Summit Street Power Plant Cooling Tower Replacement The existing Summit Street Power Plant (SPP) cross-flow cooling towers 1 through 4 are original to the construction of SPP in approximately 2001.They are at the end of their useful life and need to be replaced as detailed below. Project funding is limited to design-only at this time. The design efforts will inform the necessary construction budget with the intent of funding through critical deferred maintenance funds. The existing cross-flow cooling towers 1 through 4 serve two (2) dual-compressor electric centrifugal chillers of the same vintage. Each existing chiller is rated at 2,000 tons. The cooling towers (CT-1, 2, 3, and 4) are no longer providing adequate heat rejection capacity during hot and humid weather and high cooling load conditions. These cooling towers are also not winterized, and must be drained during cold weather; this causes undesirable operating parameters for research areas and process loads in buildings served by this chilled water system. The existing cooling towers, electric chillers, and the steam turbine chiller and towers at SPP are all controlled through KSU’s Johnson Controls BAS, with optimization through JCI’s Central Plant Optimization / EOS / OpenBlue software and team. The new cooling towers (CT-1/2/3/4) will be located at the same physical location within the plant, with modifications provided to the existing steel support structure (both dunnage steel under the towers and columns to the building steel structure, as required) and all make-up, equalizer, TWS, and TWR piping below the towers to accommodate the new cooling towers. New cooling towers shall be cross-flow type, with all-stainless steel construction (structure, hot and cold basins/covers, fan deck) with velocity recovery outlet cones, hot deck railings, access ladders, anti-vortex cold basin outlet, and basin sweepers and dedicated piping connections. New cooling towers shall be sized to provide heat rejection capacity above the design values of the existing towers; towers shall be capable of a maximum flow of 3,500 gpm per cell cooled from 95°F EWT to 85°F LWT with an 80°F EWB. New basin sweeper separators and pumps shall be provided at the SPP Lower Level near the existing sidestream filtration equipment. Dedicated piping between the new basin sweepers and the separators/pumps shall be routed through the main plant floor and coordinated with KSU SPP personnel during design. Two (2) sweeper systems shall be provided, with one system per pair of towers (CT-1+2 and CT-3+4). Shell and tube heat exchangers (steam in tubes, tower water reverse-piped in shell) shall be provided in sweeper system discharge piping to provide freeze protection at the cooling tower cold basins. The new cooling towers shall be fully winterized. EM-powered heat trace and insulation and jacket shall be provided for all exterior piping and shall extend at least 24” into the building interior, and heat trace shall be controlled using the existing SPP heat trace control system. Cooling tower fans and VFDs shall be capable of reversing air flow when signaled by the BAS. Cold basins shall be heated using the basin sweeper system heat exchangers; note that this requires the use of EM power for basin sweeper equipment. Automatic 2-position valves shall be used to drain the TWR piping up to the hot water basins into the equalizer or cold water basin and tower-specific make-up piping when towers are disabled. Cooling tower bypass piping shall be modified as required to provide improved and more complete bypass during cold weather operation of the operating chillers. Existing cooling tower bypass piping and control occurs within the plant, and does not return water discharged from the chillers’ condensers to the cold basin of the cooling towers. When full tower bypass occurs, water is stagnant in the cold basins, TWS/TWR piping, and equalizer piping. It is desired under this project to return the warmer water discharged from the chillers to the cold water basins through the equalizer piping. Existing equalizer piping appears to be under-sized, and uneven cold basin water levels have been observed by KSU plant personnel during tower operations. Equalizer piping shall be analyzed and replaced to provide improved cold basin level maintenance. Make-up water piping to each cooling tower shall be controlled through the BAS using a digital water level sensor (5 probes, 4 level indications) and a solenoid type control valve. All make-up water piping shall be heat traced from existing piping to the cooling tower cold basin connections. Manual 1” ball valves with hose thread adapters shall be provided at the makeup piping below the new towers for intermittent cleaning of the towers and other roof mounted equipment. Each cooling tower shall be provided with individual TWR/TWS control valves at the hot water inlet to the tower and the cold water outlet from the tower. Manual valves shall be provided at the hot inlet, cold outlet, equalizer, make-up, cold basin drain, and basin sweeper piping connections at each tower cell. Existing TWR, TWS, and equalizer headers under all 6 cooling towers are capable of cross-connection so all towers can serve all chillers. Under this project, these manual valves shall have actuators added to permit automatic actuation of these valves. Existing cooling tower fan VFDs are located in the SPP lower level electrical room. New cooling tower VFDs and load/line-side reactors will be located in place of the current tower fan VFDs. The existing 800A 480/3 CHPMCC-5 with one VFD providing power to CT-1/2/3/4 shall be replaced with a distribution panel with spare capacity for connection of future equipment. Note that this project will take place during winter months when cooling loads are expected to be low, but operation of the SPP steam turbine chiller and CT-5/6 is likely for at least some time period during the Work. The team will be required to ensure operation of the remaining cooling plant equipment during the project. Operations of the Power Plant will continue during the project; coordination of access and any equipment shutdowns will be required with KSU Power Plant personnel. Interested parties may attend a pre-proposal meeting on December 15, 2026, at 10 am in Room 102 Harbourt Hall, 615 Loop Road, Kent, Ohio 44242.

