This tender is from the country of Germany in Europe region. The tender was published by Federal Office for the Safety of Nuclear Waste Management BASE on 21 Apr 2026 for 4726f10303 - development of a method for identifying assessing interactions between operational and long-term safety requirements embla -basics and feasibility- Evaluating the safety of a repository includes a number of elements such as B Site characterization final storage concept safety concept and safety analyses which together form the basis for argumentation and trust for a safety statement The safety statement includes both the operational phase and the post-closure phase of a repository In the past the phases mentioned were treated more or less separately from one another The underlying approaches for the security analyzes were or are very different The separate approach has now been abandoned because the possible interactions between operational safety and long-term safety can have an influence on safety in the respective phase In addition the end of the operational phase forms the starting point for the post-closure phase There are therefore dependencies between the two phases that cannot be ignored when making a safety statement In order to consider potential interactions between repository operation and the period after repository closure a contractor should prepare a scientific study on this topic The study represents a first preparatory step towards developing the necessary fundamentals for the development of a suitable method for the systematic recording of interactions between operational and long-term safety requirements and for their assessment In addition to providing the fundamentals the investigations also include the fundamental determination of the feasibility of developing a method Overall the possibility of taking influencing factors into account the so-called FEP Features Events and Processes for both the operational phase and long-term safety should be included in the investigations Assuming a positive finding on feasibility a follow-up project will develop a method for identifying evaluating interactions between operational and long-term safety requirements. The last date to submit your bid for this tender is 27 May 2026. This tender is for the companies specializing in Feasibility study and similar sectors.
Tender Organisation:
Federal Office for the Safety of Nuclear Waste Management BASE
Tender Sector:
Tender Service:
Worldwide
Tender Region:
Tender Country:
Tender CPV:
79314000 : Feasibility study
Tender Document Type:
Tender Notice
Tender Description:
4726f10303 - development of a method for identifying assessing interactions between operational and long-term safety requirements embla -basics and feasibility- Evaluating the safety of a repository includes a number of elements such as B Site characterization final storage concept safety concept and safety analyses which together form the basis for argumentation and trust for a safety statement The safety statement includes both the operational phase and the post-closure phase of a repository In the past the phases mentioned were treated more or less separately from one another The underlying approaches for the security analyzes were or are very different The separate approach has now been abandoned because the possible interactions between operational safety and long-term safety can have an influence on safety in the respective phase In addition the end of the operational phase forms the starting point for the post-closure phase There are therefore dependencies between the two phases that cannot be ignored when making a safety statement In order to consider potential interactions between repository operation and the period after repository closure a contractor should prepare a scientific study on this topic The study represents a first preparatory step towards developing the necessary fundamentals for the development of a suitable method for the systematic recording of interactions between operational and long-term safety requirements and for their assessment In addition to providing the fundamentals the investigations also include the fundamental determination of the feasibility of developing a method Overall the possibility of taking influencing factors into account the so-called FEP Features Events and Processes for both the operational phase and long-term safety should be included in the investigations Assuming a positive finding on feasibility a follow-up project will develop a method for identifying evaluating interactions between operational and long-term safety requirements
Tender Bidding Type:
Tender Notice No:
Tender Document:
Looking for more tenders like this one in Feasibility study? With over 70 million global procurement opportunities and new tenders added daily, Tender Impulse is your gateway to international and local contracting success. Whether you're targeting the Infrastructure and construction sector in Germany, or expanding across regions, we provide live, accurate, and relevant updates every day.
Our platform sources tenders from:
Every day, we add hundreds of new RFPs, RFQs, EOIs, and contract awards across multiple sectors and geographies. This tender from Germany is just a sample of what's available right now.
Tender Impulse covers:
Each listing is categorized using CPV codes like 79314000, enabling precise filtering. Search by:
While you're viewing a tender in Germany, Tender Impulse offers access to tenders across:
Tender Impulse provides more than listings:
Thousands of new tenders are added daily-across countries, sectors, and CPV codes. With Tender Impulse, you gain strategic insight, timely alerts, and a competitive edge.
Request a free live demo now to unlock tenders customized to your Infrastructure and construction, Germany, and Feasibility study categories.
Your action completed successfully.