USA Tenders - 17 August 2026 (Page 7 of 10)

1,897 tenders published in USA on 17 August 2026.

Tender Impulse is your trusted global tender website and tender aggregator, offering access to tens of thousands of tenders from over 190 countries. On this page, explore all government tenders, business tenders, and e-tenders published in USA on 17 August 2026, across industries like Transportation & Mobility, Industrial Machinery & Equipment, Laboratory & Scientific Instruments, Telecom, Electrical Equipment & Lighting, Energy, Infrastructure and construction, IT-Software, Office Equipment & Stationery, Textiles, Clothing & Leather, Healthcare & Medical, Repair, Maintenance & Installation, Adhesive & Labels, Defence, Government & Community Services, Furniture & Furnishings, Environment & Waste Management, Education & Training.

This is page 7 of 10 for tenders published in USA on 17 August 2026.

Why Choose Tender Impulse for USA?

  • Access a curated list of tender notices from official sources, including ministries, PSUs, and local procurement authorities.
  • Daily updates of world tenders covering USA and beyond.
  • Tailored listings for sectors like Transportation & Mobility, Industrial Machinery & Equipment, Laboratory & Scientific Instruments, Telecom, Electrical Equipment & Lighting, Energy, Infrastructure and construction, IT-Software, Office Equipment & Stationery, Textiles, Clothing & Leather, Healthcare & Medical, Repair, Maintenance & Installation, Adhesive & Labels, Defence, Government & Community Services, Furniture & Furnishings, Environment & Waste Management, Education & Training, including projects in EPC, defence, and infrastructure.
  • Easy filters to sort tenders by publish date, keywords, CPV codes, or authority name.

Get Started with Full Access

With a simple free live demo, gain access to tender details, bidding documents, authority contacts, and real-time updates from USA.

