JA Habab 3 Amd Emirates Road Pumping Stations Pumps Overhauling

This tender is from the country of United Arab Emirates in Middle East region. The tender was published by DUBAI ELECTRICITY & WATER AUTHORITY (DEWA) on 02 Jun 2023 for Quotation are invited for JA Habab 3 Amd Emirates Road Pumping Stations Pumps Overhauling. COMPLETE OVERHAULING OF BOOSTER PUMP FOR JA HABAB PH3 PUMPING STATION. PUMP DETAILS: MAKE- TORISHIMA, MODEL-CDM350X300, EQUIPMENT NO .-M37104, HEAD-140M, FLOW-263L/S, RPM-1475, 630KW. PLEASE CONTACT MR. NOOR UDDIN (04-3229439) FOR FURTHER CLARIFICATION. 1.0#SCOPE OF WORK THE SCOPE OF WORK (MANDATORY & OPTIONAL) FOR THE OVERHAUL OF BOOSTER PUMPS AND THEIR ACCESSORIES OF BOOSTER PUMPING STATION . # A)#THE CONTRACTOR HAS TO TAKE THE PUMP ASSEMBLY FROM DEWA SITE TO THEIR WORKSHOP & VICE VERSA. DEWA SHALL NOT PROVIDE ANY TRANS PORT TO SHIFT THE SAME. FOR LOADING & UNLOADING CONTRACTOR CAN USE DEWA OVERHEAD CRANE AVAILABLE AT PUMPING STATIONS IN COORDINATIO N WITH THE DEWA REPRESENTATIVES. B)#MECHANICAL SEAL REPLACEMENT, COUPLING BUSH RENEWAL & GLAND PACKING RENEWAL, BEARING REPLACEMENT AS REQUIRED. C)#OVERHAULING OF PUMP (SEE ANNEXURE I-MANDATORY & II-OPTIONAL) D)#PAINTING OF PUMP EXTERNALLY E)#RECTIFICATION OF THE PUMP FOR ANY COMPLAINT ROSE AFTER INSTALLATION. F)#IF ANY PART IS FOUND DEFECTIVE, THE CONTRACTOR HAS TO REPAIR/REPLACE THE SAME. AV AILABLE SPARE SHALL BE SUPPLIED BY DEWA. IF ANY SPARE IS NOT AVAILABLE WITH DEWA THE CONTRACTOR HAS TO ARRANGE THE SAME. ADDITIONAL COST OF SPARE TO BE SUBMITTED TO DEWA FOR APPROVAL BEFORE PLACING THE ORDER. 2.0#PRIOR TO SUBMISSION OF QUOTATION, THE FOLLOWING SHALL BE DETERMINED CAREFULLY: A)#THE CONTRACTOR SHALL VISIT THE SITE AND MAKE HIMSELF FULLY FAMILIAR WITH THE WORK SCOPE, PLANT AC CESS FACILITIES, COMPLEXITIES, ETC., BEFORE SUBMITTING THE QUOTATION. B)#DEWA WILL NOT ACCEPT ANY CLAIM FOR EXTRAS BEYOND THE ORDER RATES / PRICES DURING AND AFTER THE EXECUTION OF WORK ORDERED. C)#THE CONTRACTOR WILL BE PROVIDED WITH THE EQUIPMENT SHUTDOWN PROG RAM IN COORDINATION WITH OPERATION & MAINTENANCE DEPARTMENT OF WATER DIVISION. D)# THE CONTRACTOR SHOULD SUBMIT THE TIME SCHEDULE / BAR CHART INDICATING EACH ACTIVITY. E)#ON COMPLETION OF THE WORK, THE INSPECTION CHECKLIST OF QUALITY PROCEDURES, WHEREVER APPLICAB LE SHOULD BE FILLED IN AND SUBMITTED. F)#SITE SUPERVISION, CO-ORDINATION OF FIELD ACTIVITIES, SUPPLY OF REQUIRED TECHNICIANS, TOOLS , EQUIPMENTS, TACKLES ETC. REQUIRED FOR EXECUTION OF THE CONTRACT WORKS SHALL BE SUITABLY CONSIDERED. 