TOP_PLUSZ-6.2.1-23-NY1-2025-00005_Planning

Tender Summary

The Municipality of Nyíregyháza County Town in Hungary from Europe region has released this tender for PART 1 - Development of the Forest Gymnastics Track Design delivery at the permitted level with Natura 2000 impact assessment; incorporation of the comments of the design jury and conduct of licensing procedures; Preparation of the execution plan and performance of the Design Project Management tasks; professional support of the public procurement procedures for the related construction works in connection with the planned investment with the following characteristics. The design area is the Forest Gymnastics Track, which is located in the southern part of the Sóstó Forest, on the northern side of Csaló köz. The area currently contains outdoor sports equipment, a playground, a bacon frying area, and a forest stage. The aim of the development is to create a barrier-free water block and cover the existing stage. Barrier-free water block - 1 pc. The water block must be designed in a way that is barrier-free for all user groups. Mandatory functions to be developed: - male and female water blocks, - barrier-free water blocks, - cleaning product storage room. During the design of the water block, the documentation required for water law licensing must also be prepared. Covering an existing forest stage - 1 piece - the use of a structure and materials that fit the landscape is required, - it must not disturb the landscape, - it must not cause significant terrain or vegetation disturbance, - design that complies with nature conservation and seasonal restrictions is expected. During the design, the following must be ensured: - the orderly drainage and drainage of rainwater, - the design of a storage facility suitable for the placement of stage furniture, - long-term maintainability, operability, - minimization of energy costs. Design supervision (5 times), professional support for future construction public procurement procedures related to the project, preparation of a rehabilitation engineer certificate, and the performance of cost expert tasks pursuant to Section 19 (4) of Act LXIX of 2023 (Ábtv.) will be implemented. The designer is responsible for the soundness of the cost estimates and cost calculations related to the investment (unpriced/priced design budget), as well as for the adequacy of the architectural and technical documentation. The designer does not need to have separate cost expert authorization. PART 2 - Development of a recreation park Preparation of an implementation plan (including walkway/road design); incorporation of the design jurys comments and conducting licensing procedures; performance of the Design Project Management tasks; professional support of public procurement procedures for related construction works in connection with the planned investment with the following characteristics. The design area is located in the northern part of Nyíregyháza, in the northeastern corner of the Sóstói forest. Its borders: in the north: Tölgyes street, in the east: railway area, in the west and south: the Sóstói forest. The northern planning area is divided into two separate parts: A municipally owned forest area, which runs along the railway, with a total area of ​​approximately 9,700 m². A forest area owned by Nyírség Forestry Co., Ltd.,through which a 230 m long path and a 113 m long forest strip pass. The aim of the development is to create a rest park in the planning area. The following functions and elements must be displayed in the rest park area: - creation of a nature trail, - interactive educational points, - placement of bat houses and birdhouses, - bacon roasting area, - tables, benches, sunbathing areas, - bicycle racks, - creation of a stump garden to demonstrate natural decomposition processes. The rehabilitation engineer certification must be prepared based on the provisions of Act XXVI of 1998 on the rights of disabled persons and ensuring their equal opportunities, Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA) and Act C of 2023 on Hungarian architecture. During the construction, the designer will provide site supervision (5 times between the date of successful technical handover and the date of completion of the technical acceptance procedure for the works under the construction contract concluded on the basis of the public procurement procedure for the selection of the contractor), professional support for future construction public procurement procedures(s) related to the project, and preparation of a rehabilitation engineer certificate, as well as performance of cost expert tasks pursuant to Section 19 (4) of Act LXIX of 2023 on the Procedure for State Construction Investments (Ábtv.). The designer is responsible for the soundness of the cost estimates and cost calculations related to the investment (unpriced/priced designer budget), as well as for the adequacy of the architectural and technical documentation. The designer does not need to have separate cost expert authorization. When preparing the execution design documentation, the following must be complied with, in particular, but not exclusively: - the provisions of the TOP_PLUSZ-6.2.1-23 call for tenders, - the provisions of Act C of 2023 on Hungarian architecture; - and Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA); - the provisions of Act LXIX of 2023 on the procedure for state construction investments, • the provisions of Government Decree 281/2024. (IX. 30.) on construction authority procedures and inspections, • the provisions of Government Decree 191/2009. (IX.15.) on construction contractor activities, • the provisions of Regulation 28/2015 compiled by the Hungarian Chamber of Architects. (04.09.) as set out in the document “On the content and form requirements of architectural and technical documentation” • Resolution 14/2023. (VII.14.) as set out in the document “Regulations on the content and form requirements of design documentation” compiled by the Hungarian Chamber of Engineers. Further details of the tasks to be performed are contained in the Public Procurement Documents.