Innovative solutions for thermal and electrical energy of the Wieniawa Energy Cluster

Tender Summary

The Gmina Wieniawa in Poland from Europe region has released this tender for 1. The subject of the contract is construction works and delivery, including assembly, as part of the investment project titled: “Innovative solutions for thermal and electrical energy of the Wieniawa Energy Cluster.” 2. The contract is divided into the following three lots: 1) Lot No. 1 – “Creation of a woodchip warehouse, creation of a biomass boiler room and boiler assembly, creation of heating networks and nodes, cogeneration installation with a fuel preparation system, creation of a heat storage facility with a 3.5 MWh capacity, and implementation of an energy management system in Wieniawa”; 2) Lot No. 2 – “Creation of a woodchip warehouse with a boiler room building, delivery and assembly of a boiler, creation of cogeneration with a fuel preparation system, creation of heating networks and nodes, and creation of a heat storage facility with a 3.5 MWh capacity in Sokolniki Mokre”; 3) Lot No. 3 – “Construction of photovoltaic installations and energy storage facilities on Public Utility Buildings.” 3. Under part of order No. 1 – the Contractor will be obliged to: 1) prepare design documentation(s), including Building Design(s), Technical Design(s) and Detailed Design(s), cost estimate(s) with bill of quantities(s), technical specifications for the execution and acceptance of works, together with obtaining a final decision on a building permit or notification(s) of works – for the entire scope described in the Functional-Utility Program, as well as prepare a Construction Schedule for the Ordering Party’s approval; 2) perform construction works based on the design and cost estimate documentation(s) prepared and approved by the Ordering Party, referred to in point 1) above, and the obtained final decision(s) on a building permit or notification(s), and obtain a final occupancy permit(s) or notification(s) of completion of works (if applicable); 3) implement an energy management system, monitoring, energy production and distribution management, optimization, integration of measurement systems, reporting and data analysis. 4. Under Part 2 of the Order – the Contractor will be obliged to: 1) prepare design documentation(s), including Construction Design(s), Technical Design(s) and Detailed Design(s), cost estimate(s) with bill(s) of quantities, technical specifications for the execution and acceptance of works, together with obtaining a final building permit(s) or notification(s) of works – for the entire scope described in the Functional-Utility Program, as well as prepare a Construction Schedule for the Ordering Partys approval; 2) perform construction works based on the design and cost estimate documentation(s) prepared and approved by the Ordering Party, referred to in point 1) above,and obtained final building permit(s) or notification of works, and obtain final occupancy permit(s) or notification of completion of works (if applicable); 3) implement an energy management system, monitoring, energy production and distribution management, optimization, integration of measurement systems, reporting and data analysis. 