Tender Summary
The TECHNICAL UNIVERSITY in Bulgaria from Europe region had released this tender for The subject is on assignment for engineering (design, construction and architectural supervision) for an undergraduate course at a 9-study block at TU-Sofia. When executing on the spoilage of the following and all the izvurshi ENGINEERING - Design, Construction and Authors supervision of the Object: "Izgotvyane for the assanjor mine, delivery and installation for the assanjor in Study block No. 9 at TU - Sofia", namely: - Izgotvyane for the Investment project for the assanjor vv phase “Technically, the project”, for scope and control, in accordance with ZUT and “Naredba No. 4, for coverage and control of investment projects.” The design is necessary and at a minimum follow the parts: Architectural Structural Technological Electrical Fire safety Plan for safety and health Plan for management of construction equipment Geodesy - Extracted into all necessary activities agreed upon for the Investment project with the central and territorial administration, specializing in control of organs and operating companies from the name of the Investor. - Execution for construction and installation works, in accordance with the Technical Design, instructions and commandments in the Book of the Precepts, incl. anticipate with the Quantitative Estimate (QSB) of construction and installation work (CEM). -Delivery and moisture in construction is necessary and in accordance with the Investment Project of the construction product, evidence with a certificate or declaration of conformity or declaration of performance indicators or declaration of characteristics for the construction product or equivalent. -Production and/or delivery to Stroitelni of parts/elements and constrictions (equipment) for moisture in Stroezha. -Promptly notify the Contractor when there is a need for additional testing and laboratory measurements to perform construction and installation work. -Drafted the necessary construction book for the construction process, as well as prepared the executive documentation for the preparation of the object for delivery to the Investor with the Protocol arr. 15. -Assistance in the procedure for issuing a “Certificate for entry into operation” for an object. -Removed on the ascertainment of negligence and insufficiency, establishment of the object with the Protocol arr. 15, before putting it into operation. -Removed for the manifestation of defects within the warranty period, determined from the contract for vazlagane on public damage in accordance with the offer. - Izvarshvane for copyright supervision. Interested persons can and will examine the object, which can be implemented and all work days from 9:00 to 17:00 hours, until the date, the deadline for receiving the offer has been determined, then a preliminary application through a message on the platform. The Agreement is in force from the date on the signed document and its validity period until the execution of all debts under the Agreement. Deadline for execution: Per stage: Preparation for the Investment project (as well as for the estimating of quantitative estimates) – Up to 30 (three hundred) calendar days,counted from the date on the contract to the date on the Acceptance and Delivery Protocol for submission for approval of the Investment project to the Investor. Within 10 days from signing the protocol, the EMPLOYEE and the CONSULTANT can send letters of objection to the project and punish the EXECUTOR for jointly investigating the problem. The Executor will then remove the delays/accuracies of the investment project within up to 10 (ten) calendar days, which they will receive in writing from the Investor. The period for which was agreed upon and approved for the project and issued for the permit for construction is not included in this period. For the stage: Execution for construction and installation work – Up to 90 (nineteenth) calendar days, counted from the date on the signature on the Protocol arr. 2 according to Naredba No. 3 dated July 31, 2003, beyond the opening on the construction site, before the date on the signature of the Protocol arr. 15, for the betrayal of the object from the Executor to the Depositor. It is envisaged that the time for execution at the construction site will be such that it will be sufficient for several days with suitable climatic conditions for the quality of execution at work. The period for the execution of the construction and installation work of the spiral and the flow during the spiran for construction for objective reasons, for which the Executor has no fault, signed on the Act sample 10 for the installation of the condition for the construction during the spiran for construction, in accordance with Naredba No. 3 of July 31, 2003 for the composition on the act and protocols on the time of construction. The deadline for execution of construction and installation work is renewed when signed on the Act sample 11 for establishing the condition of construction when construction is continued. For the stage: Exercises in authors supervision - From the date on the signature to the Protocol arr. 2 according to Naredba No. 3/31.07.2003, for the opening of the construction site, until