- placement of bat houses and birdhouses, - bacon grilling area, - tables, benches, sunbathing areas, - bicycle racks, - creation of a stump garden to demonstrate natural decomposition processes. The rehabilitation engineer certification must be prepared based on the provisions of Act XXVI of 1998 on the rights of disabled persons and ensuring their equal opportunities, Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA), and Act C of 2023 on Hungarian architecture. During the construction, the designer will provide site supervision (5 times between the date of successful technical handover and the date of completion of the technical acceptance procedure for the works under the construction contract concluded on the basis of the public procurement procedure for the selection of the contractor), professional support for future construction public procurement procedure(s) related to the project, and preparation of a rehabilitation engineer certificate, as well as performance of cost expert tasks pursuant to Section 19 (4) of Act LXIX of 2023 on the Procedure for State Construction Investments (Ábtv.). The designer is responsible for the soundness of the cost estimates and cost calculations related to the investment (unpriced/priced designer budget), and for the adequacy of the architectural and technical documentation. The designer does not need to have separate cost expert authorization. When preparing the execution design documentation, the following must be complied with, in particular, but not exclusively: - the provisions of the TOP_PLUSZ-6.2.1-23 call for tenders, - the provisions of Act C of 2023 on Hungarian architecture; - and Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA); - the provisions of Act LXIX of 2023 on the procedure for state construction investments, • the provisions of Government Decree 281/2024. (IX. 30.) on construction authority procedures and inspections, • the provisions of Government Decree 191/2009. (IX.15.) on construction contractor activities, • the provisions of Regulation 28/2015 compiled by the Hungarian Chamber of Architects. (04.09.) as set out in the document “On the content and form requirements of architectural and technical documentation” • Resolution 14/2023. (VII.14.) as set out in the document “Regulations on the content and form requirements of design documentation” compiled by the Hungarian Chamber of Engineers. Further details of the tasks to be performed are contained in the Public Procurement Documents.- placement of bat houses and birdhouses, - bacon grilling area, - tables, benches, sunbathing areas, - bicycle racks, - creation of a stump garden to demonstrate natural decomposition processes. The rehabilitation engineer certification must be prepared based on the provisions of Act XXVI of 1998 on the rights of disabled persons and ensuring their equal opportunities, Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA), and Act C of 2023 on Hungarian architecture. During the construction, the designer will provide site supervision (5 times between the date of successful technical handover and the date of completion of the technical acceptance procedure for the works under the construction contract concluded on the basis of the public procurement procedure for the selection of the contractor), professional support for future construction public procurement procedures(s) related to the project, and preparation of a rehabilitation engineer certificate, as well as performance of cost expert tasks pursuant to Section 19 (4) of Act LXIX of 2023 on the Procedure for State Construction Investments (Ábtv.). The designer is responsible for the soundness of the cost estimates and cost calculations related to the investment (unpriced/priced designer budget), as well as for the adequacy of the architectural and technical documentation. The designer does not need to have separate cost expert authorization. When preparing the execution design documentation, the following must be complied with, in particular, but not exclusively: - the provisions of the TOP_PLUSZ-6.2.1-23 call for tenders, - the provisions of Act C of 2023 on Hungarian architecture; - and Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA); - the provisions of Act LXIX of 2023 on the procedure for state construction investments, • the provisions of Government Decree 281/2024. (IX. 30.) on construction authority procedures and inspections, • the provisions of Government Decree 191/2009. (IX.15.) on construction contractor activities, • the provisions of Regulation 28/2015 compiled by the Hungarian Chamber of Architects. (04.09.) as set out in the document “On the content and form requirements of architectural and technical documentation” • Resolution 14/2023. (VII.14.) as set out in the document “Regulations on the content and form requirements of design documentation” compiled by the Hungarian Chamber of Engineers. Further details of the tasks to be performed are contained in the Public Procurement Documents.During the construction, the designer will provide site supervision (5 times between the date of successful technical handover and the date of completion of the technical acceptance procedure for the works under the construction contract concluded on the