Tender Summary
The ENERGA-OPERATOR S.A. in Poland from Europe region has released this tender for 1. The subject of the contract is the preparation of design and construction documentation as well as construction and assembly works for the task “Construction of a 15kV MV cable and cable-overhead power grid” divided into three Parts: 1.1. Part 1 - Construction of a 15kV MV cable power grid together with a ZKSN-3 cable connector to power a publicly accessible vehicle charging station in Kołobrzeg, Kołobrzeg commune; 1.2. Part 2 - Construction of a 15kV MV cable-overhead power grid together with the construction of a ZKSN cable connector to power a publicly accessible vehicle charging station in Nowe Bielice and Tatów, Biesiekierz commune; 1.3. Part 3 - Construction of a 15kV cable power network with ZKSN cable connectors to power publicly accessible charging stations at MOP Słupsk North and South in the town of Słupsk, Słupsk commune and in the town of Płaszewko, Redzikowo commune. 2. Scope of the investment project and order of implementation of work within each Part of the order: 2.2. Stage I – preparation of design and construction documentation, with all legally required opinions, arrangements and decisions, together with obtaining legal titles to real estates necessary to implement the task and incurring the costs of remuneration and compensation related to obtaining these legal titles, on the basis of the Functional-Utility Program (hereinafter referred to as the "Functional-Utility Program" or "FUP") and the Supplementary Information to the FUP (hereinafter jointly referred to as the "Functional-Utility Program" or "FUP"), 2.3. Stage II – execution of construction and assembly works (together with all other materials and costs related to the execution of the order), according to the design documentation prepared by the Contractor, positively accepted and agreed by the Ordering Party as part of Stage I. 3. A detailed description of the subject of the order includes a functional and utility program together with supplementary information (hereinafter collectively referred to as the “functional and utility program” or “PFU”) constituting Appendix No. 12 to the Technical Specifications. 4. The Ordering Party requires that: 4.1. the execution of the subject of the order be carried out exclusively using (regardless of its method or scope) software, materials, products or devices that originate: 4.1.1 from European Union Member States, 4.2.1 or from third countries that are parties to the World Trade Organization Agreement on Government Procurement or other international agreements to which the European Union is a party, guaranteeing reciprocal and equal access to the public procurement market, whereby the origin is determined in accordance with Art. 60, sec. 1 and 2 of Regulation (EU) No 952/2013 of the European Parliament and of the Council of 9 October 2013 laying down the Union Customs Code; 4.2. the performance of the subject matter of the contract did not include: 4.2.1. any ICT product, ICT service or ICT process, which were indicated in the recommendation of the Government Plenipotentiary for Cybersecurity, issued on the basis of Article 33 paragraph 4 of the Act of 5 July 2018.on the national cybersecurity system, stating the negative impact of such ICT products, ICT services or ICT processes on the fundamental interest of state security (art. 226 sec. 1 item 17 of the Public Procurement Law Act) and 4.2.2. any ICT product the type of which was specified in the decision of the minister responsible for computerization on recognizing the supplier as a high-risk supplier, issued on the basis of art. 67b sec. 15 of the Act of 5 July 2018 on the national cybersecurity system, or any ICT service or ICT process specified in such decision (art. 226 sec. 1 item 19 of the Public Procurement Law Act). The terms "ICT product", "ICT service" and "ICT process" shall be understood as the product, service and process referred to in art. 2 points 12-14 of Regulation (EU) 2019/881 of the European Parliament and of the Council of 17 April 2019 on ENISA (European Union Agency for Cybersecurity) and cybersecurity certification in the field of information and communication technologies and repealing Regulation (EU) No 526/2013 (Cybersecurity Act), within the meaning of the Act of 5 July 2018 on the National Cybersecurity System. 