Tender Summary

The Kent State University - Office of the University Architect in USA from Americas region has released this tender for Summit Street Power Plant Cooling Tower Replacement The existing Summit Street Power Plant (SPP) cross-flow cooling towers 1 through 4 are original to the construction of SPP in approximately 2001.They are at the end of their useful life and need to be replaced as detailed below. Project funding is limited to design-only at this time. The design efforts will inform the necessary construction budget with the intent of funding through critical deferred maintenance funds. The existing cross-flow cooling towers 1 through 4 serve two (2) dual-compressor electric centrifugal chillers of the same vintage. Each existing chiller is rated at 2,000 tons. The cooling towers (CT-1, 2, 3, and 4) are no longer providing adequate heat rejection capacity during hot and humid weather and high cooling load conditions. These cooling towers are also not winterized, and must be drained during cold weather; this causes undesirable operating parameters for research areas and process loads in buildings served by this chilled water system. The existing cooling towers, electric chillers, and the steam turbine chiller and towers at SPP are all controlled through KSU’s Johnson Controls BAS, with optimization through JCI’s Central Plant Optimization / EOS / OpenBlue software and team. The new cooling towers (CT-1/2/3/4) will be located at the same physical location within the plant, with modifications provided to the existing steel support structure (both dunnage steel under the towers and columns to the building steel structure, as required) and all make-up, equalizer, TWS, and TWR piping below the towers to accommodate the new cooling towers. New cooling towers shall be cross-flow type, with all-stainless steel construction (structure, hot and cold basins/covers, fan deck) with velocity recovery outlet cones, hot deck railings, access ladders, anti-vortex cold basin outlet, and basin sweepers and dedicated piping connections. New cooling towers shall be sized to provide heat rejection capacity above the design values of the existing towers; towers shall be capable of a maximum flow of 3,500 gpm per cell cooled from 95°F EWT to 85°F LWT with an 80°F EWB. New basin sweeper separators and pumps shall be provided at the SPP Lower Level near the existing sidestream filtration equipment. Dedicated piping between the new basin sweepers and the separators/pumps shall be routed through the main plant floor and coordinated with KSU SPP personnel during design. Two (2) sweeper systems shall be provided, with one system per pair of towers (CT-1+2 and CT-3+4). Shell and tube heat exchangers (steam in tubes, tower water reverse-piped in shell) shall be provided in sweeper system discharge piping to provide freeze protection at the cooling tower cold basins. The new cooling towers shall be fully winterized. EM-powered heat trace and insulation and jacket shall be provided for all exterior piping and shall extend at least 24” into the building interior, and heat trace shall be controlled using the existing SPP heat trace control system. Cooling tower fans and VFDs shall be capable of reversing air flow when signaled by the BAS. Cold basins shall be heated using the basin sweeper system heat exchangers; note that this requires the use of EM power for basin sweeper equipment. Automatic 2-position valves shall be used to drain the TWR piping up to the hot water basins into the equalizer or cold water basin and tower-specific make-up piping when towers are disabled. Cooling tower bypass piping shall be modified as required to provide improved and more complete bypass during cold weather operation of the operating chillers. Existing cooling tower bypass piping and control occurs within the plant, and does not return water discharged from the chillers’ condensers to the cold basin of the cooling towers. When full tower bypass occurs, water is stagnant in the cold basins, TWS/TWR piping, and equalizer piping. It is desired under this project to return the warmer water discharged from the chillers to the cold water basins through the equalizer piping. Existing equalizer piping appears to be under-sized, and uneven cold basin water levels have been observed by KSU plant personnel during tower operations. Equalizer piping shall be analyzed and replaced to provide improved cold basin level maintenance. Make-up water piping to each cooling tower shall be controlled through the BAS using a digital water level sensor (5 probes, 4 level indications) and a solenoid type control valve. All make-up water piping shall be heat traced from existing piping to the cooling tower cold basin connections. Manual 1” ball valves with hose thread adapters shall be provided at the makeup piping below the new towers for intermittent cleaning of the towers and other roof mounted equipment. Each cooling tower shall be provided with individual TWR/TWS control valves at the hot water inlet to the tower and the cold water outlet from the tower. Manual valves shall be provided at the hot inlet, cold outlet, equalizer, make-up, cold basin drain, and basin sweeper piping connections at each tower cell. Existing TWR, TWS, and equalizer headers under all 6 cooling towers are capable of cross-connection so all towers can serve all chillers. Under this project, these manual valves shall have actuators added to permit automatic actuation of these valves. Existing cooling tower fan VFDs are located in the SPP lower level electrical room. New cooling tower VFDs and load/line-side reactors will be located in place of the current tower fan VFDs. The existing 800A 480/3 CHPMCC-5 with one VFD providing power to CT-1/2/3/4 shall be replaced with a distribution panel with spare capacity for connection of future equipment. Note that this project will take place during winter months when cooling loads are expected to be low, but operation of the SPP steam turbine chiller and CT-5/6 is likely for at least some time period during the Work. The team will be required to ensure operation of the remaining cooling plant equipment during the project. Operations of the Power Plant will continue during the project; coordination of access and any equipment shutdowns will be required with KSU Power Plant personnel. Interested parties may attend a pre-proposal meeting on December 15, 2026, at 10 am in Room 102 Harbourt Hall, 615 Loop Road, Kent, Ohio 44242. with tender notice no. BIDEXPRESS-COM-KSU-27S036-50109 published on 23 Nov 2026. The tender is due to expire on 13 Jan 2027. This tender is sourced from Bid Express and is eligible for suppliers interested in Cooling towers, Cooling-water pumps, Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery, Construction work for cooling towers, Installation work of cooling equipment. Interested bidders can obtain further information including complete bid documents or ways to participate by registering on Tender Impulse and referencing via Tender Impulse ID 16712158.

