Tender Summary
The Powiat Sanocki in Poland from Europe region has released this tender for 1. The subject of the contract is the implementation of the task entitled: Construction of a Special Educational and Care Center in Sanok – Stage II. General scope of the investment: • The second stage of the investment includes comprehensive interior and exterior finishing works, installation work for all disciplines in the scope of interior and exterior installations, installation of door and window joinery, landscaping in accordance with the design, installation of a photovoltaic system, construction of a stormwater drainage collector to the San River, construction of an underground fire protection reservoir. • Delivery and installation of landscaping equipment, sports fields, recreation areas, parking lots, school surrounding lighting, and external fencing. • Delivery and possible installation of rehabilitation equipment, office and teaching equipment, gymnasium equipment, dormitory equipment, and canteen equipment. The scope and details of the deliveries must be fully agreed with the Ordering Party. • Installation of a photovoltaic system on the buildings roof. • Construction of a container transformer station under the terms specified by the electricity supplier. Currently, after Stage I of the investment, the facility is in the open shell stage. The flat roofs, covered with prestressed hollow core slabs, were secured with a single layer of heat-sealable roofing felt and equipped with temporary overflow drains. No insulation or slope layer was installed. The sports hall roof was covered with trapezoidal sheet metal at this stage. The floor subfloors in all parts of the building were sealed with a layer of lean concrete. Underneath the floors, sections of sanitary sewer lines were constructed in accordance with the design documentation, extending them outside the buildings outline. As part of the first stage of the project, the conflict with a 15 kV medium voltage cable, as specified in the design documentation, was resolved. The conditions for the construction of a water supply connection will change. After the District Infrastructure Board in Lublin completed the water supply connection to the military facilities adjacent to the Special Operations Center (SOSW), it became possible to connect to the water supply running through the district plot. The contractor is required to submit a detailed interior design plan, which should be submitted to the Client for approval. 2. The subject of the contract must be completed in accordance with the Technical Documentation (Appendix 2 to the Technical Specifications). The scope of the task being the subject of the tender is described in detail in the technical documentation, technical specifications for the execution and acceptance of works, and the bill of quantities. Any catalog items are provided solely to facilitate calculations – their use in valuation is not mandatory. The technical specifications, bill of quantities, and documentation constitute an appendix to this specification. The quality requirements for the elements comprising the subject of the contract are described in the technical documentation, in particular the technical specifications for the execution and acceptance of works. Due to this,Since the contractors remuneration indicated in the offer will be a lump sum, the contractor should base its offer evaluation on the scope indicated in the technical documentation. The bill of quantities is of an ancillary nature. The occurrence of works during the contract execution that are not included in the bill of quantities or works in greater quantity than assumed in the bill of quantities will not entitle the contractor to demand additional remuneration – if the necessity to perform these works arose from the technical documentation. 3. The contractor will provide the Ordering Party with a guarantee and warranty for the construction works performed and materials used for the period and under the conditions specified in Chapter XII of the Technical Specifications (the warranty and warranty period for defects is one of the criteria for offer evaluation). 4. Special conditions for securing the construction site and carrying out construction works: construction works must be performed in accordance with the technical conditions and occupational health and safety rules applicable in the construction industry and the design agreements, and the construction site must be secured against unauthorized access. The contractor is also responsible and liable for the following: - all types of works must be carried out by persons with valid construction licenses; - securing the construction site and carrying out the works in accordance with occupational health and safety and fire protection regulations; - preparing and submitting as-built documentation to the Ordering Party, - securing installations and equipment on the construction site and in its immediate vicinity against destruction or damage during the performance of the works constituting the subject of this Agreement; - ensuring the safe use of the area adjacent to the construction site; - completing all documentation during the performance of the works constituting the subject of this Agreement in accordance with the provisions of the Construction Law; - removing any defects and faults identified during the works within the time agreed upon by the Parties, but no longer than the technically justified time necessary to remove them; - protecting and managing the construction site until the completion of the Investment, which does not exclude the Ordering Partys rights to supervision; - eliminating the effects of the impact of the construction process on the construction site environment; - paying waste storage fees. - conducting necessary tests and obtaining an opinion before commencing use.Special conditions for securing the construction site and conducting construction works: Construction works must be performed in accordance with the technical conditions and occupational health and safety regulations applicable in the construction industry and design approvals, and the construction site must be secured against unauthorized access. The Contractor is also responsible for, and at his/her expense: - conducting all types of work by persons with valid construction licenses; - securing the construction site and conducting the work in accordance with occupational health and safety and fire protection regulations; - preparing and submitting as-built documentation to the Ordering Party; - protecting