Bangladesh Tenders - 15 November 2023 (Page 3 of 7)

1,353 tenders published in Bangladesh on 15 November 2023.

Tender Impulse is your trusted global tender website and tender aggregator, offering access to tens of thousands of tenders from over 190 countries. On this page, explore all government tenders, business tenders, and e-tenders published in Bangladesh on 15 November 2023, across industries like Infrastructure and construction, Healthcare & Medical, IT-Software, Oil and Gas, Education & Training.

This is page 3 of 7 for tenders published in Bangladesh on 15 November 2023.

Why Choose Tender Impulse for Bangladesh?

  • Access a curated list of tender notices from official sources, including ministries, PSUs, and local procurement authorities.
  • Daily updates of world tenders covering Bangladesh and beyond.
  • Tailored listings for sectors like Infrastructure and construction, Healthcare & Medical, IT-Software, Oil and Gas, Education & Training, including projects in EPC, defence, and infrastructure.
  • Easy filters to sort tenders by publish date, keywords, CPV codes, or authority name.

Get Started with Full Access

With a simple free live demo, gain access to tender details, bidding documents, authority contacts, and real-time updates from Bangladesh.

3834783 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3834837 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3834838 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority. Deadline05 Dec 2023 3834839 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3834842 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3834844 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3834853 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3834855 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authorit Deadline05 Dec 2023 3834856 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3834858 Construction of uPVC burried pipe line Deadline05 Dec 2023 3834859 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3834863 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3834869 Construction of uPVC burried pipe line. Pipe and fittings Deadline05 Dec 2023 3834917 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3834927 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3834935 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3834940 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835033 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835035 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835037 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835419 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835420 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835428 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835433 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835458 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835673 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835674 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835697 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835699 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority. one lot 10 nos. of burried pipe line to be constructed. Length of one burried pipe line is 500m Deadline05 Dec 2023 3835702 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835704 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority. Deadline05 Dec 2023 3835740 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835741 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835746 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835748 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835749 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835750 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835751 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority Deadline05 Dec 2023 3835753 Construction of uPVC burried pipe line Deadline05 Dec 2023 3835755 Construction of uPVC burried pipe line Deadline05 Dec 2023 3835756 Construction of uPVC burried pipe line Deadline05 Dec 2023 3835758 Construction of uPVC burried pipe line Deadline05 Dec 2023 3835760 Construction of uPVC burried pipe line Deadline05 Dec 2023 3835763 Construction of uPVC burried pipe line Deadline05 Dec 2023 3835764 Construction of uPVC burried pipe line Deadline05 Dec 2023 3835876 Construction of uPVC burried