a curated list of tender notices from official sources, including ministries, PSUs, and local procurement authorities.
  • Daily updates of world tenders covering Bangladesh and beyond.
  • Tailored listings for sectors like Infrastructure and construction, Healthcare & Medical, Furniture & Furnishings, Education & Training, Energy, Government & Community Services, Industrial Machinery & Equipment, Defence, Transportation & Mobility, GIS/GPS, Environment & Waste Management, Management Consultancy, Electrical Equipment & Lighting, Food & Beverages, Office Equipment & Stationery, Laboratory & Scientific Instruments, Telecom, IT-Software, Meters, including projects in EPC, defence, and infrastructure.
  • Easy filters to sort tenders by publish date, keywords, CPV codes, or authority name.

Get Started with Full Access

With a simple free live demo, gain access to tender details, bidding documents, authority contacts, and real-time updates from Bangladesh.

1687277 Construction of shed for Sheep, construction of temporary toilet at several places installation of sanitary and water supply pipe line, emergency maintenance and renovation works d Deadline12 Apr 2022 1687290 “Establishment of Shaheed M. Mansur Ali Medical College & 500 beded Hospital” at Sirajgonj.(Sub-head:Supply & Installation of Stage Light & Sound System). FY-2021-22. Deadline12 Apr 2022 1687308 Establishment of Kushtia Medical College and Hospital [Sub-Head- Supply , Installation , Testing and Commissioning of 1600 KVA Sub-Station Equipment (Including Feeder Cable , Overh Deadline12 Apr 2022 1687433 Construction of shed for rest inside the bunglow, walkway and bituminous carpeting road repair including other ancillary works at 44, Minto Road, Dhaka Deadline12 Apr 2022 1687434 Construction repair and renovation of Tin-shed over petrol pump,installation of tin-shed for police box, Heat protection insulation for tin shed garage at gate no 2, construction o Deadline12 Apr 2022 1687435 Vertical Extension works for construction of 4th floor over existing 3rd floor of Regional Server station at Cumilla. Deadline12 Apr 2022 1687437 Establishment of Kushtia Medical College & Hospital Project (2nd Revised) (S.H.:Fire Detection & Protection System).During the FY : 2021-2022 Deadline12 Apr 2022 1687438 Construction of Main Office Building (3-Storied Building with 4- Storied Foundation) with Civil, Internal Sanitary & Water Supply, Internal Electrification and other Ancillary Work Deadline12 Apr 2022 1687439 Inside construction of two animal shed, mosque and pump with staff quarter works at State guest house Padma and Meghna, Dhaka Deadline12 Apr 2022 1687441 Establishment of Bangabandhu Medical College & Hospital Sunamganj (Sub-Head:Supply & Installation of Sub-station equipment,Ring main unit) Deadline12 Apr 2022 1687442 Up-gradation & Renovation of Panchagarh District Hospital from 100 Bed to 250 Bed at Panchagarh (Sub-Head: Construction of 06 (Six) Storied Service building with 06 (Six) Storied F Deadline12 Apr 2022 1687443 Installation of kitchen cabinets and ancillary repair works of 20 flats in NAM Garden Government Officers Quarter Building No. 2, located at Section-13, Mirpur, Dhaka. FY 2021-2022 Deadline18 Apr 2022 1687445 Supply of Furniture and Fixture of University Womens Federation College Deadline21 Apr 2022 1687446 Electrical Repair Works in/c Changing of AC & Fitting-Fixtures at the Residence of the Superintendent of Police in Rangamati Hill District. Deadline18 Apr 2022 1687448 Construction of 6-Storied Academic Building with 6-Storied Foundation including Sanitary, Water Supply and General Electrification works in Patuakhali Science and Technology Univer Deadline11 May 2022 1687449 Supply & installation of education & learning Deadline18 Apr 2022 1687484 Ancillary Electrical Repair Works Including Replacement of Pump Motor at 37 Flat Government Officers