The subject of the performance of the public order is the modernization of the existing Sepekov WWTP so that it meets the newly permitted pollution parameters at the outlet which are in accordance with Government Regulation No 401 2015 sb and meet the best available technology specification for a given size of pollution source in the 500-2000 EO category it assumes a necessary increase in the capacity of the activation process A new double-wall tank will be installed for phosphorus precipitation nA new system of 2 nitrification tanks will be built as part of the construction part The external floor plan size is 7 7 7m The tanks are placed with regard to the accessibility of the site after construction During the construction period it is necessary to dismantle part of the fencing and move the gate due to the excavation encroaching on the intra-campus road at the entrance As part of the machinery part the existing WWTP will be modernized so that it meets the newly permitted pollution parameters at the outlet which are in accordance with Government Regulation No 401 2015 Coll and meet the best available technology specification for a given size of pollution source in the 500-2000 EO category it assumes a necessary increase in the capacity of the activation process A new double-wall tank will be installed for phosphorus precipitation During the modernization the existing method of wastewater treatment with a mixed culture of activated sludge with sludge separation in a vertical settling tank will be maintained and simultaneous precipitation of phosphorus will be added Arrangement of the treatment line biological stage consisting of denitrification nitrification and settling tank To increase the required volume of the biological part of the treatment plant a system of new tanks will be built 2 nitrification nrenovation of the existing pumping nAs part of the construction work the waste water station on plot KN 1203 9 in the township of Sepekov will also be renovated As part of the renovation of the pumping station it will be completely removed and replaced with a new pumping station made of prefabricated concrete rings with a diameter of 2 m and the installation of a pair of new sewage pumps Furthermore the new electrical installation and MaR including the realization of a new switchboard pillar are being dealt with n nDetailed specification of the subject of performance is given in Appendix No 1 Project documentation including itemized measurement statements More detailed information can be found in Annex No 2 of the procurement documentation - Work contract Annex No 1 includes the project documentation Modernization of the municipal sewage treatment plant in Sepekov and the project documentation Sepekov - renovation of the sewage pumping station to KN 1203 9 410 Support for the construction and technical evaluation of water supply and sewerage infrastructure III n 45232420-2 Construction work on the construction of wastewater treatment plants South Bohemian Region 45232420-2 Construction work on the construction of wastewater treatment plants Construction work on the construction of wastewater treatment plants - 11477270

The Sepekov township in Czech Republic from Europe region had released this tender for The subject of the performance of the public order is the modernization of the existing Sepekov WWTP so that it meets the newly permitted pollution parameters at the outlet which are in accordance with Government Regulation No 401 2015 sb and meet the best available technology specification for a given size of pollution source in the 500-2000 EO category it assumes a necessary increase in the capacity of the activation process A new double-wall tank will be installed for phosphorus precipitation nA new system of 2 nitrification tanks will be built as part of the construction part The external floor plan size is 7 7 7m The tanks are placed with regard to the accessibility of the site after construction During the construction period it is necessary to dismantle part of the fencing and move the gate due to the excavation encroaching on the intra-campus road at the entrance As part of the machinery part the existing WWTP will be modernized so that it meets the newly permitted pollution parameters at the outlet which are in accordance with Government Regulation No 401 2015 Coll and meet the best available technology specification for a given size of pollution source in the 500-2000 EO category it assumes a necessary increase in the capacity of the activation process A new double-wall tank will be installed for phosphorus precipitation During the modernization the existing method of wastewater treatment with a mixed culture of activated sludge with sludge separation in a vertical settling tank will be maintained and simultaneous precipitation of phosphorus will be added Arrangement of the treatment line biological stage consisting of denitrification nitrification and settling tank To increase the required volume of the biological part of the treatment plant a system of new tanks will be built 2 nitrification nrenovation of the existing pumping nAs part of the construction work the waste water station on plot KN 1203 9 in the township of Sepekov will also be renovated As part of the renovation of the pumping station it will be completely removed and replaced with a new pumping station made of prefabricated concrete rings with a diameter of 2 m and the installation of a pair of new sewage pumps Furthermore the new electrical installation and MaR including the realization of a new switchboard pillar are being dealt with n nDetailed specification of the subject of performance is given in Appendix No 1 Project documentation including itemized measurement statements More detailed information can be found in Annex No 2 of the procurement documentation - Work contract Annex No 1 includes the project documentation Modernization of the municipal sewage treatment plant in Sepekov and the project documentation Sepekov - renovation of the sewage pumping station to KN 1203 9 410 Support for the construction and technical evaluation of water supply and sewerage infrastructure III n 45232420-2 Construction work on the construction of wastewater treatment plants South Bohemian Region 45232420-2 Construction work on the construction of wastewater treatment plants Construction work on the construction of wastewater treatment plants with tender notice no. N006/26/V00000048 published on 18 Feb 2026. The tender expired on 18 Mar 2026. This tender is sourced from Sri lb and is eligible for suppliers interested in Sewage pumping stations construction work, Construction work for sewage pipes, Water-treatment plant construction work. Interested bidders can obtain further information including complete bid documents or ways to participate by registering on Tender Impulse and referencing via Tender Impulse ID 11477270.