the completion of construction with the signing of the necessary and established act for the law. Participate in consideration of the proposal. Suggest a time limit for the date and date and count it in calendar days. Provide a guarantee period in accordance with Naredba No. 2 of July 31, 2003 for the entry into operation of construction projects in the Republic of Bulgaria and a minimum guarantee period for the execution of construction and installation work, demolition and construction projects. Guaranteed service for asansiornata uredba: ≥ 3 years.2 according to Naredba No. 3 dated July 31, 2003, beyond the opening on the construction site, before the date on the signature of the Protocol arr. 15, for the betrayal of the object from the Executor to the Depositor. It is envisaged that the time for execution at the construction site will be such that it will be sufficient for several days with suitable climatic conditions for the quality of execution at work. The period for the execution of the construction and installation work of the spiral and the flow during the spiran for construction for objective reasons, for which the Executor has no fault, signed on the Act sample 10 for the installation of the condition for the construction during the spiran for construction, in accordance with Naredba No. 3 of July 31, 2003 for the composition on the act and protocols on the time of construction. The deadline for execution of construction and installation work is renewed when signed on the Act sample 11 for establishing the condition of construction when construction is continued. For the stage: Exercises in authors supervision - From the date on the signature to the Protocol arr. 2 according to Naredba No. 3/31.07.2003, for the opening of the construction site, until the completion of construction with the signing of the necessary and established act for the law. Participate in consideration of the proposal. Suggest a time limit for the date and date and count it in calendar days. Provide a guarantee period in accordance with Naredba No. 2 of July 31, 2003 for the entry into operation of construction projects in the Republic of Bulgaria and a minimum guarantee period for the execution of construction and installation work, demolition and construction projects. Guaranteed service for asansiornata uredba: ≥ 3 years.2 according to Naredba No. 3 dated July 31, 2003, beyond the opening on the construction site, before the date on the signature of the Protocol arr. 15, for the betrayal of the object from the Executor to the Depositor. It is envisaged that the time for execution at the construction site will be such that it will be sufficient for several days with suitable climatic conditions for the quality of execution at work. The period for the execution of the construction and installation work of the spiral and the flow during the spiran for construction for objective reasons, for which the Executor has no fault, signed on the Act sample 10 for the installation of the condition for the construction during the spiran for construction, in accordance with Naredba No. 3 of July 31, 2003 for the composition on the act and protocols on the time of construction. The deadline for execution of construction and installation work is renewed when signed on the Act sample 11 for establishing the condition of construction when construction is continued. For the stage: Exercises in authors supervision - From the date on the signature to the Protocol arr. 2 according to Naredba No. 3/31.07.2003, for the opening of the construction site, until the completion of construction with the signing of the necessary and established act for the law. Participate in consideration of the proposal. Suggest a time limit for the date and date and count it in calendar days. Provide a guarantee period in accordance with Naredba No. 2 of July 31, 2003 for the entry into operation of construction projects in the Republic of Bulgaria and a minimum guarantee period for the execution of construction and installation work, demolition and construction projects. Guaranteed service for asansiornata uredba: ≥ 3 years.for entry into operation at construction sites in the Republic of Bulgaria and the minimum warranty period for the execution of construction and installation work, construction and construction projects. Guaranteed service for asansiornata uredba: ≥ 3 years.for entry into operation at construction sites in the Republic of Bulgaria and the minimum warranty period for the execution of construction and installation work, construction and construction projects. Guaranteed service for asansiornata uredba: ≥ 3 years. with tender notice no. 716650-2026 published on 16 Oct 2026. The tender expired on 19 Nov 2026. This tender is sourced from TED Europa and is eligible for suppliers interested in Architectural, engineering and planning services, Project and design preparation, estimation of costs, Engineering design services, Engineering design services for the construction of civil engineering works, Engineering studies. Interested bidders can obtain further information including complete bid documents or ways to participate by registering on Tender Impulse and referencing via Tender Impulse ID 15627863.