installations and equipment on the construction site and its immediate vicinity against destruction or damage during the performance of the works that are the subject of this Agreement; - ensuring the safe use of the area adjacent to the construction site; - Completing all documentation during the execution of the works constituting the subject of this Agreement in accordance with the provisions of the Construction Law; - Removing all defects and faults identified during the works within the time agreed upon by the Parties, but no longer than the technically reasonable time necessary to remove them; - Protecting and managing the construction site until the completion of the Investment, which does not exclude the Ordering Partys rights to supervision; - Eliminating the effects of the construction process on the surrounding area; - Payment of waste storage fees; - Conducting necessary tests and obtaining an opinion before use.Special conditions for securing the construction site and conducting construction works: Construction works must be performed in accordance with the technical conditions and occupational health and safety regulations applicable in the construction industry and design approvals, and the construction site must be secured against unauthorized access. The Contractor is also responsible for, and at his/her expense: - conducting all types of work by persons with valid construction licenses; - securing the construction site and conducting the work in accordance with occupational health and safety and fire protection regulations; - preparing and submitting as-built documentation to the Ordering Party; - protecting installations and equipment on the construction site and its immediate vicinity against destruction or damage during the performance of the works that are the subject of this Agreement; - ensuring the safe use of the area adjacent to the construction site; - Completing all documentation during the execution of the works constituting the subject of this Agreement in accordance with the provisions of the Construction Law; - Removing all defects and faults identified during the works within the time agreed upon by the Parties, but no longer than the technically reasonable time necessary to remove them; - Protecting and managing the construction site until the completion of the Investment, which does not exclude the Ordering Partys rights to supervision; - Eliminating the effects of the construction process on the surrounding area; - Payment of waste storage fees; - Conducting necessary tests and obtaining an opinion before use.- carrying out the necessary tests and obtaining opinions before use- carrying out the necessary tests and obtaining opinions before use with tender notice no. 708880-2026 published on 14 Oct 2026. The tender is due to expire on 23 Oct 2026. This tender is sourced from TED Europa and is eligible for suppliers interested in Construction work for buildings relating to education and research, Construction work for kindergarten buildings, Construction work for school buildings, Construction work for college buildings, Construction work for buildings of further education. Interested bidders can obtain further information including complete bid documents or ways to participate by registering on Tender Impulse and referencing via Tender Impulse ID 15505526.
Tender Details
Tender NoticeTI Ref: 15505526
Tender Notice No
708880-2026
Tender Organisation
Powiat Sanocki
Tender CPV
45214000 : Construction work for buildings relating to education and research45214100 : Construction work for kindergarten buildings45214200 : Construction work for school buildings45214300 : Construction work for college buildings45214500 : Construction work for buildings of further education
Tender Document Type
Competition
Tender Deadline
23 Oct 2026 9 days left
Tender Description
1. The subject of the contract is the implementation of the task entitled: Construction of a Special Educational and Care Center in Sanok – Stage II. General scope of the investment: • The second stage of the investment includes comprehensive interior and exterior finishing works, installation work for all disciplines in the scope of interior and exterior installations, installation of door and window joinery, landscaping in accordance with the design, installation of a photovoltaic system, construction of a stormwater drainage collector to the San River, construction of an underground fire protection reservoir. • Delivery and installation of landscaping equipment, sports fields, recreation areas, parking lots, school surrounding lighting, and external fencing. • Delivery and possible installation of rehabilitation equipment, office and teaching equipment, gymnasium equipment, dormitory equipment, and canteen equipment. The scope and details of the deliveries must be fully agreed with the Ordering Party. • Installation of a photovoltaic system on the buildings roof. • Construction of a container transformer station under the terms specified by the electricity supplier. Currently, after Stage I of the investment, the facility is in the open shell stage. The flat roofs, covered with prestressed hollow core slabs, were secured with a single layer of heat-sealable roofing felt and equipped with temporary overflow drains. No insulation or slope layer was installed. The sports hall roof was covered with trapezoidal sheet metal at this stage. The floor subfloors in all parts of the building were sealed with a layer of lean concrete. Underneath the floors, sections of sanitary sewer lines were constructed in accordance with the design documentation, extending them outside the buildings outline. As part of the first stage of the project, the conflict with a 15 kV medium voltage cable, as specified in the design documentation, was resolved. The conditions for the construction of a water supply connection will change. After the District Infrastructure Board in Lublin completed the water supply connection to the military facilities adjacent to the Special Operations Center (SOSW), it became possible to connect to the water supply running through the district plot. The contractor is required to submit a detailed interior design plan, which should be submitted to the Client for approval. 