basis of the public procurement procedure for the selection of the contractor), professional support for future construction public procurement procedures(s) related to the project, and preparation of a rehabilitation engineer certificate, as well as performance of cost expert tasks pursuant to Section 19 (4) of Act LXIX of 2023 on the Procedure for State Construction Investments (Ábtv.). The designer is responsible for the soundness of the cost estimates and cost calculations related to the investment (unpriced/priced designer budget), as well as for the adequacy of the architectural and technical documentation. The designer does not need to have separate cost expert authorization. When preparing the execution design documentation, the following must be complied with, in particular, but not exclusively: - the provisions of the TOP_PLUSZ-6.2.1-23 call for tenders, - the provisions of Act C of 2023 on Hungarian architecture; - and Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA); - the provisions of Act LXIX of 2023 on the procedure for state construction investments, • the provisions of Government Decree 281/2024. (IX. 30.) on construction authority procedures and inspections, • the provisions of Government Decree 191/2009. (IX.15.) on construction contractor activities, • the provisions of Regulation 28/2015 compiled by the Hungarian Chamber of Architects. (04.09.) as set out in the document “On the content and form requirements of architectural and technical documentation” • Resolution 14/2023. (VII.14.) as set out in the document “Regulations on the content and form requirements of design documentation” compiled by the Hungarian Chamber of Engineers. Further details of the tasks to be performed are contained in the Public Procurement Documents.During the construction, the designer will provide site supervision (5 times between the date of successful technical handover and the date of completion of the technical acceptance procedure for the works under the construction contract concluded on the basis of the public procurement procedure for the selection of the contractor), professional support for future construction public procurement procedure(s) related to the project, and preparation of a rehabilitation engineer certificate, as well as performance of cost expert tasks pursuant to Section 19 (4) of Act LXIX of 2023 on the Procedure for State Construction Investments (Ábtv.). The designer is responsible for the soundness of the cost estimates and cost calculations related to the investment (unpriced/priced designer budget), and for the adequacy of the architectural and technical documentation. The designer does not need to have separate cost expert authorization. When preparing the execution design documentation, the following must be complied with, in particular, but not exclusively: - the provisions of the TOP_PLUSZ-6.2.1-23 call for tenders, - the provisions of Act C of 2023 on Hungarian architecture; - and Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA); - the provisions of Act LXIX of 2023 on the procedure for state construction investments, • the provisions of Government Decree 281/2024. (IX. 30.) on construction authority procedures and inspections, • the provisions of Government Decree 191/2009. (IX.15.) on construction contractor activities, • the provisions of Regulation 28/2015 compiled by the Hungarian Chamber of Architects. (04.09.) as set out in the document “On the content and form requirements of architectural and technical documentation” • Resolution 14/2023. (VII.14.) as set out in the document “Regulations on the content and form requirements of design documentation” compiled by the Hungarian Chamber of Engineers. Further details of the tasks to be performed are contained in the Public Procurement Documents.Act; - and Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA); - Act LXIX of 2023 on the procedure for state construction investments, • Government Decree 281/2024. (IX. 30.) on construction authority procedures and inspections, • Government Decree 191/2009. (IX.15.) on construction contractor activities, • Resolution 28/2015. (04.09.) compiled by the Hungarian Chamber of Architects, the document “Content and form requirements of architectural and technical documentation” • Resolution 14/2023 compiled by the Hungarian Chamber of Engineers (VII.14.) resolution of the “Regulations on the content and form requirements of design documentation”. Further details of the tasks to be performed are contained in the Public Procurement Documents.Act; - and Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA); - Act LXIX of 2023 on the procedure for state construction investments, • Government Decree 281/2024. (IX. 30.) on construction authority procedures and inspections, • Government Decree 191/2009. (IX.15.) on construction contractor activities, • Resolution 28/2015. (04.09.) compiled by the Hungarian Chamber of Architects, the document “Content and form requirements of architectural and technical documentation” • Resolution 14/2023 compiled by the Hungarian Chamber of Engineers (VII.14.) resolution of the “Regulations on the content and form requirements of design documentation”. Further details of the tasks to be performed are contained in the Public Procurement Documents. with tender notice no. 721097-2026 published on 19 Oct 2026. The tender is due to expire on 10 Nov 2026. This tender is sourced from TED Europa and is eligible for suppliers interested in Engineering design services. Interested bidders can obtain further information including complete bid documents or ways to participate by registering on Tender Impulse and referencing via Tender Impulse ID 15673923.

