USA Tenders - 2 April 2025 (Page 1 of 10)

1,871 tenders published in USA on 2 April 2025.

Tender Impulse is your trusted global tender website and tender aggregator, offering access to tens of thousands of tenders from over 190 countries. On this page, explore all government tenders, business tenders, and e-tenders published in USA on 2 April 2025, across industries like IT-Software, Repair, Maintenance & Installation, Defence, Energy, Management Consultancy, Transportation & Mobility, Electrical Equipment & Lighting, Infrastructure and construction, Industrial Machinery & Equipment, Government & Community Services, Furniture & Furnishings, Meters, Telecom, Laboratory & Scientific Instruments, Chemicals & Fertilizers, Textiles, Clothing & Leather, Transportation Ports & Waterways.

This is page 1 of 10 for tenders published in USA on 2 April 2025.

Why Choose Tender Impulse for USA?

  • Access a curated list of tender notices from official sources, including ministries, PSUs, and local procurement authorities.
  • Daily updates of world tenders covering USA and beyond.
  • Tailored listings for sectors like IT-Software, Repair, Maintenance & Installation, Defence, Energy, Management Consultancy, Transportation & Mobility, Electrical Equipment & Lighting, Infrastructure and construction, Industrial Machinery & Equipment, Government & Community Services, Furniture & Furnishings, Meters, Telecom, Laboratory & Scientific Instruments, Chemicals & Fertilizers, Textiles, Clothing & Leather, Transportation Ports & Waterways, including projects in EPC, defence, and infrastructure.
  • Easy filters to sort tenders by publish date, keywords, CPV codes, or authority name.

Get Started with Full Access

With a simple free live demo, gain access to tender details, bidding documents, authority contacts, and real-time updates from USA.

