Niendorf Pumping Station - Replacement Building

Tender Summary

The NLWKN Lüneburg branch in Germany from Europe region has released this tender for The NLWKN (Lower Saxony Water Management, Coastal Protection and Nature Conservation Agency) wishes to award the planning services for the replacement construction of the Niendorf pumping station (Amt Neuhaus) in two lots: 1 "Environmental Planning" and 2 "Engineering Structure". Further information can be found in the enclosed application conditions and appendices, as well as the specifications. The procurement procedure will be conducted as a "negotiated procedure with prior publication of a contract notice" in accordance with Section 17 of the German Procurement Ordinance (VgV). You can now apply to participate in the negotiated procedure via the Lower Saxony procurement portal. To do so, please complete the application documents available under the "Participant Documents" tab and upload the required documents to the procurement portal. A list of the required application documents can be found in Appendix 2, Application Form, under number 1.3. The Niendorf pumping station was built in the 1960s in the GDR and drains the Krainke catchment area of ​​approximately 12,240 hectares. It protects residential areas and agricultural land from flooding of the Elbe River and backwater flow into the Sude River, as well as from flooding of the Sude itself. The right Krainke dike, connected to the pumping station, was adjusted to the new design flood level in 2014. The left Krainke dike was renovated and its height adjusted in 2016. Adjustments to the new design water levels have not yet been made in the area of ​​the pumping station, resulting in a 30 cm drop in height. Six installed propeller pumps have a total capacity of approximately 11.7 m³/s. These pumps date back to the original construction in 1963 and are partly in poor condition; two pumps were replaced in 2005 and 2006. There is no trash rack cleaning system. In addition, the pumping station has four open-flow channels that serve regular drainage outside of flood periods, although these do not meet the requirements for continuity according to the Water Framework Directive (WFD). A needs assessment was conducted in 2016, resulting in the conclusion that a comprehensive overhaul is necessary. Since 2021, engineering plans for phases 1 to 3 and parts of phase 4 have been provided for this overhaul. As part of the planning process, various components of the pumping station were examined in detail: concrete, plaster, pressure pipes, wastewater channel, etc. The results of the planning showed that almost all components of the pumping station would need to be repaired, replaced, or rebuilt. Due to the foreseeable extensive repair work, a feasibility study was conducted in 2025 to investigate whether a complete replacement of the pumping station would be a technically and economically superior solution to the existing structure. Based on current plans and the results of the 2025 feasibility study, the NLWKN intends to replace the existing pumping station with a modern new building.The pumping station is to be built at the site of the existing one. The new pumping station is intended to meet current requirements regarding design water level, river continuity, and fish-friendly and economical operation. Furthermore, an increase in pumping capacity will address the challenges of climate change. The following inland water levels must be ensured by the pumping station: - maximum permissible inland water level: +7.80 m above sea level (NHN) - highest winter water level: +7.70 m above sea level (NHN) - highest summer water level: +7.40 m above sea level (NHN) - lowest inland water level: +7.20 m above sea level (NHN). The design flood level is currently 10.60 m above sea level (NHN), and the corresponding height of the dike, taking into account a freeboard of 70 cm, is +11.30 m above sea level (NHN). The following discharges must be handled by the pumping station's pumps, provided the outside water level is above the inside water level: - Maximum flood discharge (HHQ): 11.142 m³/s - Design flood discharge: 11.30 m³/s - Design flood discharge taking climate adaptation factor into account: 13.715 m³/s - Summer mean flow discharge (SMQ): 2.076 m³/s. The pumps must be designed for geodetic heads between 0.00 m and 3.20 m. These parameters must also be considered in the planning of the free-flow channel and the associated fish ladder to ensure the inland water level and fish passage. The current Niendorf pumping station is located in several areas protected under nature conservation law: - Biosphere Reserve "Lower Saxony Elbe Valley" (location of the technical structure within area section A, directly adjacent to the strictly protected area section C) - FFH area "Elbe Lowlands between Schnackenburg and Geesthacht" - EU bird protection area "Lower Saxony Middle Elbe" (location of the technical structure outside the EU bird protection area, but directly adjacent to the EU bird protection area) - Coherence assurance measure for the fish species bitterling and spined loach in the immediate vicinity. The corresponding protected area regulations must be taken into account during planning.30 m³/s - Design flood discharge taking climate adaptation factor into account: 13.715 m³/s - Summer mean flow discharge (SMQ): 2.076 m³/s. The pumps must be designed for geodetic delivery heads between 0.00 m and 3.20 m. These boundary conditions must also be taken into account when planning the free flow channel and the associated fish ladder to ensure the inland water level gauges and continuity. The current Niendorf pumping station is located in several areas protected under nature conservation law: - Biosphere Reserve "Lower Saxony Elbe Valley" (location of the technical structure within area section A, directly adjacent to the strictly protected area section C) - FFH area "Elbe Lowlands between Schnackenburg and Geesthacht" - EU bird protection area "Lower Saxony Middle Elbe" (location of the technical structure outside the EU bird protection area, but directly adjacent to the EU bird protection area) - Coherence assurance measure for the fish species bitterling and spined loach in the immediate vicinity. The corresponding protected area regulations must be taken into account during planning.30 m³/s - Design flood discharge taking climate adaptation factor into account: 13.715 m³/s - Summer mean flow discharge (SMQ): 2.076 m³/s. The pumps must be designed for geodetic delivery heads between 0.00 m and 3.20 m. These boundary conditions must also be taken into account when planning the free flow channel and the associated fish ladder to ensure the inland water level gauges and continuity. The current Niendorf pumping station is located in several areas protected under nature conservation law: - Biosphere Reserve "Lower Saxony Elbe Valley" (location of the technical structure within area section A, directly adjacent to the strictly protected area section C) - FFH area "Elbe Lowlands between Schnackenburg and Geesthacht" - EU bird protection area "Lower Saxony Middle Elbe" (location of the technical structure outside the EU bird protection area, but directly adjacent to the EU bird protection area) - Coherence assurance measure for the fish species bitterling and spined loach in the immediate vicinity. The corresponding protected area regulations must be taken into account during planning. with tender notice no. 681651-2026 published on 07 Oct 2026. The tender is due to expire on 22 Oct 2026. This tender is sourced from TED Europa and is eligible for suppliers interested in Engineering design services. Interested bidders can obtain further information including complete bid documents or ways to participate by registering on Tender Impulse and referencing via Tender Impulse ID 15302861.

