This tender with tender notice no. PPP0WC-687/6213/P8779 TE012340_002 is from the country of Belgium in Europe region. The tender was published by University Hospitals Leuven on 02 Jul 2026 for Cooling plant 7 KC7 was commissioned at the end of 2012 and is responsible for cold production for phase IVa and VI as well as heat production for phase IVa IVb1 2 3 and VI The plant is equipped with a connection to the heat-cold storage system WKO for energy storage in the ground A hydraulic coupling was also recently realized with cooling plant 8 KC8 so that KC7 can also take over the cold supply for phase IVb1 2 3 during the winter period and KC8 can be switched off The aim of this connection is to maximize the energetic efficiency of KC7 in winter operation The current assignment includes the reprogramming replacement and optimization of the control technology of KC7 aimed at - optimization of the installation efficiency - reduction of CO emissions - minimization of energy consumption - increased reliability and transparency of the control technology The assignment is divided into three phases Phase 1 Pre-engineering Concept phase In phase 1 the functional operation and structure of the software are developed Based on the available process and the instrumentation diagram P ID diagram a Functional Installation Overview FIO is drawn up in which the release conditions and the expected output are recorded for each operating status of the installation both operating status tables and sequence diagrams The information in the FIO serves as a technical framework for this phase and the next two phases To keep the programming as transparent as possible it is divided into a master control and functional units The functional units represent one or more logically related components of the installation In phase 1 the Entrepreneur draws up a list of all control signals inputs and outputs per functional unit whereby the control logic within this unit relates exclusively to that specific unit Examples of functional units include heat pump group of heat pumps WKO installation water-cooled chillers with venting to dry coolers dry coolers etc All unit-transcending control logic is integrated within the master control in which the operating modes and the interactions between the functional units are recorded for each operating state Requirements - The programming frameworks of the functional units are set up as versatile as possible so that reuse on other installations is possible without significant adjustments - Programs must be structured simple and transparent - Only Siemens program blocks with fully traceable and predictable behavior are permitted The use of the Siemens program blocks plant control and power control is not permitted - Programming is done in TIA Portal for the new Siemens PXC5 7 controllers The Entrepreneur - Documents the functionality in operating status tables sequence diagrams status diagrams and function texts prior to programming - Draws up improvement proposals based on analysis of current programming and user experiences - Provides a TIA Portal function library - Participates in at least two formal approval moments The Contracting Authority - Draws up a Functional Installation Overview FIO - Provides all necessary information to prepare the conversion of the electrical panels - Draws up a technical operating description - Provides for at least two formal approval moments namely approval of preliminary design and final design The end result of phase 1 is a full-fledged and detailed operating description including programming frameworks per functional unit of the installation and the overarching master control which will control the functional units The Contracting Authority reserves the right after a negative evaluation of the provisional delivery of phase 1 not to have both phase 2 and phase 3 carried out without the right to any compensation from the Entrepreneur This means that he or she is not entitled to minimum purchases or exclusivity Phase 2 Implementation - Replacement and reprogramming of the DDC control Phase 2 aims to replace the DDC control and implement the revised programming with full testing and recommissioning of the entire installation The works include - Reprogramming of the entire installation based on the technical operating description FIO and the program. The last date to submit your bid for this tender is 16 Jul 2026. This tender is for the companies specializing in Energy storage and similar sectors. Tender Impulse ID: 13617856.
Tender Notice No:
PPP0WC-687/6213/P8779 TE012340_002
Tender Organisation:
University Hospitals Leuven
Tender Sector:
Tender Service:
Worldwide
Tender Region:
Tender Country:
Tender CPV:
875491320 : Energy storage
Tender Document Type:
Tender Notice
Tender Description:
Cooling plant 7 KC7 was commissioned at the end of 2012 and is responsible for cold production for phase IVa and VI as well as heat production for phase IVa IVb1 2 3 and VI The plant is equipped with a connection to the heat-cold storage system WKO for energy storage in the ground A hydraulic coupling was also recently realized with cooling plant 8 KC8 so that KC7 can also take over the cold supply for phase IVb1 2 3 during the winter period and KC8 can be switched off The aim of this connection is to maximize the energetic efficiency of KC7 in winter operation The current assignment includes the reprogramming replacement and optimization of the control technology of KC7 aimed at - optimization of the installation efficiency - reduction of CO emissions - minimization of energy consumption - increased reliability and transparency of the control technology The assignment is divided into three phases Phase 1 Pre-engineering Concept phase In phase 1 the functional operation and structure of the software are developed Based on the available process and the instrumentation diagram P ID diagram a Functional Installation Overview FIO is drawn up in which the release conditions and the expected output are recorded for each operating status of the installation both operating status tables and sequence diagrams The information in the FIO serves as a technical framework for this phase and the next two phases To keep the programming as transparent as possible it is divided into a master control and functional units The functional units represent one or more logically related components of the installation In phase 1 the Entrepreneur draws up a list of all control signals inputs and outputs per functional unit whereby the control logic within this unit relates exclusively to that specific unit Examples of functional units include heat pump group of heat pumps WKO installation water-cooled chillers with venting to dry coolers dry coolers etc All unit-transcending control logic is integrated within the master control in which the operating modes and the interactions between the functional units are recorded for each operating state Requirements - The programming frameworks of the functional units are set up as versatile as possible so that reuse on other installations is possible without significant adjustments - Programs must be structured simple and transparent - Only Siemens program blocks with fully traceable and predictable behavior are permitted The use of the Siemens program blocks plant control and power control is not permitted - Programming is done in TIA Portal for the new Siemens PXC5 7 controllers The Entrepreneur - Documents the functionality in operating status tables sequence diagrams status diagrams and function texts prior to programming - Draws up improvement proposals based on analysis of current programming and user experiences - Provides a TIA Portal function library - Participates in at least two formal approval moments The Contracting Authority - Draws up a Functional Installation Overview FIO - Provides all necessary information to prepare the conversion of the electrical panels - Draws up a technical operating description - Provides for at least two formal approval moments namely approval of preliminary design and final design The end result of phase 1 is a full-fledged and detailed operating description including programming frameworks per functional unit of the installation and the overarching master control which will control the functional units The Contracting Authority reserves the right after a negative evaluation of the provisional delivery of phase 1 not to have both phase 2 and phase 3 carried out without the right to any compensation from the Entrepreneur This means that he or she is not entitled to minimum purchases or exclusivity Phase 2 Implementation - Replacement and reprogramming of the DDC control Phase 2 aims to replace the DDC control and implement the revised programming with full testing and recommissioning of the entire installation The works include - Reprogramming of the entire installation based on the technical operating description FIO and the program
Tender Bidding Type:
Tender Document:
Looking for more tenders like this one in Energy storage? With over 11 million global procurement opportunities and new tenders added daily, Tender Impulse is your gateway to international and local contracting success. Whether you're targeting the Defence sector in Belgium, or expanding across regions, we provide live, accurate, and relevant updates every day.
Our platform sources tenders from:
Every day, we add hundreds of new RFPs, RFQs, EOIs, and contract awards across multiple sectors and geographies. This tender from Belgium is just a sample of what's available right now.
Tender Impulse covers:
Each listing is categorized using CPV codes like 875491320, enabling precise filtering. Search by:
While you're viewing a tender in Belgium, Tender Impulse offers access to tenders across:
Tender Impulse provides more than listings:
Thousands of new tenders are added daily-across countries, sectors, and CPV codes. With Tender Impulse, you gain strategic insight, timely alerts, and a competitive edge.
Request a free live demo now to unlock tenders customized to your Defence, Belgium, and Energy storage categories.
Your action completed successfully.