Quarter in Rangamati Hill District. Deadline18 Apr 2022 1687485 Construction of 25.00m ling PSC Girder Bridge on Aolai UP (St. at Panail More)-Pagla bazar-Barokandi hat road at Chainage: 1200m under Replacement category [138743009] in Panchbibi Deadline27 Apr 2022 1687487 Installation of Air Conditioner at Pfizer Vaccine Center in/c Ancillary Electric Works in Rangamati General Hospital. Deadline27 Apr 2022 1687488 Construction of Boundary wall of 1. Bishkhali 2. Chomra 3. Nehal Khali 4. Shingjor Chandipur GPS Deadline20 Apr 2022 1687489 Horizontal Extension of 4-Storied Firm House Building with 4-Storied Foundation including Pile, Sanitary, Water Supply and General Electrification Works at Patuakhali Science and T Deadline11 May 2022 1687490 Repair & Renovation Works of Civil-Sanitary & Sewerage at the Residence of The Executive Engineer in Rangamati Hill District. Deadline18 Apr 2022 1687492 Electrical Repair Works at National Security Intelligence Office in Rangamati Hill District. Deadline18 Apr 2022 1687493 Construction of additional class room KASISIRA GPS under PEDP4. Deadline18 Apr 2022 1687494 Part-A: Improvement of Kumaria GC-Bohugram UP office via Sreepur Takerhat ( Kasiani Part) Road Deadline25 Apr 2022 1687495 Construction of Administrative Extension Building & Hall Room for Trishal Upazila Parishad, Mymensingh under Upazila Complex Extension Project-II Deadline05 May 2022 1687536 Vertical and Horizontal Extension of Existing Kabi Begaum Sufia Kamal Hall Deadline11 May 2022 1687537 Construction of Community Based Small Piped Water Supply Scheme Installing of 38 nos 100mm x 75mm dia (Depth: 250 m) Deadline09 May 2022 1687538 Road safety Works in different roads of Jamalpur, Kurigram, Rangpur, Lalmonirhat & Gaibandha Districts. Deadline20 Apr 2022 1687539 Furniture Supply for 67 Nos. Class Room and 7 Nos. Teachers Room of Selected 18 Nos. Govt. Primary School at different location of Pabna District. Deadline20 Apr 2022 1687540 Furniture Supply for 102 Nos. Class Room and 12 Nos. Teachers Room of Selected 23 Nos. Govt. Primary School at different location of Pabna District. Deadline20 Apr 2022 1687542 Works of renovation Including construction repair and maintenance work of car garage under sales and distribution division-3, BPDB, Sylhet. Deadline18 Apr 2022 1687543 Works of internal construction repair and maintenance work of the complaint center including modernization under Sales and Distribution Division-3, BPDB, Sylhet. Deadline18 Apr 2022 1687544 Construction of 1.00 No. R.C.C Box Culvert of Single vent Straight 2.00m Clear, 3.00m height & 10.25m width at Ch. 07+500 of Madaripur-Kalkini-Bhurghata Road (Z-8604) PMP (Minor) u Deadline20 Apr 2022 1687545 Construction of additional class room at Goga Purbo Digital Village GPS under Sarsha Upazila District-Jashore. Deadline21 Apr 2022 1687546 Works of Repair and Maintenance of the internal construction work of the KAPOTAKKHO building of Bagbari used by officials under the jurisdiction of Sales and Distribution Division- Deadline18 Apr 2022 1687548 Construction of 63.06m long RCC Girder Bridge on Daulatpur GC-Katlamari R&H Road at Chainage: 12150m under Replacement category [Road ID No. 250392002] [Upazila-Daulatpur, District Deadline09 May 2022 1687549 Repair of Office Staff Quarter's at Shaistagonj & Bahubal Road Section under Shaistagonj Road Sub-Division, Road Division Habiganj during the year 2021-2022 Deadline18 Apr 2022 1687550 Renovation work including modernization of the office of the Director (Local Government) of the office building of the Divisional Commissioner's Office. Deadline18 Apr 2022 1687555 Construction of inspection pit, raising of drain, apron repair, weather coating and sanitary work in male boy's hostel of Chattogram Medical College. Deadline18 Apr 2022 1687557 Deposit work for construction of 11 KV Express Feedersin order to supply