*The deadline for this tender has passed.

Tender Notice No:

N006/26/V00000048

Tender Organisation:

Sepekov township

Tender Service:

Worldwide

Tender Region:

Tender Country:

Tender CPV:

45232423 : Sewage pumping stations construction work
45232440 : Construction work for sewage pipes
45252120 : Water-treatment plant construction work

Tender Source:

Sri lb

Tender Document Type:

Tender Notice

Tender Description:

The subject of the performance of the public order is the modernization of the existing Sepekov WWTP so that it meets the newly permitted pollution parameters at the outlet which are in accordance with Government Regulation No 401 2015 sb and meet the best available technology specification for a given size of pollution source in the 500-2000 EO category it assumes a necessary increase in the capacity of the activation process A new double-wall tank will be installed for phosphorus precipitation nA new system of 2 nitrification tanks will be built as part of the construction part The external floor plan size is 7 7 7m The tanks are placed with regard to the accessibility of the site after construction During the construction period it is necessary to dismantle part of the fencing and move the gate due to the excavation encroaching on the intra-campus road at the entrance As part of the machinery part the existing WWTP will be modernized so that it meets the newly permitted pollution parameters at the outlet which are in accordance with Government Regulation No 401 2015 Coll and meet the best available technology specification for a given size of pollution source in the 500-2000 EO category it assumes a necessary increase in the capacity of the activation process A new double-wall tank will be installed for phosphorus precipitation During the modernization the existing method of wastewater treatment with a mixed culture of activated sludge with sludge separation in a vertical settling tank will be maintained and simultaneous precipitation of phosphorus will be added Arrangement of the treatment line biological stage consisting of denitrification nitrification and settling tank To increase the required volume of the biological part of the treatment plant a system of new tanks will be built 2 nitrification nrenovation of the existing pumping nAs part of the construction work the waste water station on plot KN 1203 9 in the township of Sepekov will also be renovated As part of the renovation of the pumping station it will be completely removed and replaced with a new pumping station made of prefabricated concrete rings with a diameter of 2 m and the installation of a pair of new sewage pumps Furthermore the new electrical installation and MaR including the realization of a new switchboard pillar are being dealt with n nDetailed specification of the subject of performance is given in Appendix No 1 Project documentation including itemized measurement statements More detailed information can be found in Annex No 2 of the procurement documentation - Work contract Annex No 1 includes the project documentation Modernization of the municipal sewage treatment plant in Sepekov and the project documentation Sepekov - renovation of the sewage pumping station to KN 1203 9 410 Support for the construction and technical evaluation of water supply and sewerage infrastructure III n 45232420-2 Construction work on the construction of wastewater treatment plants South Bohemian Region 45232420-2 Construction work on the construction of wastewater treatment plants Construction work on the construction of wastewater treatment plants

Tender Bidding Type:

Publish Date: 18 Feb 2026

Deadline Date: 18 Mar 2026

  • 1 week to go
  • 15 Days to go
  • More than 15 days to go

Get A Callback Within 24 Hours

Fill form below to get callback from Tender Experts.

168149

Explore More Sewage pumping stations construction work, Construction work for sewage pipes, Water-treatment plant construction work Tenders in Czech Republic, Europe, and Worldwide

Looking for more tenders like this one in Sewage pumping stations construction work, Construction work for sewage pipes, Water-treatment plant construction work? With over 11 million global procurement opportunities and new tenders added daily, Tender Impulse is your gateway to international and local contracting success. Whether you're targeting the Infrastructure and construction sector in Czech Republic, or expanding across regions, we provide live, accurate, and relevant updates every day.

Our platform sources tenders from:

  • National and local government portals
  • International development and funding agencies
  • Municipal corporations and state authorities
  • NGOs, education ministries, and public-private partnerships
  • Current tender was sourced from Sri lb's official portal

Daily Tender Updates Across 190+ Countries

Every day, we add hundreds of new RFPs, RFQs, EOIs, and contract awards across multiple sectors and geographies. This tender from Czech Republic is just a sample of what's available right now.

Tender Impulse covers:

  • Public procurement tenders
  • International development projects
  • Local municipal bids
  • Private and PPP contracts
  • Framework agreements and supply tenders

Search Smarter with CPV and Industry Matching

Each listing is categorized using CPV codes like 45232423, 45232440, 45252120, enabling precise filtering. Search by:

  • Tender type: RFP, RFQ, EOI, GPN, Contract Awards
  • Location: Czech Republic, Europe, or global
  • Industry: Infrastructure and construction
  • Deadline and issue date
  • Issuing organization or funding agency

Opportunities in Every Industry and Region

While you're viewing a tender in Czech Republic, Tender Impulse offers access to tenders across:

  • Asia, Europe, Africa, the Americas, and Oceania
  • Defence, Energy, Healthcare, Construction, Education, IT, Agriculture, and more
  • All CPV categories—from consultancy to infrastructure

Tools to Help You Succeed

Tender Impulse provides more than listings:

  • Custom email alerts by CPV and location
  • Downloadable bid documents and submission support
  • Registration guidance and compliance tools
  • Translation support for non-English tenders
  • Proposal writing tips and examples

Stay Ahead with Real-Time Updates

Thousands of new tenders are added daily-across countries, sectors, and CPV codes. With Tender Impulse, you gain strategic insight, timely alerts, and a competitive edge.

