Bangladesh Tenders - 22 September 2022 (Page 1 of 2)

218 tenders published in Bangladesh on 22 September 2022.

Tender Impulse is your trusted global tender website and tender aggregator, offering access to tens of thousands of tenders from over 190 countries. On this page, explore all government tenders, business tenders, and e-tenders published in Bangladesh on 22 September 2022, across industries like Education & Training, Healthcare & Medical, Infrastructure and construction, Management Consultancy, Industrial Machinery & Equipment, IT-Software, Transportation & Mobility, Repair, Maintenance & Installation, Furniture & Furnishings.

This is page 1 of 2 for tenders published in Bangladesh on 22 September 2022.

Why Choose Tender Impulse for Bangladesh?

  • Access a curated list of tender notices from official sources, including ministries, PSUs, and local procurement authorities.
  • Daily updates of world tenders covering Bangladesh and beyond.
  • Tailored listings for sectors like Education & Training, Healthcare & Medical, Infrastructure and construction, Management Consultancy, Industrial Machinery & Equipment, IT-Software, Transportation & Mobility, Repair, Maintenance & Installation, Furniture & Furnishings, including projects in EPC, defence, and infrastructure.
  • Easy filters to sort tenders by publish date, keywords, CPV codes, or authority name.

Get Started with Full Access

With a simple free live demo, gain access to tender details, bidding documents, authority contacts, and real-time updates from Bangladesh.

2104583 Construction of Additional classroom Dakerpara GPS under PEDP4. Deadline20 Oct 2022 2104584 Procurement of Basic Eye Care Equipment Deadline17 Oct 2022 2104585 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2104586 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2104587 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104588 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2104589 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104590 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104591 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104592 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104593 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104594 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104595 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104596 Emergency electrification work for the office of the Chief Accounts Officer, Public Works Department located at the 11th floor of the 2nd-12th floor government office building, Seg Deadline06 Oct 2022 2104597 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104598 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104599 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104600 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104601 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104602 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104603 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104604 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104605 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104606 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104607 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2104608 Construction of boardwalks on bear and Crocodile enclosures for tourists. Deadline12 Oct 2022 2104609 Construction of underground drainage pipelines with infrastructure to remove waterlogging (1000 meters each). Deadline04 Oct 2022 2104610 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104611 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104612 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104613 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104614 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104615 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104616 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104617 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104618 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104619 Emergency electrical work including replacement of burnt main service cable in the office of Election Commission Ramna and Motijheel sub-division located on the 5th floor of the 1s Deadline06 Oct 2022 2104620 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104654 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104671 Construction of uPVC buried pipeline ( (1000 meter each) for 2-cusec old force mode tube well scheme. Deadline04 Oct 2022 2104672 Construction of uPVC buried pipeline ( (1000 meter each) for 2-cusec old force mode tube well scheme. Deadline04 Oct 2022 2104673 Construction of buried pipeline (1000meter each) for 1-cusec Electric/Solar operated LLP. Deadline04 Oct 2022 2104674 Construction