Tender Details

Tender NoticeTI Ref: 15302861
Tender Notice No
681651-2026
Tender Organisation
NLWKN Lüneburg branch
Tender Service
Worldwide
Tender Region
Tender Project Location
Tender CPV
71320000 : Engineering design services
Tender Source
TED Europa
Tender Document Type
Competition
Tender Deadline
22 Oct 2026 14 days left
Tender Description
The NLWKN (Lower Saxony Water Management, Coastal Protection and Nature Conservation Agency) wishes to award the planning services for the replacement construction of the Niendorf pumping station (Amt Neuhaus) in two lots: 1 "Environmental Planning" and 2 "Engineering Structure". Further information can be found in the enclosed application conditions and appendices, as well as the specifications. The procurement procedure will be conducted as a "negotiated procedure with prior publication of a contract notice" in accordance with Section 17 of the German Procurement Ordinance (VgV). You can now apply to participate in the negotiated procedure via the Lower Saxony procurement portal. To do so, please complete the application documents available under the "Participant Documents" tab and upload the required documents to the procurement portal. A list of the required application documents can be found in Appendix 2, Application Form, under number 1.3. The Niendorf pumping station was built in the 1960s in the GDR and drains the Krainke catchment area of ​​approximately 12,240 hectares. It protects residential areas and agricultural land from flooding of the Elbe River and backwater flow into the Sude River, as well as from flooding of the Sude itself. The right Krainke dike, connected to the pumping station, was adjusted to the new design flood level in 2014. The left Krainke dike was renovated and its height adjusted in 2016. Adjustments to the new design water levels have not yet been made in the area of ​​the pumping station, resulting in a 30 cm drop in height. Six installed propeller pumps have a total capacity of approximately 11.7 m³/s. These pumps date back to the original construction in 1963 and are partly in poor condition; two pumps were replaced in 2005 and 2006. There is no trash rack cleaning system. In addition, the pumping station has four open-flow channels that serve regular drainage outside of flood periods, although these do not meet the requirements for continuity according to the Water Framework Directive (WFD). A needs assessment was conducted in 2016, resulting in the conclusion that a comprehensive overhaul is necessary. Since 2021, engineering plans for phases 1 to 3 and parts of phase 4 have been provided for this overhaul. As part of the planning process, various components of the pumping station were examined in detail: concrete, plaster, pressure pipes, wastewater channel, etc. The results of the planning showed that almost all components of the pumping station would need to be repaired, replaced, or rebuilt. Due to the foreseeable extensive repair work, a feasibility study was conducted in 2025 to investigate whether a complete replacement of the pumping station would be a technically and economically superior solution to the existing structure. Based on current plans and the results of the 2025 feasibility study, the NLWKN intends to replace the existing pumping station with a modern new building.The pumping station is to be built at the site of the existing one. The new pumping station is intended to meet current requirements regarding design water level, river continuity, and fish-friendly and economical operation. Furthermore, an increase in pumping capacity will address the challenges of climate change. The following inland water levels must be ensured by the pumping station: - maximum permissible inland water level: +7.80 m above sea level (NHN) - highest winter water level: +7.70 m above sea level (NHN) - highest summer water level: +7.40 m above sea level (NHN) - lowest inland water level: +7.20 m above sea level (NHN). The design flood level is currently 10.60 m above sea level (NHN), and the corresponding height of the dike, taking into account a freeboard of 70 cm, is +11.30 m above sea level (NHN). The following discharges must be handled by the pumping station's pumps, provided the outside water level is above the inside water level: - Maximum flood discharge (HHQ): 11.142 m³/s - Design flood discharge: 11.30 m³/s - Design flood discharge taking climate adaptation factor into account: 13.715 m³/s - Summer mean flow discharge (SMQ): 2.076 m³/s. The pumps must be designed for geodetic heads between 0.00 m and 3.20 m. These parameters must also be considered in the planning of the free-flow channel and the associated fish ladder to ensure the inland water level and fish passage. The current Niendorf pumping station is located in several areas protected under nature conservation law: - Biosphere Reserve "Lower Saxony Elbe Valley" (location of the technical structure within area section A, directly adjacent to the strictly protected area section C) - FFH area "Elbe Lowlands between Schnackenburg and Geesthacht" - EU bird protection area "Lower Saxony Middle Elbe" (location of the technical structure outside the EU bird protection area, but directly adjacent to the EU bird protection area) - Coherence assurance measure for the fish species bitterling and spined loach in the immediate vicinity. The corresponding protected area regulations must be taken into account during planning.30 m³/s - Design flood discharge taking climate adaptation factor into account: 13.715 m³/s - Summer mean flow discharge (SMQ): 2.076 m³/s. The pumps must be designed for geodetic delivery heads between 0.00 m and 3.20 m. These boundary conditions must also be taken into account when planning the free flow channel and the associated fish ladder to ensure the inland water level gauges and continuity. The current Niendorf pumping station is located in several areas protected under nature conservation law: - Biosphere Reserve "Lower Saxony Elbe Valley" (location of the technical structure within area section A, directly adjacent to the strictly protected area section C) - FFH area "Elbe Lowlands between Schnackenburg and Geesthacht" - EU bird protection area "Lower Saxony Middle Elbe" (location of the technical structure outside the EU bird protection area, but directly adjacent to the EU bird protection area) - Coherence assurance measure for the fish species bitterling and spined loach in the immediate vicinity. The corresponding protected area regulations must be taken into account during planning.30 m³/s - Design flood discharge taking climate adaptation factor into account: 13.715 m³/s - Summer mean flow discharge (SMQ): 2.076 m³/s. The pumps must be designed for geodetic delivery heads between 0.00 m and 3.20 m. These boundary conditions must also be taken into account when planning the free flow channel and the associated fish ladder to ensure the inland water level gauges and continuity. The current Niendorf pumping station is located in several areas protected under nature conservation law: - Biosphere Reserve "Lower Saxony Elbe Valley" (location of the technical structure within area section A, directly adjacent to the strictly protected area section C) - FFH area "Elbe Lowlands between Schnackenburg and Geesthacht" - EU bird protection area "Lower Saxony Middle Elbe" (location of the technical structure outside the EU bird protection area, but directly adjacent to the EU bird protection area) - Coherence assurance measure for the fish species bitterling and spined loach in the immediate vicinity. The corresponding protected area regulations must be taken into account during planning.
Tender Bidding Type
Unlock Full Details — Register Free

