“Flood protection in the Wątok stream valley in the Tarnów commune, Skrzyszów and Ryglice, Tarnów poviat” – updating the concept, PFU and obtaining DUŚ

The submission deadline for this tender has passed.

Tender Summary

The State Water Management Polish Waters in Poland from Europe region had released this tender for The subject of the contract is to update the concept, develop a Functional-Utility Program, and obtain a decision on environmental conditions for the investment project entitled Flood protection in the Wątok stream valley in the Tarnów commune, as well as Skrzyszów and Ryglice, Tarnów County. Active flood protection design work includes: 1. Czernicha Reservoir 2. Szynwałd Dolny Reservoir 3. Japan Reservoir 4. Łękawica Górna Reservoir 5. Łękawica Reservoir 6. Bednarzówka Reservoir 7. Łękawica Dolna Reservoir Passive flood protection design work includes linear measures. — Area 1- Along the Wątok stream bed at km 0+653 — 3+060 in the city of Tarnów — Area 2 - Along the Wątok stream bed at km 3+330 — 5+782 in the city of Tarnów — Area 3 - Along the Strusinka stream bed at km 0+842 — 3+240 in the city of Tarnów — Area 4 - Along the Wątok stream bed at km 10+412 — 11+960 and the Wątoczek stream at km 0+189 - 0+462 in the town of Skrzyszów Górny — Area 5 - Along the Wątok stream bed at km 13+192 — 14+311 in the town of Skrzyszów Górny — Area 6 - Along the Wątok stream bed at km 22+710 — 22+975 in Zalasowa Niżna. All planned active and passive activities are discussed in detail in the annexes to the description of the subject of the contract, i.e., functional and utility programs, and concepts for individual structures. Scope of design work: 1. Concept. The contract covers a concept defining the direction of flood protection activities in the Wątok stream valley, i.e.: - development of an updated concept; - development of a conceptual design. a) Development of a concept defining the objectives and directions of activities as well as the current possibilities, methods, and estimated costs of conducting flood protection activities in the Wątok stream valley, and includes: - Inventory of the streambed in terms of existing hydrotechnical, regulatory, and bank protection structures, plotted on a base map and orthophotomap, along with photographic documentation and an assessment of the technical condition of the structures. - Preliminary geological survey for the planned investments, based on existing cartographic materials and cross-sections. - Inventory, acquisition, and development of geodetic materials, such as master maps, valley cross-sections, structure cross-sections, and riverbed cross-sections at a scale of 1:100/1000, to the extent necessary to develop the concept. - Hydrological and hydraulic calculations (one-dimensional hydraulic model) and designation of flood hazard zones for waters with a specific probability of exceedance of p=10%, 1%, and 0.2%. - As part of this task, the Contractor, in consultation with the Ordering Party, may use the hydraulic model for the Wątok Stream developed as part of the update of flood hazard and flood risk maps, executed in MIKE11 software. Please also note that the provided model constitutes an integral whole.Therefore, it is unacceptable to use the component data (such as cross-sections or boundary conditions) that were the basis for its development. The provided model also cannot be used for any other purpose. The Ordering Party also reserves the right to verify and approve the method of introducing new data. For this purpose, before performing the actual simulations, the model with implemented changes should be submitted for approval by the Ordering Party. - Analysis of the existing streambed condition in terms of environmental conditions for ichthyofauna and conducting a preliminary hydromorphological assessment, including analysis and description of phenomena that negatively impact the biological balance of the river, the dynamic balance of bottom sediments, and identification of biological and anthropogenic obstacles to the free migration of aquatic organisms. - Proposal of technical measures to protect the Wątok stream valley from floods, taking into account changes in infrastructure, terrain, density, and distribution of residential buildings. - Evaluation of the effectiveness of the proposed technical measures using a hydraulic model. - Development of estimated costs for implementing the planned measures. b) Development of a conceptual design for the technical solutions selected from the concepts and recommended for implementation, which will form the basis for developing a Functional-Utility Program and preparing a Project Information Document (KIP) along with an application for an environmental decision. The scope of the contract includes: - Conceptual design of the adopted technical solution, containing a technical description, orientation, site map, and necessary drawings, profiles, cross-sections, etc. However, the drawings are not required to be presented on maps for design purposes. 2. Functional-Utility Program: The subject of the contract includes the development of a Functional-Utility Program along with a calculation of the planned costs of design and construction works and a project information sheet for the project "Flood protection in the Wątok stream valley in the Tarnów commune, as well as Skrzyszów and Ryglice, Tarnów County." 