electricity Deadline27 Apr 2022 1687558 Repair of Damaged Pavement by Aggregate Base Type-II including Premixed Bituminous Carpeting & Seal Coat work Deadline18 Apr 2022 1687559 Establishment of 5 Training Centers in 5 Basic Centers,1 Fashion Design Institute and 2 Market Promotion Centers under Bangladesh Handloom Board Deadline18 Apr 2022 1687560 Construction of Boundary Wall (90m) for Tulshikhali Inspection Bunglow of Keraniganj Road Sub-Division Under Munshiganj Road Division, During the Year 2021-2022. Deadline18 Apr 2022 1687561 Supplying best quality 1st Class Bricks for departmental emergency maintenance work at different roads of Sreenagar road Sub-Division, Under Munshiganj Road Division during the yea Deadline18 Apr 2022 1687562 Maintenance of Badly Damaged Pavement with Carpeting/Seal Coat including Strengthening & necessary repair of pavement distresses at 1st km (p) & 17th km Baniachong-Nabiganj Road (Z Deadline18 Apr 2022 1687563 Construction of a Pucca Kitchen inside of Sheikh Fazilatunnesa Mujib 250 Bedded General Hospital, Sirajganj. Deadline18 Apr 2022 1687564 Establishment of 5 Training Centers in 5 Basic Centers,1 Fashion Design Institute and 2 Market Promotion Centers under Bangladesh Handloom Deadline18 Apr 2022 1687565 Construction of ceiling, wall tiles, plastering and changing of roof C.I sheet of bir uttom shah alom auditorium of Chattogram Medical College. Deadline18 Apr 2022 1687566 Repair of Different type of works of Narisha Inspection Banglo Under Munshiganj Road Division During the Year 2021-2022. Deadline18 Apr 2022 1687567 Supplying Semi-Skilled & Un-Skilled Labour for Routine Maintenance Work (Jungle Cutting of Both Side Soft Shoulder) at Ch. 8+000 to Ch. 11+500 of Keraniganj Deadline18 Apr 2022 1687568 Construction of Bamnikathi Community Clinic (Old Ward No -1, New Ward No -3, Type-B) at Darial Union under Bakergonj Upazila in Barishal District. Deadline18 Apr 2022 1687569 Construction of Walkway on GL, Walkway on pile, Bank Protection, RCC Stair, Quay Wall, Drain Along Walkway, RCC Railing, RCC Bench, Deadline08 Apr 2022 1687570 Lift Servicing and Maintenance (G+5) works for Medical Bhaban at National University, Bangladesh Deadline26 Apr 2022 1687571 Repair of Damaged Pavement by Sub-Base, Base Type-II, Carpeting & Seal Coat and Construction of Soil Earthen Shoulder & Protective Work at Different Km Deadline18 Apr 2022 1687572 Supply & Construction of 3 Nos. Electrical Line From Constructed of 350 Cum/Hour Capacity Ground Water Treatment Plant to Pump House Deadline18 Apr 2022 1687573 Renovation and repair work of office of the seven nos Assistant Commissioner of Divisional Commissioner Office Building. Deadline18 Apr 2022 1687574 Renovation work including modernization of the office of the Deputy Director (Local Government) of the office building of the Divisional Commissioner's Office. Deadline18 Apr 2022 1687575 Installing Deep tube well adjacent to new academic building of Chattogram Medical College. Deadline18 Apr 2022 1687576 Necessary repair and renovation work as per the demand of the Divisional Continuing Education Center under the department of Nursing and Midwifery. Deadline18 Apr 2022 1687577 Gas line repair work of the staff quarter (Quarter no. 12 to 20) of Chattogram Medical College Hospital. Deadline18 Apr 2022 1687578 Supply & Installation of new grill,door net and old wood fram replacement by Aluminium thai glass at all window at Habiganj Circuit House.Year-2021-2022. Deadline25 Apr 2022 1687583 38 mm Tear Gas Launcher (06 Shot); 2,000 pcs Deadline17 May 2022 1687585 Supplying SPLIT TYPE AIR COOLER & IPS Under Munshiganj Road Division, During the Year 2021-2022. Deadline18 Apr 2022 1687586 Supplying Semi-Skilled & Un-Skilled Labour for Routine Maintenance Work (Jungle Cutting of Both Side Soft Shoulder) at Ch. 03+000 to Ch. 07+000 of Padma By-Pass Road (Z-8205) Under