pipe line Deadline05 Dec 2023 3836091 Construction of uPVC burried pipe line Deadline05 Dec 2023 3836171 Construction of uPVC burried pipe line Deadline05 Dec 2023 3836172 Construction of uPVC burried pipe lin Deadline05 Dec 2023 3836178 Construction of uPVC burried pipe line. Pipe and fittings supplied by the authority. one lot 10 nos.s Deadline05 Dec 2023 3836184 Construction of uPVC burried pipe line. Pipe and fittings supplied Deadline05 Dec 2023 3836968 Repair, Maintenance of Civil, Sanitary & Electrical Works of Sonmania UH&FWC at Kapasia Upazila under Gazipur District. Deadline30 Nov 2023 3836969 Repair, Maintenance of Civil, Sanitary & Electrical Works of Korihata UH&FWC at Kapasia Upazila under Gazipur District. Deadline30 Nov 2023 3836971 Repair, Maintenance of Civil, Sanitary & Electrical Works of Konabari UH&FWC at Sadar Upazila Deadline30 Nov 2023 3836973 Supply of Toner and Cartridges for Different Types of Printer in BRTA Hq Deadline03 Dec 2023 3836975 Construction of Diabetic Corner at Hossainpur Health Complex. Deadline30 Nov 2023 3836976 Construction of Hygiene Corner at Kachuahat Shaheed HRM Girls High School etc Deadline06 Dec 2023 3836980 Supplying of Ultrasonogram Machine Deadline06 Dec 2023 3837486 Gun Spray Paint,Standard Deadline15 Nov 2023 3837518 Development Works of existing Solar and Non-Solar LED Street Light Deadline27 Nov 2023 3837571 Works procurement for the maintenance of GBC crane, chlorination house crane, River water pump house crane etc. Deadline25 Mar 2024 3837572 Refilling work of fire extinguishers and supply of new fire extinguishers. Deadline19 Mar 2024 3837576 Painting Work of Different Pipe Line, Tank and Structure. Deadline22 Jan 2024 3837619 Construction of Chamachi Khal WRS 2V-(1.5mx2.5m) at ch.(0+100km), etc Deadline28 Nov 2023 3837623 Construction of 3x4.50mx4.50m RCC Box Culvert on Iman ali bazar- Ramgoti road Deadline22 Nov 2023 3837629 Electrical Rewiring & Fitting/Fixing Switch,Socket, Light, Fan, SDB service cable & others necessary works for newly construction of female anser barrack cook house at Ahskona, Irs Deadline06 Dec 2023 3837632 Unseen/Emergency works under E/M Division-2-Rewiring & Repair, fitting /Fixture , etc Deadline30 Nov 2023 3837637 Improvement of Azizpur Taltola -Idris Munshi Bari - Bhuiyan Market road etc Deadline22 Nov 2023 3837778 Precautionary Bank Protective work from km. 75.529 to km. 75.669 = 140.00 m along the Right Bank of Mohananda River Deadline03 Dec 2023 3837780 Precautionary Bank Protection Work on the Right bank of the Mohanonda River Deadline26 Nov 2023 3838814 Changing of Rulling Shutter at ground floor canteen Deadline28 Nov 2023 3838987 Rehabilitation of National High Way-Kakonhat via Machmara Road Deadline26 Nov 2023 3838994 Rehabilitation of Kadamhazirmor-Sabdipur Road from Ch:00m-930m (Road ID: 181344088) Deadline26 Nov 2023 3838998 Rehabilitation of Tanore Amnura Pacca Road-Aradighi Village Road from Ch:00m-1300m Deadline28 Jan 2024 3839009 Rehabilitation of Dargapara R&H-Beluapara Road from Ch:00m-800m Deadline26 Nov 2023 3839203 Procurement of Wall Calendar, Desk Calendar, Diary and Table Planner Deadline29 Nov 2023 3839304 Supply of Different Types of Cartridges at SAIA,CTG. Deadline27 Nov 2023 3839306 Construction of Boundary/Security Wall and land development of Bazbi Rural Pipe Water Supply Scheme at Araihazar Upazila of Narayanganj under Arsenic risk reduction project (ARRP) Deadline27 Nov 2023 3839307 Special repair works including renewal of floor tiles in bedroom & other rooms and toilet floor & wall tiles, changing toilet water distribution pipes, sanitary fittings & curtain Deadline27 Nov 2023 3839309 Widening & Strengthening of Muladi GC - Talukder Hat - Bashtala Bazar - Mirdar Hat upto Muladi Boarder Road from Ch. 5640m - 9840m including 03 Nos. Double Vent 4.00m x 4.00m RCC B Deadline14 Dec 2023 3839311 Big Data Analytical Devices (Type-2, Mid Level Server) Deadline05 Dec 2023 3839313 Special repair works including renewal of floor tiles in bedroom & other rooms and toilet floor & wall tiles, changing toilet water distribution pipes, sanitary fittings & curtain Deadline27 Nov 2023 3839314 Hype Analyzer(Second Phase) Deadline05 Dec 2023 3839315 Equipment for predictive Intelligence solution. Deadline05 Dec 2023 3839316 Device for Social Media Analysis Deadline05 