3. Project Information Sheet: As part of the contract, the Contractor will prepare a Project Information Sheet and prepare an application for an Environmental Decision.- Analysis of the existing streambed in terms of environmental conditions for ichthyofauna and a preliminary hydromorphological assessment, including analysis and description of phenomena negatively impacting the river's biological balance, the dynamic balance of bottom sediments, and the identification of biological and anthropogenic obstacles to the free migration of aquatic organisms. - Proposal of technical measures to protect the Wątok Stream valley from floods, taking into account changes in infrastructure, terrain, density, and distribution of residential buildings. - Evaluation of the effectiveness of the proposed technical measures using a hydraulic model. - Development of estimated implementation costs for the planned measures. b) Development of a conceptual design for selected technical solutions recommended for implementation, which will form the basis for the development of a Functional-Utility Program and the preparation of a National Planning and Development Plan (KIP) along with an application for an environmental decision. The scope of the contract includes: - Conceptual design of the adopted technical solution, including a technical description, orientation, situational map, and necessary drawings, profiles, cross-sections, etc. However, the drawings are not required to be presented on maps for design purposes. 2. Functional-Utility Program: The subject of the contract includes the development of a Functional-Utility Program along with a calculation of the planned costs of design and construction works and a project information sheet for the project "Flood protection in the Wątok stream valley in the Tarnów commune, Skrzyszów and Ryglice, Tarnów County." 3. Project information sheet: As part of the contract, the Contractor will prepare a Project Information Sheet and an application for a Decision on Environmental Conditions.- Analysis of the existing streambed in terms of environmental conditions for ichthyofauna and a preliminary hydromorphological assessment, including analysis and description of phenomena negatively impacting the river's biological balance, the dynamic balance of bottom sediments, and the identification of biological and anthropogenic obstacles to the free migration of aquatic organisms. - Proposal of technical measures to protect the Wątok Stream valley from floods, taking into account changes in infrastructure, terrain, density, and distribution of residential buildings. - Evaluation of the effectiveness of the proposed technical measures using a hydraulic model. - Development of estimated implementation costs for the planned measures. b) Development of a conceptual design for selected technical solutions recommended for implementation, which will form the basis for the development of a Functional-Utility Program and the preparation of a National Planning and Development Plan (KIP) along with an application for an environmental decision. The scope of the contract includes: - Conceptual design of the adopted technical solution, including a technical description, orientation, situational map, and necessary drawings, profiles, cross-sections, etc. However, the drawings are not required to be presented on maps for design purposes. 2. Functional-Utility Program: The subject of the contract includes the development of a Functional-Utility Program along with a calculation of the planned costs of design and construction works and a project information sheet for the project "Flood protection in the Wątok stream valley in the Tarnów commune, Skrzyszów and Ryglice, Tarnów County." 3. Project information sheet: As part of the contract, the Contractor will prepare a Project Information Sheet and an application for a Decision on Environmental Conditions.The subject of the contract includes the development of a Functional-Utility Program along with a calculation of the planned costs of design and construction works and a project information sheet for the project "Flood protection in the Wątok stream valley in the Tarnów commune, Skrzyszów and Ryglice, Tarnów County." 3. Project information sheet: As part of the contract, the Contractor will prepare a Project Information Sheet and an application for a Decision on Environmental Conditions.The subject of the contract includes the development of a Functional-Utility Program along with a calculation of the planned costs of design and construction works and a project information sheet for the project "Flood protection in the Wątok stream valley in the Tarnów commune, Skrzyszów and Ryglice, Tarnów County." 3. Project information sheet: As part of the contract, the Contractor will prepare a Project Information Sheet and an application for a Decision on Environmental Conditions. with tender notice no. 686748-2026 published on 07 Oct 2026. The tender expired on 16 Oct 2026. This tender is sourced from TED Europa and is eligible for suppliers interested in Engineering design services for the construction of civil engineering works. Interested bidders can obtain further information including complete bid documents or ways to participate by registering on Tender Impulse and referencing via Tender Impulse ID 15305405.

