Tender Summary
The Gmina Zawiercie in Poland from Europe region has released this tender for 1. The subject of the contract is the delivery and installation, along with the design and commissioning of a 450 kWp photovoltaic installation as part of the funding application entitled: Development of distributed energy based on renewable energy sources for public buildings in the Zawiercie commune 6. 2. The subject of the contract is the design of a photovoltaic installation and execution of construction and engineering works for electrical and mechanical devices designed by the Contractor. 3. Execution of the subject of the contract includes in particular: a) Preparation of design documentation and obtaining on behalf of the Ordering Party a decision enabling the implementation of the investment; b) Preparation of detailed designs and as-built documentation; c) Execution of construction and assembly works, including delivery of necessary materials and equipment as well as software licenses, installation and configuration; d) Performing surveying works and developing a concept for the arrangement and installation of 450 kWp photovoltaic panels; e) Connecting the photovoltaic installation to the existing energy infrastructure, taking into account the requirements contained in Conditions of connection to the power grid no. WP/040507/2025/O07R00 issued by Tauron Dystrybucja on August 28, 2025. f) Integration of the designed photovoltaic installation with the existing 2 x 250 kW cogeneration generators using a PLC industrial controller or an industrial computer (Industrial PC); g) Providing data in a standard compliant with the Modbus TCP IP protocol to the RPWiK Sp z o. o. Monitoring system and the SCADA-type sewage treatment plant operation visualization system; h) Performing final tests; i) Removal of all defects and faults in the Works; j) Obtaining a valid occupancy permit (in the case of obtaining a Building Permit) and other permits necessary for the use of the completed facilities; k) Commissioning the project scope for use 4. INVESTMENT ADDRESS Sewage Treatment Plant RPWiK Sp. z o. o. ul. Włodowska 21, 42‑400 Zawiercie Plots no.: 67/3, 68/3, 69/3, 48/13, 29/2, 30/2, 31/3, 32/3, 33/3, 34/3, 35/3, 36/3, 37/3, 70/1, 71/1, 72/1, 73/1, 74/1, 75/1, 76/1, 76/2, 77/1 (km 7, Zawiercie district) 5. BASIC DESIGN ASSUMPTIONS REGARDING THE PHOTOVOLTAIC INSTALLATION a) Installed power of PV panels: 450 kWp (due to the OSD requirements, the total rated power of installed panels reduced by 500 Wp is permissible) b) Installation type: above-ground, ground c) Operation model: own consumption, cooperation with existing biogas generators d) Control and monitoring: PLC industrial controller or industrial computer (Industrial PC) e) Preview and visualization: SCADA system, Monitoring RPWiK Sp. z o.o. 6. Place of connection of the installation to the grid and division of the system into sections in accordance with the Conditions of connection of the installation to the power grid and arrangements with Tauron Dystrybucja 7. The delivered devices must be unused and brand new (manufactured no later than 2026),come from the official distribution channel. 8. A detailed description of the subject matter of the order as well as a description of the method of performing part of the order can be found in the Functional-Utility Program (FUP), which constitutes an annex to the ToR. 9. Pursuant to the provisions of the Draft Contract Provisions, the Ordering Party has provided for a lump sum settlement within the meaning of Article 632 of the Civil Code (for the design and execution of a given type of installation). 10. The Ordering Party also informs that, in accordance with the provisions of the Draft Contract Provisions, it will require the Contractor selected in the proceedings to establish insurance coverage for the duration of the contract (in accordance with the principles specified in the Draft Contract Provisions) and to provide a performance security, in accordance with the content of these ToR. 11. The Ordering Party requires the Contractor to provide a warranty for the construction and assembly works as well as the delivered and installed equipment: a minimum of 5 years, counted from the date of the Ordering Partys signing of the defect-free final acceptance protocol. 12. Time to remove the fault – up to 5 business days from the date of commencing the removal of the fault on business days from 7:00 a.m. to 3:00 p.m. 13. Response time to a service request – up to 24 hours from the moment of notification on business days from 7:00 a.m. to 3:00 p.m. on the terms resulting from the Agreement. 