Deadline18 Apr 2022 1687588 Construction of Protection work at Hazrail Ashrayan Prokolpo under Dhakuria Union at Monirampur upazila in Jashore District. Deadline18 Apr 2022 1687589 Construction of Walkway on GL, Walkway on pile, Bank Protection, RCC Stair, Quay Wall, Drain Along Walkway, RCC Railing, RCC Bench Deadline08 May 2022 1687590 7016 VER-10 Vertical Extension of Existing Academic Building 1st & 2nd Floor In/c Sanitary Water Supply & Electrification Works at Arif Mahmud Degree College Muladi Upazila Barisha Deadline25 Apr 2022 1687591 Construction of Walkway on GL, Walkway on Pile, Bank Protection, RCC Stair, Quay Wall, Drain Along Walkway, Foot Over Bridge, RCC Railing, Deadline08 May 2022 1687593 Construction of steel frame wooden jetty with allied works between Communication from Vashanchar Rohinga Camp and Bayarchar Chairman ghat under Chattogram Division,BIWTA, Chattogra Deadline17 Apr 2022 1687594 Construction of Walkway on GL, Walkway on Pile, Bank Protection, RCC Stair, Drain Along Walkway, Footover Bridge, RCC Railing, RCC Bench Deadline08 May 2022 1687595 Transportation of 425-485 HP Caterpillar Engine with Propulsion unit for Ferry No.-UT-I(Imp)-005/1986 from Procurement and Storage Division Deadline18 Apr 2022 1687596 Construction of Walkway on GL, Walkway on Pile, Bank Protection, RCC Stair, Drain Along Walkway, Footover Bridge, RCC Railing, RCC Bench Deadline08 May 2022 1687597 Construction of box culvert-1 (2V-3.0mx2.5m) at Ch. (1+500Km) (b) Construction of box culvert-2 (2V-3.0mx2.5m) at Ch. (2+900Km) (c) Construction of WMCA Office building Deadline18 Apr 2022 1687599 Construction of Walkway on GL, Walkway on Pile, Bank Protection, RCC Stair, Quay Wall, Drain Along Walkway, Footover Bridge, RCC Railing, Deadline08 May 2022 1687600 Manufacturing, Supplying & Fixing Furniture at Singra Upazila Natore District under the Project of Establishment of 40 (forty) Technical Training Centre (TTC) at Upazila Level and Deadline19 Apr 2022 1687601 Construction of Basketball Ground Under Revenue Budget of Comilla University Main Campus. Deadline18 Apr 2022 1687602 Civil,Sanitary and painting work at the 600 sft quarter at Bangabandhu Sheikh Mujib Medical College, Faridpur. Deadline19 Apr 2022 1687603 Renovation and Civil Sanitary work Including ( tiles,plaster and dying ) at the kitchen stairways from kitchen to female hostel at Faridpur Medical Assistant Training School female Deadline19 Apr 2022 1687605 Construction of Walkway on GL, Walkway on Pile, Bank Protection, RCC Stair, Quay Wall, Drain Along Walkway, Boulder protection for Scour Deadline08 May 2022 1687606 Repair work at Civil surgeon office building, Faridpur. Deadline19 Apr 2022 1687607 Inside and outside painting including placement of thai window overhead water tank changinjg with ancillary work at the female hostel-2 at Bangabandhu Sheikh Mujib Medical College, Deadline19 Apr 2022 1687608 Construction of Walkway on GL, Walkway on Pile, Bank Protection, RCC Stair, Quay Wall, Drain Along Walkway, Boulder protection for Scour Deadline08 May 2022 1687609 Construction of Walkway on GL, Walkway on Pile, Bank Protection, RCC Stair, Quay Wall, Drain Along Walkway, RCC Railing, RCC Bench Deadline08 May 2022 1687610 Construction of Buffalo Calf Shed with Yard at BLRI Regional Station, Rajshahi Deadline18 Apr 2022 1687611 Construction of Hard Shoulder by Aggregate Base Type-ii & Carpeting at 114th(p),115th(p),116th(p),127th(p) and 128th(p) km Deadline19 Apr 2022 1687612 External Electrification of IHT at Mohakhali, Dhaka. (Sub-Head : Supply and installation of Solar System) Deadline26 Apr 2022 1687613 1). Construction and repair work of the boundary wall in front of the Faridpur Medical Assistant Training School at Faridpur. 