Bangladesh Tenders - 6 July 2022

71 tenders published in Bangladesh on 6 July 2022.

Tender Impulse is your trusted global tender website and tender aggregator, offering access to tens of thousands of tenders from over 190 countries. On this page, explore all government tenders, business tenders, and e-tenders published in Bangladesh on 6 July 2022, across industries like IT-Software, Healthcare & Medical, Infrastructure and construction, Repair, Maintenance & Installation, Industrial Machinery & Equipment, Education & Training, GIS/GPS, Management Consultancy, Transportation & Mobility, Energy, Security Printing, Laboratory & Scientific Instruments.

Why Choose Tender Impulse for Bangladesh?

  • Access a curated list of tender notices from official sources, including ministries, PSUs, and local procurement authorities.
  • Daily updates of world tenders covering Bangladesh and beyond.
  • Tailored listings for sectors like IT-Software, Healthcare & Medical, Infrastructure and construction, Repair, Maintenance & Installation, Industrial Machinery & Equipment, Education & Training, GIS/GPS, Management Consultancy, Transportation & Mobility, Energy, Security Printing, Laboratory & Scientific Instruments, including projects in EPC, defence, and infrastructure.
  • Easy filters to sort tenders by publish date, keywords, CPV codes, or authority name.

Get Started with Full Access

With a simple free live demo, gain access to tender details, bidding documents, authority contacts, and real-time updates from Bangladesh.