7489487 Keysight Technologies Peak Power Analyzer TYCOM AIR Deadline07 Apr 2025 7489520 Request for Proposals - City of Chandler Recreation and Library Strategic Master Plan, Project No. PR2503.101 Deadline29 Apr 2025 7489521 DEMA Landscape Maintenance FMON/CN RV Park (M25-0004) Annual Deadline25 Apr 2025 7489768 25-0024-4. Annual Contract to Provide Body Armor and Accessories (Chatham County Police Department) Deadline23 Apr 2025 7490082 29--INJECTOR,FUEL Deadline10 Apr 2025 7490083 15--MANIFOLD,FUEL SERVI Deadline07 Apr 2025 7490088 INJECTOR,FUEL Deadline28 Apr 2025 7490106 29--FUEL HEATER Deadline15 Apr 2025 7490114 29--PUMP,FUEL,CAM ACTUA Deadline11 Apr 2025 7490116 29--BELLOWS,FUEL CONTRO Deadline08 Apr 2025 7490118 JBE081 F-22 Fuel Systems Deadline30 Apr 2025 7490120 Intent to Sole Source Subscription Requirement Deadline10 Mar 2025 7490156 15--TANK,FUEL,AIRCRAFT Deadline30 Apr 2025 7490159 15--TANK,FUEL,AIRCRAFT Deadline30 Apr 2025 7490161 15--TANK,FUEL,AIRCRAFT Deadline01 May 2025 7490164 29--FILTER,FUEL,ENGINE Deadline14 Apr 2025 7490167 Government-Owned, Contractor-Operated (GOCO) Fuel Services NAS Key West, FL Deadline16 Apr 2025 7490252 49--NOZZLE,FUEL AND OIL Deadline10 Apr 2025 7491212 48--VALVE,BUTTERFLY Deadline10 Apr 2025 7491213 47--COUPLING HALF,QUICK Deadline10 Apr 2025 7491214 17--SIDE PLATE ASSEMBLY Deadline07 Apr 2025 7491215 30--WEIGHT,COUNTERBALAN Deadline14 Apr 2025 7491216 25--INSTALLATION KIT,VE Deadline10 Apr 2025 7491345 25--INSTALLATION KIT,VE Deadline10 Apr 2025 7491346 29--FILTER ELEMENT,INTA Deadline10 Apr 2025 7491347 30--SHAFT,SHOULDERED Deadline10 Apr 2025 7491348 29 - ENGINE ACCESSORIES Deadline10 Apr 2025 7491349 58--INTERCONNECTING BOX Deadline07 Apr 2025 7491350 59--HOLDER ASSEMBLY,ELE Deadline14 Apr 2025 7491351 59 - ELECTRICAL/ELECTRONIC EQPT COMPNTS Deadline14 Apr 2025 7491352 59--RING,ELECTRICAL CON Deadline14 Apr 2025 7491353 59--INSULATION SLEEVING Deadline14 Apr 2025 7491354 62--LENS,LIGHT Deadline14 Apr 2025 7491355 59--HOLDER,ELECTRICAL C Deadline14 Apr 2025 7491356 62--LAMP,INCANDESCENT Deadline14 Apr 2025 7491357 66--TRANSDUCER,VELOCITY Deadline07 Apr 2025 7491358 66--THERMOCOUPLE,HEATIN Deadline07 Apr 2025 7491359 16--CHIP DETECTOR,AIRCR Deadline07 Apr 2025 7491360 61--WIRING HARNESS Deadline07 Apr 2025 7491361 41--COOLER UNIT,AIR Deadline10 Apr 2025 7491362 59--CONNECTOR,PLUG,ELEC Deadline10 Apr 2025 7491363 47--COUPLING,TUBE Deadline10 Apr 2025 7491364 47--CAP,TUBE Deadline10 Apr 2025 7491365 53--NUT,SELF-LOCKING,HEXAG Deadline10 Apr 2025 7491366 29--CONTROL UNIT,GOVERN Deadline14 Apr 2025 7491367 53--RETAINER,PACKING Deadline14 Apr 2025 7491368 10--MG CLEANING KIT Deadline10 Apr 2025 7491369 62 - LIGHTING FIXTURES, LAMPS Deadline14 Apr 2025 7491370 59--INSULATION SLEEVING Deadline14 Apr 2025 7491371 59--INSULATION SLEEVING Deadline14 Apr 2025 7491372 25--INSTALLATION KIT,VE Deadline10 Apr 2025 7491373 59--BRUSH,ELECTRICAL CONTA Deadline14 Apr 2025 7491374 62--LIGHT,INDICATOR Deadline14 Apr 2025 7491375 59--SLEEVING SET Deadline14 Apr 2025 7491376 62--LIGHT,NAVIGATIONAL, Deadline14 Apr 2025 7491377 66--METER,FLUID FLOW INDIC Deadline07 Apr 2025 7491378 31--BEARING,BALL,ANNULA Deadline07 Apr 2025 7491379 31--BEARING, BALL, ANNULAR Deadline07 Apr 2025 7491380 53--SCREW,CLOSE TOLERAN Deadline07 Apr 2025 7491381 59--INSULATION SLEEVING Deadline14 Apr 2025 7491382 59--ELECTRODE Deadline14 Apr 2025 7491383 59--HOLDER ASSEMBLY,ELE Deadline14 Apr 2025 7491384 62--LENS,LIGHT Deadline14 Apr 2025 7491385 62--LAMP,INCANDESCENT Deadline14 Apr 2025 7491386 62--LAMP,INCANDESCENT Deadline14 Apr 2025 7491387 59--INSULATION SLEEVING,EL Deadline14 Apr 2025 7491388 66--INDICATOR,PRESSURE Deadline07 Apr 2025 7491389 28--SEAL,METALLIC,NONAI Deadline07 