4.0#TAKE OVER ON COMPLET ION OF ALL WORK WITHIN THE SCOPE OF THE CONTRACT, FOR ACCEPTANCE OF THE MAINTENANCE WORK, CONTRACTOR SHALL NOTIFY DEWA IN WRITING. A CERTIFICATE OF COMPLETION WILL BE ISSUED BY DEWA ON FINAL INSPECTION ONLY WHEN THE CONTRACT WORK IS DEEMED TO HAVE BEEN TAKEN OVER BY DEWA AFTER NECESSARY CONDITION MONITORING CHECKS WHEREVER & WHENEVER REQUIRED. 5.0#WARRANTY A)#ALL THE WORK CARRIED OUT SHALL CARRY A WARRANTY FOR 8000 HOURS OF OPERATION OR 1 YEAR WHICHEVER IS EARLIER. B)#THE GUARANTEE WILL TAKE EFFECT FROM THE DATE OF TA KEOVER BY DEWA OF THE JOB CARRIED OUT BY THE CONTRACTOR. C)#WHEN A DEFECT IS NOTICED DURING THE PERIOD OF WARRANTY, THE CONTRACTOR MUST RECTIFY THE DEFECT WITHIN A REASONABLE AMOUNT OF TIME FIXED BY DEWA WITH NO CLAIM OR COMPENSATION. 6.0#DOCUMENTS: # ON SATISF ACTORY COMPLETION OF THE WORK & HANDING OVER, THE CONTRACTOR SHOULD SUBMIT THE FOLLOWING TO DEWA. ## A)#IN SPECTION REPORT. B)#OVERHAUL REPORT. C)#JOB COMPLETION REPORT FOR JOBS OTHER THAN ROUTINE INSPECTION & OVERHAULS D)##AS-FITTED# BI LL OF MATERIALS FOR CONSUMPTION OF SPARES E)#REQUISITION FOR PLANNING OF SPARES BY DEWA BASED ON CURRENT CONDITION OF THE EQUIPMENT FOR WHICH MAINTENANCE WORK WAS TAKEN UP. ANNEXURE # I DETAIL SCOPE OF WORK (MANDATORY) FOR OVERHAUL THE BOOSTER PUMP OF PUMP ING STATION SL.NO#ACTIVITY#REMARKS# 01#DISMANTLING OF THE PUMP#DISMANTLING OF THE PUMP AS PER DEWA ENGINEER#S INSTRUCTION# ##PUMP SHALL BE REMOVED AS PER SEQUENCE WITH SKILLED WORKMANSHIP & CARE.# 02#OVERHAULING OF PUMP#THE CONTRACTOR SHALL DISMANTLE THE COMPLE TE ROTATING ASSEMBLY AT THEIR WORKSHOP AND RECORD ALL FINDINGS IN A TRACK SHEET WITH PHOTOGRAPHS OF DETERIORATED COMPONENTS.# ##THE CONTRACTOR HAS TO CHECK FOR SHAFT STRAIGHTNESS AND IDENTIFY WORN-OUT AREAS IF ANY. RECONDITIONING OF THE SHAFT SHALL BE CARRIED OUT IN COMPLIANCE WITH THE LATEST STANDARDS & PROCEDURES.# ##THE CONTRACTOR HAS TO CHECK THE IMPELLER THOROUGHLY FOR ANY RECONDITIONING REQUIRED. # ##BEARING CONDITION TO BE CHECKED & REPLACE THE BEARINGS IF REQUIRED. # ##MECHANICAL SEAL / GLAND SLEEVE CONDITION TO BE CHECKED & TO BE REPLACED IF REQUIRED.# ##WEAR RINGS DIMENSIONS TO BE CHECKED FOR CLEARANCE & TO BE REPLACED IF REQUIRED.# ##IF ANY PART IS FOUND DEFECTIVE, THE CONTRACTOR HAS TO REPAIR/REPLACE THE SAME. AVAILABLE SPARE SHALL BE SUPPLIED BY DEWA. Qty: 1 JA Habab 3 amd Emirates Road pumping stations pumps overhauling STANDARD TERMS & CONDITIONS 1) Prices should be 'DDP' delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is '30 days credit' from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis. The last date to submit your bid for this tender was 07 Jun 2023. This tender is for the companies specializing in Pumping station construction work and similar sectors.