Tender Details

Tender NoticeTI Ref: 15305405
Tender Notice No
686748-2026
Tender Organisation
State Water Management Polish Waters
Tender Service
Worldwide
Tender Region
Tender Project Location
Tender CPV
71322000 : Engineering design services for the construction of civil engineering works
Tender Source
TED Europa
Tender Document Type
Competition
Tender Deadline
16 Oct 2026 Deadline passed
Tender Description
The subject of the contract is to update the concept, develop a Functional-Utility Program, and obtain a decision on environmental conditions for the investment project entitled Flood protection in the Wątok stream valley in the Tarnów commune, as well as Skrzyszów and Ryglice, Tarnów County. Active flood protection design work includes: 1. Czernicha Reservoir 2. Szynwałd Dolny Reservoir 3. Japan Reservoir 4. Łękawica Górna Reservoir 5. Łękawica Reservoir 6. Bednarzówka Reservoir 7. Łękawica Dolna Reservoir Passive flood protection design work includes linear measures. — Area 1- Along the Wątok stream bed at km 0+653 — 3+060 in the city of Tarnów — Area 2 - Along the Wątok stream bed at km 3+330 — 5+782 in the city of Tarnów — Area 3 - Along the Strusinka stream bed at km 0+842 — 3+240 in the city of Tarnów — Area 4 - Along the Wątok stream bed at km 10+412 — 11+960 and the Wątoczek stream at km 0+189 - 0+462 in the town of Skrzyszów Górny — Area 5 - Along the Wątok stream bed at km 13+192 — 14+311 in the town of Skrzyszów Górny — Area 6 - Along the Wątok stream bed at km 22+710 — 22+975 in Zalasowa Niżna. All planned active and passive activities are discussed in detail in the annexes to the description of the subject of the contract, i.e., functional and utility programs, and concepts for individual structures. Scope of design work: 1. Concept. The contract covers a concept defining the direction of flood protection activities in the Wątok stream valley, i.e.: - development of an updated concept; - development of a conceptual design. a) Development of a concept defining the objectives and directions of activities as well as the current possibilities, methods, and estimated costs of conducting flood protection activities in the Wątok stream valley, and includes: - Inventory of the streambed in terms of existing hydrotechnical, regulatory, and bank protection structures, plotted on a base map and orthophotomap, along with photographic documentation and an assessment of the technical condition of the structures. - Preliminary geological survey for the planned investments, based on existing cartographic materials and cross-sections. - Inventory, acquisition, and development of geodetic materials, such as master maps, valley cross-sections, structure cross-sections, and riverbed cross-sections at a scale of 1:100/1000, to the extent necessary to develop the concept. - Hydrological and hydraulic calculations (one-dimensional hydraulic model) and designation of flood hazard zones for waters with a specific probability of exceedance of p=10%, 1%, and 0.2%. - As part of this task, the Contractor, in consultation with the Ordering Party, may use the hydraulic model for the Wątok Stream developed as part of the update of flood hazard and flood risk maps, executed in MIKE11 software. Please also note that the provided model constitutes an integral whole.Therefore, it is unacceptable to use the component data (such as cross-sections or boundary conditions) that were the basis for its development. The provided model also cannot be used for any other purpose. The Ordering Party also reserves the right to verify and approve the method of introducing new data. For this purpose, before performing the actual simulations, the model with implemented changes should be submitted for approval by the Ordering Party. - Analysis of the existing streambed condition in terms of environmental conditions for ichthyofauna and conducting a preliminary hydromorphological assessment, including analysis and description of phenomena that negatively impact the biological balance of the river, the dynamic balance of bottom sediments, and identification of biological and anthropogenic obstacles to the free migration of aquatic organisms. - Proposal of technical measures to protect the Wątok stream valley from floods, taking into account changes in infrastructure, terrain, density, and distribution of residential buildings. - Evaluation of the effectiveness of the proposed technical measures using a hydraulic model. - Development of estimated costs for implementing the planned measures. b) Development of a conceptual design for the technical solutions selected from the concepts and recommended for implementation, which will form the basis for developing a Functional-Utility Program and preparing a Project Information Document (KIP) along with an application for an environmental decision. The scope of the contract includes: - Conceptual design of the adopted technical solution, containing a technical description, orientation, site map, and necessary drawings, profiles, cross-sections, etc. However, the drawings are not required to be presented on maps for design purposes. 