14. Where the Specifications of Essential Terms, including the Functional-Utility Program (FUP) or other order documents indicate a trademark (brand), patent or origin, source or specific process that characterizes the products or services delivered by a specific Contractor, or where standards, technical assessments, technical specifications and technical reference systems referred to in art. 101 sec. 1 item 2 and sec. 3 of the Act are indicated, the Ordering Party, in accordance with art. 99 sec. 5 of the Act, allows the submission of an equivalent offer or in accordance with art. 101 sec. 4 of the Act, offering solutions "equivalent" to those indicated in the Description of the Subject Matter of the Contract, provided that they ensure the achievement of technical parameters not worse than those assumed in the Specification of Technical Specifications, including the FUP. 15. Pursuant to Art. 101 sec. 5 of the Public Procurement Act, the Contractor who invokes solutions equivalent to those described by the Ordering Party (in terms of standards, technical assessments, technical specifications and technical reference systems referred to in Art. 101 sec. 1 item 2 and sec. 3 of the Public Procurement Act) must prove in the offer, in particular using the evidence referred to in Art. 104-107 of the Public Procurement Act, that the proposed solutions meet the requirements specified in the Description of the Subject Matter of the Contract to an equivalent extent. Continued in the section belowThe Ordering Party also informs that, in accordance with the Draft Contract Provisions, it will require the Contractor selected in the proceedings to establish insurance coverage for the duration of the contract (in accordance with the principles specified in the Draft Contract Provisions) and to provide a performance bond, in accordance with the content of these ToR. 11. The Ordering Party requires the Contractor to provide a warranty for the construction and assembly works, as well as the delivered and installed equipment: a minimum of 5 years, counted from the date of the Ordering Partys signing of the fault-free final acceptance protocol. 12. Time to repair the fault – up to 5 business days from the date of commencement of the repair on business days from 7:00 a.m. to 3:00 p.m. 13. Response time to a service request – up to 24 hours from the moment of notification on business days from 7:00 a.m. to 3:00 p.m., in accordance with the terms of the Agreement. 14. Where the Technical Specifications, including the Functional-Utility Program (FUP) or other procurement documents indicate a trademark (brand), patent or origin, source or specific process that characterizes the products or services delivered by a specific Contractor, or standards, technical assessments, technical specifications and technical reference systems referred to in art. 101 sec. 1 item 2 and sec. 3 of the Act, the Ordering Party, in accordance with art. 99 sec. 5 of the Act, allows the submission of an equivalent offer or, in accordance with art. 101 sec. 4 of the Act, the offering of "equivalent" solutions to those indicated in the Description of the Subject Matter of the Procurement, provided that they ensure the achievement of technical parameters not worse than those assumed in the Technical Specifications, including FUP. 15. In accordance with art. 101 sec. 5 of the Public Procurement Law, a Contractor who refers to solutions equivalent to those described by the Ordering Party (in terms of standards, technical assessments, technical specifications and technical reference systems referred to in Art. 101, Section 1, Item 2 and Section 3 of the Public Procurement Law) must prove in the offer, in particular by means of the evidence referred to in Art. 104-107 of the Public Procurement Law, that the proposed solutions meet the requirements specified in the description of the subject of the contract to an equivalent extent. Continued in the section belowThe Ordering Party also informs that, in accordance with the Draft Contract Provisions, it will require the Contractor selected in the proceedings to establish insurance coverage for the duration of the contract (in accordance with the principles specified in the Draft Contract Provisions) and to provide a performance bond, in accordance with the content of these ToR. 11. The Ordering Party requires the Contractor to provide a warranty for the construction and assembly works, as well as the delivered and installed equipment: a minimum of 5 years, counted from the date of the Ordering Partys signing of the fault-free final acceptance protocol. 12. Time to repair the fault – up to 5 business days from the date of commencement of the repair on business days from 7:00 a.m. to 3:00 p.m. 13. Response time to a service request – up to 24 hours from the moment of notification on business days from 7:00 a.m. to 3:00 p.m., in accordance with the terms of the Agreement. 