2. The subject of the contract must be completed in accordance with the Technical Documentation (Appendix 2 to the Technical Specifications). The scope of the task being the subject of the tender is described in detail in the technical documentation, technical specifications for the execution and acceptance of works, and the bill of quantities. Any catalog items are provided solely to facilitate calculations – their use in valuation is not mandatory. The technical specifications, bill of quantities, and documentation constitute an appendix to this specification. The quality requirements for the elements comprising the subject of the contract are described in the technical documentation, in particular the technical specifications for the execution and acceptance of works. Due to this,Since the contractors remuneration indicated in the offer will be a lump sum, the contractor should base its offer evaluation on the scope indicated in the technical documentation. The bill of quantities is of an ancillary nature. The occurrence of works during the contract execution that are not included in the bill of quantities or works in greater quantity than assumed in the bill of quantities will not entitle the contractor to demand additional remuneration – if the necessity to perform these works arose from the technical documentation. 3. The contractor will provide the Ordering Party with a guarantee and warranty for the construction works performed and materials used for the period and under the conditions specified in Chapter XII of the Technical Specifications (the warranty and warranty period for defects is one of the criteria for offer evaluation). 4. Special conditions for securing the construction site and carrying out construction works: construction works must be performed in accordance with the technical conditions and occupational health and safety rules applicable in the construction industry and the design agreements, and the construction site must be secured against unauthorized access. The contractor is also responsible and liable for the following: - all types of works must be carried out by persons with valid construction licenses; - securing the construction site and carrying out the works in accordance with occupational health and safety and fire protection regulations; - preparing and submitting as-built documentation to the Ordering Party, - securing installations and equipment on the construction site and in its immediate vicinity against destruction or damage during the performance of the works constituting the subject of this Agreement; - ensuring the safe use of the area adjacent to the construction site; - completing all documentation during the performance of the works constituting the subject of this Agreement in accordance with the provisions of the Construction Law; - removing any defects and faults identified during the works within the time agreed upon by the Parties, but no longer than the technically justified time necessary to remove them; - protecting and managing the construction site until the completion of the Investment, which does not exclude the Ordering Partys rights to supervision; - eliminating the effects of the impact of the construction process on the construction site environment; - paying waste storage fees. - conducting necessary tests and obtaining an opinion before commencing use.Special conditions for securing the construction site and conducting construction works: Construction works must be performed in accordance with the technical conditions and occupational health and safety regulations applicable in the construction industry and design approvals, and the construction site must be secured against unauthorized access. The Contractor is also responsible for, and at his/her expense: - conducting all types of work by persons with valid construction licenses; - securing the construction site and conducting the work in accordance with occupational health and safety and fire protection regulations; - preparing and submitting as-built documentation to the Ordering Party; - protecting installations and equipment on the construction site and its immediate vicinity against destruction or damage during the performance of the works that are the subject of this Agreement; - ensuring the safe use of the area adjacent to the construction site; - Completing all documentation during the execution of the works constituting the subject of this Agreement in accordance with the provisions of the Construction Law; - Removing all defects and faults identified during the works within the time agreed upon by the Parties, but no longer than the technically reasonable time necessary to remove them; - Protecting and managing the construction site until the completion of the Investment, which does not exclude the Ordering Partys rights to supervision; - Eliminating the effects of the construction process on the surrounding area; - Payment of waste storage fees; - Conducting necessary tests and obtaining an opinion before use.Special conditions for securing the construction site and conducting construction works: Construction works must be performed in accordance with the technical conditions and occupational health and safety regulations applicable in the construction industry and design approvals, and the construction site must be secured against unauthorized access. The Contractor is also responsible for, and at his/her expense: - conducting all types of work by persons with valid construction licenses; - securing the construction site and conducting the work in accordance with occupational health and safety and fire protection regulations; - preparing and submitting as-built documentation to the Ordering Party; - protecting installations and equipment on the construction site and its immediate vicinity against destruction or damage during the performance of the works that are the subject of this Agreement; - ensuring the safe use of the area adjacent to the construction site; - Completing all documentation during the execution of the works constituting the subject of this Agreement in accordance with the provisions of the Construction Law; - Removing all defects and faults identified during the works within the time agreed upon by the Parties, but no longer than the technically reasonable time necessary to remove them; - Protecting and managing the construction site until the completion of the Investment, which does not exclude the Ordering Partys rights to supervision; - Eliminating the effects of the construction process on the surrounding area; - Payment of waste storage fees; - Conducting necessary tests and obtaining an opinion before use.- carrying out the necessary tests and obtaining opinions before use- carrying out the necessary tests and obtaining opinions before use
Frequently Asked Questions About This Tender
Who has issued this tender, and what is it for?
