This tender is from the country of Germany in Europe region. The tender was published by Oberspreewald-Lausitz district on 03 Jul 2025 for Refurbishment and modernization of the friedrich-engels-gymnasium 3 ba-los 3 01 rewery work 210 m2 protective nets on balcony systems resolutions for 12 weeks 365 m2 stand scaffolding height 14 m forced time 12 weeks 50 m2 stand framework height 5 m reservelive duration for 12 weeks 880 m2 stand framework height 10 m reservelive duration 28 weeks 1 ST system grid carrier L 6-7 5 m reservelive duration 28 weeks 25 m fall protection on the flat roof reservelive duration 28 weeks 1 hour staircase in front of a long time 28 weeks 1 hour staircase for a total of 12 weeks The construction of the scaffolding is planned for the roof work on the connector and the auditorium and in addition to the facade work in the area of the entire 3rd construction phase The scaffolding is required for the shell and the roofer to manufacture the Attic head in the connector and auditorium In the future ventilation devices will be set up on the roof of the connector for which substructure work in the edge area of the flat roof will be necessary After swapping the windows on the north and east side of the school building the facade work must be carried out For this purpose a scaffold with a total height of 5 m must be built on the balcony systems of the 3rd floor In the area of the 3 Ba s are the balcony systems which consist of sometimes heavily weathered wooden coverings first laying out with load -distributing scaffolding planks and securing against slipping The gable surface on the east side must be fully equipped and to lead around the corner at approx 1 50 m on both sides up to the balcony systems The scaffolding is to be equipped with a stair tower for the roofer The planned height on the edge of the roof is approx 14 m above ground A white tower tower with a height of 10 m must be provided on the auditorium On the south side there is a connecting building that connects the school building with the auditorium A scaffold with a height of 5 m must also be built on the roof of the connector In the area of the construction section transition roof from the 2nd to 3rd BA flow protection must be built on the existing roof area For the facade work in the area of the 3rd construction phase protective nets along the balcony must be arranged on both sides in the 1st and 2 OG The connector and the auditorium are to be fully equipped In the area of the starting stairs door from the auditorium a bridging carrier must be arranged The scaffolds are leading to the roof edge Along the connector there are greennings which are located in the upstream not flat beds In general the armor is not fastened to the facade so that the scaffolding is to be supported For this purpose proof of stability must be provided The work is carried out when school operations are running in the 3rd construction cut to be renovated is not school operations From September 8 2025 the open spaces must be paid to school traffic The construction site sequence is to be operated with a reasonable effort in such a way that a lowest possible burden on school operations occurs Gritty areas paving surfaces or paved concrete and asphalt surfaces are the surface underground Sometimes there are planting areas raised beds. The last date to submit your bid for this tender was 29 Jul 2025. This tender is for the companies specializing in Gymnasium construction work and similar sectors.
*The deadline for this tender has passed.
Tender Organisation:
Oberspreewald-Lausitz district
Tender Sector:
Tender Service:
Worldwide
Tender Region:
Tender Country:
Tender CPV:
45212222 : Gymnasium construction work
Tender Document Type:
Tender Notice
Tender Description:
Refurbishment and modernization of the friedrich-engels-gymnasium 3 ba-los 3 01 rewery work 210 m2 protective nets on balcony systems resolutions for 12 weeks 365 m2 stand scaffolding height 14 m forced time 12 weeks 50 m2 stand framework height 5 m reservelive duration for 12 weeks 880 m2 stand framework height 10 m reservelive duration 28 weeks 1 ST system grid carrier L 6-7 5 m reservelive duration 28 weeks 25 m fall protection on the flat roof reservelive duration 28 weeks 1 hour staircase in front of a long time 28 weeks 1 hour staircase for a total of 12 weeks The construction of the scaffolding is planned for the roof work on the connector and the auditorium and in addition to the facade work in the area of the entire 3rd construction phase The scaffolding is required for the shell and the roofer to manufacture the Attic head in the connector and auditorium In the future ventilation devices will be set up on the roof of the connector for which substructure work in the edge area of the flat roof will be necessary After swapping the windows on the north and east side of the school building the facade work must be carried out For this purpose a scaffold with a total height of 5 m must be built on the balcony systems of the 3rd floor In the area of the 3 Ba s are the balcony systems which consist of sometimes heavily weathered wooden coverings first laying out with load -distributing scaffolding planks and securing against slipping The gable surface on the east side must be fully equipped and to lead around the corner at approx 1 50 m on both sides up to the balcony systems The scaffolding is to be equipped with a stair tower for the roofer The planned height on the edge of the roof is approx 14 m above ground A white tower tower with a height of 10 m must be provided on the auditorium On the south side there is a connecting building that connects the school building with the auditorium A scaffold with a height of 5 m must also be built on the roof of the connector In the area of the construction section transition roof from the 2nd to 3rd BA flow protection must be built on the existing roof area For the facade work in the area of the 3rd construction phase protective nets along the balcony must be arranged on both sides in the 1st and 2 OG The connector and the auditorium are to be fully equipped In the area of the starting stairs door from the auditorium a bridging carrier must be arranged The scaffolds are leading to the roof edge Along the connector there are greennings which are located in the upstream not flat beds In general the armor is not fastened to the facade so that the scaffolding is to be supported For this purpose proof of stability must be provided The work is carried out when school operations are running in the 3rd construction cut to be renovated is not school operations From September 8 2025 the open spaces must be paid to school traffic The construction site sequence is to be operated with a reasonable effort in such a way that a lowest possible burden on school operations occurs Gritty areas paving surfaces or paved concrete and asphalt surfaces are the surface underground Sometimes there are planting areas raised beds
Tender Bidding Type:
Tender Notice No:
Tender Document:
Looking for more tenders like this one in Gymnasium construction work? With over 70 million global procurement opportunities and new tenders added daily, Tender Impulse is your gateway to international and local contracting success. Whether you're targeting the Infrastructure and construction sector in Germany, or expanding across regions, we provide live, accurate, and relevant updates every day.
Our platform sources tenders from:
Every day, we add hundreds of new RFPs, RFQs, EOIs, and contract awards across multiple sectors and geographies. This tender from Germany is just a sample of what's available right now.
Tender Impulse covers:
Each listing is categorized using CPV codes like 45212222, enabling precise filtering. Search by:
While you're viewing a tender in Germany, Tender Impulse offers access to tenders across:
Tender Impulse provides more than listings:
Thousands of new tenders are added daily-across countries, sectors, and CPV codes. With Tender Impulse, you gain strategic insight, timely alerts, and a competitive edge.
Start your free trial to unlock tenders customized to your Infrastructure and construction, Germany, and Gymnasium construction work categories.