*The deadline for this tender has passed.

Tender Organisation:

DUBAI ELECTRICITY & WATER AUTHORITY (DEWA)

Tender Service:

Worldwide

Tender Region:

Tender Country:

Tender CPV:

45232152 : Pumping station construction work

Tender Document Type:

Tender Notice

Tender Description:

Quotation are invited for JA Habab 3 Amd Emirates Road Pumping Stations Pumps Overhauling. COMPLETE OVERHAULING OF BOOSTER PUMP FOR JA HABAB PH3 PUMPING STATION. PUMP DETAILS: MAKE- TORISHIMA, MODEL-CDM350X300, EQUIPMENT NO .-M37104, HEAD-140M, FLOW-263L/S, RPM-1475, 630KW. PLEASE CONTACT MR. NOOR UDDIN (04-3229439) FOR FURTHER CLARIFICATION. 1.0#SCOPE OF WORK THE SCOPE OF WORK (MANDATORY & OPTIONAL) FOR THE OVERHAUL OF BOOSTER PUMPS AND THEIR ACCESSORIES OF BOOSTER PUMPING STATION . # A)#THE CONTRACTOR HAS TO TAKE THE PUMP ASSEMBLY FROM DEWA SITE TO THEIR WORKSHOP & VICE VERSA. DEWA SHALL NOT PROVIDE ANY TRANS PORT TO SHIFT THE SAME. FOR LOADING & UNLOADING CONTRACTOR CAN USE DEWA OVERHEAD CRANE AVAILABLE AT PUMPING STATIONS IN COORDINATIO N WITH THE DEWA REPRESENTATIVES. B)#MECHANICAL SEAL REPLACEMENT, COUPLING BUSH RENEWAL & GLAND PACKING RENEWAL, BEARING REPLACEMENT AS REQUIRED. C)#OVERHAULING OF PUMP (SEE ANNEXURE I-MANDATORY & II-OPTIONAL) D)#PAINTING OF PUMP EXTERNALLY E)#RECTIFICATION OF THE PUMP FOR ANY COMPLAINT ROSE AFTER INSTALLATION. F)#IF ANY PART IS FOUND DEFECTIVE, THE CONTRACTOR HAS TO REPAIR/REPLACE THE SAME. AV AILABLE SPARE SHALL BE SUPPLIED BY DEWA. IF ANY SPARE IS NOT AVAILABLE WITH DEWA THE CONTRACTOR HAS TO ARRANGE THE SAME. ADDITIONAL COST OF SPARE TO BE SUBMITTED TO DEWA FOR APPROVAL BEFORE PLACING THE ORDER. 2.0#PRIOR TO SUBMISSION OF QUOTATION, THE FOLLOWING SHALL BE DETERMINED CAREFULLY: A)#THE CONTRACTOR SHALL VISIT THE SITE AND MAKE HIMSELF FULLY FAMILIAR WITH THE WORK SCOPE, PLANT AC CESS FACILITIES, COMPLEXITIES, ETC., BEFORE SUBMITTING THE QUOTATION. B)#DEWA WILL NOT ACCEPT ANY CLAIM FOR EXTRAS BEYOND THE ORDER RATES / PRICES DURING AND AFTER THE EXECUTION OF WORK ORDERED. C)#THE CONTRACTOR WILL BE PROVIDED WITH THE EQUIPMENT SHUTDOWN PROG RAM IN COORDINATION WITH OPERATION & MAINTENANCE DEPARTMENT OF WATER DIVISION. D)# THE CONTRACTOR SHOULD SUBMIT THE TIME SCHEDULE / BAR CHART INDICATING EACH ACTIVITY. E)#ON COMPLETION OF THE WORK, THE INSPECTION CHECKLIST OF QUALITY PROCEDURES, WHEREVER APPLICAB LE SHOULD BE FILLED IN AND SUBMITTED. F)#SITE SUPERVISION, CO-ORDINATION OF FIELD ACTIVITIES, SUPPLY OF REQUIRED TECHNICIANS, TOOLS , EQUIPMENTS, TACKLES ETC. REQUIRED FOR EXECUTION OF THE CONTRACT WORKS SHALL BE SUITABLY CONSIDERED. 