5. Under part of order no. 3, the Contractor will be obliged to: 1) design and construct photovoltaic installations and energy storage systems on Public Utility Buildings; 2) develop detailed design documentation; 3) deliver and assemble complete photovoltaic system installations with energy storage systems and connect them to existing energy systems; 4) implement an energy management system, monitoring, energy production and distribution management, optimization, integration of measurement systems, reporting and data analysis; - to the extent described in the Functional-Utility Program. 6. The detailed scope of the subject of this order is specified in: 1) for parts of the order No. 1 and 2 – Appendix No. 8 to the Specification of Functional-Utility Program, appropriate for these parts of the order, while the requirements for the performance of the order are provided in Appendix No. 9a to the Specification of Functional-Utility Program – Draft Agreement; 2) for part of the order No. 3 – Appendix No. 8 to the Specification of Functional-Utility Program, appropriate for this part of the order, while the requirements for the performance of the order are provided in Appendix No. 9b to the Specification of Functional-Utility Program – Draft Agreement. 7. It is desirable that, before submitting the Bid, the Contractor conduct an on-site inspection of the areas where the works covered by the subject of this order will be located. Conducting an on-site inspection is not a condition for submitting a bid in this procedure. The costs of an on-site inspection of the construction site will be borne by the Contractor. 8. The construction works constituting the subject of this order must be performed in accordance with these Specification of Functional-Utility Programs, the Description of the Subject of the Order (DOC), the Draft Agreement, and in accordance with good construction practice, technical knowledge, applicable regulations and standards. The obligation to perform the works in accordance with the above documents does not release the Contractor from, among other things, from the obligation to verify this documentation during the term of the contract and to report to the Ordering Party any defects or omissions discovered therein that may result in non-compliance with the terms of the contract or a violation of the law. 9. From the date of acceptance of the construction site, the Contractor is responsible for all events that occur during the performance of the contract. The Contractor is liable for any damage caused to anyone during or in connection with construction, unless there is no causal relationship between the performance of the works and the damage caused. The Contractor will accept liability in particular for: 1) damage and consequences of accidents involving the Contractors employees and third parties present in the area of ​​the works; 2) damage resulting from destruction and other events in relation to the works,materials, equipment and other movable property related to the performance of works during the implementation of the subject of this contract; Further provisions in the SWZ. with tender notice no. 709634-2026 published on 14 Oct 2026. The tender is due to expire on 21 Oct 2026. This tender is sourced from TED Europa and is eligible for suppliers interested in Electricity, heating, solar and nuclear energy, Energy and related services, Electrical services, Engineering design services for mechanical and electrical installations for buildings, Mechanical and electrical engineering services. Interested bidders can obtain further information including complete bid documents or ways to participate by registering on Tender Impulse and referencing via Tender Impulse ID 15506131.