2. Functional-Utility Program: The subject of the contract includes the development of a Functional-Utility Program along with a calculation of the planned costs of design and construction works and a project information sheet for the project "Flood protection in the Wątok stream valley in the Tarnów commune, as well as Skrzyszów and Ryglice, Tarnów County." 3. Project Information Sheet: As part of the contract, the Contractor will prepare a Project Information Sheet and prepare an application for an Environmental Decision.- Analysis of the existing streambed in terms of environmental conditions for ichthyofauna and a preliminary hydromorphological assessment, including analysis and description of phenomena negatively impacting the river's biological balance, the dynamic balance of bottom sediments, and the identification of biological and anthropogenic obstacles to the free migration of aquatic organisms. - Proposal of technical measures to protect the Wątok Stream valley from floods, taking into account changes in infrastructure, terrain, density, and distribution of residential buildings. - Evaluation of the effectiveness of the proposed technical measures using a hydraulic model. - Development of estimated implementation costs for the planned measures. b) Development of a conceptual design for selected technical solutions recommended for implementation, which will form the basis for the development of a Functional-Utility Program and the preparation of a National Planning and Development Plan (KIP) along with an application for an environmental decision. The scope of the contract includes: - Conceptual design of the adopted technical solution, including a technical description, orientation, situational map, and necessary drawings, profiles, cross-sections, etc. However, the drawings are not required to be presented on maps for design purposes. 2. Functional-Utility Program: The subject of the contract includes the development of a Functional-Utility Program along with a calculation of the planned costs of design and construction works and a project information sheet for the project "Flood protection in the Wątok stream valley in the Tarnów commune, Skrzyszów and Ryglice, Tarnów County." 3. Project information sheet: As part of the contract, the Contractor will prepare a Project Information Sheet and an application for a Decision on Environmental Conditions.- Analysis of the existing streambed in terms of environmental conditions for ichthyofauna and a preliminary hydromorphological assessment, including analysis and description of phenomena negatively impacting the river's biological balance, the dynamic balance of bottom sediments, and the identification of biological and anthropogenic obstacles to the free migration of aquatic organisms. - Proposal of technical measures to protect the Wątok Stream valley from floods, taking into account changes in infrastructure, terrain, density, and distribution of residential buildings. - Evaluation of the effectiveness of the proposed technical measures using a hydraulic model. - Development of estimated implementation costs for the planned measures. b) Development of a conceptual design for selected technical solutions recommended for implementation, which will form the basis for the development of a Functional-Utility Program and the preparation of a National Planning and Development Plan (KIP) along with an application for an environmental decision. The scope of the contract includes: - Conceptual design of the adopted technical solution, including a technical description, orientation, situational map, and necessary drawings, profiles, cross-sections, etc. However, the drawings are not required to be presented on maps for design purposes. 2. Functional-Utility Program: The subject of the contract includes the development of a Functional-Utility Program along with a calculation of the planned costs of design and construction works and a project information sheet for the project "Flood protection in the Wątok stream valley in the Tarnów commune, Skrzyszów and Ryglice, Tarnów County." 3. Project information sheet: As part of the contract, the Contractor will prepare a Project Information Sheet and an application for a Decision on Environmental Conditions.The subject of the contract includes the development of a Functional-Utility Program along with a calculation of the planned costs of design and construction works and a project information sheet for the project "Flood protection in the Wątok stream valley in the Tarnów commune, Skrzyszów and Ryglice, Tarnów County." 3. Project information sheet: As part of the contract, the Contractor will prepare a Project Information Sheet and an application for a Decision on Environmental Conditions.The subject of the contract includes the development of a Functional-Utility Program along with a calculation of the planned costs of design and construction works and a project information sheet for the project "Flood protection in the Wątok stream valley in the Tarnów commune, Skrzyszów and Ryglice, Tarnów County." 3. Project information sheet: As part of the contract, the Contractor will prepare a Project Information Sheet and an application for a Decision on Environmental Conditions.
Tender Bidding Type
Unlock Full Details — Register Free