5. The Ordering Party, taking into account that the completion of the contract will take place after 1 January 2028, informs that it will not accept any equipment using fluorinated greenhouse gases with a global warming potential of 1 or greater, because on the date of acceptance of the construction works it will not be able to put such equipment into service in accordance with Art. 13 sec. 9 lit. a) and c) Regulation (EU) 2024/573 of the European Parliament and of the Council of 7 February 2024 on fluorinated greenhouse gases, amending Directive (EU) 2019/1937 and repealing Regulation (EU) No 517/2014 (https://eur-lex.europa.eu/eli/reg/2024/573/oj?locale=pl).on the national cybersecurity system. 5. The Ordering Party, taking into account that the contract will be completed after 1 January 2028, informs that it will not accept any equipment using fluorinated greenhouse gases with a global warming potential of 1 or greater, because on the date of acceptance of the construction work it will not be able to put such equipment into service in accordance with Article 13 paragraph 9 letters a) and c) of Regulation (EU) 2024/573 of the European Parliament and of the Council of 7 February 2024 on fluorinated greenhouse gases, amending Directive (EU) 2019/1937 and repealing Regulation (EU) No 517/2014 (https://eur-lex.europa.eu/eli/reg/2024/573/oj?locale=pl).on the national cybersecurity system. 5. The Ordering Party, taking into account that the contract will be completed after 1 January 2028, informs that it will not accept any equipment using fluorinated greenhouse gases with a global warming potential of 1 or greater, because on the date of acceptance of the construction work it will not be able to put such equipment into service in accordance with Article 13 paragraph 9 letters a) and c) of Regulation (EU) 2024/573 of the European Parliament and of the Council of 7 February 2024 on fluorinated greenhouse gases, amending Directive (EU) 2019/1937 and repealing Regulation (EU) No 517/2014 (https://eur-lex.europa.eu/eli/reg/2024/573/oj?locale=pl). with tender notice no. 713548-2026 published on 15 Oct 2026. The tender is due to expire on 17 Nov 2026. This tender is sourced from TED Europa and is eligible for suppliers interested in Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, Construction work for pipelines, communication and power lines, Construction work for electricity power lines, Substation construction work, Construction work for power plant. Interested bidders can obtain further information including complete bid documents or ways to participate by registering on Tender Impulse and referencing via Tender Impulse ID 15556791.
Tender Details
Tender NoticeTI Ref: 15556791
Tender Notice No
713548-2026
Tender Organisation
ENERGA-OPERATOR S.A.
Tender CPV
45230000 : Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork45231000 : Construction work for pipelines, communication and power lines45231400 : Construction work for electricity power lines45232220 : Substation construction work45251100 : Construction work for power plant
Tender Document Type
Competition
Tender Deadline
17 Nov 2026 30 days left
Tender Description
1. The subject of the contract is the preparation of design and construction documentation as well as construction and assembly works for the task “Construction of a 15kV MV cable and cable-overhead power grid” divided into three Parts: 1.1. Part 1 - Construction of a 15kV MV cable power grid together with a ZKSN-3 cable connector to power a publicly accessible vehicle charging station in Kołobrzeg, Kołobrzeg commune; 1.2. Part 2 - Construction of a 15kV MV cable-overhead power grid together with the construction of a ZKSN cable connector to power a publicly accessible vehicle charging station in Nowe Bielice and Tatów, Biesiekierz commune; 1.3. Part 3 - Construction of a 15kV cable power network with ZKSN cable connectors to power publicly accessible charging stations at MOP Słupsk North and South in the town of Słupsk, Słupsk commune and in the town of Płaszewko, Redzikowo commune. 2. Scope of the investment project and order of implementation of work within each Part of the order: 2.2. Stage I – preparation of design and construction documentation, with all legally required opinions, arrangements and decisions, together with obtaining legal titles to real estates necessary to implement the task and incurring the costs of remuneration and compensation related to obtaining these legal titles, on the basis of the Functional-Utility Program (hereinafter referred to as the "Functional-Utility Program" or "FUP") and the Supplementary Information to the FUP (hereinafter jointly referred to as the "Functional-Utility Program" or "FUP"), 2.3. Stage II – execution of construction and assembly works (together with all other materials and costs related to the execution of the order), according to the design documentation prepared by the Contractor, positively accepted and agreed by the Ordering Party as part of Stage I. 3. A detailed description of the subject of the order includes a functional and utility program together with supplementary information (hereinafter collectively referred to as the “functional and utility program” or “PFU”) constituting Appendix No. 12 to the Technical Specifications. 