14387251 15--TANK,FUEL,AIRCRAFT Deadline24 Aug 2026 14387252 28--HUB,COMPRESSOR,NONA Deadline24 Aug 2026 14387253 66--GAGE,ABSOLUTE PRESS Deadline24 Aug 2026 14387254 58--FILTER,INFRARED LIGHT Deadline24 Aug 2026 14387255 61--CABLE ASSEMBLY,SPECIAL Deadline24 Aug 2026 14387256 16--SHAFT,SPLINED Deadline24 Aug 2026 14387257 63--SENSING ELEMENT,FIR Deadline24 Aug 2026 14387258 58--IMAGE CONVERTER,NIGHT Deadline24 Aug 2026 14387259 30--SHAFT,SHOULDERED Deadline24 Aug 2026 14387260 59--BOX CONNECTOR,ELECTRIC Deadline27 Aug 2026 14387261 53--RIVET,BLIND Deadline24 Aug 2026 14387262 28--MANIFOLD ASSEMBLY Deadline24 Aug 2026 14387263 61--CABLE ASSEMBLY,POWER,E Deadline24 Aug 2026 14387264 31--BEARING, CARTRIDGE Deadline24 Aug 2026 14387265 61--CABLE ASSEMBLY,SPECIAL Deadline24 Aug 2026 14387266 63--SENSING ELEMENT,FIRE D Deadline24 Aug 2026 14387267 15--WINDOW PANEL,AIRCRAFT Deadline24 Aug 2026 14387268 61--MOTOR,ALTERNATING CURR Deadline24 Aug 2026 14387269 16--CLAMP ASSEMBLY Deadline27 Aug 2026 14387270 16--GREASER,ACTUATOR Deadline24 Aug 2026 14387271 62--LIGHT,NAVIGATIONAL, Deadline24 Aug 2026 14387272 66--TRANSMITTER,LIQUID Deadline24 Aug 2026 14387273 25--ARM ASSEMBLY,PIVOT,TRA Deadline27 Aug 2026 14387274 61--CABLE ASSEMBLY-SWITCH, Deadline24 Aug 2026 14387275 66--GAGE,PRESSURE,DIAL IND Deadline24 Aug 2026 14387276 59--SWITCH,PROXIMITY Deadline27 Aug 2026 14387277 43--FILTER ELEMENT,FLUID Deadline27 Aug 2026 14387278 66--GAGE,DIFFERENTIAL,DIAL Deadline24 Aug 2026 14387279 16--CAP ASSEMBLY,ACTUATOR Deadline24 Aug 2026 14387280 16--PANEL,CONTROL,ELECTRIC Deadline24 Aug 2026 14387281 28--VALVE ASSEMBLY,PIST Deadline24 Aug 2026 14387282 66--THREADED AIR SWIVEL AN Deadline24 Aug 2026 14387283 59--ADAPTER,CABLE SHIEL Deadline24 Aug 2026 14387284 66--MAGNETIC PICKUP,TRANSD Deadline24 Aug 2026 14387285 66--TRANSMITTER,PRESSURE Deadline24 Aug 2026 14387286 66--PROBE,EDDY CURRENT Deadline24 Aug 2026 14387287 28--SHAFT,TURBINE,NONAI Deadline24 Aug 2026 14387288 28--CARRIER,PLANETARY R Deadline24 Aug 2026 14387289 31--BEARING,ROLLER,NEED Deadline24 Aug 2026 14387290 49--CIRCUIT CARD,MAIN B Deadline24 Aug 2026 14387291 47--HOSE ASSEMBLY,NONME Deadline27 Aug 2026 14387292 53--STUD,PLAIN Deadline24 Aug 2026 14387293 15--SEAL,NOZZLE,IRS,SEC Deadline24 Aug 2026 14387294 59--LOCKNUT,ELECTRICAL Deadline24 Aug 2026 14387295 16--CAP,VENT,LOX Deadline24 Aug 2026 14387296 53--NUT,CLIP-ON Deadline24 Aug 2026 14387297 62--LENS,LIGHT Deadline24 Aug 2026 14387298 49--COMPOSITE REPAIR SET, Deadline24 Aug 2026 14387299 47--ELBOW,TUBE Deadline24 Aug 2026 14387300 53--SETSCREW Deadline24 Aug 2026 14387301 16--DIVERTER STRIP,AIRC Deadline24 Aug 2026 14387302 66--INDICATOR,TEMPERATU Deadline24 Aug 2026 14387303 16--HORIZONTAL SHAFT AS Deadline24 Aug 2026 14387304 61--WIRING HARNESS Deadline24 Aug 2026 14387305 31--BUSHING,SLEEVE Deadline24 Aug 2026 14387306 66--GAGE,DIFFERENTIAL,DIAL Deadline24 Aug 2026 14387307 28--LOCK,TURBINE SHAFT COU Deadline24 Aug 2026 14387308 59--SWITCH,PRESSURE Deadline27 Aug 2026 14387309 68--CALIBRATING GAS MIXTUR Deadline24 Aug 2026 14387313 66--ANEROID ASSEMBLY Deadline24 Aug 2026 14387314 47--ADAPTER,STRAIGHT,TUBE Deadline27 Aug 2026 14387315 66--GAGE,DIFFERENTIAL,DIAL Deadline24 Aug 2026 14387316 15--INSULATION,THERMAL, Deadline24 Aug 2026 14387317 53--NUT,PLAIN,KNURLED Deadline24 Aug 2026 14387318 61--CABLE ASSEMBLY,POWER,E Deadline24 Aug 2026 14387319 66--RECEIVER,LIQUID QUA Deadline24 Aug 2026 14387320 29--VALVE AND SLEEVE ASSEM Deadline24 Aug 2026 14387321 61--PANEL,POWER DISTRIBUTI Deadline27 Aug 2026 14387322 