Frequently Asked Questions About This Tender

Who has issued this tender, and what is it for?
The tender has been issued by NLWKN Lneburg branch in Germany. Such a type of tender falls under Engineering design services, within the Infrastructure and construction sector, and is listed on Tender Impulse under notice number 681651-2026.
What are the key dates for this tender?
The notice was published on 07 Oct 2026 and submissions close on 22 Oct 2026. Late bids are rarely accepted in public procurement, so aim to have your documents ready several days before the closing date.
Which CPV codes apply to this tender?
It is classified under CPV codes 71320000, which correspond to Engineering design services. If your company supplies these products or services, these are the codes to save in your alert profile so no matching tender passes you by.
Can I submit my bid for this tender to Tender Impulse?
No - and this matters. Tender Impulse is a tender aggregation and alert service: we collect procurement notices from official sources around the world and list them in one place. We do not receive, forward or evaluate bids. Your bid for this tender must be submitted directly to NLWKN Lneburg branch, using the method described in the original tender document, before 22 Oct 2026. Tender Impulse provides complete assistance in submitting all bids posted on its website.
How do I get the bid documents and participation details?
Request a live demo on Tender Impulse and our tender experts will walk you through this listing, share the available documents, and explain how to submit your bid to NLWKN Lneburg branch. Subscribers also receive help with registration requirements and, where needed, translation of non-English notices - but the submission itself always goes from you to the buyer.
How can I find more tenders like this in Germany?
There are currently 32082 live tenders of 558839 total tenders from Germany on Tender Impulse. You can browse them on our Germany tenders page, or save a search combining Germany with CPV codes 71320000 - we will then email you every new match on the day it is published.
How to prepare for this bid?
Suppliers must verify technical specifications, the delivery schedules and any other intrinsic details as provided in the complete bid documents before deciding to submit their bids. All necessary certifications and supplier registrations must be undertaken before participation.
Is this tender beneficial for me?
The procurement is applicable to companies in the Engineering design services and related industries. If you belong to this industry, you can review the technical documents before assessing your relevance to your company.
What is the procurement trend for Niendorf Pumping Station - Replacement Building?
The public procurement trends for Niendorf Pumping Station - Replacement Building can be assessed by viewing historical data and buying patterns for this product. Subscribed members can view and even download reports of tenders released in the past for their market research. This shall allow them to carefully prepare a compelling bid.

Explore More Engineering design services Tenders in Germany, Europe Region and Worldwide

Looking for more tenders like this one in Engineering design services? With millions of global procurement opportunities and new tenders added daily, Tender Impulse is your gateway to international and local contracting success. Whether you're targeting the Infrastructure and construction sector in Germany, or expanding across regions, we provide live, accurate and relevant updates every day.

Our platform sources tenders from national and local government portals, international development and funding agencies, municipal corporations, state authorities, NGOs, education ministries and public-private partnerships.

Daily Tender Updates Across 190+ Countries

Every day we add hundreds of new RFPs, RFQs, EOIs and contract awards across multiple sectors and geographies. This tender from Germany is just a sample of what's available right now - there are currently 32,082 live Germany tenders to explore.

Search Smarter with CPV and Industry Matching

Each listing is categorised using CPV codes such as 71320000, enabling precise filtering by tender type, location, industry, deadline and issuing organisation.

Start Your Tender Journey

Request a free live demo to unlock tenders customised to your sector, country and CPV categories - with alerts, documents and submission support.

API Integration — seamlessly integrate global tender data into your systems
AI-Powered Tender Intelligence for smarter bidding decisions
Publish Your Tenders — reach a global network of suppliers
Source Tenders Faster — discover verified tenders from across the globe
Chat with us