2). Repair and renovation work of the roof top RCC pad Deadline19 Apr 2022 1687614 1.) Civil, sanitary repair and renovation work all the Breaking pit, soak well and septic tank at Faridpur Medical Assistant Training School, Faridpur Deadline19 Apr 2022 1687615 Construction of RCC TOE Wall & Palisiding at 5th(p), 6th(p), 8th(p),10th(p), 14th(p), 18th(p), 19th(p),20th(p) & 23th(p) km of Shibpur-Durgapur-Taherpur Road under RHD Road Divisio Deadline19 Apr 2022 1687616 const. of machuaghata registered primary school,khoksha upazila ,kushtia Deadline25 May 2022 1687641 const. of UTTAR JAYANTIHAJRA GPS under khoksha upazila ,kushtia Deadline25 Apr 2022 1687643 3000 FUR-25 Manufacturing and Supplying of Furniture for Academic Building to Bapiest Mission Boy's High School Sadar Barishal. Deadline25 Apr 2022 1687644 (1). Renovation with ancillary work at the care taker room,at Nursing and and Midwifery college Faridpur. (2). Repair and renovation work surrounding the boundary wall, drain with Deadline19 Apr 2022 1687645 Manufacturing, Supplying & Fixing Furniture at Dashmina Upazila in Patuakhali District under the Project of Establishment of 40 (forty) Technical Training Centre (TTC) at Upazila L Deadline19 Apr 2022 1687646 Improvement of Saint Martin Bangabandhu Sarak Road By Uni-Block at Ch.1200m-3200m [Road ID: 422904050] Under Teknaf Upazila, District: Cox`s Bazar. Deadline27 Apr 2022 1687647 Installation work of wall tiles Men Surgery ward -01 250 bed Hospital Deadline20 Apr 2022 1687649 Construction of 09 Nos Warehouse for Firefighting Equipment and Satellite Fire Station in Ukhiya Upazila, District: Coxsbazar. Deadline10 May 2022 1687651 Construction of remaining portion of RCC Walkway with railing in the west side along the Main Approach Road of SUST, Sylhet. Deadline18 Apr 2022 1687652 Cleaning work of Shaympur Khal & Titash Khal (Package -Ga). Deadline18 Apr 2022 1687653 Cleaning work of Manda Khal & Kajla Khal (Package -Kha). Deadline18 Apr 2022 1687654 Electrification Works at BLRI Regional Station, Rajshahi. Deadline19 Apr 2022 1687655 Cleaning work of different branch khal beside DND & Dhaka-Chattagram Highway area (Package -Umo). Deadline18 Apr 2022 1687656 Cleaning work of Jirani Khal (Nandipara), Basaboo Khal, Kadamtala Khal & Khilgaon Bagicha Khal (Package-Ka). Deadline18 Apr 2022 1687657 Construction of Boundary wall with Gate, Compound drain, Arboriculture, Road including necessary civil, sanitary Deadline21 Apr 2022 1687659 Construction of additional class room Mohammadpur GPS under PEDP4 at Pirganj, Thakurgaon Deadline26 Apr 2022 1687660 Construction of additional class room Chapor GPS under PEDP4 at Pirganj,Dist - Thakurgaon Deadline26 Apr 2022 1687661 Construction of Boundary wall with gate, Compound drain, Arboriculture, Road including necessary civil, sanitary remaining works of 13-storied Deadline21 Apr 2022 1687663 Construction of 6 Nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works at different Upazila of Net Deadline20 Apr 2022 1687665 Installation of Laundry and drying Dress sheds Inside 250 bed Hospital at patuakhali. Deadline19 Apr 2022 1687666 3000 FUR-23 Manufacturing and Supplying of Furniture for Academic Building to Mohabaj Secondary School Sadar Barishal. Deadline25 Apr 2022 1687667 Construction of 6 Nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works at different Upazila of Net Deadline20 Apr 2022 1687669 Installation of 50 Nos 100 x 38 mm dia. deep tube well with submersible pump at different primary schools of Netrokona District. Deadline20 Apr 2022 1687670 Construction of 6 Nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works at different Upazila of Net Deadline20 Apr 2022 1687672 Supply of 1st Class Bricks, Sand & Fire Wood (2nd Phase) for Maintenance of Different of Roads Under Road Sub-Division, Kulaura During The Year 2021-2022 Deadline21 Apr 2022 1687673 Construction of 6 Nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works at different Upazila of Net Deadline20 Apr 2022 