14. Where the Technical Specifications, including the Functional-Utility Program (FUP) or other procurement documents indicate a trademark (brand), patent or origin, source or specific process that characterizes the products or services delivered by a specific Contractor, or standards, technical assessments, technical specifications and technical reference systems referred to in art. 101 sec. 1 item 2 and sec. 3 of the Act, the Ordering Party, in accordance with art. 99 sec. 5 of the Act, allows the submission of an equivalent offer or, in accordance with art. 101 sec. 4 of the Act, the offering of "equivalent" solutions to those indicated in the Description of the Subject Matter of the Procurement, provided that they ensure the achievement of technical parameters not worse than those assumed in the Technical Specifications, including FUP. 15. In accordance with art. 101 sec. 5 of the Public Procurement Law, a Contractor who refers to solutions equivalent to those described by the Ordering Party (in terms of standards, technical assessments, technical specifications and technical reference systems referred to in Art. 101, Section 1, Item 2 and Section 3 of the Public Procurement Law) must prove in the offer, in particular by means of the evidence referred to in Art. 104-107 of the Public Procurement Law, that the proposed solutions meet the requirements specified in the description of the subject of the contract to an equivalent extent. Continued in the section belowResponse time to a service request – up to 24 hours from the moment of reporting on business days from 7:00 a.m. to 3:00 p.m. on the terms resulting from the Agreement. 14. Where the Technical Specifications, including the Functional-Utility Program (FUP) or other order documents indicate a trademark (brand), patent or origin, source or specific process that characterizes the products or services delivered by a specific Contractor, or where standards, technical assessments, technical specifications and technical reference systems referred to in art. 101 sec. 1 item 2 and sec. 3 of the Act are indicated, the Ordering Party, in accordance with art. 99 sec. 5 of the Act, allows the submission of an equivalent offer or, in accordance with art. 101 sec. 4 of the Act, the offering of “equivalent” solutions to those indicated in the Description of the Subject Matter of the Order, provided that they ensure the achievement of technical parameters not worse than those assumed in the Technical Specifications, including FUP. 15. In accordance with art. 101 sec. 5 of the Public Procurement Law, a Contractor who refers to solutions equivalent to those described by the Ordering Party (in terms of standards, technical assessments, technical specifications and technical reference systems referred to in Art. 101, Section 1, Item 2 and Section 3 of the Public Procurement Law) must prove in the offer, in particular by means of the evidence referred to in Art. 104-107 of the Public Procurement Law, that the proposed solutions meet the requirements specified in the description of the subject of the contract to an equivalent extent. Continued in the section belowResponse time to a service request – up to 24 hours from the moment of reporting on business days from 7:00 a.m. to 3:00 p.m. on the terms resulting from the Agreement. 14. Where the Technical Specifications, including the Functional-Utility Program (FUP) or other order documents indicate a trademark (brand), patent or origin, source or specific process that characterizes the products or services delivered by a specific Contractor, or where standards, technical assessments, technical specifications and technical reference systems referred to in art. 101 sec. 1 item 2 and sec. 3 of the Act are indicated, the Ordering Party, in accordance with art. 99 sec. 5 of the Act, allows the submission of an equivalent offer or, in accordance with art. 101 sec. 4 of the Act, the offering of “equivalent” solutions to those indicated in the Description of the Subject Matter of the Order, provided that they ensure the achievement of technical parameters not worse than those assumed in the Technical Specifications, including FUP. 15. In accordance with art. 101 sec. 5 of the Public Procurement Law, a Contractor who refers to solutions equivalent to those described by the Ordering Party (in terms of standards, technical assessments, technical specifications and technical reference systems referred to in Art. 101, Section 1, Item 2 and Section 3 of the Public Procurement Law) must prove in the offer, in particular by means of the evidence referred to in Art. 104-107 of the Public Procurement Law, that the proposed solutions meet the requirements specified in the description of the subject of the contract to an equivalent extent. Continued in the section below with tender notice no. 702846-2026 published on 12 Oct 2026. The tender is due to expire on 27 Oct 2026. This tender is sourced from TED Europa and is eligible for suppliers interested in Solar photovoltaic modules. Interested bidders can obtain further information including complete bid documents or ways to participate by registering on Tender Impulse and referencing via Tender Impulse ID 15409154.