Tender Details

Tender NoticeTI Ref: 15673923
Tender Notice No
721097-2026
Tender Organisation
Municipality of Nyíregyháza County Town
Tender Sector
Tender Service
Worldwide
Tender Region
Tender Project Location
Tender CPV
71320000 : Engineering design services
Tender Source
TED Europa
Tender Document Type
Competition
Tender Deadline
10 Nov 2026 7 days left
Tender Description
PART 1 - Development of the Forest Gymnastics Track Design delivery at the permitted level with Natura 2000 impact assessment; incorporation of the comments of the design jury and conduct of licensing procedures; Preparation of the execution plan and performance of the Design Project Management tasks; professional support of the public procurement procedures for the related construction works in connection with the planned investment with the following characteristics. The design area is the Forest Gymnastics Track, which is located in the southern part of the Sóstó Forest, on the northern side of Csaló köz. The area currently contains outdoor sports equipment, a playground, a bacon frying area, and a forest stage. The aim of the development is to create a barrier-free water block and cover the existing stage. Barrier-free water block - 1 pc. The water block must be designed in a way that is barrier-free for all user groups. Mandatory functions to be developed: - male and female water blocks, - barrier-free water blocks, - cleaning product storage room. During the design of the water block, the documentation required for water law licensing must also be prepared. Covering an existing forest stage - 1 piece - the use of a structure and materials that fit the landscape is required, - it must not disturb the landscape, - it must not cause significant terrain or vegetation disturbance, - design that complies with nature conservation and seasonal restrictions is expected. During the design, the following must be ensured: - the orderly drainage and drainage of rainwater, - the design of a storage facility suitable for the placement of stage furniture, - long-term maintainability, operability, - minimization of energy costs. Design supervision (5 times), professional support for future construction public procurement procedures related to the project, preparation of a rehabilitation engineer certificate, and the performance of cost expert tasks pursuant to Section 19 (4) of Act LXIX of 2023 (Ábtv.) will be implemented. The designer is responsible for the soundness of the cost estimates and cost calculations related to the investment (unpriced/priced design budget), as well as for the adequacy of the architectural and technical documentation. The designer does not need to have separate cost expert authorization. PART 2 - Development of a recreation park Preparation of an implementation plan (including walkway/road design); incorporation of the design jurys comments and conducting licensing procedures; performance of the Design Project Management tasks; professional support of public procurement procedures for related construction works in connection with the planned investment with the following characteristics. The design area is located in the northern part of Nyíregyháza, in the northeastern corner of the Sóstói forest. Its borders: in the north: Tölgyes street, in the east: railway area, in the west and south: the Sóstói forest. The northern planning area is divided into two separate parts: A municipally owned forest area, which runs along the railway, with a total area of ​​approximately 9,700 m². A forest area owned by Nyírség Forestry Co., Ltd.,through which a 230 m long path and a 113 m long forest strip pass. The aim of the development is to create a rest park in the planning area. The following functions and elements must be displayed in the rest park area: - creation of a nature trail, - interactive educational points, - placement of bat houses and birdhouses, - bacon roasting area, - tables, benches, sunbathing areas, - bicycle racks, - creation of a stump garden to demonstrate natural decomposition processes. The rehabilitation engineer certification must be prepared based on the provisions of Act XXVI of 1998 on the rights of disabled persons and ensuring their equal opportunities, Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA) and Act C of 2023 on Hungarian architecture. During the construction, the designer will provide site supervision (5 times between the date of successful technical handover and the date of completion of the technical acceptance procedure for the works under the construction contract concluded on the basis of the public procurement procedure for the selection of the contractor), professional support for future construction public procurement procedures(s) related to the project, and preparation of a rehabilitation engineer certificate, as well as performance of cost expert tasks pursuant to Section 19 (4) of Act LXIX of 2023 on the Procedure for State Construction Investments (Ábtv.). The designer is responsible for the soundness of the cost estimates and cost calculations related to the investment (unpriced/priced designer budget), as well as for the adequacy of the architectural and technical documentation. The designer does not need to have separate cost expert authorization. When preparing the execution design documentation, the following must be complied with, in particular, but not exclusively: - the provisions of the TOP_PLUSZ-6.2.1-23 call for tenders, - the provisions of Act C of 2023 on Hungarian architecture; - and Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA); - the provisions of Act LXIX of 2023 on the procedure for state construction investments, • the provisions of Government Decree 281/2024. (IX. 30.) on construction authority procedures and inspections, • the provisions of Government Decree 191/2009. (IX.15.) on construction contractor activities, • the provisions of Regulation 28/2015 compiled by the Hungarian Chamber of Architects. (04.09.) as set out in the document “On the content and form requirements of architectural and technical documentation” • Resolution 14/2023. (VII.14.) as set out in the document “Regulations on the content and form requirements of design documentation” compiled by the Hungarian Chamber of Engineers. Further details of the tasks to be performed are contained in the Public Procurement Documents.