1687674 Up-gradation & Renovation of Rangamati District Hospital from 100 Bed to 250 Bed at Rangamati District (S.H: Supply & Installation of Lift) Deadline27 Apr 2022 1687676 Raw Materials for Tourism & Hospitality Management. Deadline19 Apr 2022 1687677 Repairing & Seal coat work at 1st(P), 2nd(P), 3rd(P) & 4th (p) km of Sari-Goainghat Road (Z-2012) under Sylhet Road Division, Sylhet during the year 2021-2022. Deadline20 Apr 2022 1687678 Construction of 6 Nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works at different Upazila of Net Deadline20 Apr 2022 1687819 Providing and installation of HT Cable i/c. related works from Main Power Plant to RADAR sub-station at HSIA. Deadline26 Apr 2022 1687823 Installation of 50 Nos 100 x 38 mm dia. deep tube well with submersible pump at different primary schools of Netrokona District. Deadline20 Apr 2022 1687825 Renovation works, Interior Designing works (Civil works, Electrification & Interior Designing ) Development of animation Studio in Faculty of fine arts, university of Dhaka. Deadline11 Apr 2022 1687826 Construction of One Storied Upazila office Building at Fulbari Upazila including additional one story stair case arrangement with Four storied foundation for Department of public h Deadline19 Apr 2022 1687828 Supply of Tulip Contact and Spout Bushing Male Contact for 11 kV ABB Breaker Located at different substations under Grid South-2, DPDC Deadline20 Apr 2022 1687829 Supply of Ambulance at Nayinkhoachari Upzila Healh Complexe,Nayinkhoachari ,Bandorban. Deadline19 Apr 2022 1687830 Construction of 2nd & 3rd Floor of CMP Dangar Char Naval Investigation Center Building with 6 storied foundation. (Sub Head: Civil, Sanitary & Electrical works). Deadline19 Apr 2022 1687831 Installation of 14 nos. SDB, necessary cables, supply of circuit breaker Deadline21 Apr 2022 1687832 Construction of 9 storied building at 38/C & 39/C Asad avenue, Mohammadpur Housing Estate under Mirpur Housing & Settlement Division-2 Deadline08 May 2022 1687834 Yearly Maintenance of Air Coolers Located at different Substations under Grid South-2, DPDC Deadline20 Apr 2022 1687835 Repair & Maintenance of Air Coolers Located at different Substations under Grid South-1, DPDC Deadline20 Apr 2022 1687837 Supply & Installation of Earthing System at different Substations under Grid South-2, DPDC Deadline20 Apr 2022 1687839 Construction of Additional Class Room RAZARAMPUR GPS,Under PEDP4.(2H+2V+1V/F4+WB) Deadline26 Apr 2022 1687840 Construction of VIP/VVIP Lounge(i/c E/M works - Providing & Installation of Electric Water Geyser, Casset type AC for VIP 1 & 2 lounge, Departure lounge, Rest House, Control Tower Deadline19 Apr 2022 1687842 Construction of additional Class room Moddho Dirgha Akhrabari GPS under PEDP-4 Deadline26 Apr 2022 1687845 Repair of Damaged Flexible Pavement with carpeting and seal coat work including aggregate Base Type 1 at 1st KM (p) of Gowainghat Old Riverghat Road (Z 2019) under Road Division Sy Deadline20 Apr 2022 1687846 Construction of 40 nos (Nachole: 20 nos; Gomastapur: 20 nos) Community Based Small Piped Water Supply Scheme Deadline26 Apr 2022 1687848 1.(a) Construction of Vegetables & Agriculture Products Markets (Madrasa Mor Bazar) (b) Construction of Public Toilet (Nichabazar) (c) Construction of Shed for Public Transport Pas Deadline27 Apr 2022 1687850 Improvement of Budhunda-Horipur-Padua Road from Ch. 00-1550m Road ID-413584058. Deadline28 Apr 2022 1687851 Repair and Renovation of Different Residential Building under Moulvibazar Road Division during the year 2021-2022 Deadline21 Apr 2022 1687853 Repair of existing Drain at 251st Km(P) on Dhaka (Katchpur)-Bhairab-Jagadishpur-Shaistaganj-Sylhet-Tamabil-Jaflong Road ( N2) under Road Division Sylhet during the year 2021-2022. Deadline20 Apr 2022 1687855 Supply of Different Size Well Graded Stone Chips & Pea-gravels (Second Phase) for