Tender Details
Tender NoticeTI Ref: 15409154
Tender Notice No
702846-2026
Tender Organisation
Gmina Zawiercie
Tender CPV
09331200 : Solar photovoltaic modules
Tender Document Type
Competition
Tender Deadline
27 Oct 2026 13 days left
Tender Description
1. The subject of the contract is the delivery and installation, along with the design and commissioning of a 450 kWp photovoltaic installation as part of the funding application entitled: Development of distributed energy based on renewable energy sources for public buildings in the Zawiercie commune 6. 2. The subject of the contract is the design of a photovoltaic installation and execution of construction and engineering works for electrical and mechanical devices designed by the Contractor. 3. Execution of the subject of the contract includes in particular: a) Preparation of design documentation and obtaining on behalf of the Ordering Party a decision enabling the implementation of the investment; b) Preparation of detailed designs and as-built documentation; c) Execution of construction and assembly works, including delivery of necessary materials and equipment as well as software licenses, installation and configuration; d) Performing surveying works and developing a concept for the arrangement and installation of 450 kWp photovoltaic panels; e) Connecting the photovoltaic installation to the existing energy infrastructure, taking into account the requirements contained in Conditions of connection to the power grid no. WP/040507/2025/O07R00 issued by Tauron Dystrybucja on August 28, 2025. f) Integration of the designed photovoltaic installation with the existing 2 x 250 kW cogeneration generators using a PLC industrial controller or an industrial computer (Industrial PC); g) Providing data in a standard compliant with the Modbus TCP IP protocol to the RPWiK Sp z o. o. Monitoring system and the SCADA-type sewage treatment plant operation visualization system; h) Performing final tests; i) Removal of all defects and faults in the Works; j) Obtaining a valid occupancy permit (in the case of obtaining a Building Permit) and other permits necessary for the use of the completed facilities; k) Commissioning the project scope for use 4. INVESTMENT ADDRESS Sewage Treatment Plant RPWiK Sp. z o. o. ul. Włodowska 21, 42‑400 Zawiercie Plots no.: 67/3, 68/3, 69/3, 48/13, 29/2, 30/2, 31/3, 32/3, 33/3, 34/3, 35/3, 36/3, 37/3, 70/1, 71/1, 72/1, 73/1, 74/1, 75/1, 76/1, 76/2, 77/1 (km 7, Zawiercie district) 5. BASIC DESIGN ASSUMPTIONS REGARDING THE PHOTOVOLTAIC INSTALLATION a) Installed power of PV panels: 450 kWp (due to the OSD requirements, the total rated power of installed panels reduced by 500 Wp is permissible) b) Installation type: above-ground, ground c) Operation model: own consumption, cooperation with existing biogas generators d) Control and monitoring: PLC industrial controller or industrial computer (Industrial PC) e) Preview and visualization: SCADA system, Monitoring RPWiK Sp. z o.o. 6. Place of connection of the installation to the grid and division of the system into sections in accordance with the Conditions of connection of the installation to the power grid and arrangements with Tauron Dystrybucja 7. The delivered devices must be unused and brand new (manufactured no later than 2026),come from the official distribution channel. 8. A detailed description of the subject matter of the order as well as a description of the method of performing part of the order can be found in the Functional-Utility Program (FUP), which constitutes an annex to the ToR. 9. Pursuant to the provisions of the Draft Contract Provisions, the Ordering Party has provided for a lump sum settlement within the meaning of Article 632 of the Civil Code (for the design and execution of a given type of installation). 10. The Ordering Party also informs that, in accordance with the provisions of the Draft Contract Provisions, it will require the Contractor selected in the proceedings to establish insurance coverage for the duration of the contract (in accordance with the principles specified in the Draft Contract Provisions) and to provide a performance security, in accordance with the content of these ToR. 11. The Ordering Party requires the Contractor to provide a warranty for the construction and assembly works as well as the delivered and installed equipment: a minimum of 5 years, counted from the date of the Ordering Partys signing of the defect-free final acceptance protocol. 12. Time to remove the fault – up to 5 business days from the date of commencing the removal of the fault on business days from 7:00 a.m. to 3:00 p.m. 13. Response time to a service request – up to 24 hours from the moment of notification on business days from 7:00 a.m. to 3:00 p.m. on the terms resulting from the Agreement. 