of uPVC buried pipeline ( (1000 meter each) for 2-cusec electric operated LLP Scheme. Deadline04 Oct 2022 2104675 Construction of uPVC buried pipeline ( (1000 meter each) for 2-cusec electric operated LLP Scheme. Deadline04 Oct 2022 2104676 Package No.:- NBIDGPS-1/G1.0071Furniture Supply for 91 Nos Class Room and 7 Nos Teachers Room of Selected 26 Govt. Primary School at different location of Tangail District. Deadline03 Oct 2022 2104677 Construction of uPVC buried pipeline ( (1000 meter each) for 2-cusec old force mode tube well scheme. Deadline04 Oct 2022 2104678 Construction of uPVC buried pipeline ( (1000 meter each) for 2-cusec old force mode tube well scheme. Deadline04 Oct 2022 2104679 Construction of uPVC buried pipeline ( (1000 meter each) for 2-cusec old force mode tube well scheme. Deadline04 Oct 2022 2104696 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104697 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104698 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104700 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104701 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104702 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2104703 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2104704 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2104705 Construction of 2.5m wide loop road for tourists to visit enclosures. Deadline12 Oct 2022 2104706 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104707 Construction of additional class room MuraripurDakkinpara GPS under PEDP4 Deadline20 Oct 2022 2104708 CONSTRUCTION OF ACADEMIC (5-STORIED) CUM ADMINISTRATIVE (4-STORIED) BUILDING WIIH WORKSHOP & SERVICE AREA (SINGLE STORIED) IN/C SANITARY, ELECTRIFICATION & RAIN WATER PRESERVATION Deadline20 Oct 2022 2104709 Arboriculture works in Poragacha, Ramgoti, Lakshmipur under the project construction of Bangabandhu smriti stomvo and upgraded gucchogram at Poragacha, Ramgoti, Lakshmipur. Deadline06 Oct 2022 2104710 Construction of uPVC buried pipeline ( (1000 meter each) for 2-cusec electric operated LLP Scheme. Deadline04 Oct 2022 2104711 Extension of existing UPVC underground irrigation line (buried pipe) for 2-cusec force mode tube well. (400 m each). Deadline04 Oct 2022 2104712 Construction of uPVC buried pipeline ( (1000 meter each) for 2-cusec old force mode tube well scheme. Deadline04 Oct 2022 2104713 Extension of existing UPVC underground irrigation line (buried pipe) for 2-cusec force mode tube well. (400 m each). Deadline04 Oct 2022 2104714 Extension of existing UPVC underground irrigation line (buried pipe) for 2-cusec force mode tube well. (400 m each). Deadline04 Oct 2022 2104715 Extension of existing UPVC underground irrigation line (buried pipe) for 2-cusec force mode tube well. (400 m each). Deadline04 Oct 2022 2104716 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2104717 Construction of uPVC buried pipeline ( (1000 meter each) for 2-cusec electric operated LLP Scheme. Deadline04 Oct 2022 2104718 Extension of existing UPVC underground irrigation line (buried pipe) for 2-cusec force mode tube well. (400 m each). Deadline04 Oct 2022 2104719 Supply fitting fixing of sanitary and hardware materials of West, South, North, North-West, South-West block of national Parliament building and Parliament members residence Buildi Deadline06 Oct 2022 2104720 Periodic Maintenance Programme for Construction of Service Road (SMVT Lane) from Ch: 0+000 (Kazla) to Ch: 2+650 (Matuail) of Dhaka(Jatrabari) - Cumilla (Mainamati) - Chattogram - T Deadline19 Oct 2022 2104721 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2104722 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2104723 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2104724 Construction of underground drainage pipelines with infrastructure to remove waterlogging (1000 meters each). Deadline04 Oct 2022 2104725 Construction of underground drainage pipelines with infrastructure to remove waterlogging (1000 meters each). Deadline04 Oct 2022 2104726 Construction of underground drainage pipelines with infrastructure to remove waterlogging (1000 meters each). Deadline04 Oct 2022 2104727 Establishment of Demonstration Plots in drip irrigation system including supplying of all required accessories. Deadline04 Oct 2022 2104728 Construction of underground drainage pipelines with infrastructure to remove waterlogging (1000 meters each). Deadline04 Oct 2022 2104729 Construction of underground drainage pipelines with infrastructure to remove waterlogging (1000 meters each). Deadline04 Oct 2022 2104730 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104731 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104732 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104733 