Maintenance of Different Roads Under Road Sub-Division, Kulaura During The Year 2021-2022 Deadline21 Apr 2022 1687857 HBB work at 33rd (P), 47th (P), & 48th (P) km. of Rajnagar - Kulaura - Juri - Barlekha - Beanibazar - Sheola - Charkhai (R-281) Road under Road Division, Moulvibazar during the yea Deadline21 Apr 2022 1687858 Furniture (Chair, Table, Decoration, air Condition ,Light etc.) Development of Animation Studio in Faculty of fine arts, University of Dhaka. Deadline11 Apr 2022 1687859 Construction of Additional Class Room Dowlatpur GPS Under PEDP4 Deadline26 Apr 2022 1687862 Skill Development For Mobile Game and Application (3rd Revised) Project Deadline13 Apr 2022 1687863 Procurement of Books & Journals for Departments and Library of Puran Bazar Degree College Deadline20 Apr 2022 1687864 Skill Development For Mobile Game and Application (3rd Revised) Project Deadline13 Apr 2022 1687865 Construction of 20nos. Community Based Small Piped Water Supply Scheme by Installing 100mm x 75mm dia (Avr. Depth: 200 m) Deadline26 Apr 2022 1687868 Construction of Growing Buffalo Shed with Yard at BLRI Regional Station, Rajshahi. Deadline21 Apr 2022 1687869 Renovation and Refurbishment of Classroom, Wash Room, Administrative Room and Department at Dhaka Commerce College Deadline21 Apr 2022 1687871 Construction of Main Gate with Sentry Post at DPHE Ranir Bazar Compound Adarsha Sadar Upazila of Cumilla District under the Revenue Budget of DPHE 2021-22. Deadline19 Apr 2022 1687872 Supply of Medical and Surgical Requisite Deadline20 Apr 2022 1687876 Procurement of Laboratory Equipmentâ??s. Deadline19 Apr 2022 1687877 Skill Development For Mobile Game and Application (3rd Revised) Project Deadline13 Apr 2022 1687879 Procurement of different types of Raw Materials for manufacturing of Telecommunication Copper Cables, Optical Fiber Cables, HDPE Duct and Electrical Overhead Conductors and Cables. Deadline25 Apr 2022 1687880 Construction of Sewage Treatment Plant (Civil Works & STP Module) at BPATC, Savar, Dhaka; Under the Project of Deadline28 Apr 2022 1687881 Engineering & others Equipment for Software Lab Deadline18 Apr 2022 1687882 Supplying & Installation of AC, CCTV, Lightning Arrester, 150KVA Transformer, Telephone System, Conference System) under the project of ''Establishment of Testing Laboratory of fou Deadline17 Apr 2022 1687883 Construction of Textile Vocational Institute, Jagannathpur, Sunamganj Deadline18 Apr 2022 1687885 Supply & installation of education & learning Deadline18 Apr 2022 1687910 Establishment of Kushtia Medical College and Hospital (Sub-Head: Supply, Installation, Testing and Commissioning of 500 & 300 KVA Disel Generator with ATS ( For Hospital ,OT & Acad Deadline18 Apr 2022 1687911 Supply Of Education & LEARNING Equipments Deadline18 Apr 2022 1687912 Construction of 2 (two) semipaca shed, kitchen, toilet and garderners semipaca shed, paca shed all repir including others ancillary work of Government residence at 34 Minto road, D Deadline12 Apr 2022 1687914 Establishment of Shaheed Tajuddin Ahmad Medical College & Hospital, Gazipur (1st Revised) (Sub-Head: Land Development Lot-02: From 03(three) Feet Height to FGL) Deadline13 Apr 2022 1687916 Supply of Desktop Computer & Related Accessories Deadline20 Apr 2022 1687918 Establishment of Shaheed Tajuddin Ahmad Medical College & Hospital, Gazipur (1st Revised) (Sub-Head: Construction of Boundary Wall/ Retaining Wall) Deadline13 Apr 2022 1687920 Supply of Laptop Computer & Related Accessories Deadline20 Apr 2022 1687922 Establishment of Kushtia Medical College and Hospital(2nd Revised)[Sub-Head - Construction of Internee Doctors Dormitory Building Male , Female , Multipurpose Building (Commercial Deadline12 Apr 2022 1687923 Construction of Laboratory Cum Store Building(2-storied Building with 6-storied foundation) including Civil, Sanitary & Electrification