Apr 2025 7491390 65--BATTERY,ASSEMBLY,BL Deadline07 Apr 2025 7491391 53--INSERT,PANEL FASTENER Deadline07 Apr 2025 7491392 59--RELAY,ELECTROMAGNET Deadline14 Apr 2025 7491393 48--VALVE,CHECK Deadline10 Apr 2025 7491394 25--HINGE,DOOR,VEHICULA Deadline14 Apr 2025 7491395 ANTENNA GRP ASS, IN REPAIR/MODIFICATION OF Deadline16 Apr 2025 7491396 DISPLAY UNIT,FLIGHT Deadline04 Apr 2025 7491397 1305--Ammunition Deadline09 Apr 2025 7491398 47--PACKING NUT Deadline10 Apr 2025 7491399 47--ELBOW,TUBE Deadline10 Apr 2025 7491400 61--MOTOR,DIRECT CURREN Deadline10 Apr 2025 7491401 43--PARTS KIT,ROTARY PU Deadline10 Apr 2025 7491402 30--CYLINDER ASSEMBLY,A Deadline14 Apr 2025 7491403 30--GEAR CLUSTER Deadline14 Apr 2025 7491404 59--RACK POSITIONING SE Deadline10 Apr 2025 7491405 28--SPEED SENSOR,DIESEL Deadline14 Apr 2025 7491406 40--WIRE ROPE ASSEMBLY, Deadline07 Apr 2025 7491407 28--SEAL,METALLIC,AIRCR Deadline07 Apr 2025 7491408 62--LAMP UNIT,VEHICULAR Deadline14 Apr 2025 7491409 62--FIXTURE,LIGHTING Deadline14 Apr 2025 7491410 62--LENS,LIGHT Deadline14 Apr 2025 7491411 62--DECK LIGHT STATUS Deadline14 Apr 2025 7491412 61--ROTOR,MOTOR Deadline10 Apr 2025 7491413 31--BUSHING,SLEEVE Deadline07 Apr 2025 7491414 59--INSULATION SLEEVING Deadline14 Apr 2025 7491415 59--HOLDER ASSEMBLY,ELE Deadline14 Apr 2025 7491416 16--COVER,ACTUATOR Deadline07 Apr 2025 7491417 15--DOOR,AIRCRAFT Deadline07 Apr 2025 7491418 48--BODY,VALVE Deadline07 Apr 2025 7491419 48--GAGGING DEVICE,VALV Deadline10 Apr 2025 7491420 59--SWITCH,THERMOSTATIC Deadline10 Apr 2025 7491421 29--CONTROL ASSEMBLY,PU Deadline14 Apr 2025 7491422 61--SUPPORT,ARMATURE Deadline10 Apr 2025 7491423 10--HARNESS,W44 Deadline14 Apr 2025 7491424 61--POWER SUPPLY Deadline10 Apr 2025 7491425 53--RETAINER,PACKING Deadline14 Apr 2025 7491426 61--BATTERY,NONRECHARGE Deadline10 Apr 2025 7491427 30--CONNECTING LINK,RIG Deadline10 Apr 2025 7491428 25--PANEL,VEHICULAR OPE Deadline10 Apr 2025 7491429 JM82 Shielded Mild Detonating Cord Deadline16 Apr 2025 7491430 16--HOOK,AIRCRAFT,EXTER Deadline07 Apr 2025 7491431 61--MAGNET WIRE Deadline14 Apr 2025 7491432 59--INSULATION SLEEVING Deadline14 Apr 2025 7491433 59--SWITCH,ROTARY Deadline10 Apr 2025 7491434 59--SWITCH,PRESSURE Deadline10 Apr 2025 7491435 61--DISTRIBUTION BOX Deadline10 Apr 2025 7491436 59--RELAY,HYBRID Deadline14 Apr 2025 7491437 30--GEAR COUPLING ASSY Deadline14 Apr 2025 7491438 53--SEAL ASSEMBLY KIT Deadline14 Apr 2025 7491439 25--SPRING ASSEMBLY,LEA Deadline10 Apr 2025 7491440 62--LIGHT,DOME Deadline14 Apr 2025 7491441 29--IGNITER,SPARK,GAS T Deadline07 Apr 2025 7491442 62--LAMP,INCANDESCENT Deadline14 Apr 2025 7491443 62--LIGHT,INDICATOR Deadline14 Apr 2025 7491444 62--LAMP ASSEMBLY,NAVIG Deadline14 Apr 2025 7491445 62--LIGHT,INDICATOR Deadline14 Apr 2025 7491446 15--PANEL,STRUCTURAL,AI Deadline07 Apr 2025 7491447 10--PARTS KIT,GUN Deadline10 Apr 2025 7491448 62--LIGHT,NAVIGATIONAL, Deadline14 Apr 2025 7491449 RMP Sources Sought Synopsis - Radar Deadline09 Apr 2025 7491450 Concealment and Tactical Holsters Deadline18 Apr 2025 7491451 COTS Tactical Air Navigation (TACAN) Antenna System Deadline21 Apr 2025 7491452 43 - PUMPS AND COMPRESSORS Deadline10 Apr 2025 7491453 47--PIPE AND HOSE ASSEM Deadline10 Apr 2025 7491454 25 - VEHICULAR EQUIPMENT COMPONENTS Deadline10 Apr 2025 7491455 30--GEAR CLUSTER Deadline14 Apr 2025 7491456 59--INSULATOR,WASHER Deadline14 Apr 2025 7491457 62--FLOODLIGHT,ELECTRIC Deadline14 Apr 2025 7491458 59--INDUSTRIAL SLEEVING Deadline14 Apr 2025 7491459 62--LAMPHOLDER Deadline14 Apr 2025 7491460 62--HOUSING,LIGHT Deadline14 Apr 2025 7491461 16--REGULATOR,SPECIAL Deadline04 Apr 2025 7491462 30--SHAFT ASSEMBLY,SHOU Deadline07 Apr 2025 7491463 59--CIRCUIT CARD ASSEMB Deadline10 