47--COUPLING HALF,QUICK DI Deadline27 Aug 2026 14387323 53--STUD ASSEMBLY,TURNLOCK Deadline24 Aug 2026 14387324 66--TRANSMITTER,PRESSURE Deadline24 Aug 2026 14387325 16--RETAINER,AUXILIARY Deadline24 Aug 2026 14387326 31--BEARING,SLEEVE Deadline24 Aug 2026 14387327 53--BOLT,EYE Deadline24 Aug 2026 14387328 16--HUB,GEAR SPLINED Deadline24 Aug 2026 14387329 40--WIRE ROPE ASSEMBLY,SIN Deadline24 Aug 2026 14387330 16--DAMPER ASSY,STABILIZER Deadline24 Aug 2026 14387331 66--GENERATOR,TACHOMETER Deadline24 Aug 2026 14387332 47--TUBE ASSEMBLY,METAL Deadline27 Aug 2026 14387333 25--SHOCK ABSORBER,DIRE Deadline27 Aug 2026 14387334 66--TRANSMITTER,PRESSUR Deadline24 Aug 2026 14387335 59--SWITCH,FLOW Deadline27 Aug 2026 14387336 53--NUT,SELF-LOCKING,EXTEN Deadline24 Aug 2026 14387337 16--BUSHING,LANDING GEA Deadline24 Aug 2026 14387338 31--BUSHING,SLEEVE Deadline24 Aug 2026 14387339 28--DUCT,EXHAUST,NONAIR Deadline24 Aug 2026 14387340 61--MOTOR,DIRECT CURRENT Deadline24 Aug 2026 14387341 15--COVER ASSEMBLY,COLL Deadline24 Aug 2026 14387342 59--CABLE ASSEMBLY,SPECIAL Deadline24 Aug 2026 14387343 59--WIRING HARNESS Deadline24 Aug 2026 14387344 28--RING SET,PISTON Deadline27 Aug 2026 14387345 61--BATTERY,STORAGE Deadline27 Aug 2026 14387346 58--CABLE ASSEMBLY,SPEC Deadline24 Aug 2026 14387347 16--GEARSHAFT,WORM-SPUR Deadline24 Aug 2026 14387348 59--MOUNTING BASE,ELECTRIC Deadline24 Aug 2026 14387349 59--EARPHONE ELEMENT Deadline27 Aug 2026 14387350 31--BEARING,PLAIN,SPHERICA Deadline24 Aug 2026 14387351 29--DAMPER,SPECIAL Deadline24 Aug 2026 14387352 61--CABLE ASSEMBLY,SPEC Deadline24 Aug 2026 14387353 66--COMPASS,MAGNETIC,MOUNT Deadline24 Aug 2026 14387354 53--RING,RETAINING Deadline24 Aug 2026 14387355 53--STUD,TURNLOCK FASTENER Deadline24 Aug 2026 14387356 62--LIGHT,NAVIGATIONAL, Deadline24 Aug 2026 14387357 53--BOLT,MACHINE Deadline24 Aug 2026 14387358 66--TRANSDUCER,MOTIONAL PI Deadline24 Aug 2026 14387359 31--BEARING,ELASTOMERIC Deadline24 Aug 2026 14387360 66--TRANSDUCER,LINEAR Deadline24 Aug 2026 14387361 53--SCREW,STEM Deadline24 Aug 2026 14387362 31--BUSHING,SLEEVE Deadline24 Aug 2026 14387363 28--SHROUD,STAGE 1 Deadline24 Aug 2026 14387364 66--TRANSMITTER,PRESSUR Deadline24 Aug 2026 14387365 48--VALVE,CHECK Deadline24 Aug 2026 14387366 53--BUSHING BLANK Deadline24 Aug 2026 14387367 15--SUPPORT,STRUCTURAL COM Deadline24 Aug 2026 14387368 16--PISTON ASSEMBLY,BRA Deadline24 Aug 2026 14387369 31--BEARING,PLAIN,SELF-ALI Deadline24 Aug 2026 14387370 66--GAGE,ABSOLUTE PRESSURE Deadline24 Aug 2026 14387371 59--CABLE ASSEMBLY,SPECIAL Deadline24 Aug 2026 14387372 66--TRANSDUCER,MOTIONAL PI Deadline24 Aug 2026 14387373 16--DAMPER,SHIMMY Deadline24 Aug 2026 14387374 53--STUD,TURNLOCK FASTENER Deadline24 Aug 2026 14387375 31--BEARING UNIT,PLAIN Deadline24 Aug 2026 14387376 30--CLUTCH,MAGNETIC,NON Deadline27 Aug 2026 14387377 61--CABLE ASSEMBLY,SPEC Deadline24 Aug 2026 14387378 59--SOLENOID,ELECTRICAL Deadline24 Aug 2026 14387379 25--CUSHION,SEAT,VEHICULAR Deadline27 Aug 2026 14387380 16--SUPPORT,ICE SHIELD, Deadline24 Aug 2026 14387381 31--BEARING,ROLLER,CYLI Deadline24 Aug 2026 14387382 61--WIRING HARNESS Deadline24 Aug 2026 14387383 49--NRP,DIESEL ENGINE A Deadline24 Aug 2026 14387384 47--HOSE ASSEMBLY,NONMETAL Deadline27 Aug 2026 14387385 16--PISTON Deadline27 Aug 2026 14387386 16--SUPPORT,SPRING WASH Deadline24 Aug 2026 14387387 15--GENERATOR,VORTEX UP Deadline24 Aug 2026 14387388 59--CABLE ASSEMBLY,SPEC Deadline24 Aug 2026 14387389 16--MAST,HEATER DRAIN Deadline24 Aug 2026 14387390 16--PANEL,FAULT-FUNCTIO Deadline24 Aug 2026 