Tender Details

Tender NoticeTI Ref: 16712158
Tender Notice No
BIDEXPRESS-COM-KSU-27S036-50109
Tender Organisation
Kent State University - Office of the University Architect
Tender Sector
Tender Service
Worldwide
Tender Region
Tender Project Location
Tender CPV
31140000 : Cooling towers42122161 : Cooling-water pumps42510000 : Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery45251150 : Construction work for cooling towers45331230 : Installation work of cooling equipment
Tender Source
Bid Express
Tender Document Type
Tender Notice
Tender Deadline
13 Jan 2027 46 days left
Tender Description
Summit Street Power Plant Cooling Tower Replacement The existing Summit Street Power Plant (SPP) cross-flow cooling towers 1 through 4 are original to the construction of SPP in approximately 2001.They are at the end of their useful life and need to be replaced as detailed below. Project funding is limited to design-only at this time. The design efforts will inform the necessary construction budget with the intent of funding through critical deferred maintenance funds. The existing cross-flow cooling towers 1 through 4 serve two (2) dual-compressor electric centrifugal chillers of the same vintage. Each existing chiller is rated at 2,000 tons. The cooling towers (CT-1, 2, 3, and 4) are no longer providing adequate heat rejection capacity during hot and humid weather and high cooling load conditions. These cooling towers are also not winterized, and must be drained during cold weather; this causes undesirable operating parameters for research areas and process loads in buildings served by this chilled water system. The existing cooling towers, electric chillers, and the steam turbine chiller and towers at SPP are all controlled through KSU’s Johnson Controls BAS, with optimization through JCI’s Central Plant Optimization / EOS / OpenBlue software and team. The new cooling towers (CT-1/2/3/4) will be located at the same physical location within the plant, with modifications provided to the existing steel support structure (both dunnage steel under the towers and columns to the building steel structure, as required) and all make-up, equalizer, TWS, and TWR piping below the towers to accommodate the new cooling towers. New cooling towers shall be cross-flow type, with all-stainless steel construction (structure, hot and cold basins/covers, fan deck) with velocity recovery outlet cones, hot deck railings, access ladders, anti-vortex cold basin outlet, and basin sweepers and dedicated piping connections. New cooling towers shall be sized to provide heat rejection capacity above the design values of the existing towers; towers shall be capable of a maximum flow of 3,500 gpm per cell cooled from 95°F EWT to 85°F LWT with an 80°F EWB. New basin sweeper separators and pumps shall be provided at the SPP Lower Level near the existing sidestream filtration equipment. Dedicated piping between the new basin sweepers and the separators/pumps shall be routed through the main plant floor and coordinated with KSU SPP personnel during design. Two (2) sweeper systems shall be provided, with one system per pair of towers (CT-1+2 and CT-3+4). Shell and tube heat exchangers (steam in tubes, tower water reverse-piped in shell) shall be provided in sweeper system discharge piping to provide freeze protection at the cooling tower cold basins. The new cooling towers shall be fully winterized. EM-powered heat trace and insulation and jacket shall be provided for all exterior piping and