Tender Details
Tender NoticeTI Ref: 15627863
Tender Notice No
716650-2026
Tender Organisation
TECHNICAL UNIVERSITY
Tender CPV
71240000 : Architectural, engineering and planning services71242000 : Project and design preparation, estimation of costs71320000 : Engineering design services71322000 : Engineering design services for the construction of civil engineering works71335000 : Engineering studies
Tender Document Type
Competition
Tender Deadline
19 Nov 2026 Deadline passed
Tender Description
The subject is on assignment for engineering (design, construction and architectural supervision) for an undergraduate course at a 9-study block at TU-Sofia. When executing on the spoilage of the following and all the izvurshi ENGINEERING - Design, Construction and Authors supervision of the Object: "Izgotvyane for the assanjor mine, delivery and installation for the assanjor in Study block No. 9 at TU - Sofia", namely: - Izgotvyane for the Investment project for the assanjor vv phase “Technically, the project”, for scope and control, in accordance with ZUT and “Naredba No. 4, for coverage and control of investment projects.” The design is necessary and at a minimum follow the parts: Architectural Structural Technological Electrical Fire safety Plan for safety and health Plan for management of construction equipment Geodesy - Extracted into all necessary activities agreed upon for the Investment project with the central and territorial administration, specializing in control of organs and operating companies from the name of the Investor. - Execution for construction and installation works, in accordance with the Technical Design, instructions and commandments in the Book of the Precepts, incl. anticipate with the Quantitative Estimate (QSB) of construction and installation work (CEM). -Delivery and moisture in construction is necessary and in accordance with the Investment Project of the construction product, evidence with a certificate or declaration of conformity or declaration of performance indicators or declaration of characteristics for the construction product or equivalent. -Production and/or delivery to Stroitelni of parts/elements and constrictions (equipment) for moisture in Stroezha. -Promptly notify the Contractor when there is a need for additional testing and laboratory measurements to perform construction and installation work. -Drafted the necessary construction book for the construction process, as well as prepared the executive documentation for the preparation of the object for delivery to the Investor with the Protocol arr. 15. -Assistance in the procedure for issuing a “Certificate for entry into operation” for an object. -Removed on the ascertainment of negligence and insufficiency, establishment of the object with the Protocol arr. 15, before putting it into operation. -Removed for the manifestation of defects within the warranty period, determined from the contract for vazlagane on public damage in accordance with the offer. - Izvarshvane for copyright supervision. Interested persons can and will examine the object, which can be implemented and all work days from 9:00 to 17:00 hours, until the date, the deadline for receiving the offer has been determined, then a preliminary application through a message on the platform. The Agreement is in force from the date on the signed document and its validity period until the execution of all debts under the Agreement. Deadline for execution: Per stage: Preparation for the Investment project (as well as for the estimating of quantitative estimates) – Up to 30 (three hundred) calendar days,counted from the date on the contract to the date on the Acceptance and Delivery Protocol for submission for approval of the Investment project to the Investor. Within 10 days from signing the protocol, the EMPLOYEE and the CONSULTANT can send letters of objection to the project and punish the EXECUTOR for jointly investigating the problem. The Executor will then remove the delays/accuracies of the investment project within up to 10 (ten) calendar days, which they will receive in writing from the Investor. The period for which was agreed upon and approved for the project and issued for the permit for construction is not included in this period. For the stage: Execution for construction and installation work – Up to 90 (nineteenth) calendar days, counted from the date on the signature on the Protocol arr. 2 according to Naredba No. 3 dated July 31, 2003, beyond the opening on the construction site, before the date on the signature of the Protocol arr. 15, for the betrayal of the object from the Executor to the Depositor. It is envisaged that the time for execution at the construction site will be such that it will be sufficient for several days with suitable climatic conditions for the quality of execution at work. The period for the execution of the construction and installation work of the spiral and the flow during the spiran for construction for objective reasons, for which the Executor has no fault, signed on the Act sample 10 for the installation of the condition for the construction during the spiran for construction, in accordance with Naredba No. 3 of July 31, 2003 for the composition on the act and protocols on the time of construction. The deadline for execution of construction and installation work is renewed when signed on the Act sample 11 for establishing the condition of