14. Where the Specifications of Essential Terms, including the Functional-Utility Program (FUP) or other order documents indicate a trademark (brand), patent or origin, source or specific process that characterizes the products or services delivered by a specific Contractor, or where standards, technical assessments, technical specifications and technical reference systems referred to in art. 101 sec. 1 item 2 and sec. 3 of the Act are indicated, the Ordering Party, in accordance with art. 99 sec. 5 of the Act, allows the submission of an equivalent offer or in accordance with art. 101 sec. 4 of the Act, offering solutions "equivalent" to those indicated in the Description of the Subject Matter of the Contract, provided that they ensure the achievement of technical parameters not worse than those assumed in the Specification of Technical Specifications, including the FUP. 15. Pursuant to Art. 101 sec. 5 of the Public Procurement Act, the Contractor who invokes solutions equivalent to those described by the Ordering Party (in terms of standards, technical assessments, technical specifications and technical reference systems referred to in Art. 101 sec. 1 item 2 and sec. 3 of the Public Procurement Act) must prove in the offer, in particular using the evidence referred to in Art. 104-107 of the Public Procurement Act, that the proposed solutions meet the requirements specified in the Description of the Subject Matter of the Contract to an equivalent extent. Continued in the section belowThe Ordering Party also informs that, in accordance with the Draft Contract Provisions, it will require the Contractor selected in the proceedings to establish insurance coverage for the duration of the contract (in accordance with the principles specified in the Draft Contract Provisions) and to provide a performance bond, in accordance with the content of these ToR. 11. The Ordering Party requires the Contractor to provide a warranty for the construction and assembly works, as well as the delivered and installed equipment: a minimum of 5 years, counted from the date of the Ordering Partys signing of the fault-free final acceptance protocol. 12. Time to repair the fault – up to 5 business days from the date of commencement of the repair on business days from 7:00 a.m. to 3:00 p.m. 13. Response time to a service request – up to 24 hours from the moment of notification on business days from 7:00 a.m. to 3:00 p.m., in accordance with the terms of the Agreement. 14. Where the Technical Specifications, including the Functional-Utility Program (FUP) or other procurement documents indicate a trademark (brand), patent or origin, source or specific process that characterizes the products or services delivered by a specific Contractor, or standards, technical assessments, technical specifications and technical reference systems referred to in art. 101 sec. 1 item 2 and sec. 3 of the Act, the Ordering Party, in accordance with art. 99 sec. 5 of the Act, allows the submission of an equivalent offer or, in accordance with art. 101 sec. 4 of the Act, the offering of "equivalent" solutions to those indicated in the Description of the Subject Matter of the Procurement, provided that they ensure the achievement of technical parameters not worse than those assumed in the Technical Specifications, including FUP. 15. In accordance with art. 101 sec. 5 of the Public Procurement Law, a Contractor who refers to solutions equivalent to those described by the Ordering Party (in terms of standards, technical assessments, technical specifications and technical reference systems referred to in Art. 101, Section 1, Item 2 and Section 3 of the Public Procurement Law) must prove in the offer, in particular by means of the evidence referred to in Art. 104-107 of the Public Procurement Law, that the proposed solutions meet the requirements specified in the description of the subject of the contract to an equivalent extent. Continued in the section belowThe Ordering Party also informs that, in accordance with the Draft Contract Provisions, it will require the Contractor selected in the proceedings to establish insurance coverage for the duration of the contract (in accordance with the principles specified in the Draft Contract Provisions) and to provide a performance bond, in accordance with the content of these ToR. 11. The Ordering Party requires the Contractor to provide a warranty for the construction and assembly works, as well as the delivered and installed equipment: a minimum of 5 years, counted from the date of the Ordering Partys signing of the fault-free final acceptance protocol. 12. Time to repair the fault – up to 5 business days from the date of commencement of the repair on business days from 7:00 a.m. to 3:00 p.m. 13. Response time to a service request – up to 24 hours from the moment of notification on business days from 7:00 a.m. to 3:00 p.m., in accordance with the terms of the Agreement. 