Frequently Asked Questions About This Tender

Who has issued this tender, and what is it for?
The tender has been issued by State Water Management Polish Waters in Poland. Such a type of tender falls under Engineering design services for the construction of civil engineering works, within the Education & Training sector, and is listed on Tender Impulse under notice number 686748-2026.
What are the key dates for this tender?
The notice was published on 07 Oct 2026 and submissions close on 16 Oct 2026. Late bids are rarely accepted in public procurement, so aim to have your documents ready several days before the closing date.
Which CPV codes apply to this tender?
It is classified under CPV codes 71322000, which correspond to Engineering design services for the construction of civil engineering works. If your company supplies these products or services, these are the codes to save in your alert profile so no matching tender passes you by.
Can I submit my bid for this tender to Tender Impulse?
No - and this matters. Tender Impulse is a tender aggregation and alert service: we collect procurement notices from official sources around the world and list them in one place. We do not receive, forward or evaluate bids. Your bid for this tender must be submitted directly to State Water Management Polish Waters, using the method described in the original tender document, before 16 Oct 2026. Tender Impulse provides complete assistance in submitting all bids posted on its website.
How do I get the bid documents and participation details?
Request a live demo on Tender Impulse and our tender experts will walk you through this listing, share the available documents, and explain how to submit your bid to State Water Management Polish Waters. Subscribers also receive help with registration requirements and, where needed, translation of non-English notices - but the submission itself always goes from you to the buyer.
How can I find more tenders like this in Poland?
There are currently 37982 live tenders of 531714 total tenders from Poland on Tender Impulse. You can browse them on our Poland tenders page, or save a search combining Poland with CPV codes 71322000 - we will then email you every new match on the day it is published.
How to prepare for this bid?
Suppliers must verify technical specifications, the delivery schedules and any other intrinsic details as provided in the complete bid documents before deciding to submit their bids. All necessary certifications and supplier registrations must be undertaken before participation.
Is this tender beneficial for me?
The procurement is applicable to companies in the Engineering design services for the construction of civil engineering works and related industries. If you belong to this industry, you can review the technical documents before assessing your relevance to your company.
What is the procurement trend for Flood protection in the Wtok stream valley in the Tarnw commune, Skrzyszw and Ryglice, Tarnw poviat updating the concept, PFU and obtaining DU?
The public procurement trends for Flood protection in the Wtok stream valley in the Tarnw commune, Skrzyszw and Ryglice, Tarnw poviat updating the concept, PFU and obtaining DU can be assessed by viewing historical data and buying patterns for this product. Subscribed members can view and even download reports of tenders released in the past for their market research. This shall allow them to carefully prepare a compelling bid.

Explore More Engineering design services for the construction of civil engineering works Tenders in Poland, Europe Region and Worldwide

Looking for more tenders like this one in Engineering design services for the construction of civil engineering works? With millions of global procurement opportunities and new tenders added daily, Tender Impulse is your gateway to international and local contracting success. Whether you're targeting the Education & Training sector in Poland, or expanding across regions, we provide live, accurate and relevant updates every day.

Our platform sources tenders from national and local government portals, international development and funding agencies, municipal corporations, state authorities, NGOs, education ministries and public-private partnerships.

Daily Tender Updates Across 190+ Countries

Every day we add hundreds of new RFPs, RFQs, EOIs and contract awards across multiple sectors and geographies. This tender from Poland is just a sample of what's available right now - there are currently 37,982 live Poland tenders to explore.

Search Smarter with CPV and Industry Matching

Each listing is categorised using CPV codes such as 71322000, enabling precise filtering by tender type, location, industry, deadline and issuing organisation.

Start Your Tender Journey

Request a free live demo to unlock tenders customised to your sector, country and CPV categories - with alerts, documents and submission support.

API Integration — seamlessly integrate global tender data into your systems
AI-Powered Tender Intelligence for smarter bidding decisions
Publish Your Tenders — reach a global network of suppliers
Source Tenders Faster — discover verified tenders from across the globe
Chat with us