This tender is from the country of Germany in Europe region. The tender was published by City of Bielefeld - Office for Central Services on 13 Jan 2026 for Reconstruction of the air raid shelter on the station forecourt including an extension to create a bicycle parking facility - specialist planning consultation for fire protection The planning services advertised relate to the Advice technical fire protection planning according to AHO booklet no 17 for the sub-projects TP 1 and TP 2 - all basic services from service phases 1 to 5 and 8 - The following optional services Lph 1 On-site inventory Evaluating submitted construction files Lph 2 Qualitative analysis of the intended use with regard to particular fire and explosion risks Determining the need for an explosion protection document Determine the required extinguishing water retention volume based on handed over lists safety data sheets for corresponding water hazard classes Determining the need and objective of a smoke extraction concept for specific issues Determining the need and objective of an evacuation concept for specific issues Advise on the property-specific needs of BIM in fire protection Determining fire loads on site Evaluating submitted lists safety data sheets for flammable liquids or hazardous substances Participate in meetings where fire safety is not addressed in a consolidated manner Lph 3 Advice on determining relevant fire scenarios for fire simulation Advice on defining relevant scenarios for evacuation concepts Lph 4 Review of building templates for property planning for the correct implementation Fire protection planning and compliance with the explanatory report Checking the construction template for ventilation planning for the correct implementation of the fire protection planning and for compliance with the explanatory report Updating the fire protection concept which can in principle be approved to include the results of the preliminary inspection by the building supervisory authorities or the requirements of the inspection expert test engineer Lph 5 One-off checking of execution plans and assembly plans of the property and specialist planners with regard to structural fire protection Participate in determining the suitability of submitted proof of usability and applicability of unregulated construction products and designs for the installation situation Participate in the creation of a cross-trade fire protection matrix Lph 6 Advising the property and specialist planners on the creation of the fire protection parts of the service specifications Checking defined fire protection partial services in the list of services Lph 7 Advising the property and specialist planners on the evaluation of the fire protection-relevant parts of the service specifications Lph 8 Fire protection specialist construction management as a systematic random and if necessary destructive control of structural fire protection measures Checking the evidence submitted for unregulated construction products and types as well as declarations on structural fire protection Participate in the technical acceptance of special components systems and equipment to identify defects Participate in the review of the fire control table or cross-trade fire matrix Checking fire brigade plans Checking escape and rescue plans Lph 9 none. The last date to submit your bid for this tender is 12 Feb 2026. This tender is for the companies specializing in Engineering design services and similar sectors.
Tender Organisation:
City of Bielefeld - Office for Central Services
Tender Sector:
Tender Service:
Worldwide
Tender Region:
Tender Country:
Tender CPV:
71320000 : Engineering design services
Tender Document Type:
Tender Notice
Tender Description:
Reconstruction of the air raid shelter on the station forecourt including an extension to create a bicycle parking facility - specialist planning consultation for fire protection The planning services advertised relate to the Advice technical fire protection planning according to AHO booklet no 17 for the sub-projects TP 1 and TP 2 - all basic services from service phases 1 to 5 and 8 - The following optional services Lph 1 On-site inventory Evaluating submitted construction files Lph 2 Qualitative analysis of the intended use with regard to particular fire and explosion risks Determining the need for an explosion protection document Determine the required extinguishing water retention volume based on handed over lists safety data sheets for corresponding water hazard classes Determining the need and objective of a smoke extraction concept for specific issues Determining the need and objective of an evacuation concept for specific issues Advise on the property-specific needs of BIM in fire protection Determining fire loads on site Evaluating submitted lists safety data sheets for flammable liquids or hazardous substances Participate in meetings where fire safety is not addressed in a consolidated manner Lph 3 Advice on determining relevant fire scenarios for fire simulation Advice on defining relevant scenarios for evacuation concepts Lph 4 Review of building templates for property planning for the correct implementation Fire protection planning and compliance with the explanatory report Checking the construction template for ventilation planning for the correct implementation of the fire protection planning and for compliance with the explanatory report Updating the fire protection concept which can in principle be approved to include the results of the preliminary inspection by the building supervisory authorities or the requirements of the inspection expert test engineer Lph 5 One-off checking of execution plans and assembly plans of the property and specialist planners with regard to structural fire protection Participate in determining the suitability of submitted proof of usability and applicability of unregulated construction products and designs for the installation situation Participate in the creation of a cross-trade fire protection matrix Lph 6 Advising the property and specialist planners on the creation of the fire protection parts of the service specifications Checking defined fire protection partial services in the list of services Lph 7 Advising the property and specialist planners on the evaluation of the fire protection-relevant parts of the service specifications Lph 8 Fire protection specialist construction management as a systematic random and if necessary destructive control of structural fire protection measures Checking the evidence submitted for unregulated construction products and types as well as declarations on structural fire protection Participate in the technical acceptance of special components systems and equipment to identify defects Participate in the review of the fire control table or cross-trade fire matrix Checking fire brigade plans Checking escape and rescue plans Lph 9 none
Tender Bidding Type:
Tender Notice No:
Tender Document:
Looking for more tenders like this one in Engineering design services? With over 70 million global procurement opportunities and new tenders added daily, Tender Impulse is your gateway to international and local contracting success. Whether you're targeting the Infrastructure and construction sector in Germany, or expanding across regions, we provide live, accurate, and relevant updates every day.
Our platform sources tenders from:
Every day, we add hundreds of new RFPs, RFQs, EOIs, and contract awards across multiple sectors and geographies. This tender from Germany is just a sample of what's available right now.
Tender Impulse covers:
Each listing is categorized using CPV codes like 71320000, enabling precise filtering. Search by:
While you're viewing a tender in Germany, Tender Impulse offers access to tenders across:
Tender Impulse provides more than listings:
Thousands of new tenders are added daily-across countries, sectors, and CPV codes. With Tender Impulse, you gain strategic insight, timely alerts, and a competitive edge.
Start your free trial to unlock tenders customized to your Infrastructure and construction, Germany, and Engineering design services categories.