4. The Ordering Party requires that: 4.1. the execution of the subject of the order be carried out exclusively using (regardless of its method or scope) software, materials, products or devices that originate: 4.1.1 from European Union Member States, 4.2.1 or from third countries that are parties to the World Trade Organization Agreement on Government Procurement or other international agreements to which the European Union is a party, guaranteeing reciprocal and equal access to the public procurement market, whereby the origin is determined in accordance with Art. 60, sec. 1 and 2 of Regulation (EU) No 952/2013 of the European Parliament and of the Council of 9 October 2013 laying down the Union Customs Code; 4.2. the performance of the subject matter of the contract did not include: 4.2.1. any ICT product, ICT service or ICT process, which were indicated in the recommendation of the Government Plenipotentiary for Cybersecurity, issued on the basis of Article 33 paragraph 4 of the Act of 5 July 2018.on the national cybersecurity system, stating the negative impact of such ICT products, ICT services or ICT processes on the fundamental interest of state security (art. 226 sec. 1 item 17 of the Public Procurement Law Act) and 4.2.2. any ICT product the type of which was specified in the decision of the minister responsible for computerization on recognizing the supplier as a high-risk supplier, issued on the basis of art. 67b sec. 15 of the Act of 5 July 2018 on the national cybersecurity system, or any ICT service or ICT process specified in such decision (art. 226 sec. 1 item 19 of the Public Procurement Law Act). The terms "ICT product", "ICT service" and "ICT process" shall be understood as the product, service and process referred to in art. 2 points 12-14 of Regulation (EU) 2019/881 of the European Parliament and of the Council of 17 April 2019 on ENISA (European Union Agency for Cybersecurity) and cybersecurity certification in the field of information and communication technologies and repealing Regulation (EU) No 526/2013 (Cybersecurity Act), within the meaning of the Act of 5 July 2018 on the National Cybersecurity System. 5. The Ordering Party, taking into account that the completion of the contract will take place after 1 January 2028, informs that it will not accept any equipment using fluorinated greenhouse gases with a global warming potential of 1 or greater, because on the date of acceptance of the construction works it will not be able to put such equipment into service in accordance with Art. 13 sec. 9 lit. a) and c) Regulation (EU) 2024/573 of the European Parliament and of the Council of 7 February 2024 on fluorinated greenhouse gases, amending Directive (EU) 2019/1937 and repealing Regulation (EU) No 517/2014 (https://eur-lex.europa.eu/eli/reg/2024/573/oj?locale=pl).on the national cybersecurity system. 5. The Ordering Party, taking into account that the contract will be completed after 1 January 2028, informs that it will not accept any equipment using fluorinated greenhouse gases with a global warming potential of 1 or greater, because on the date of acceptance of the construction work it will not be able to put such equipment into service in accordance with Article 13 paragraph 9 letters a) and c) of Regulation (EU) 2024/573 of the European Parliament and of the Council of 7 February 2024 on fluorinated greenhouse gases, amending Directive (EU) 2019/1937 and repealing Regulation (EU) No 517/2014 (https://eur-lex.europa.eu/eli/reg/2024/573/oj?locale=pl).on the national cybersecurity system. 5. The Ordering Party, taking into account that the contract will be completed after 1 January 2028, informs that it will not accept any equipment using fluorinated greenhouse gases with a global warming potential of 1 or greater, because on the date of acceptance of the construction work it will not be able to put such equipment into service in accordance with Article 13 paragraph 9 letters a) and c) of Regulation (EU) 2024/573 of the European Parliament and of the Council of 7 February 2024 on fluorinated greenhouse gases, amending Directive (EU) 2019/1937 and repealing Regulation (EU) No 517/2014 (https://eur-lex.europa.eu/eli/reg/2024/573/oj?locale=pl).
Frequently Asked Questions About This Tender
Who has issued this tender, and what is it for?