Request a free live demo now to unlock tenders customized to your Infrastructure and construction, Czech Republic, and Sewage pumping stations construction work, Construction work for sewage pipes, Water-treatment plant construction work categories.

Common Questions About This Tender

  • Who has issued this tender, and what is it for?

    The tender has been issued by Sepekov township in Czech Republic. Such a type of tender falls under Sewage pumping stations construction work, Construction work for sewage pipes, Water-treatment plant construction work, within the Infrastructure and construction Tenders sector, and is listed on Tender Impulse under notice number N00626V00000048.

  • What are the key dates for this tender?

    The notice was published on 18 Feb 2026 and submissions close on 18 Mar 2026. Late bids are rarely accepted in public procurement, so aim to have your documents ready several days before the closing date.

  • Which CPV codes apply to this tender?

    It is classified under CPV codes 45232423, 45232440, 45252120, which correspond to Sewage pumping stations construction work, Construction work for sewage pipes, Water-treatment plant construction work. If your company supplies these products or services, these are the codes to save in your alert profile so no matching tender passes you by.

  • Can I submit my bid for this tender to Tender Impulse?

    No - and this matters. Tender Impulse is a tender aggregation and alert service: we collect procurement notices from official sources around the world and list them in one place. We do not receive, forward or evaluate bids. Your bid for this tender must be submitted directly to Sepekov township, using the method described in the original tender document, before 18 Mar 2026. Tender Impulse provides complete assistance in submitting all bids posted on its website.

  • How do I get the bid documents and participation details?

    Request a live demo on Tender Impulse and our tender experts will walk you through this listing, share the available documents, and explain how to submit your bid to Sepekov township. Subscribers also receive help with registration requirements and, where needed, translation of non-English notices - but the submission itself always goes from you to the buyer.

  • How can I find more tenders like this in Czech Republic?

    There are currently 2750 live tenders of 77819 total tenders from Czech Republic on Tender Impulse. You can browse them on our Czech Republic tenders page, or save a search combining Czech Republic with CPV codes {full_cpv_codes} - we will then email you every new match on the day it is published.

  • How to prepare for this bid?

    Suppliers must verify technical specifications, the delivery schedules and any other intrinsic details as provided in the complete bid documents before deciding to submit their bids. All necessary certifications and supplier registrations must be undertaken before participation.

  • Is this tender beneficial for me?

    The procurement is applicable to companies in the Sewage pumping stations construction work, Construction work for sewage pipes, Water-treatment plant construction work and related industries. If you belong to this industry, you can review the technical documents before assessing your relevance to your company.

  • What is the Procurement trend for The subject of the performance of the public order is the modernization of the existing Sepekov WWTP so that it meets the newly permitted pollution parameters at the outlet which are in accordance with Government Regulation No 401 2015 sb and meet the best available technology specification for a given size of pollution source in the 500-2000 EO category it assumes a necessary increase in the capacity of the activation process A new double-wall tank will be installed for phosphorus precipitation nA new system of 2 nitrification tanks will be built as part of the construction part The external floor plan size is 7 7 7m The tanks are placed with regard to the accessibility of the site after construction During the construction period it is necessary to dismantle part of the fencing and move the gate due to the excavation encroaching on the intra-campus road at the entrance As part of the machinery part the existing WWTP will be modernized so that it meets the newly permitted pollution..?

    The public procurement trends for The subject of the performance of the public order is the modernization of the existing Sepekov WWTP so that it meets the newly permitted pollution parameters at the outlet which are in accordance with Government Regulation No 401 2015 sb and meet the best available technology specification for a given size of pollution source in the 500-2000 EO category it assumes a necessary increase in the capacity of the activation process A new double-wall tank will be installed for phosphorus precipitation nA new system of 2 nitrification tanks will be built as part of the construction part The external floor plan size is 7 7 7m The tanks are placed with regard to the accessibility of the site after construction During the construction period it is necessary to dismantle part of the fencing and move the gate due to the excavation encroaching on the intra-campus road at the entrance As part of the machinery part the existing WWTP will be modernized so that it meets the newly permitted pollution.. can be assessed by viewing historical data and buying patterns for this product. Subscribed members can view and even download reports of tenders released in the past for their market research. This shall allow them to carefully prepare a compelling bid.

Latest Tenders by Region

Latest Tenders by Sector

Latest Tenders by Country

Success

Your action completed successfully.