This tender is from the country of Germany in Europe region. The tender was published by Db infrago ag track division bukr 16 on 16 Dec 2025 for As part of the implementation of the vde 8 1 freight train line project numerous construction measures are necessary in the construction section between km g 4 5 and km g 6 702 award package 1 - conversion south which must be monitored throughout the entire construction process by a construction supervisory authority b w the construction project includes the following trades or basic services kib superstructure ola cable foundation engineering tk lst 50hz environmental b w geotechnical b w surveying waste management construction operations planning participation in the lph 6 and 7 as well as railway operational services and security monitoring award package 1 includes the relocation of the existing route 5950 as well as the construction of a new trough structure and subsequently an open-cut tunnel with a length of approximately 505m the adjoining f rth freight train tunnel 6 500 m long which is to be built using mechanical tunneling is part of a different procurement package due to the highly complex and interlinked construction process award package 1 results in a long overall construction period of around 10 years at the beginning of the construction project initial preliminary measures in particular the dismantling of existing ola cross-fields in the bf nbg wholesale market and extensive underground cable construction are required after the main construction work has been awarded the existing route 5950 will first be extensively converted the continuous main tracks of the route are being moved outwards one after the other while the wheels are rolling in order to create space for the future trough structure the first parts of the tunnel structure are already being built using the cut-and-cover method after the commissioning of route 5950 in its final state planned for april 2032 the construction of the trough structure and the completion of the tunnel using the cut-and-cover method will begin the superstructure technical equipment and overhead lines can then be installed and the new line 5955 can be put into operation which should be completed by the end of 2035 the services to be provided are divided into four successive phases the monitoring of the preliminary measures from april 2026 participation in tendering and awarding as well as the subsequent monitoring of the main construction work until the first major interim commissioning of route 5950 in december 2029 will be firmly transferred the construction of the tunnel section using the cut-and-cover method and the final relocation of route 5950 to the intended final position are then planned these construction measures are included in option 1 and are scheduled to be completed by april 2032 the related option 2 includes the complete construction of route 5955 including the trough structure up to the implementation of trial operations and full commissioning in december 2035 option 3 includes remaining services associated with the completion of the project in particular the continuation of invoice verification and addendum processing. The last date to submit your bid for this tender is 16 Jan 2026. This tender is for the companies specializing in Construction work and similar sectors.
Tender Organisation:
Db infrago ag track division bukr 16
Tender Sector:
Tender Service:
Worldwide
Tender Region:
Tender Country:
Tender CPV:
45000000 : Construction work
Tender Document Type:
Tender Notice
Tender Description:
As part of the implementation of the vde 8 1 freight train line project numerous construction measures are necessary in the construction section between km g 4 5 and km g 6 702 award package 1 - conversion south which must be monitored throughout the entire construction process by a construction supervisory authority b w the construction project includes the following trades or basic services kib superstructure ola cable foundation engineering tk lst 50hz environmental b w geotechnical b w surveying waste management construction operations planning participation in the lph 6 and 7 as well as railway operational services and security monitoring award package 1 includes the relocation of the existing route 5950 as well as the construction of a new trough structure and subsequently an open-cut tunnel with a length of approximately 505m the adjoining f rth freight train tunnel 6 500 m long which is to be built using mechanical tunneling is part of a different procurement package due to the highly complex and interlinked construction process award package 1 results in a long overall construction period of around 10 years at the beginning of the construction project initial preliminary measures in particular the dismantling of existing ola cross-fields in the bf nbg wholesale market and extensive underground cable construction are required after the main construction work has been awarded the existing route 5950 will first be extensively converted the continuous main tracks of the route are being moved outwards one after the other while the wheels are rolling in order to create space for the future trough structure the first parts of the tunnel structure are already being built using the cut-and-cover method after the commissioning of route 5950 in its final state planned for april 2032 the construction of the trough structure and the completion of the tunnel using the cut-and-cover method will begin the superstructure technical equipment and overhead lines can then be installed and the new line 5955 can be put into operation which should be completed by the end of 2035 the services to be provided are divided into four successive phases the monitoring of the preliminary measures from april 2026 participation in tendering and awarding as well as the subsequent monitoring of the main construction work until the first major interim commissioning of route 5950 in december 2029 will be firmly transferred the construction of the tunnel section using the cut-and-cover method and the final relocation of route 5950 to the intended final position are then planned these construction measures are included in option 1 and are scheduled to be completed by april 2032 the related option 2 includes the complete construction of route 5955 including the trough structure up to the implementation of trial operations and full commissioning in december 2035 option 3 includes remaining services associated with the completion of the project in particular the continuation of invoice verification and addendum processing
Tender Bidding Type:
Tender Notice No:
Tender Document:
Looking for more tenders like this one in Construction work? With over 70 million global procurement opportunities and new tenders added daily, Tender Impulse is your gateway to international and local contracting success. Whether you're targeting the Infrastructure and construction sector in Germany, or expanding across regions, we provide live, accurate, and relevant updates every day.
Our platform sources tenders from:
Every day, we add hundreds of new RFPs, RFQs, EOIs, and contract awards across multiple sectors and geographies. This tender from Germany is just a sample of what's available right now.
Tender Impulse covers:
Each listing is categorized using CPV codes like 45000000, enabling precise filtering. Search by:
While you're viewing a tender in Germany, Tender Impulse offers access to tenders across:
Tender Impulse provides more than listings:
Thousands of new tenders are added daily-across countries, sectors, and CPV codes. With Tender Impulse, you gain strategic insight, timely alerts, and a competitive edge.
Start your free trial to unlock tenders customized to your Infrastructure and construction, Germany, and Construction work categories.