Tender Details

Tender NoticeTI Ref: 15506131
Tender Notice No
709634-2026
Tender Organisation
Gmina Wieniawa
Tender Service
Worldwide
Tender Region
Tender Project Location
Tender CPV
09300000 : Electricity, heating, solar and nuclear energy71314000 : Energy and related services71314100 : Electrical services71321000 : Engineering design services for mechanical and electrical installations for buildings71334000 : Mechanical and electrical engineering services
Tender Source
TED Europa
Tender Document Type
Competition
Tender Deadline
21 Oct 2026 4 days left
Tender Description
1. The subject of the contract is construction works and delivery, including assembly, as part of the investment project titled: “Innovative solutions for thermal and electrical energy of the Wieniawa Energy Cluster.” 2. The contract is divided into the following three lots: 1) Lot No. 1 – “Creation of a woodchip warehouse, creation of a biomass boiler room and boiler assembly, creation of heating networks and nodes, cogeneration installation with a fuel preparation system, creation of a heat storage facility with a 3.5 MWh capacity, and implementation of an energy management system in Wieniawa”; 2) Lot No. 2 – “Creation of a woodchip warehouse with a boiler room building, delivery and assembly of a boiler, creation of cogeneration with a fuel preparation system, creation of heating networks and nodes, and creation of a heat storage facility with a 3.5 MWh capacity in Sokolniki Mokre”; 3) Lot No. 3 – “Construction of photovoltaic installations and energy storage facilities on Public Utility Buildings.” 3. Under part of order No. 1 – the Contractor will be obliged to: 1) prepare design documentation(s), including Building Design(s), Technical Design(s) and Detailed Design(s), cost estimate(s) with bill of quantities(s), technical specifications for the execution and acceptance of works, together with obtaining a final decision on a building permit or notification(s) of works – for the entire scope described in the Functional-Utility Program, as well as prepare a Construction Schedule for the Ordering Party’s approval; 2) perform construction works based on the design and cost estimate documentation(s) prepared and approved by the Ordering Party, referred to in point 1) above, and the obtained final decision(s) on a building permit or notification(s), and obtain a final occupancy permit(s) or notification(s) of completion of works (if applicable); 3) implement an energy management system, monitoring, energy production and distribution management, optimization, integration of measurement systems, reporting and data analysis. 4. Under Part 2 of the Order – the Contractor will be obliged to: 1) prepare design documentation(s), including Construction Design(s), Technical Design(s) and Detailed Design(s), cost estimate(s) with bill(s) of quantities, technical specifications for the execution and acceptance of works, together with obtaining a final building permit(s) or notification(s) of works – for the entire scope described in the Functional-Utility Program, as well as prepare a Construction Schedule for the Ordering Partys approval; 2) perform construction works based on the design and cost estimate documentation(s) prepared and approved by the Ordering Party, referred to in point 1) above,and obtained final building permit(s) or notification of works, and obtain final occupancy permit(s) or notification of completion of works (if applicable); 3) implement an energy management system, monitoring, energy production and distribution management, optimization, integration of measurement systems, reporting and data analysis. 5. Under part of order no. 3, the Contractor will be obliged to: 1) design and construct photovoltaic installations and energy storage systems on Public Utility Buildings; 2) develop detailed design documentation; 3) deliver and assemble complete photovoltaic system installations with energy storage systems and connect them to existing energy systems; 4) implement an energy management system, monitoring, energy production and distribution management, optimization, integration of measurement systems, reporting and data analysis; - to the extent described in the Functional-Utility Program. 6. The detailed scope of the subject of this order is specified in: 1) for parts of the order No. 1 and 2 – Appendix No. 8 to the Specification of Functional-Utility Program, appropriate for these parts of the order, while the requirements for the performance of the order are provided in Appendix No. 9a to the Specification of Functional-Utility Program – Draft Agreement; 2) for part of the order No. 3 – Appendix No. 8 to the Specification of Functional-Utility Program, appropriate for this part of the order, while the requirements for the performance of the order are provided in Appendix No. 9b to the Specification of Functional-Utility Program – Draft Agreement. 7. It is desirable that, before submitting the Bid, the Contractor conduct an on-site inspection of the areas where the works covered by the subject of this order will be located. Conducting an on-site inspection is not a condition for submitting a bid in this procedure. The costs of an on-site inspection of the construction site will be borne by the Contractor. 8. The construction works constituting the subject of this order must be performed in accordance with these Specification of Functional-Utility Programs, the Description of the Subject of the Order (DOC), the Draft Agreement, and in accordance with good construction practice, technical knowledge, applicable regulations and standards. The obligation to perform the works in accordance with the above documents does not release the Contractor from, among other things, from the obligation to verify this documentation during the term of the contract and to report to the Ordering Party any defects or omissions discovered therein that may result in non-compliance with the terms of the contract or a violation of the law. 9. From the date of acceptance of the construction site, the Contractor is responsible for all events that occur during the performance of the contract. The Contractor is liable for any damage caused to anyone during or in connection with construction, unless there is no causal relationship between the performance of the works and the damage caused. The Contractor will accept liability in particular for: 1) damage and consequences of accidents involving the Contractors employees and third parties present in the area of ​​the works; 2) damage resulting from destruction and other events in relation to the works,materials, equipment and other movable property related to the performance of works during the implementation of the subject of this contract; Further provisions in the SWZ.
Tender Bidding Type
Unlock Full Details — Register Free