works at 250 Bed Jamalpur District Hospital Deadline27 Apr 2022 1687925 Construction of 10 Storied Staff Nurses Dormitory with 10 storied foundation including Civil, Sanitary, Internal Electrification Works under the Project of ''Establishment of Shahe Deadline05 May 2022 1687926 Supply, Installation & Commissioning of Multimedia Projector & Photocopy Machine. Deadline20 Apr 2022 1687928 Construction of Ward for mentally handicapped prisoners, Male-classified prisoner ward and Juvenile prisoner barrack, Condemn cell, Security and other cells, High Security Prisoner Deadline24 Apr 2022 1687929 Supply of Dasktop Computer, Laser Printer, Scanner, Offline Deadline20 Apr 2022 1687930 Establishment of 5 Training Centers in 5 Basic Centers,1 Fashion Design Institute and 2 Market Promotion Centers under Bangladesh Handloom Board (1st revised) One at Sirajganj.(Sub Deadline17 Apr 2022 1687931 Construction of a Pucca Kitchen inside of Sheikh Fazilatunnesa Mujib 250 Bedded General Hospital, Sirajganj. Deadline17 Apr 2022 1687932 Procurement of Photogrammetric Solution {(1).Workstation with 3D Mouse & Monitor Deadline19 Apr 2022 1687935 Construction of Multistoried Residential Flat for Govt. Officers-Staffs at Paikpara, Mirpur, Dhaka. (Sub-Head: Construction of Utility Buildings eg: Sub-Station/Service Building-1 Deadline17 Apr 2022 1687936 Construction of box culvert-1 (2V-3.0mx2.5m Deadline18 Apr 2022 1687937 Construction of 9-Storied office Building with 2 Basement and 10-Storied Residential Building of the Department of Public Library,Dhaka including Civil, Internal Sanitary and Inter Deadline17 Apr 2022 1687938 Procurement of Hydrographic Survey Software (Hypack Max, Hypack Deadline20 Apr 2022 1687939 Procurement of RTK Based Differential Global Positioning System (DGPS) Receiver & Related Accessories. Deadline19 Apr 2022 1688046 Supply of Printer Toner at National University, Bangladesh Deadline25 Apr 2022 1688048 Supply of Photocopier Toner at National University, Bangladesh Deadline24 Apr 2022 1688050 Supply of Oracle license (renewal) at National University, Bangladesh Deadline25 Apr 2022 1688051 Supply of Brand Computer, Laptop, Printer and UPS for Pro-Vice Chancellor and Treasurer's office at National University, Bangladesh Deadline21 Apr 2022 1688052 Supply & Installation of Network backup equipment Deadline18 Apr 2022 1688054 Supply of Computer Accessories for All Department 3255101 Deadline17 Apr 2022 1688055 Construction of WMCA office building (6mx12), (b) Electrical works Deadline18 Apr 2022 1688056 Printing Binding & Supplying 05 kind of Text books for BOU MEd program 1st semester. Deadline19 Apr 2022 1688057 Supply & Installation Teaching Training and Learning Materials. Deadline19 Apr 2022 1688059 Supply of Electrical Items Deadline19 Apr 2022 1688060 Raw Materials for Computer Science & Technology Deadline19 Apr 2022 1688061 Supply & Installation of Conference Sound System (30 Delegates) for Additional Director's Office, Jashore Region, Jashore Deadline19 Apr 2022 1688062 Supply, Installation, Configuration and Customization/Development of RegTech/SupTech Deadline04 May 2022 1688066 Supply,installation,testing and commissioning of IP equipment at district level and related facilities Deadline10 May 2022 1688067 IT Consultant (Programmer) (9) IT Consultant (System Documentation) ( Deadline25 Apr 2022 1688068 Supply of enterprise graded storage system and servers system for ASA Deadline18 Apr 2022 1688636 Supply 10,00,000 units EMV VISA CHIP CARDS Deadline19 Apr 2022 1688640 Installation of 5Lac smart pre-payment meter Deadline10 May 2022
API Integration — seamlessly integrate global tender data into your systems
AI-Powered Tender Intelligence for smarter bidding decisions
Publish Your Tenders — reach a global network of suppliers
Source Tenders Faster — discover verified tenders from across the globe
Chat with us