- placement of bat houses and birdhouses, - bacon grilling area, - tables, benches, sunbathing areas, - bicycle racks, - creation of a stump garden to demonstrate natural decomposition processes. The rehabilitation engineer certification must be prepared based on the provisions of Act XXVI of 1998 on the rights of disabled persons and ensuring their equal opportunities, Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA), and Act C of 2023 on Hungarian architecture. During the construction, the designer will provide site supervision (5 times between the date of successful technical handover and the date of completion of the technical acceptance procedure for the works under the construction contract concluded on the basis of the public procurement procedure for the selection of the contractor), professional support for future construction public procurement procedure(s) related to the project, and preparation of a rehabilitation engineer certificate, as well as performance of cost expert tasks pursuant to Section 19 (4) of Act LXIX of 2023 on the Procedure for State Construction Investments (Ábtv.). The designer is responsible for the soundness of the cost estimates and cost calculations related to the investment (unpriced/priced designer budget), and for the adequacy of the architectural and technical documentation. The designer does not need to have separate cost expert authorization. When preparing the execution design documentation, the following must be complied with, in particular, but not exclusively: - the provisions of the TOP_PLUSZ-6.2.1-23 call for tenders, - the provisions of Act C of 2023 on Hungarian architecture; - and Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA); - the provisions of Act LXIX of 2023 on the procedure for state construction investments, • the provisions of Government Decree 281/2024. (IX. 30.) on construction authority procedures and inspections, • the provisions of Government Decree 191/2009. (IX.15.) on construction contractor activities, • the provisions of Regulation 28/2015 compiled by the Hungarian Chamber of Architects. (04.09.) as set out in the document “On the content and form requirements of architectural and technical documentation” • Resolution 14/2023. (VII.14.) as set out in the document “Regulations on the content and form requirements of design documentation” compiled by the Hungarian Chamber of Engineers. Further details of the tasks to be performed are contained in the Public Procurement Documents.- placement of bat houses and birdhouses, - bacon grilling area, - tables, benches, sunbathing areas, - bicycle racks, - creation of a stump garden to demonstrate natural decomposition processes. The rehabilitation engineer certification must be prepared based on the provisions of Act XXVI of 1998 on the rights of disabled persons and ensuring their equal opportunities, Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA), and Act C of 2023 on Hungarian architecture. During the construction, the designer will provide site supervision (5 times between the date of successful technical handover and the date of completion of the technical acceptance procedure for the works under the construction contract concluded on the basis of the public procurement procedure for the selection of the contractor), professional support for future construction public procurement procedures(s) related to the project, and preparation of a rehabilitation engineer certificate, as well as performance of cost expert tasks pursuant to Section 19 (4) of Act LXIX of 2023 on the Procedure for State Construction Investments (Ábtv.). The designer is responsible for the soundness of the cost estimates and cost calculations related to the investment (unpriced/priced designer budget), as well as for the adequacy of the architectural and technical documentation. The designer does not need to have separate cost expert authorization. When preparing the execution design documentation, the following must be complied with, in particular, but not exclusively: - the provisions of the TOP_PLUSZ-6.2.1-23 call for tenders, - the provisions of Act C of 2023 on Hungarian architecture; - and Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA); - the provisions of Act LXIX of 2023 on the procedure for state construction investments, • the provisions of Government Decree 281/2024. (IX. 30.) on construction authority procedures and inspections, • the provisions of Government Decree 191/2009. (IX.15.) on construction contractor activities, • the provisions of Regulation 28/2015 compiled by the Hungarian Chamber of Architects. (04.09.) as set out in the document “On the content and form requirements of architectural and technical documentation” • Resolution 14/2023. (VII.14.) as set out in the document “Regulations on the content and form requirements of design documentation” compiled by the Hungarian Chamber of Engineers. Further details of the tasks to be performed are contained in the Public Procurement