Construction of two enclosures for mammals. Deadline12 Oct 2022 2104734 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104735 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104736 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104737 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104738 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104739 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2104740 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104741 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104742 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104743 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104744 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2104745 Construction of 2.75 m height enclosure with entrance gate for breeding of the crocodiles. Deadline12 Oct 2022 2104746 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104747 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104748 Construction of underground drainage pipelines with infrastructure to remove waterlogging (1000 meters each). Deadline04 Oct 2022 2104749 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2104750 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2104751 Construction of underground drainage pipelines with infrastructure to remove waterlogging (1000 meters each). Deadline04 Oct 2022 2104752 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104753 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104754 Conducting Prework and Post work survey of Khal/ Nala for measurement of soil volume and submission report as booklet. Deadline04 Oct 2022 2104755 Construction of additional Class Room of Tarosree Govt. Primary School under PEDP-4 at Gaffargaon Upazila District- Mymensingh Deadline12 Oct 2022 2104756 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104757 Construction of underground drainage pipelines with infrastructure to remove waterlogging (1000 meters each). Deadline04 Oct 2022 2104758 Re-Excavation of Irrigation and drainage Khal/canal with leveling, dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and const Deadline04 Oct 2022 2104759 Construction of crop protection Embankment (including leveling, dressing, turfing etc.). Deadline04 Oct 2022 2104760 Construction of crop protection Embankment (including leveling, dressing, turfing etc.). Deadline04 Oct 2022 2104761 Construction of crop protection Embankment (including leveling, dressing, turfing etc.). Deadline04 Oct 2022 2104762 Construction of crop protection Embankment (including leveling, dressing, turfing etc.). Deadline04 Oct 2022 2104763 Construction of crop protection Embankment (including leveling, dressing, turfing etc.). Deadline04 Oct 2022 2104764 Construction of pump house for new 1 or 2 or 5-cusec LLP scheme. Deadline04 Oct 2022 2104765 Construction of pump house for new 1 or 2 or 5-cusec LLP scheme. Deadline04 Oct 2022 2104766 Construction of pump house for new 1 or 2 or 5-cusec LLP scheme. Deadline04 Oct 2022 2104767 Construction of reservoirs (surrounding land development ,establishment of connection line from water pump to reservoir and provision of shade etc.) Deadline12 Oct 2022 2104768 Construction of pump house for new 1 or 2 or 5-cusec LLP scheme. Deadline04 Oct 2022 2104769 Construction of pump house for new 1 or 2 or 5-cusec LLP scheme. Deadline04 Oct 2022 2104770 Construction of pump house for new 1 or 2 or 5-cusec LLP scheme. Deadline04 Oct 2022 2104771 Construction of pump house for new 1 or 2 or 5-cusec LLP scheme. Deadline04 Oct 2022 2104772 Construction of pump house for new 1 or 2 or 5-cusec LLP scheme. Deadline04 Oct 2022 2104773 Construction of pump house for new 1 or 2 or 5-cusec LLP scheme. Deadline04 Oct 2022 2104774 Construction of pump house for new 1 or 2 or 5-cusec LLP scheme. Deadline04 Oct 2022 2104775 Construction of pump house for new 1 or 2 or 5-cusec LLP scheme. Deadline04 Oct 2022 2104776 Construction of 12 inches diameter, 140 psig pressure and 8.0 k.m. long Distribution-Main gas pipeline from Gazaria TBS to Abdul Monem Economic Zone Limited. Deadline17 Oct 2022 2104777 Supply and Installation work of 2 H.P Submersible Pump motor at the West side of office of the Deputy Commissioner, Kishoreganj. F.Y-2022-2023. Deadline06 Oct 2022 2104778 Installation work of water supply line at garden & garage and garage repair work of residence of Deputy Commissioner, Kishoreganj. F.Y-2022-2023. Deadline06 Oct 2022 2104779 Improvement of existing 47 (Forty Seven) Nos foot over bridges with necessary electrification works under DNCC (Package No: WD-7) Deadline20 Oct 2022 2104780 Repair and Renovation Works at Orakandi High School Under Kashiani Upazila Gopalganj District. Deadline11 Oct 