shall extend at least 24” into the building interior, and heat trace shall be controlled using the existing SPP heat trace control system. Cooling tower fans and VFDs shall be capable of reversing air flow when signaled by the BAS. Cold basins shall be heated using the basin sweeper system heat exchangers; note that this requires the use of EM power for basin sweeper equipment. Automatic 2-position valves shall be used to drain the TWR piping up to the hot water basins into the equalizer or cold water basin and tower-specific make-up piping when towers are disabled. Cooling tower bypass piping shall be modified as required to provide improved and more complete bypass during cold weather operation of the operating chillers. Existing cooling tower bypass piping and control occurs within the plant, and does not return water discharged from the chillers’ condensers to the cold basin of the cooling towers. When full tower bypass occurs, water is stagnant in the cold basins, TWS/TWR piping, and equalizer piping. It is desired under this project to return the warmer water discharged from the chillers to the cold water basins through the equalizer piping. Existing equalizer piping appears to be under-sized, and uneven cold basin water levels have been observed by KSU plant personnel during tower operations. Equalizer piping shall be analyzed and replaced to provide improved cold basin level maintenance. Make-up water piping to each cooling tower shall be controlled through the BAS using a digital water level sensor (5 probes, 4 level indications) and a solenoid type control valve. All make-up water piping shall be heat traced from existing piping to the cooling tower cold basin connections. Manual 1” ball valves with hose thread adapters shall be provided at the makeup piping below the new towers for intermittent cleaning of the towers and other roof mounted equipment. Each cooling tower shall be provided with individual TWR/TWS control valves at the hot water inlet to the tower and the cold water outlet from the tower. Manual valves shall be provided at the hot inlet, cold outlet, equalizer, make-up, cold basin drain, and basin sweeper piping connections at each tower cell. Existing TWR, TWS, and equalizer headers under all 6 cooling towers are capable of cross-connection so all towers can serve all chillers. Under this project, these manual valves shall have actuators added to permit automatic actuation of these valves. Existing cooling tower fan VFDs are located in the SPP lower level electrical room. New cooling tower VFDs and load/line-side reactors will be located in place of the current tower fan VFDs. The existing 800A 480/3 CHPMCC-5 with one VFD providing power to CT-1/2/3/4 shall be replaced with a distribution panel with spare capacity for connection of future equipment. Note that this project will take place during winter months when cooling loads are expected to be low, but operation of the SPP steam turbine chiller and CT-5/6 is likely for at least some time period during the Work. The team will be required to ensure operation of the remaining cooling plant equipment during the project. Operations of the Power Plant will continue during the project; coordination of access and any equipment shutdowns will be required with KSU Power Plant personnel. Interested parties may attend a pre-proposal meeting on December 15, 2026, at 10 am in Room 102 Harbourt Hall, 615 Loop Road, Kent, Ohio 44242.
Tender Bidding Type
Unlock Full Details — Register Free