construction when construction is continued. For the stage: Exercises in authors supervision - From the date on the signature to the Protocol arr. 2 according to Naredba No. 3/31.07.2003, for the opening of the construction site, until the completion of construction with the signing of the necessary and established act for the law. Participate in consideration of the proposal. Suggest a time limit for the date and date and count it in calendar days. Provide a guarantee period in accordance with Naredba No. 2 of July 31, 2003 for the entry into operation of construction projects in the Republic of Bulgaria and a minimum guarantee period for the execution of construction and installation work, demolition and construction projects. Guaranteed service for asansiornata uredba: ≥ 3 years.2 according to Naredba No. 3 dated July 31, 2003, beyond the opening on the construction site, before the date on the signature of the Protocol arr. 15, for the betrayal of the object from the Executor to the Depositor. It is envisaged that the time for execution at the construction site will be such that it will be sufficient for several days with suitable climatic conditions for the quality of execution at work. The period for the execution of the construction and installation work of the spiral and the flow during the spiran for construction for objective reasons, for which the Executor has no fault, signed on the Act sample 10 for the installation of the condition for the construction during the spiran for construction, in accordance with Naredba No. 3 of July 31, 2003 for the composition on the act and protocols on the time of construction. The deadline for execution of construction and installation work is renewed when signed on the Act sample 11 for establishing the condition of construction when construction is continued. For the stage: Exercises in authors supervision - From the date on the signature to the Protocol arr. 2 according to Naredba No. 3/31.07.2003, for the opening of the construction site, until the completion of construction with the signing of the necessary and established act for the law. Participate in consideration of the proposal. Suggest a time limit for the date and date and count it in calendar days. Provide a guarantee period in accordance with Naredba No. 2 of July 31, 2003 for the entry into operation of construction projects in the Republic of Bulgaria and a minimum guarantee period for the execution of construction and installation work, demolition and construction projects. Guaranteed service for asansiornata uredba: ≥ 3 years.2 according to Naredba No. 3 dated July 31, 2003, beyond the opening on the construction site, before the date on the signature of the Protocol arr. 15, for the betrayal of the object from the Executor to the Depositor. It is envisaged that the time for execution at the construction site will be such that it will be sufficient for several days with suitable climatic conditions for the quality of execution at work. The period for the execution of the construction and installation work of the spiral and the flow during the spiran for construction for objective reasons, for which the Executor has no fault, signed on the Act sample 10 for the installation of the condition for the construction during the spiran for construction, in accordance with Naredba No. 3 of July 31, 2003 for the composition on the act and protocols on the time of construction. The deadline for execution of construction and installation work is renewed when signed on the Act sample 11 for establishing the condition of construction when construction is continued. For the stage: Exercises in authors supervision - From the date on the signature to the Protocol arr. 2 according to Naredba No. 3/31.07.2003, for the opening of the construction site, until the completion of construction with the signing of the necessary and established act for the law. Participate in consideration of the proposal. Suggest a time limit for the date and date and count it in calendar days. Provide a guarantee period in accordance with Naredba No. 2 of July 31, 2003 for the entry into operation of construction projects in the Republic of Bulgaria and a minimum guarantee period for the execution of construction and installation work, demolition and construction projects. Guaranteed service for asansiornata uredba: ≥ 3 years.for entry into operation at construction sites in the Republic of Bulgaria and the minimum warranty period for the execution of construction and installation work, construction and construction projects. Guaranteed service for asansiornata uredba: ≥ 3 years.for entry into operation at construction sites in the Republic of Bulgaria and the minimum warranty period for the execution of construction and installation work, construction and construction projects. Guaranteed service for asansiornata uredba: ≥ 3 years.
Frequently Asked Questions About This Tender
Who has issued this tender, and what is it for?
The tender has been issued by TECHNICAL UNIVERSITY in Bulgaria. Such a type of tender falls under Architectural, engineering and planning services, Project and design preparation, estimation of costs, Engineering design services, Engineering design services for the construction of civil engineering works, Engineering studies, within the Education & Training sector, and is listed on Tender Impulse under notice number 716650-2026.