Documents.During the construction, the designer will provide site supervision (5 times between the date of successful technical handover and the date of completion of the technical acceptance procedure for the works under the construction contract concluded on the basis of the public procurement procedure for the selection of the contractor), professional support for future construction public procurement procedures(s) related to the project, and preparation of a rehabilitation engineer certificate, as well as performance of cost expert tasks pursuant to Section 19 (4) of Act LXIX of 2023 on the Procedure for State Construction Investments (Ábtv.). The designer is responsible for the soundness of the cost estimates and cost calculations related to the investment (unpriced/priced designer budget), as well as for the adequacy of the architectural and technical documentation. The designer does not need to have separate cost expert authorization. When preparing the execution design documentation, the following must be complied with, in particular, but not exclusively: - the provisions of the TOP_PLUSZ-6.2.1-23 call for tenders, - the provisions of Act C of 2023 on Hungarian architecture; - and Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA); - the provisions of Act LXIX of 2023 on the procedure for state construction investments, • the provisions of Government Decree 281/2024. (IX. 30.) on construction authority procedures and inspections, • the provisions of Government Decree 191/2009. (IX.15.) on construction contractor activities, • the provisions of Regulation 28/2015 compiled by the Hungarian Chamber of Architects. (04.09.) as set out in the document “On the content and form requirements of architectural and technical documentation” • Resolution 14/2023. (VII.14.) as set out in the document “Regulations on the content and form requirements of design documentation” compiled by the Hungarian Chamber of Engineers. Further details of the tasks to be performed are contained in the Public Procurement Documents.During the construction, the designer will provide site supervision (5 times between the date of successful technical handover and the date of completion of the technical acceptance procedure for the works under the construction contract concluded on the basis of the public procurement procedure for the selection of the contractor), professional support for future construction public procurement procedure(s) related to the project, and preparation of a rehabilitation engineer certificate, as well as performance of cost expert tasks pursuant to Section 19 (4) of Act LXIX of 2023 on the Procedure for State Construction Investments (Ábtv.). The designer is responsible for the soundness of the cost estimates and cost calculations related to the investment (unpriced/priced designer budget), and for the adequacy of the architectural and technical documentation. The designer does not need to have separate cost expert authorization. When preparing the execution design documentation, the following must be complied with, in particular, but not exclusively: - the provisions of the TOP_PLUSZ-6.2.1-23 call for tenders, - the provisions of Act C of 2023 on Hungarian architecture; - and Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA); - the provisions of Act LXIX of 2023 on the procedure for state construction investments, • the provisions of Government Decree 281/2024. (IX. 30.) on construction authority procedures and inspections, • the provisions of Government Decree 191/2009. (IX.15.) on construction contractor activities, • the provisions of Regulation 28/2015 compiled by the Hungarian Chamber of Architects. (04.09.) as set out in the document “On the content and form requirements of architectural and technical documentation” • Resolution 14/2023. (VII.14.) as set out in the document “Regulations on the content and form requirements of design documentation” compiled by the Hungarian Chamber of Engineers. Further details of the tasks to be performed are contained in the Public Procurement Documents.Act; - and Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA); - Act LXIX of 2023 on the procedure for state construction investments, • Government Decree 281/2024. (IX. 30.) on construction authority procedures and inspections, • Government Decree 191/2009. (IX.15.) on construction contractor activities, • Resolution 28/2015. (04.09.) compiled by the Hungarian Chamber of Architects, the document “Content and form requirements of architectural and technical documentation” • Resolution 14/2023 compiled by the Hungarian Chamber of Engineers (VII.14.) resolution of the “Regulations on the content and form requirements of design documentation”. Further details of the tasks to be performed are contained in the Public Procurement Documents.Act; - and Government Decree 280/2024. (IX. 30.) on the basic regulations of settlement planning and construction requirements (TÉKA); - Act LXIX of 2023 on the procedure for state construction investments, • Government Decree 281/2024. (IX. 30.) on construction authority procedures and inspections, • Government Decree 191/2009. (IX.15.) on construction contractor activities, • Resolution 28/2015. (04.09.) compiled by the Hungarian Chamber of Architects, the document “Content and form requirements of architectural and technical documentation” • Resolution 14/2023 compiled by the Hungarian Chamber of Engineers (VII.14.) resolution of the “Regulations on the content and form requirements of design documentation”. Further details of the tasks to be performed are contained in the Public Procurement Documents.
Tender Bidding Type
Unlock Full Details — Register Free