14387391 53--STUD,TURNLOCK FASTENER Deadline24 Aug 2026 14387392 66--INDICATOR SUBASSEMBLY, Deadline24 Aug 2026 14387393 15--DUCT ASSEMBLY,FORWA Deadline24 Aug 2026 14387394 16--BUFFER,YOKE ASSY Deadline24 Aug 2026 14387395 31--BUSHING,SLEEVE Deadline24 Aug 2026 14387396 31--BEARING,PLAIN,SELF-ALI Deadline24 Aug 2026 14387397 16--WHEEL HALF ASSEMBLY,AI Deadline24 Aug 2026 14387398 15--SKIN,AIRCRAFT Deadline24 Aug 2026 14387399 53--NUT,SELF-LOCKING,HEXAG Deadline24 Aug 2026 14387400 59--TERMINAL,QUICK DISC Deadline27 Aug 2026 14387401 47--COUPLING HALF,QUICK Deadline27 Aug 2026 14387402 16--BRACKET,MOUNTING,IS Deadline24 Aug 2026 14387403 15--SUPPORT,STRUCTURAL COM Deadline24 Aug 2026 14387404 40--WIRE ROPE ASSEMBLY, Deadline24 Aug 2026 14387405 15--LATCH ASSEMBLY,AIRCRAF Deadline24 Aug 2026 14387406 62--LIGHT,BLACKOUT Deadline24 Aug 2026 14387407 12--RECEIVER,ASSEMBLY Deadline24 Aug 2026 14387457 15--DOOR,ACCESS,AIRCRAF Deadline24 Aug 2026 14387507 66--THERMOSTAT,TEMPERATURE Deadline24 Aug 2026 14387508 31--BEARING, BALL, ANNULAR Deadline24 Aug 2026 14387509 31--BEARING,SLEEVE Deadline24 Aug 2026 14387510 66--ACCELEROMETER,ELECT Deadline24 Aug 2026 14387511 58--COVER ASSEMBLY Deadline24 Aug 2026 14387512 31--BEARING, PLAIN, ROD E Deadline24 Aug 2026 14387513 31--BEARING,SLEEVE Deadline24 Aug 2026 14387514 16--LIMITER,TEMPERATURE,DE Deadline24 Aug 2026 14387577 Brand Name Mandatory Teledyne Cables Deadline26 Aug 2026 14387578 SNOW REMOVAL SERVICES AT NWS IN JOHNSON CITY, NY Deadline25 Aug 2026 14387593 59--JUNCTION BOX ASSEMBLY Deadline24 Aug 2026 14387607 48--COCK,DRAIN Deadline24 Aug 2026 14387608 31--BUSHING,SLEEVE Deadline24 Aug 2026 14387609 66--DRIVE ASSEMBLY,INDI Deadline24 Aug 2026 14387610 66--TRANSMITTER,PRESSUR Deadline24 Aug 2026 14387611 66--INDICATOR PRESSURE Deadline24 Aug 2026 14387612 53--PLUG,MACHINE THREAD Deadline27 Aug 2026 14387613 53--SEAL,TRANSPARENT IN Deadline24 Aug 2026 14387614 16--DISC,RUPTURE,AIRCRA Deadline24 Aug 2026 14387615 29--TURBO SUPERCHARGER,ENG Deadline24 Aug 2026 14387616 66--RECORDING SET,WEATH Deadline24 Aug 2026 14387617 66--INDICATOR ASSEMBLY Deadline24 Aug 2026 14387618 16--HOSE ASSEMBLY,EMERGENC Deadline24 Aug 2026 14387619 53--SPACER,RING Deadline24 Aug 2026 14387620 47--HOSE ASSEMBLY,NONMETAL Deadline27 Aug 2026 14387621 15--FRAME,DOOR Deadline24 Aug 2026 14387622 48--VALVE,CHECK Deadline27 Aug 2026 14387623 59--BRUSH,ELECTRICAL CONTA Deadline24 Aug 2026 14387624 48--VALVE,SAFETY RELIEF Deadline27 Aug 2026 14387625 59--HEADSET,ELECTRICAL Deadline27 Aug 2026 14387626 59--BRUSH SET,ELECTRICAL C Deadline24 Aug 2026 14387627 16--MAT,WALKWAY,AIRCRAF Deadline24 Aug 2026 14387628 15--DUCT,EJECTOR EXHAUS Deadline24 Aug 2026 14387629 61--WEDGE,HOLDING Deadline24 Aug 2026 14387630 16--ADAPTER,SOLENOID Deadline24 Aug 2026 14387631 53--NUT,SELF-LOCKING,EX Deadline24 Aug 2026 14387632 53--RING,RETAINING Deadline24 Aug 2026 14387633 28--BOSS Deadline24 Aug 2026 14387634 16--CAP ASSEMBLY Deadline27 Aug 2026 14387635 66--TRANSMITTER,PRESSUR Deadline24 Aug 2026 14387636 28--LEAD ASSEMBLY Deadline24 Aug 2026 14387637 31--BUSHING,SLEEVE Deadline24 Aug 2026 14387638 59--TERMINAL,CASUALTY POWE Deadline24 Aug 2026 14387639 31--BUSHING,SLEEVE Deadline24 Aug 2026 14387640 66--THERMOMETER,INDICAT Deadline24 Aug 2026
API Integration — seamlessly integrate global tender data into your systems
AI-Powered Tender Intelligence for smarter bidding decisions
Publish Your Tenders — reach a global network of suppliers
Source Tenders Faster — discover verified tenders from across the globe
Chat with us