What are the key dates for this tender?
The notice was published on 16 Oct 2026 and submissions close on 19 Nov 2026. Late bids are rarely accepted in public procurement, so aim to have your documents ready several days before the closing date.
Which CPV codes apply to this tender?
It is classified under CPV codes 71240000, 71242000, 71320000, 71322000, 71335000, which correspond to Architectural, engineering and planning services, Project and design preparation, estimation of costs, Engineering design services, Engineering design services for the construction of civil engineering works, Engineering studies. If your company supplies these products or services, these are the codes to save in your alert profile so no matching tender passes you by.
Can I submit my bid for this tender to Tender Impulse?
No - and this matters. Tender Impulse is a tender aggregation and alert service: we collect procurement notices from official sources around the world and list them in one place. We do not receive, forward or evaluate bids. Your bid for this tender must be submitted directly to TECHNICAL UNIVERSITY, using the method described in the original tender document, before 19 Nov 2026. Tender Impulse provides complete assistance in submitting all bids posted on its website.
How do I get the bid documents and participation details?
Request a live demo on Tender Impulse and our tender experts will walk you through this listing, share the available documents, and explain how to submit your bid to TECHNICAL UNIVERSITY. Subscribers also receive help with registration requirements and, where needed, translation of non-English notices - but the submission itself always goes from you to the buyer.
How can I find more tenders like this in Bulgaria?
There are currently 3929 live tenders of 45735 total tenders from Bulgaria on Tender Impulse. You can browse them on our Bulgaria tenders page, or save a search combining Bulgaria with CPV codes 71240000, 71242000, 71320000, 71322000, 71335000 - we will then email you every new match on the day it is published.
How to prepare for this bid?
Suppliers must verify technical specifications, the delivery schedules and any other intrinsic details as provided in the complete bid documents before deciding to submit their bids. All necessary certifications and supplier registrations must be undertaken before participation.
Is this tender beneficial for me?
The procurement is applicable to companies in the Architectural, engineering and planning services, Project and design preparation, estimation of costs, Engineering design services, Engineering design services for the construction of civil engineering works, Engineering studies and related industries. If you belong to this industry, you can review the technical documents before assessing your relevance to your company.
What is the procurement trend for Execution for engineering (design, design and architectural supervision) for undergraduate studies at 9 academic blocks at TU-Sofia?
The public procurement trends for Execution for engineering (design, design and architectural supervision) for undergraduate studies at 9 academic blocks at TU-Sofia can be assessed by viewing historical data and buying patterns for this product. Subscribed members can view and even download reports of tenders released in the past for their market research. This shall allow them to carefully prepare a compelling bid.
Explore More Architectural, engineering and planning services, Project and design preparation, estimation of costs, Engineering design services, Engineering design services for the construction of civil engineering works, Engineering studies Tenders in Bulgaria, Europe Region and Worldwide
Looking for more tenders like this one in Architectural, engineering and planning services, Project and design preparation, estimation of costs, Engineering design services, Engineering design services for the construction of civil engineering works, Engineering studies? With millions of global procurement opportunities and new tenders added daily, Tender Impulse is your gateway to international and local contracting success. Whether you're targeting the Education & Training sector in Bulgaria, or expanding across regions, we provide live, accurate and relevant updates every day.
Our platform sources tenders from national and local government portals, international development and funding agencies, municipal corporations, state authorities, NGOs, education ministries and public-private partnerships.
Daily Tender Updates Across 190+ Countries
Every day we add hundreds of new RFPs, RFQs, EOIs and contract awards across multiple sectors and geographies. This tender from Bulgaria is just a sample of what's available right now - there are currently 3,929 live Bulgaria tenders to explore.
Search Smarter with CPV and Industry Matching
Each listing is categorised using CPV codes such as 71240000, 71242000, 71320000, 71322000, 71335000, enabling precise filtering by tender type, location, industry, deadline and issuing organisation.
Start Your Tender Journey
Request a free live demo to unlock tenders customised to your sector, country and CPV categories - with alerts, documents and submission support.