2022 2104781 Construction of appointment room of Sarkari Shishu Paribar Monohordi Narsingdi under the project of Surveillance and Security for Eighty Five Sarkari Shishu Paribar through Control Deadline06 Oct 2022 2104810 Construction of Class Room at Biam Laboratory School Companiganj Upazila, District: Sylhet. Deadline06 Oct 2022 2104811 Supply of Laboratory Re-Agent, equipment & others related item for PWTP. Deadline11 Oct 2022 2104812 Construction of 10 (Ten) Nos Deep Tube Wells with related works under EWS Project Dhaka WASA, Dhaka. (Package No: W2.229) Deadline20 Oct 2022 2104813 Installing wall tiles and ceiling , painting wall and grills and other ancillary works at corridor of 2nd floor near void off administrative block at Shaheed Suhrawardy Medical Col Deadline06 Oct 2022 2104814 Construction of 10 (Ten) Nos Deep Tube Wells with related works under EWS Project Dhaka WASA, Dhaka. (Package No: W2.126) Deadline19 Oct 2022 2104815 Installing CONVEX MIRROR at different points of internal road of National parliament building Deadline06 Oct 2022 2104816 Construction of Additional classroom Parbamunia GPS under PEDP4. Deadline20 Oct 2022 2104817 Construction of Submerged Weir with Foot Over Bridge Deadline11 Oct 2022 2104818 Changing tiles, sanitary fittings in general toilet at level 2 in the office of the Minister of Home Affairs, changing carpet in office of honorable whip and other ancillary works Deadline06 Oct 2022 2104819 Making partition wall, installing tiles, making wooden stage, interior work in the 4th floor conference room in College building of Shaheed Suhrawardy Medical College and Hospital Deadline06 Oct 2022 2104820 Construction of 40.974 m long ( single span) P.C Girder Bridge (Dikshir Beel Bridge) at Ch. 20+400 of Chatmohor-Parshadanga-Edilpur-Dengargaon-Pabna Road (Z-6031) under Pabna Road Deadline19 Oct 2022 2104821 Establishment of Kushtia Medical College and Hospital (Sub-head: Medical Waste Treatment Plant) Deadline11 Oct 2022 2104822 Supply of Two School Bus (52 seats per bus) for RDA Laboratory School and College, Bogura. Deadline06 Oct 2022 2104823 Construction of Submerged Weir with Foot Over Bridge Deadline11 Oct 2022 2104824 Construction of Submerged Weir with Foot Over Bridge Deadline11 Oct 2022 2104825 Installation of 65 Nos Shallow Tara Tube Well (Non-Extractable) with # 6 Hand Pump on the occasion of MUJIB HUNDRED YEARS celebration for drinking water to the people those who hav Deadline06 Oct 2022 2104826 Periodic Maintenance Programme for Construction of U-Turn by flexible & rigid pavement from Ch: 15+942m (Langalbandh) to 16+242m(Langalbandh) at Dhaka end & from Ch: 16+402(Langalb Deadline19 Oct 2022 2104827 Construction of Submerged Weir with Foot Over Bridge Deadline11 Oct 2022 2104828 Construction of Cottogram District Relief Godown Cum Disaster Management Information Center Deadline20 Oct 2022 2104829 Construction of additional class room KACHOIR GPS under PEDP4 Deadline12 Oct 2022 2104830 Construction of additional class room MuraripurDakkinpara GPS under PEDP4 Deadline20 Oct 2022 2104831 Capacity Expansion of 15.73m Long RCC Girder Bridge with Construction of 15.73m Long RCC Girder Bridge on Barguna UZ HQ - Patharghata UZ HQ Via Parirhkal GC Road at Chainage:5400m( Deadline13 Oct 2022 2104832 NBIDGPS-1/G1.0074Furniture Supply for 116 Nos Class Room and 13 Nos Teachers Room of Selected 29 Govt. Primary School at different location of Tangail District. Deadline03 Oct 2022 2104833 Construction of Submerged Weir with Foot Over Bridge. Deadline11 Oct 2022 2104834 Construction of 114 Nos(Patiya-38,Sandwip-38 & Mirsarai-38) Community Based Small Piped Water Supply Scheme under Rural Water, Sanitation and Hygiene for Human Capital Development Deadline19 Oct 2022 2104835 NBIDGPS-1/G1.0073Furniture Supply for 85 Nos Class Room and 10 Nos Teachers Room of Selected 22 Govt. Primary School at different location of Tangail District. Deadline03 Oct 2022 2104836 Construction of Remaining work Joypurhat District Relief Godown Cum Disaster Management Information Center Deadline06 Oct 2022 2104837 NBIDGPS-1/G1.0072Furniture Supply for 107 Nos Class Room and 11 Nos Teachers Room of Selected 31 Govt. Primary School at different location of Tangail District. Deadline03 Oct 2022 2104838 Supply, Installation, Testing & Commissioning of 2 Nos 1600 kg 10 stop passenger Lift (Panaroma/Capsule type) at Chief Judicial Magistrate Court Building at Mymensingh . Deadline13 Oct 2022 2104839 Construction of uPVC buried pipeline ( (1000 meter each) for 2-cusec electric operated LLP Scheme. Deadline04 Oct 2022 2104840 Construction of buried pipeline (1000meter each) for 1-cusec Electric/Solar operated LLP. Deadline04 Oct 2022 2104841 Construction of Additional