Frequently Asked Questions About This Tender

Who has issued this tender, and what is it for?
The tender has been issued by Municipality of Nyregyhza County Town in Hungary. Such a type of tender falls under Engineering design services, within the Oil and Gas sector, and is listed on Tender Impulse under notice number 721097-2026.
What are the key dates for this tender?
The notice was published on 19 Oct 2026 and submissions close on 10 Nov 2026. Late bids are rarely accepted in public procurement, so aim to have your documents ready several days before the closing date.
Which CPV codes apply to this tender?
It is classified under CPV codes 71320000, which correspond to Engineering design services. If your company supplies these products or services, these are the codes to save in your alert profile so no matching tender passes you by.
Can I submit my bid for this tender to Tender Impulse?
No - and this matters. Tender Impulse is a tender aggregation and alert service: we collect procurement notices from official sources around the world and list them in one place. We do not receive, forward or evaluate bids. Your bid for this tender must be submitted directly to Municipality of Nyregyhza County Town, using the method described in the original tender document, before 10 Nov 2026. Tender Impulse provides complete assistance in submitting all bids posted on its website.
How do I get the bid documents and participation details?
Request a live demo on Tender Impulse and our tender experts will walk you through this listing, share the available documents, and explain how to submit your bid to Municipality of Nyregyhza County Town. Subscribers also receive help with registration requirements and, where needed, translation of non-English notices - but the submission itself always goes from you to the buyer.
How can I find more tenders like this in Hungary?
There are currently 1023 live tenders of 38601 total tenders from Hungary on Tender Impulse. You can browse them on our Hungary tenders page, or save a search combining Hungary with CPV codes 71320000 - we will then email you every new match on the day it is published.
How to prepare for this bid?
Suppliers must verify technical specifications, the delivery schedules and any other intrinsic details as provided in the complete bid documents before deciding to submit their bids. All necessary certifications and supplier registrations must be undertaken before participation.
Is this tender beneficial for me?
The procurement is applicable to companies in the Engineering design services and related industries. If you belong to this industry, you can review the technical documents before assessing your relevance to your company.
What is the procurement trend for TOPPLUSZ-6.2.1-23-NY1-2025-00005Planning?
The public procurement trends for TOPPLUSZ-6.2.1-23-NY1-2025-00005Planning can be assessed by viewing historical data and buying patterns for this product. Subscribed members can view and even download reports of tenders released in the past for their market research. This shall allow them to carefully prepare a compelling bid.

Explore More Engineering design services Tenders in Hungary, Europe Region and Worldwide

Looking for more tenders like this one in Engineering design services? With millions of global procurement opportunities and new tenders added daily, Tender Impulse is your gateway to international and local contracting success. Whether you're targeting the Oil and Gas sector in Hungary, or expanding across regions, we provide live, accurate and relevant updates every day.

Our platform sources tenders from national and local government portals, international development and funding agencies, municipal corporations, state authorities, NGOs, education ministries and public-private partnerships.

Daily Tender Updates Across 190+ Countries

Every day we add hundreds of new RFPs, RFQs, EOIs and contract awards across multiple sectors and geographies. This tender from Hungary is just a sample of what's available right now - there are currently 1,023 live Hungary tenders to explore.

Search Smarter with CPV and Industry Matching

Each listing is categorised using CPV codes such as 71320000, enabling precise filtering by tender type, location, industry, deadline and issuing organisation.

Start Your Tender Journey

Request a free live demo to unlock tenders customised to your sector, country and CPV categories - with alerts, documents and submission support.

API Integration — seamlessly integrate global tender data into your systems
AI-Powered Tender Intelligence for smarter bidding decisions
Publish Your Tenders — reach a global network of suppliers
Source Tenders Faster — discover verified tenders from across the globe
Chat with us