The tender has been issued by Powiat Sanocki in Poland. Such a type of tender falls under Construction work for buildings relating to education and research, Construction work for kindergarten buildings, Construction work for school buildings, Construction work for college buildings, Construction work for buildings of further education, within the Oil and Gas sector, and is listed on Tender Impulse under notice number 708880-2026.
What are the key dates for this tender?
The notice was published on 14 Oct 2026 and submissions close on 23 Oct 2026. Late bids are rarely accepted in public procurement, so aim to have your documents ready several days before the closing date.
Which CPV codes apply to this tender?
It is classified under CPV codes 45214000, 45214100, 45214200, 45214300, 45214500, which correspond to Construction work for buildings relating to education and research, Construction work for kindergarten buildings, Construction work for school buildings, Construction work for college buildings, Construction work for buildings of further education. If your company supplies these products or services, these are the codes to save in your alert profile so no matching tender passes you by.
Can I submit my bid for this tender to Tender Impulse?
No - and this matters. Tender Impulse is a tender aggregation and alert service: we collect procurement notices from official sources around the world and list them in one place. We do not receive, forward or evaluate bids. Your bid for this tender must be submitted directly to Powiat Sanocki, using the method described in the original tender document, before 23 Oct 2026. Tender Impulse provides complete assistance in submitting all bids posted on its website.
How do I get the bid documents and participation details?
Request a live demo on Tender Impulse and our tender experts will walk you through this listing, share the available documents, and explain how to submit your bid to Powiat Sanocki. Subscribers also receive help with registration requirements and, where needed, translation of non-English notices - but the submission itself always goes from you to the buyer.
How can I find more tenders like this in Poland?
There are currently 30985 live tenders of 514830 total tenders from Poland on Tender Impulse. You can browse them on our Poland tenders page, or save a search combining Poland with CPV codes 45214000, 45214100, 45214200, 45214300, 45214500 - we will then email you every new match on the day it is published.
How to prepare for this bid?
Suppliers must verify technical specifications, the delivery schedules and any other intrinsic details as provided in the complete bid documents before deciding to submit their bids. All necessary certifications and supplier registrations must be undertaken before participation.
Is this tender beneficial for me?
The procurement is applicable to companies in the Construction work for buildings relating to education and research, Construction work for kindergarten buildings, Construction work for school buildings, Construction work for college buildings, Construction work for buildings of further education and related industries. If you belong to this industry, you can review the technical documents before assessing your relevance to your company.
What is the procurement trend for Construction of the Special Educational Centre in Sanok stage II?
The public procurement trends for Construction of the Special Educational Centre in Sanok stage II can be assessed by viewing historical data and buying patterns for this product. Subscribed members can view and even download reports of tenders released in the past for their market research. This shall allow them to carefully prepare a compelling bid.
Explore More Construction work for buildings relating to education and research, Construction work for kindergarten buildings, Construction work for school buildings, Construction work for college buildings, Construction work for buildings of further education Tenders in Poland, Europe Region and Worldwide
Looking for more tenders like this one in Construction work for buildings relating to education and research, Construction work for kindergarten buildings, Construction work for school buildings, Construction work for college buildings, Construction work for buildings of further education? With millions of global procurement opportunities and new tenders added daily, Tender Impulse is your gateway to international and local contracting success. Whether you're targeting the Oil and Gas sector in Poland, or expanding across regions, we provide live, accurate and relevant updates every day.
Our platform sources tenders from national and local government portals, international development and funding agencies, municipal corporations, state authorities, NGOs, education ministries and public-private partnerships.
Daily Tender Updates Across 190+ Countries
Every day we add hundreds of new RFPs, RFQs, EOIs and contract awards across multiple sectors and geographies. This tender from Poland is just a sample of what's available right now - there are currently 30,985 live Poland tenders to explore.
Search Smarter with CPV and Industry Matching
Each listing is categorised using CPV codes such as 45214000, 45214100, 45214200, 45214300, 45214500, enabling precise filtering by tender type, location, industry, deadline and issuing organisation.
Start Your Tender Journey
Request a free live demo to unlock tenders customised to your sector, country and CPV categories - with alerts, documents and submission support.