Frequently Asked Questions About This Tender

Who has issued this tender, and what is it for?
The tender has been issued by Gmina Wieniawa in Poland. Such a type of tender falls under Electricity, heating, solar and nuclear energy, Energy and related services, Electrical services, Engineering design services for mechanical and electrical installations for buildings, Mechanical and electrical engineering services, within the Healthcare & Medical sector, and is listed on Tender Impulse under notice number 709634-2026.
What are the key dates for this tender?
The notice was published on 14 Oct 2026 and submissions close on 21 Oct 2026. Late bids are rarely accepted in public procurement, so aim to have your documents ready several days before the closing date.
Which CPV codes apply to this tender?
It is classified under CPV codes 09300000, 71314000, 71314100, 71321000, 71334000, which correspond to Electricity, heating, solar and nuclear energy, Energy and related services, Electrical services, Engineering design services for mechanical and electrical installations for buildings, Mechanical and electrical engineering services. If your company supplies these products or services, these are the codes to save in your alert profile so no matching tender passes you by.
Can I submit my bid for this tender to Tender Impulse?
No - and this matters. Tender Impulse is a tender aggregation and alert service: we collect procurement notices from official sources around the world and list them in one place. We do not receive, forward or evaluate bids. Your bid for this tender must be submitted directly to Gmina Wieniawa, using the method described in the original tender document, before 21 Oct 2026. Tender Impulse provides complete assistance in submitting all bids posted on its website.
How do I get the bid documents and participation details?
Request a live demo on Tender Impulse and our tender experts will walk you through this listing, share the available documents, and explain how to submit your bid to Gmina Wieniawa. Subscribers also receive help with registration requirements and, where needed, translation of non-English notices - but the submission itself always goes from you to the buyer.
How can I find more tenders like this in Poland?
There are currently 26834 live tenders of 516836 total tenders from Poland on Tender Impulse. You can browse them on our Poland tenders page, or save a search combining Poland with CPV codes 09300000, 71314000, 71314100, 71321000, 71334000 - we will then email you every new match on the day it is published.
How to prepare for this bid?
Suppliers must verify technical specifications, the delivery schedules and any other intrinsic details as provided in the complete bid documents before deciding to submit their bids. All necessary certifications and supplier registrations must be undertaken before participation.
Is this tender beneficial for me?
The procurement is applicable to companies in the Electricity, heating, solar and nuclear energy, Energy and related services, Electrical services, Engineering design services for mechanical and electrical installations for buildings, Mechanical and electrical engineering services and related industries. If you belong to this industry, you can review the technical documents before assessing your relevance to your company.
What is the procurement trend for Innovative solutions for thermal and electrical energy of the Wieniawa Energy Cluster?
The public procurement trends for Innovative solutions for thermal and electrical energy of the Wieniawa Energy Cluster can be assessed by viewing historical data and buying patterns for this product. Subscribed members can view and even download reports of tenders released in the past for their market research. This shall allow them to carefully prepare a compelling bid.

Explore More Electricity, heating, solar and nuclear energy, Energy and related services, Electrical services, Engineering design services for mechanical and electrical installations for buildings, Mechanical and electrical engineering services Tenders in Poland, Europe Region and Worldwide

Looking for more tenders like this one in Electricity, heating, solar and nuclear energy, Energy and related services, Electrical services, Engineering design services for mechanical and electrical installations for buildings, Mechanical and electrical engineering services? With millions of global procurement opportunities and new tenders added daily, Tender Impulse is your gateway to international and local contracting success. Whether you're targeting the Healthcare & Medical sector in Poland, or expanding across regions, we provide live, accurate and relevant updates every day.

Our platform sources tenders from national and local government portals, international development and funding agencies, municipal corporations, state authorities, NGOs, education ministries and public-private partnerships.

Daily Tender Updates Across 190+ Countries

Every day we add hundreds of new RFPs, RFQs, EOIs and contract awards across multiple sectors and geographies. This tender from Poland is just a sample of what's available right now - there are currently 26,834 live Poland tenders to explore.

Search Smarter with CPV and Industry Matching

Each listing is categorised using CPV codes such as 09300000, 71314000, 71314100, 71321000, 71334000, enabling precise filtering by tender type, location, industry, deadline and issuing organisation.

Start Your Tender Journey

Request a free live demo to unlock tenders customised to your sector, country and CPV categories - with alerts, documents and submission support.

API Integration — seamlessly integrate global tender data into your systems
AI-Powered Tender Intelligence for smarter bidding decisions
Publish Your Tenders — reach a global network of suppliers
Source Tenders Faster — discover verified tenders from across the globe
Chat with us