14. Where the Technical Specifications, including the Functional-Utility Program (FUP) or other procurement documents indicate a trademark (brand), patent or origin, source or specific process that characterizes the products or services delivered by a specific Contractor, or standards, technical assessments, technical specifications and technical reference systems referred to in art. 101 sec. 1 item 2 and sec. 3 of the Act, the Ordering Party, in accordance with art. 99 sec. 5 of the Act, allows the submission of an equivalent offer or, in accordance with art. 101 sec. 4 of the Act, the offering of "equivalent" solutions to those indicated in the Description of the Subject Matter of the Procurement, provided that they ensure the achievement of technical parameters not worse than those assumed in the Technical Specifications, including FUP. 15. In accordance with art. 101 sec. 5 of the Public Procurement Law, a Contractor who refers to solutions equivalent to those described by the Ordering Party (in terms of standards, technical assessments, technical specifications and technical reference systems referred to in Art. 101, Section 1, Item 2 and Section 3 of the Public Procurement Law) must prove in the offer, in particular by means of the evidence referred to in Art. 104-107 of the Public Procurement Law, that the proposed solutions meet the requirements specified in the description of the subject of the contract to an equivalent extent. Continued in the section belowResponse time to a service request – up to 24 hours from the moment of reporting on business days from 7:00 a.m. to 3:00 p.m. on the terms resulting from the Agreement. 14. Where the Technical Specifications, including the Functional-Utility Program (FUP) or other order documents indicate a trademark (brand), patent or origin, source or specific process that characterizes the products or services delivered by a specific Contractor, or where standards, technical assessments, technical specifications and technical reference systems referred to in art. 101 sec. 1 item 2 and sec. 3 of the Act are indicated, the Ordering Party, in accordance with art. 99 sec. 5 of the Act, allows the submission of an equivalent offer or, in accordance with art. 101 sec. 4 of the Act, the offering of “equivalent” solutions to those indicated in the Description of the Subject Matter of the Order, provided that they ensure the achievement of technical parameters not worse than those assumed in the Technical Specifications, including FUP. 15. In accordance with art. 101 sec. 5 of the Public Procurement Law, a Contractor who refers to solutions equivalent to those described by the Ordering Party (in terms of standards, technical assessments, technical specifications and technical reference systems referred to in Art. 101, Section 1, Item 2 and Section 3 of the Public Procurement Law) must prove in the offer, in particular by means of the evidence referred to in Art. 104-107 of the Public Procurement Law, that the proposed solutions meet the requirements specified in the description of the subject of the contract to an equivalent extent. Continued in the section belowResponse time to a service request – up to 24 hours from the moment of reporting on business days from 7:00 a.m. to 3:00 p.m. on the terms resulting from the Agreement. 14. Where the Technical Specifications, including the Functional-Utility Program (FUP) or other order documents indicate a trademark (brand), patent or origin, source or specific process that characterizes the products or services delivered by a specific Contractor, or where standards, technical assessments, technical specifications and technical reference systems referred to in art. 101 sec. 1 item 2 and sec. 3 of the Act are indicated, the Ordering Party, in accordance with art. 99 sec. 5 of the Act, allows the submission of an equivalent offer or, in accordance with art. 101 sec. 4 of the Act, the offering of “equivalent” solutions to those indicated in the Description of the Subject Matter of the Order, provided that they ensure the achievement of technical parameters not worse than those assumed in the Technical Specifications, including FUP. 15. In accordance with art. 101 sec. 5 of the Public Procurement Law, a Contractor who refers to solutions equivalent to those described by the Ordering Party (in terms of standards, technical assessments, technical specifications and technical reference systems referred to in Art. 101, Section 1, Item 2 and Section 3 of the Public Procurement Law) must prove in the offer, in particular by means of the evidence referred to in Art. 104-107 of the Public Procurement Law, that the proposed solutions meet the requirements specified in the description of the subject of the contract to an equivalent extent. Continued in the section below
Frequently Asked Questions About This Tender
Who has issued this tender, and what is it for?