The tender has been issued by ENERGA-OPERATOR S.A. in Poland. Such a type of tender falls under Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, Construction work for pipelines, communication and power lines, Construction work for electricity power lines, Substation construction work, Construction work for power plant, within the IT-Software sector, and is listed on Tender Impulse under notice number 713548-2026.
What are the key dates for this tender?
The notice was published on 15 Oct 2026 and submissions close on 17 Nov 2026. Late bids are rarely accepted in public procurement, so aim to have your documents ready several days before the closing date.
Which CPV codes apply to this tender?
It is classified under CPV codes 45230000, 45231000, 45231400, 45232220, 45251100, which correspond to Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, Construction work for pipelines, communication and power lines, Construction work for electricity power lines, Substation construction work, Construction work for power plant. If your company supplies these products or services, these are the codes to save in your alert profile so no matching tender passes you by.
Can I submit my bid for this tender to Tender Impulse?
No - and this matters. Tender Impulse is a tender aggregation and alert service: we collect procurement notices from official sources around the world and list them in one place. We do not receive, forward or evaluate bids. Your bid for this tender must be submitted directly to ENERGA-OPERATOR S.A., using the method described in the original tender document, before 17 Nov 2026. Tender Impulse provides complete assistance in submitting all bids posted on its website.
How do I get the bid documents and participation details?
Request a live demo on Tender Impulse and our tender experts will walk you through this listing, share the available documents, and explain how to submit your bid to ENERGA-OPERATOR S.A.. Subscribers also receive help with registration requirements and, where needed, translation of non-English notices - but the submission itself always goes from you to the buyer.
How can I find more tenders like this in Poland?
There are currently 26753 live tenders of 516836 total tenders from Poland on Tender Impulse. You can browse them on our Poland tenders page, or save a search combining Poland with CPV codes 45230000, 45231000, 45231400, 45232220, 45251100 - we will then email you every new match on the day it is published.
How to prepare for this bid?
Suppliers must verify technical specifications, the delivery schedules and any other intrinsic details as provided in the complete bid documents before deciding to submit their bids. All necessary certifications and supplier registrations must be undertaken before participation.
Is this tender beneficial for me?
The procurement is applicable to companies in the Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, Construction work for pipelines, communication and power lines, Construction work for electricity power lines, Substation construction work, Construction work for power plant and related industries. If you belong to this industry, you can review the technical documents before assessing your relevance to your company.
What is the procurement trend for Preparation of a construction and execution design and construction and assembly works according to this design for the project entitled Construction of a cable and cable-overhead MV 15 kV power grid (3 Parts)?
The public procurement trends for Preparation of a construction and execution design and construction and assembly works according to this design for the project entitled Construction of a cable and cable-overhead MV 15 kV power grid (3 Parts) can be assessed by viewing historical data and buying patterns for this product. Subscribed members can view and even download reports of tenders released in the past for their market research. This shall allow them to carefully prepare a compelling bid.
Explore More Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, Construction work for pipelines, communication and power lines, Construction work for electricity power lines, Substation construction work, Construction work for power plant Tenders in Poland, Europe Region and Worldwide
Looking for more tenders like this one in Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, Construction work for pipelines, communication and power lines, Construction work for electricity power lines, Substation construction work, Construction work for power plant? With millions of global procurement opportunities and new tenders added daily, Tender Impulse is your gateway to international and local contracting success. Whether you're targeting the IT-Software sector in Poland, or expanding across regions, we provide live, accurate and relevant updates every day.
Our platform sources tenders from national and local government portals, international development and funding agencies, municipal corporations, state authorities, NGOs, education ministries and public-private partnerships.
Daily Tender Updates Across 190+ Countries
Every day we add hundreds of new RFPs, RFQs, EOIs and contract awards across multiple sectors and geographies. This tender from Poland is just a sample of what's available right now - there are currently 26,753 live Poland tenders to explore.
Search Smarter with CPV and Industry Matching
Each listing is categorised using CPV codes such as 45230000, 45231000, 45231400, 45232220, 45251100, enabling precise filtering by tender type, location, industry, deadline and issuing organisation.
Start Your Tender Journey
Request a free live demo to unlock tenders customised to your sector, country and CPV categories - with alerts, documents and submission support.