1898664 Hiring a firm for International Patent (PCT) Support Deadline14 Jul 2022 1898721 Scanner,X-Ray Baggage-Medium,220V Ac 50/60Hz 15Amps Deadline14 Jul 2022 1898754 Construction of 3-Storied Upazilla Model Mosque and Islamic Cultural Centre with 3- storied Foundation (B- type) Including Civil, Sanitary &. Electrical works at Kendua Upazilla in Deadline19 Jul 2022 1898755 Construction of 3-Storied Upazilla Model Mosque and Islamic Cultural Centre with 3- storied Foundation (B- type) Including Civil, Sanitary &. Electrical works at Madan Upazilla in Deadline19 Jul 2022 1898757 Construction of 3-Storied Upazilla Model Mosque and Islamic Cultural Centre with 3- storied Foundation (B- type) Including Civil, Sanitary &. Electrical works at Mohangonj Upazilla Deadline19 Jul 2022 1898758 Operation and Maintenance for Electrical work of Alternative Residence of Honorable Prime Minister (SudhaSadon), House No-52, Road No-5 at Dhanmondi, Dhaka. FY: 2022-2023. Deadline17 Jul 2022 1898759 Repair and maintenance work of Sree Shyamol Chandra Das, Office Assistant, DPHE, Banani compound under store Division, Dhaka Department of Public Health Engineering (Financial Year Deadline19 Jul 2022 1898760 Construction of PCR Lab at National Institute of Preventive & Social Medicine, Dhaka. Deadline16 Aug 2022 1898761 Replacing of unserviceable air cooler and wiring with related works in the Shohid Dr. Milon Bhaban at Mohakhali, Dhaka. Deadline19 Jul 2022 1898769 Remaining works of Ground floor & 1st floor female barrack of Chattogram district police line at Halishahar Deadline19 Jul 2022 1898776 Repair and Renovation Works for Suhrawardy Hall at the University of Chittagong. Deadline19 Jul 2022 1898777 Lab Equipment for Cell Culture Laboratory of Jashore University of Science and Technology, Jashore Deadline17 Jul 2022 1898778 Construction of Additional Class Room of Balosh Para Government Primary School Under PEDP-4 Project. Deadline20 Jul 2022 1898779 REPAIRING OF VARIOUS TYPE AIR CONDITION UNIT, SUBMERSIBLE PUMP, CENTRIFUGAL PUMP, WIITH RELATED WORKS MAINTENANCE OF SSAE/ELEC'S UNDER DEE/PXC OFFICE. Deadline18 Jul 2022 1898780 Construction of additional classroom Hasham Pur GPS under PEDP4 Deadline02 Aug 2022 1898781 Rehabilitation of Gamaritola UP(Kolsindur GC)-Moulovibazar Road via Ranshinghpur Bazar from Ch. 00-3350m & 3722-4222m under Upazila: Dhobaura, District: Mymensingh (Road ID: 361163 Deadline31 Jul 2022 1898783 Construction of RCC Road in front of Central Oxygen Generation Plant at CPA Hospital. Deadline21 Jul 2022 1898784 Construction of additional class room DORI GAON GPS under PEDP4 Deadline19 Jul 2022 1898785 Construction of Dakkin Abdullahpur Aftabuddin Bhuian GPS under PEDP4 Deadline18 Jul 2022 1898786 AT CTG (Goalpara R.F.L pump to CRB 7-xing moor): Construction of new water supply pipe line from goalpara RFL pump to CRB 7-xing moor in connection of agent hill water reserve tank Deadline02 Aug 2022 1898787 Supply of High and Low Bench for Students in various secondary level educational institution, Under Kalihati Upazia, District Tangail (Sub-Project) Deadline25 Jul 2022 1898788 Construction of additional classroom 79 NO. BORPA GPS under PEDP4 Deadline26 Jul 2022 1898789 Construction of additional class room of Ramnagor Khamatpara GPS under PEDP4. Deadline28 Jul 2022 1898790 Fenestration Works(Civil & Electrical) of Sonali Bank Limited, Head Office, Motijheel, Dhaka. Deadline02 Aug 2022 1898791 Repair and Necessary Maintenance Works of Shaheed Abdur Rob Hall at the University of Chittagong. Deadline19 Jul 2022 1898792 Repair and Necessary Maintenance Works of Shah Amanat Hall at the University of Chittagong. Deadline19 Jul 2022 1898793 Construction of additional class room Nolbunia R.G under PEDP4. Deadline19 Jul 2022 1898794 Construction of 3-Storied Upazilla Model Mosque and Islamic Cultural Centre with 3- storied Foundation (B- type) Including Civil, Sanitary &. Electrical works at Barhatta Upazilla Deadline19 Jul 2022 1898795 Upgradation & Renovation of Joypurhat District Hospital from 100 to 250 bed.(sub-head: Compound & Garder light, Overhead line,PABX System, CC TV, Sound System and other Electro-Mec Deadline18 Jul 2022 1898796 Replacement of existing damaged/unserviceable tube light, fan, power point and other electrical repair works for VIP central circuit house room no-7,8 in Dhaka. Deadline19 Jul 2022 1898797 Construction of Reservoir, Deep Tube-Well, Play Ground, Rain Water Harvesting System and Emplacement of Foundation Stone in the Area of Administrative and Dormitory Building (Site Deadline20 Jul 2022 1898798 Construction of Auditorium & Training Building with 4 Storied Foundation (Internal Sanitary, Water Distribution, Internal Electrification, External Water Supply in/c Ancillary Work Deadline01 Aug 2022 1898799 Construction of Internal Road, Retaining Wall and Ghat in the Area of Administrative and Dormitory Building (Site No-1), Chairman Bungalow (Site No-2) and in the Residential Area ( Deadline01 Aug 2022 1898800 International Consultancy Services for Feasibility Study, Detailed Planning & Design of Smart/Advance Distribution Network Including Upgradation Deadline21 Aug 2022 1898801 International Consultancy Services for Feasibility Study, Detailed