Apr 2025 7491464 20 - SHIP AND MARINE EQUIPMENT Deadline10 Apr 2025 7491465 59--TAPE,INSULATION,ELE Deadline14 Apr 2025 7491466 53--SEAL ASSEMBLY Deadline10 Apr 2025 7491467 58--INSTALLATION KIT,EL Deadline07 Apr 2025 7491468 62--LIGHT,MARKER,DISTRE Deadline14 Apr 2025 7491469 16 - AEROSPACE CRAFT COMPONENTS AND ACCESSORIES Deadline07 Apr 2025 7491470 16--TUBE,REGULATOR SPRI Deadline07 Apr 2025 7491471 59--COUPLER,ANTENNA Deadline10 Apr 2025 7491472 29--FILTER ELEMENT,FLUID Deadline14 Apr 2025 7491473 25--INSTALLATION KIT,VE Deadline10 Apr 2025 7491474 59--INSULATION SLEEVING Deadline14 Apr 2025 7491475 62--FLOODLIGHT Deadline14 Apr 2025 7491476 59--INSULATION SLEEVING Deadline14 Apr 2025 7491477 59--INSULATION SLEEVING Deadline14 Apr 2025 7491478 62--FLOODLIGHT,ELECTRIC Deadline14 Apr 2025 7491479 62--FLASHLIGHT Deadline14 Apr 2025 7491480 59--HOLDER,ELECTRICAL C Deadline14 Apr 2025 7491481 61--CABLE ASSEMBLY,SPECIAL Deadline07 Apr 2025 7491482 59--SWITCH,REED Deadline10 Apr 2025 7491483 59--ADAPTER,CONNECTOR Deadline10 Apr 2025 7491484 59--RELAY,ELECTROMAGNET Deadline02 Apr 2025 7491485 30 - MECHANICAL POWER TRANSMISSION EQPT Deadline14 Apr 2025 7491486 28 - ENGINES AND TURBINES AND COMPONENT Deadline10 Apr 2025 7491487 15 - AEROSPACE CRAFT AND STRUCTURAL COMPONENTS Deadline07 Apr 2025 7491488 25--COVER,VEHICULAR COM Deadline10 Apr 2025 7491489 62--LIGHT,NAVIGATIONAL, Deadline14 Apr 2025 7491490 10 - WEAPONS Deadline10 Apr 2025 7491491 29 - ENGINE ACCESSORIES Deadline07 Apr 2025 7491492 10--CHUTE,AMMUNITION Deadline10 Apr 2025 7491493 28--DUCT,FAN,AIRCRAFT G Deadline07 Apr 2025 7491494 59--INSULATION SLEEVING Deadline14 Apr 2025 7491495 65--BLANKET,SURVIVAL Deadline07 Apr 2025 7491496 16--REGULATOR,TENSION,C Deadline07 Apr 2025 7491497 48 - VALVES Deadline10 Apr 2025 7491498 48--VALVE,SHUTTLE Deadline10 Apr 2025 7491499 61--POWER SUPPLY Deadline10 Apr 2025 7491500 10--EJECTOR,CARTRIDGE Deadline10 Apr 2025 7491501 53 - HARDWARE AND ABRASIVES Deadline10 Apr 2025 7491502 Incident Command Systems Deadline09 Apr 2025 7491503 M72-series Light Assault Weapon (LAW) Sources Sought Notice Deadline05 May 2025 7491504 MK316 MOD 0, 7.62mm Special Ball, Long Range ammunition, DODIC AB39. Deadline22 May 2025 7491509 Multiple NSNs, Honeywell Sole Source Licensed Exclusively to Boeing Distribution Services, Inc. (BDSI), Weapon Systems: 05F (C/K-135), 25F (E-3A AWACS), 43N (F/A-18), 26F (F-16) Deadline16 Apr 2025 7491513 29 - ENGINE ACCESSORIES Deadline07 Apr 2025 7491514 53 - HARDWARE AND ABRASIVES Deadline10 Apr 2025 7491518 61--STARTER,MOTOR Deadline10 Apr 2025 7491524 25 - VEHICULAR EQUIPMENT COMPONENTS Deadline10 Apr 2025 7491527 Industrial Valve Manufacturing Deadline11 Apr 2025 7491533 REPAIR CRACKS AND SPALLS B43131 Deadline15 Apr 2025 7491538 REPAIR CRACKS AND SPALLS, B43429 Deadline15 Apr 2025 7491554 61--BATTERY,STORAGE Deadline11 Apr 2025 7491561 Naval Information Warfare Center (NIWC) Atlantic Equipment Evaluation and Repair Deadline08 Apr 2025 7491564 P-1458 2nd Radio Battalion Complex, Phase 2, Parachute and Supply Facilities Deadline30 Apr 2025 7491578 Patrol Rifle Replacement Red Dot System and Suppressors. Deadline11 Apr 2025 7491669 Propelling Charge Support - 60mm, 81mm, 120mm - Solicitation Deadline11 Apr 2025 7491678 62--HEADLIGHT Deadline14 Apr 2025 7491679 62--LIGHT,INDICATOR Deadline14 Apr 2025 7491680 59--INSULATION SLEEVING Deadline14 Apr 2025 7491681 62--LIGHT ASSEMBLY,STABLIZ Deadline14 Apr 2025
API Integration — seamlessly integrate global tender data into your systems
AI-Powered Tender Intelligence for smarter bidding decisions
Publish Your Tenders — reach a global network of suppliers
Source Tenders Faster — discover verified tenders from across the globe
Chat with us