4.0#TAKE OVER ON COMPLET ION OF ALL WORK WITHIN THE SCOPE OF THE CONTRACT, FOR ACCEPTANCE OF THE MAINTENANCE WORK, CONTRACTOR SHALL NOTIFY DEWA IN WRITING. A CERTIFICATE OF COMPLETION WILL BE ISSUED BY DEWA ON FINAL INSPECTION ONLY WHEN THE CONTRACT WORK IS DEEMED TO HAVE BEEN TAKEN OVER BY DEWA AFTER NECESSARY CONDITION MONITORING CHECKS WHEREVER & WHENEVER REQUIRED. 5.0#WARRANTY A)#ALL THE WORK CARRIED OUT SHALL CARRY A WARRANTY FOR 8000 HOURS OF OPERATION OR 1 YEAR WHICHEVER IS EARLIER. B)#THE GUARANTEE WILL TAKE EFFECT FROM THE DATE OF TA KEOVER BY DEWA OF THE JOB CARRIED OUT BY THE CONTRACTOR. C)#WHEN A DEFECT IS NOTICED DURING THE PERIOD OF WARRANTY, THE CONTRACTOR MUST RECTIFY THE DEFECT WITHIN A REASONABLE AMOUNT OF TIME FIXED BY DEWA WITH NO CLAIM OR COMPENSATION. 6.0#DOCUMENTS: # ON SATISF ACTORY COMPLETION OF THE WORK & HANDING OVER, THE CONTRACTOR SHOULD SUBMIT THE FOLLOWING TO DEWA. ## A)#IN SPECTION REPORT. B)#OVERHAUL REPORT. C)#JOB COMPLETION REPORT FOR JOBS OTHER THAN ROUTINE INSPECTION & OVERHAULS D)##AS-FITTED# BI LL OF MATERIALS FOR CONSUMPTION OF SPARES E)#REQUISITION FOR PLANNING OF SPARES BY DEWA BASED ON CURRENT CONDITION OF THE EQUIPMENT FOR WHICH MAINTENANCE WORK WAS TAKEN UP. ANNEXURE # I DETAIL SCOPE OF WORK (MANDATORY) FOR OVERHAUL THE BOOSTER PUMP OF PUMP ING STATION SL.NO#ACTIVITY#REMARKS# 01#DISMANTLING OF THE PUMP#DISMANTLING OF THE PUMP AS PER DEWA ENGINEER#S INSTRUCTION# ##PUMP SHALL BE REMOVED AS PER SEQUENCE WITH SKILLED WORKMANSHIP & CARE.# 02#OVERHAULING OF PUMP#THE CONTRACTOR SHALL DISMANTLE THE COMPLE TE ROTATING ASSEMBLY AT THEIR WORKSHOP AND RECORD ALL FINDINGS IN A TRACK SHEET WITH PHOTOGRAPHS OF DETERIORATED COMPONENTS.# ##THE CONTRACTOR HAS TO CHECK FOR SHAFT STRAIGHTNESS AND IDENTIFY WORN-OUT AREAS IF ANY. RECONDITIONING OF THE SHAFT SHALL BE CARRIED OUT IN COMPLIANCE WITH THE LATEST STANDARDS & PROCEDURES.# ##THE CONTRACTOR HAS TO CHECK THE IMPELLER THOROUGHLY FOR ANY RECONDITIONING REQUIRED. # ##BEARING CONDITION TO BE CHECKED & REPLACE THE BEARINGS IF REQUIRED. # ##MECHANICAL SEAL / GLAND SLEEVE CONDITION TO BE CHECKED & TO BE REPLACED IF REQUIRED.# ##WEAR RINGS DIMENSIONS TO BE CHECKED FOR CLEARANCE & TO BE REPLACED IF REQUIRED.# ##IF ANY PART IS FOUND DEFECTIVE, THE CONTRACTOR HAS TO REPAIR/REPLACE THE SAME. AVAILABLE SPARE SHALL BE SUPPLIED BY DEWA. Qty: 1 JA Habab 3 amd Emirates Road pumping stations pumps overhauling STANDARD TERMS & CONDITIONS 1) Prices should be 'DDP' delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is '30 days credit' from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis

Tender Bidding Type:

Publish Date: 02 Jun 2023

Deadline Date: 07 Jun 2023

  • 1 week to go
  • 15 Days to go
  • More than 15 days to go

Get A Callback Within 24 Hours

Fill form below to get callback from Tender Experts.

464984

Explore More Pumping station construction work Tenders in United Arab Emirates, Middle East, and Worldwide

Looking for more tenders like this one in Pumping station construction work? With over 70 million global procurement opportunities and new tenders added daily, Tender Impulse is your gateway to international and local contracting success. Whether you're targeting the Infrastructure and construction sector in United Arab Emirates, or expanding across regions, we provide live, accurate, and relevant updates every day.

Our platform sources tenders from:

  • National and local government portals
  • International development and funding agencies
  • Municipal corporations and state authorities
  • NGOs, education ministries, and public-private partnerships

Daily Tender Updates Across 200+ Countries

Every day, we add hundreds of new RFPs, RFQs, EOIs, and contract awards across multiple sectors and geographies. This tender from United Arab Emirates is just a sample of what's available right now.

Tender Impulse covers:

  • Public procurement tenders
  • International development projects
  • Local municipal bids
  • Private and PPP contracts
  • Framework agreements and supply tenders

Search Smarter with CPV and Industry Matching

Each listing is categorized using CPV codes like 45232152, enabling precise filtering. Search by:

  • Tender type: RFP, RFQ, EOI, GPN, Contract Awards
  • Location: United Arab Emirates, Middle East, or global
  • Industry: Infrastructure and construction
  • Deadline and issue date
  • Issuing organization or funding agency

Opportunities in Every Industry and Region

While you're viewing a tender in United Arab Emirates, Tender Impulse offers access to tenders across:

  • Asia, Europe, Africa, the Americas, and Oceania
  • Defence, Energy, Healthcare, Construction, Education, IT, Agriculture, and more
  • All CPV categories—from consultancy to infrastructure

Tools to Help You Succeed

Tender Impulse provides more than listings:

  • Custom email alerts by CPV and location
  • Downloadable bid documents and submission support
  • Registration guidance and compliance tools
  • Translation support for non-English tenders
  • Proposal writing tips and examples

Stay Ahead with Real-Time Updates

Thousands of new tenders are added daily-across countries, sectors, and CPV codes. With Tender Impulse, you gain strategic insight, timely alerts, and a competitive edge.

Start your free trial to unlock tenders customized to your Infrastructure and construction, United Arab Emirates, and Pumping station construction work categories.

Tender by Region

Tender by Sector

Tender by Country