The tender has been issued by Gmina Zawiercie in Poland. Such a type of tender falls under Solar photovoltaic modules, within the Education & Training sector, and is listed on Tender Impulse under notice number 702846-2026.
What are the key dates for this tender?
The notice was published on 12 Oct 2026 and submissions close on 27 Oct 2026. Late bids are rarely accepted in public procurement, so aim to have your documents ready several days before the closing date.
Which CPV codes apply to this tender?
It is classified under CPV codes 09331200, which correspond to Solar photovoltaic modules. If your company supplies these products or services, these are the codes to save in your alert profile so no matching tender passes you by.
Can I submit my bid for this tender to Tender Impulse?
No - and this matters. Tender Impulse is a tender aggregation and alert service: we collect procurement notices from official sources around the world and list them in one place. We do not receive, forward or evaluate bids. Your bid for this tender must be submitted directly to Gmina Zawiercie, using the method described in the original tender document, before 27 Oct 2026. Tender Impulse provides complete assistance in submitting all bids posted on its website.
How do I get the bid documents and participation details?
Request a live demo on Tender Impulse and our tender experts will walk you through this listing, share the available documents, and explain how to submit your bid to Gmina Zawiercie. Subscribers also receive help with registration requirements and, where needed, translation of non-English notices - but the submission itself always goes from you to the buyer.
How can I find more tenders like this in Poland?
There are currently 28772 live tenders of 512376 total tenders from Poland on Tender Impulse. You can browse them on our Poland tenders page, or save a search combining Poland with CPV codes 09331200 - we will then email you every new match on the day it is published.
How to prepare for this bid?
Suppliers must verify technical specifications, the delivery schedules and any other intrinsic details as provided in the complete bid documents before deciding to submit their bids. All necessary certifications and supplier registrations must be undertaken before participation.
Is this tender beneficial for me?
The procurement is applicable to companies in the Solar photovoltaic modules and related industries. If you belong to this industry, you can review the technical documents before assessing your relevance to your company.
What is the procurement trend for Delivery and assembly, along with design and commissioning of a 450 kWp photovoltaic installation as part of the application for funding entitled Development of distributed energy based on renewable energy sources for public buildings in the Zawiercie Commune 6?
The public procurement trends for Delivery and assembly, along with design and commissioning of a 450 kWp photovoltaic installation as part of the application for funding entitled Development of distributed energy based on renewable energy sources for public buildings in the Zawiercie Commune 6 can be assessed by viewing historical data and buying patterns for this product. Subscribed members can view and even download reports of tenders released in the past for their market research. This shall allow them to carefully prepare a compelling bid.
Explore More Solar photovoltaic modules Tenders in Poland, Europe Region and Worldwide
Looking for more tenders like this one in Solar photovoltaic modules? With millions of global procurement opportunities and new tenders added daily, Tender Impulse is your gateway to international and local contracting success. Whether you're targeting the Education & Training sector in Poland, or expanding across regions, we provide live, accurate and relevant updates every day.
Our platform sources tenders from national and local government portals, international development and funding agencies, municipal corporations, state authorities, NGOs, education ministries and public-private partnerships.
Daily Tender Updates Across 190+ Countries
Every day we add hundreds of new RFPs, RFQs, EOIs and contract awards across multiple sectors and geographies. This tender from Poland is just a sample of what's available right now - there are currently 28,772 live Poland tenders to explore.
Search Smarter with CPV and Industry Matching
Each listing is categorised using CPV codes such as 09331200, enabling precise filtering by tender type, location, industry, deadline and issuing organisation.
Start Your Tender Journey
Request a free live demo to unlock tenders customised to your sector, country and CPV categories - with alerts, documents and submission support.