Frequently Asked Questions About This Tender

Who has issued this tender, and what is it for?
The tender has been issued by Kent State University - Office of the University Architect in USA. Such a type of tender falls under Cooling towers, Cooling-water pumps, Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery, Construction work for cooling towers, Installation work of cooling equipment, within the Energy sector, and is listed on Tender Impulse under notice number BIDEXPRESS-COM-KSU-27S036-50109.
What are the key dates for this tender?
The notice was published on 23 Nov 2026 and submissions close on 13 Jan 2027. Late bids are rarely accepted in public procurement, so aim to have your documents ready several days before the closing date.
Which CPV codes apply to this tender?
It is classified under CPV codes 31140000, 42122161, 42510000, 45251150, 45331230, which correspond to Cooling towers, Cooling-water pumps, Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery, Construction work for cooling towers, Installation work of cooling equipment. If your company supplies these products or services, these are the codes to save in your alert profile so no matching tender passes you by.
Can I submit my bid for this tender to Tender Impulse?
No - and this matters. Tender Impulse is a tender aggregation and alert service: we collect procurement notices from official sources around the world and list them in one place. We do not receive, forward or evaluate bids. Your bid for this tender must be submitted directly to Kent State University - Office of the University Architect, using the method described in the original tender document, before 13 Jan 2027. Tender Impulse provides complete assistance in submitting all bids posted on its website.
How do I get the bid documents and participation details?
Request a live demo on Tender Impulse and our tender experts will walk you through this listing, share the available documents, and explain how to submit your bid to Kent State University - Office of the University Architect. Subscribers also receive help with registration requirements and, where needed, translation of non-English notices - but the submission itself always goes from you to the buyer.
How can I find more tenders like this in USA?
There are currently 19329 live tenders of 730604 total tenders from USA on Tender Impulse. You can browse them on our USA tenders page, or save a search combining USA with CPV codes 31140000, 42122161, 42510000, 45251150, 45331230 - we will then email you every new match on the day it is published.
How to prepare for this bid?
Suppliers must verify technical specifications, the delivery schedules and any other intrinsic details as provided in the complete bid documents before deciding to submit their bids. All necessary certifications and supplier registrations must be undertaken before participation.
Is this tender beneficial for me?
The procurement is applicable to companies in the Cooling towers, Cooling-water pumps, Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery, Construction work for cooling towers, Installation work of cooling equipment and related industries. If you belong to this industry, you can review the technical documents before assessing your relevance to your company.
What is the procurement trend for Summit Street Power Plant Cooling Tower Replacement The existing Summit Street Power Plant (SPP) cross-flow cooling towers 1 through 4 are original to the construction of SPP in approximately 2001.They are at the end of their useful life and need to be replaced as detailed below. Project funding is limited to design-only at this time. The design efforts will inform the necessary construction budget with the intent of funding through critical deferred maintenance funds. The existing cross-flow cooling towers 1 through 4 serve two (2) dual-compressor electric centrifugal chillers of the same vintage. Each existing chiller is rated at 2,000 tons. The cooling towers (CT-1, 2, 3, and 4) are no longer providing adequate heat rejection capacity during hot and humid weather and high cooling load conditions. These cooling towers are also not winterized, and must be drained during cold weather this causes undesirable operating parameters for research areas and process loads in buildings serve..?
The public procurement trends for Summit Street Power Plant Cooling Tower Replacement The existing Summit Street Power Plant (SPP) cross-flow cooling towers 1 through 4 are original to the construction of SPP in approximately 2001.They are at the end of their useful life and need to be replaced as detailed below. Project funding is limited to design-only at this time. The design efforts will inform the necessary construction budget with the intent of funding through critical deferred maintenance funds. The existing cross-flow cooling towers 1 through 4 serve two (2) dual-compressor electric centrifugal chillers of the same vintage. Each existing chiller is rated at 2,000 tons. The cooling towers (CT-1, 2, 3, and 4) are no longer providing adequate heat rejection capacity during hot and humid weather and high cooling load conditions. These cooling towers are also not winterized, and must be drained during cold weather this causes undesirable operating parameters for research areas and process loads in buildings serve.. can be assessed by viewing historical data and buying patterns for this product. Subscribed members can view and even download reports of tenders released in the past for their market research. This shall allow them to carefully prepare a compelling bid.

Explore More Cooling towers, Cooling-water pumps, Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery, Construction work for cooling towers, Installation work of cooling equipment Tenders in USA, Americas Region and Worldwide

Looking for more tenders like this one in Cooling towers, Cooling-water pumps, Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery, Construction work for cooling towers, Installation work of cooling equipment? With millions of global procurement opportunities and new tenders added daily, Tender Impulse is your gateway to international and local contracting success. Whether you're targeting the Energy sector in USA, or expanding across regions, we provide live, accurate and relevant updates every day.

Our platform sources tenders from national and local government portals, international development and funding agencies, municipal corporations, state authorities, NGOs, education ministries and public-private partnerships.

Daily Tender Updates Across 190+ Countries

Every day we add hundreds of new RFPs, RFQs, EOIs and contract awards across multiple sectors and geographies. This tender from USA is just a sample of what's available right now - there are currently 19,329 live USA tenders to explore.

Search Smarter with CPV and Industry Matching

Each listing is categorised using CPV codes such as 31140000, 42122161, 42510000, 45251150, 45331230, enabling precise filtering by tender type, location, industry, deadline and issuing organisation.

Start Your Tender Journey

Request a free live demo to unlock tenders customised to your sector, country and CPV categories - with alerts, documents and submission support.

API Integration — seamlessly integrate global tender data into your systems
AI-Powered Tender Intelligence for smarter bidding decisions
Publish Your Tenders — reach a global network of suppliers
Source Tenders Faster — discover verified tenders from across the globe
Chat with us