Planning & Design of Smart/Advance Distribution Network Including Upgradation Deadline21 Aug 2022 1898802 Project titled Deadline14 Jul 2022 1898803 Aspire to Innovate Programme Deadline14 Jul 2022 1898804 Project titled Deadline14 Jul 2022 1898805 Construction of Betar Complex Bhabon (5 storied Building with 20 storied Foundation & 1 Basement) and Well Decorated Bangabondhu Corner at Bangladesh Betar, Chattogram under the pr Deadline21 Jul 2022 1898806 Construction of Main Office Building (3-Storied Building with 4- Storied Foundation) with Civil, Internal Sanitary & Water Supply, Internal Electrification and other Ancillary Work Deadline24 Jul 2022 1898807 Invitation for appointment of manpower like medical officer, lab consultant, nurse, technologist, data operator, maid, ward boy and cleaner by outsourcing-method Deadline21 Jul 2022 1898808 Sub soil investigation for the site of Construction of sports complex for the people with special needs beside Bank Town, Savar, Dhaka. Deadline13 Jul 2022 1898812 Remaining works of Ground floor & 1st floor female barrack of Chattogram district police line at Halishahar Deadline19 Jul 2022 1898813 Construction of PCR Lab at National Institute of Preventive & Social Medicine, Dhaka. Deadline16 Aug 2022 1898814 e/ZPSYL/2021-22/RB-21 Deadline16 Aug 2022 1898815 Outsourcing of driver for inspection vehicle of Executive Engineer and Sub-divisional Engineer-1/2/3 under PWD Maintenance division, Chattogram during the year 2022-2023. Deadline19 Jul 2022 1898817 Construction of 03 Nos. Test Tubewell at different locations within Chattogram City Corporation area under Construction Division-2, Chattogram WASA Deadline19 Jul 2022 1898820 Construction of Additional class room Bauria GPS under PEDP4 Deadline19 Jul 2022 1898821 Construction of Main Gate and Gate House (Phase-1) at Khulna University, Khulna Deadline19 Jul 2022 1898823 Construction of Single Storied Sub-Station Building and Supply & Installation of Sub-Station Equipment (Phase-1) at Khulna University, Khulna. Deadline25 Jul 2022 1898824 Annual servicing, maintenance and operation work of 2 Nos 13-stop 800 kg passenger lift (OTIS SIGMA brand) at13 story government residential building Togor (1000sft and 1250 sft), Deadline14 Jul 2022 1898825 Repair and renovation of unserviceable air cooler power line, drain line, control with related works in Bangladesh College of Physicians and Surgeons (BCPS) at Mohakhali, Dhaka. Deadline19 Jul 2022 1898827 Improvement of Bousha Bazar -Adarshanagor Bazar Road with protective works [Bousha Bazar- Chasrakhali Bazar Road (Atpara Part)] (Ch: 500-850m all weather and 850-2010m by RCC), Con Deadline25 Jul 2022 1898828 Yearly maintenance and Supervision works of 5 (five) lifts of Khulna cgm court and district and session judge court. Deadline14 Jul 2022 1898830 Emergency maintenance/removal of service line (illegal pipe line if any)/replacement/relaying of distribution / service gas pipeline in Chittagong northern area (Phase- 08). Deadline25 Jul 2022 1898831 Yearly maintenance and Supervision works of 2 (two) lifts of Khulna Medical College Academic Building Deadline14 Jul 2022 1898833 Yearly Maintenance and Supervision works of 09(nine) lifts at 250 bed Shaheed Sheikh Abu Naser Specialized Hospital. Deadline18 Jul 2022 1898834 Yearly Maintenance and Supervision works of 05 (five) lifts at Khulna Medical College and Hospital Deadline18 Jul 2022 1898835 Providing Shelving Racking System in CFS shed at New Mooring Overflow Container Yard. Deadline27 Jul 2022 1898837 Repair of burnout main control switch & loop cable for IVF section and sub station for IPH at Mohakhali, Dhaka. Deadline19 Jul 2022 1898838 Yearly maintenance and operation work of 2 Nos 630 Kg 7-Stop lift in Purta Bhaban, Segunbagich, Dhaka. Duration 1st July 2022 to 30th June 2023. Deadline14 Jul 2022 1898871 Appointment of Supplier for Supplying Manpower Survices by Outsourcing Method Deadline25 Jul 2022 1898872 Bangladesh Insurance Sector Development Project Deadline11 Aug 2022 1899103 Supply of 11/0.4KV, 250 KVA Distribution Transformer, Package-15, Lot-04. Deadline08 Aug 2022 1899111 Supply of 11/0.4KV, 200 KVA Distribution Transformer, Package-16, Lot-04. Deadline08 Aug 2022 1899156 Procurement of 03 (three) items of spare parts for 10 Ton capacity SENNEBOGEN brand Mobile Crane Deadline21 Jul 2022 1899189 Procurement of 08 (eight) items of spare parts for 30 Ton capacity Tadano brand Mobile Crane Deadline21 Jul 2022 1899583 Overhaul and Exchange of modules of 02 passport personalization machine LP2100 Deadline11 Aug 2022 1899637 Supply of automobile spare parts Deadline03 Aug 2022 1899800 Site preparation for two body scanners Chattogram Airport (as per drawing given by JICA Engineer). Deadline21 Jul 2022 1900230 Periodic & Emergency Maintenance Works with necessary Spare Parts for Water Bath Heaters, Regulators & Filter Separators at various TBS/CMS/RMS under Jalalabad Gas Franchise area, Deadline20 Jul 2022
API Integration — seamlessly integrate global tender data into your systems
AI-Powered Tender Intelligence for smarter bidding decisions
Publish Your Tenders — reach a global network of suppliers
Source Tenders Faster — discover verified tenders from across the globe
Chat with us