classroom Parbamunia GPS under PEDP4. Deadline20 Oct 2022 2104986 Construction of uPVC buried pipeline ( (1000 meter each) for 2-cusec electric operated LLP Scheme. Deadline04 Oct 2022 2104987 Construction of uPVC buried pipeline ( (1000 meter each) for 2-cusec electric operated LLP Scheme. Deadline04 Oct 2022 2104988 Extension of existing UPVC underground irrigation line (buried pipe) for 2-cusec old LLP scheme of previous projects/programs. (400 m each). Deadline04 Oct 2022 2104989 Construction of uPVC buried pipeline ( (1000 meter each) for 2-cusec old force mode tube well scheme. Deadline04 Oct 2022 2104990 Extension of existing UPVC underground irrigation line (buried pipe) for 5-cusec old LLP scheme of previous projects/programs. (400 m each). Deadline04 Oct 2022 2104992 Extension of existing UPVC underground irrigation line (buried pipe) for 5-cusec old LLP scheme of previous projects/programs. (400 m each). Deadline04 Oct 2022 2104993 Construction of Additional classroom Sakowa GPS under PEDP4. Deadline20 Oct 2022 2104994 Construction of buried pipeline (1000meter each) for 1-cusec Electric/Solar operated LLP. Deadline04 Oct 2022 2105003 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2105004 Extension of existing UPVC underground irrigation line (buried pipe) for 2-cusec old LLP scheme of previous projects/programs. (400 m each). Deadline04 Oct 2022 2105005 Construction of irrigation water control / reservoir infrastructure (siphon / submerged weir etc.). Deadline04 Oct 2022 2105006 Construction of uPVC buried pipeline ( (1000 meter each) for 2-cusec old force mode tube well scheme. Deadline04 Oct 2022 2105007 Construction of uPVC buried pipeline ( (1200 meter each) for 5-cusec electric operated LLP Scheme. Deadline04 Oct 2022 2105008 Construction of uPVC buried pipeline ( (1200 meter each) for 5-cusec electric operated LLP Scheme. Deadline04 Oct 2022 2105009 Construction of uPVC buried pipeline ( (1200 meter each) for 5-cusec electric operated LLP Scheme. Deadline04 Oct 2022 2105010 Construction of uPVC buried pipeline ( (1200 meter each) for 5-cusec electric operated LLP Scheme. Deadline04 Oct 2022 2105011 Extension of existing UPVC underground irrigation line (buried pipe) for 2-cusec force mode tube well. (400 m each). Deadline04 Oct 2022 2105012 Extension of existing UPVC underground irrigation line (buried pipe) for 2-cusec force mode tube well. (400 m each). Deadline04 Oct 2022 2105013 Construction of additional class room Dakkin Krishnopur GPS under PEDP4 Deadline20 Oct 2022 2105014 Extension of existing UPVC underground irrigation line (buried pipe) for 2-cusec force mode tube well. (400 m each). Deadline04 Oct 2022 2105015 Extension of existing UPVC underground irrigation line (buried pipe) for 2-cusec force mode tube well. (400 m each). Deadline04 Oct 2022 2105016 Extension of existing UPVC underground irrigation line (buried pipe) for 2-cusec force mode tube well. (400 m each). Deadline04 Oct 2022 2105017 Extension of existing UPVC underground irrigation line (buried pipe) for 2-cusec force mode tube well. (400 m each). Deadline04 Oct 2022 2105018 Extension of existing UPVC underground irrigation line (buried pipe) for 2-cusec old LLP scheme of previous projects/programs. (400 m each). Deadline04 Oct 2022 2105019 Extension of existing UPVC underground irrigation line (buried pipe) for 2-cusec force mode tube well. (400 m each). Deadline04 Oct 2022 2105020 Extension of existing UPVC underground irrigation line (buried pipe) for 2-cusec force mode tube well. (400 m each). Deadline04 Oct 2022 2105022 Extension of existing UPVC underground irrigation line (buried pipe) for 2-cusec old LLP scheme of previous projects/programs. (400 m each). Deadline04 Oct 2022 2105023 Construction of irrigation water control / reservoir infrastructure (siphon / submerged weir etc.). Deadline04 Oct 2022 2105024 Construction of 02 Storied Auditorium with 02 Storied Foundation at Govt.Anandamohan College Sadar Mymensingh. Deadline11 Oct 2022 2105025 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2105026 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2105027 Construction of irrigation water control / reservoir infrastructure (siphon / submerged weir etc.). Deadline04 Oct 2022 2105028 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2105029 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022 2105030 Construction of Conduit / Water Pass Structure. Deadline04 Oct 2022
API Integration — seamlessly integrate global tender data into your systems
AI-Powered Tender Intelligence for smarter bidding decisions
Publish Your Tenders — reach a global network of suppliers
Source Tenders Faster — discover verified tenders from across the globe
Chat with us