Dec 2023 3839317 Supply of Medical Equipment (Manual bed & Ceiling Fan) at Health Complex Dacope Upazila, District: Khulna Deadline27 Nov 2023 3839319 Construction of Passenger Shed at Pankhali and Poddarganj Ferry ghat under Dacope Upazila, District: Khulna Deadline27 Nov 2023 3839320 Construction of Delivery Room of Pankhali Hoglabunia Community Clinic under Dacope Upazila, District: Khulna Deadline27 Nov 2023 3839321 Artificial Intelligence (AI) Big Data Analysis Robot (Second Phase) Deadline05 Dec 2023 3839322 Special repair works including renewal of floor tiles in bedroom & other rooms and toilet floor & wall tiles, changing toilet water distribution pipes, sanitary fittings & curtain Deadline27 Nov 2023 3839324 Rehabilitation of Tila Para-Pahartali Road By BC from Ch:438-1580m under Mahalchari Upazila, Dist. Khagrachari. (Road ID:446654015) (Salvage: Tk.37,36,083.00) Deadline29 Nov 2023 3839325 Construction of Boundary Wall & Including gate of (1) Roypur Government Primary School (2) Ayor Para Government Primary School & (3) Andharia Para Government Primary School under U Deadline27 Nov 2023 3839327 Widening & Strengthening of Ulania GC - Aliganj GC Road (Mehendigonj Part) road from Ch. 00m - 3000m including 01 No. 4.00m x 4.00m RCC Box Culvert at Ch. 2412m under Mehendigonj U Deadline14 Dec 2023 3839328 a) Construction of drain at Sonar Bangla Road Under Sreemangal Pourashava. Ch 0.00m+311.00m, b) Improvement of RCC Drain from Station road to Habiganj Road. ch.0.00m-440.00m Habiga Deadline10 Dec 2023 3839329 Repair and Renovation of Shariatpur PTI under PEDP-4 (FY: 23-24) Deadline28 Nov 2023 3839330 Construction of additional class room Kazla GPS under PEDP4 Under Tarail Upazila, District: Kishoreganj Deadline04 Dec 2023 3839333 Construction of two storied RCC WASH Block for MT & FT with sanitary, plumbing & electrical works under Primary Education Development Program-4. Deadline27 Nov 2023 3839334 Widening & Strengthening of Shaestabad GC (Barishal Sadar) - Hizla Upazila HQ via Gazirhat, Kazirhat GC, Miarhat & Ekkoterhat Road from Ch. 5200m - 10000m and 100m RCC Road (Bangha Deadline14 Dec 2023 3839336 Widening & Strengthening of Shaestabad GC (Barishal Sadar) - Hizla Upazila HQ via Gazirhat, Kazirhat GC, Miarhat & Ekkoterhat Road from Ch. 300m - 5200m and 235m RCC Road (Dafader Deadline14 Dec 2023 3839337 Widening & Strengthening of Shaestabad GC (Barishal Sadar) - Hizla Upazila HQ via Gazirhat, Kazirhat GC, Miarhat & Ekkoterhat Road from Ch. 10000m - 14700m and 150m RCC Road (Gabto Deadline14 Dec 2023 3839345 Widening & Strengthening of Sanuhar R & H Dhamura GC - Jalla - Satla GC Road from Ch. 00m - 8000m including 06 Nos. 0.900m x 0.900m Drainage Culvert at Ch. 735m, 1210m 3080m, 5800m Deadline14 Dec 2023 3839346 Widening & Strengthening of Sanuhar R & H Dhamura GC - Jalla - Satla GC Road from Ch. 15000m - 22965m under Uzirpur Upazila, District : Barishal. [Salvage Materials Cost Tk. 18,97, Deadline14 Dec 2023 3839347 Widening & Strengthening of Sanuhar R & H Dhamura GC - Jalla - Satla GC Road from Ch. 8000m - 15000m under Uzirpur Upazila, District : Barishal. [Salvage Materials Cost Tk. 23,24,2 Deadline14 Dec 2023 3839349 Major Maintenance Of 20 Nos Government Primary School (40 Nos Wash Block) of all Upazila of Shariatpur District Under Primary Education Development Programme-4 Deadline28 Nov 2023 3839350 Installation of 100 x 38 mm dia. deep tube well with submersible pump at different primary schools of Shariatpur District under PEDP-4 (FY: 2023-2024) Deadline28 Nov 2023 3839351 Construction of 7 nos single storied RCC WASH Block having 1 storied foundation for MT & Boys and FT & Girls including all associated construction, sanitary, plumbing & electrical Deadline28 Nov 2023 3839352 Construction of 6 nos 2 storied RCC WASH Block having 2 storied foundation at Cyclone/Flood Shelter including all associated construction, sanitary, plumbing & electrical works at Deadline28 Nov 2023 3839353 Construction of 6 nos 2 storied RCC WASH Block having 2 storied foundation for MT & Boys and FT & Girls including all associated construction, sanitary, plumbing & electrical works Deadline28 Nov 2023 3839355 Construction of 7 nos 2 storied RCC WASH Block having 2 storied foundation for MT & Boys and FT & Girls including all associated construction, sanitary, plumbing & electrical works Deadline28 Nov 2023 3839356 Construction of 6 nos 2 storied RCC WASH Block having 2 storied foundation for MT & Boys and FT & Girls including all associated construction, sanitary, plumbing & electrical works Deadline28 Nov 2023 3839357 Construction of 6 nos 2 storied RCC WASH Block having 2 storied foundation for MT & Boys and FT & Girls including all associated construction, sanitary, plumbing & electrical works Deadline28 Nov 2023 3839359 Construction of 6 nos 2 storied RCC WASH Block (Small Size-10' Wide) having 2 storied foundation for MT & Boys and FT & Girls including all associated construction, sanitary, plumb Deadline28 Nov 2023 3839361 Construction of 6 nos 2 storied RCC WASH Block having 2 storied foundation for MT & Boys and FT & Girls including all associated construction, sanitary, plumbing & electrical works Deadline28 Nov 2023 3839363 Construction of 6 nos 2 storied RCC WASH Block having 2 storied foundation for MT & Boys and FT & Girls including all associated construction, sanitary, plumbing & electrical works Deadline28 Nov 2023 3839364 Construction of 7 nos 2 storied RCC WASH Block having 2 storied foundation for MT & Boys and FT & Girls including all associated construction, sanitary, plumbing & electrical works Deadline28 Nov 2023 3839365 Construction of 7 nos 2 storied RCC WASH Block having 2 storied foundation for MT & Boys and FT & Girls including all associated construction, sanitary, plumbing & electrical works Deadline28 Nov 2023 3839367 Construction of 5 nos 2 storied RCC WASH Block having 2 storied foundation for MT & Boys and FT & Girls including all associated construction, sanitary, plumbing & electrical works Deadline28 Nov 2023 3839368 Procurement of Furniture Deadline28 Nov 2023 3839369 Procurement of Exhaust Fan Deadline28 Nov 2023 3839371 Procurement of Ceiling Fan Deadline28 Nov 2023 3839372 Procurement of Air cooler (AC) 24000 BTU Deadline28 Nov 2023 3839373 Procurement of Workshop Materials for 14 Regional Workshop Deadline28 Nov 2023 3839380 Procurement of Laptop Computer Deadline28 Nov 2023 3839382 Construction of boundary wall at Pabna PBS-2 H/Q complex. Deadline04 Dec 2023 3839383 Construction of boundary wall (South side) at Natore PBS-1 H/Q complex. Deadline27 Nov 2023 3839384 Supplying Fitting, Fixing, Assembling & installing some Solar Street lights and solar Panels with Poles on different roads of Nageswari Pourashava. Deadline07 Dec 2023 3839385 Procurement of Laboratory Equipment Deadline04 Dec 2023 3839386 Improvement of Shahrail to Bandail Road by BC (Ch.1000-3450m), Salvage Cost 66,06,196.00 Road ID No: 356824023 Under Upazila: Singair District Manikganj Deadline27 Nov 2023 3839389 Construction of additional classroom Khontakata United GPS under PEDP4 Deadline26 Nov 2023 3839390 Construction of additional classroom Uttar Sonatala GPS under PEDP4 Deadline26 Nov 2023 3839391 Construction of Additional classroom 38no Taltoli Nalbunia GPS under PEDP4 Deadline26 Nov 2023 3839393 Bank Protective work along the left bank of the Atrai River in Between Km. 0.00 to Km. 0.100 = 45 m at adjacent to Anondonagor/ Kalakandar Shoshan Area in Gurudashpur Pouroshova, D Deadline27 Nov 2023 3839396 Bank Protection work long the left bank of the Barnai River in between Km. 65.450 to Km. 65.630 = 60.00 m to Protect Kolom Degree college & Kolom bazzar area in C/W Chalan Beel Pro Deadline27 Nov 2023 3839397 Construction of Addition Class Room L.P Uttar Para Government Primary School under PEDP4 Deadline27 Nov 2023 3839398 (a) lmprovement of Bhelabari Bazer-Muhammadpur Via H/O Osman Member Road. (Ch.00-2165m) [R.ID.152024023] (b) Construction of 03no 0.625mx0.600m Box culvert at ch.396m, 1245m, 1890m Deadline04 Dec 2023 3839400 Periodic Maintenance of Mymensingh Took RHD (Health Complex) - Chak Rampur GC Road from Ch.340 m - 4500 m under Gaffargaon Upazila, District: Mymensingh; Road ID 361222004. Deadline03 Dec 2023 3839401 Vertical Extension of 4th Floor at Baraigram Upazila Complex Administrative Extension Building under EDC Project, Upazila: Baraigram, Dist: Natore. Deadline04 Dec 2023 3839402 Supply of various stationery, Printing & Computer consumable Goods for the financial year 2023-2024 NOCS Bangshal under DPDC. Deadline27 Nov 2023 3839404 Furniture & kitchen Items Deadline27 Nov 2023 3839405 Chemical Re-Agent Deadline27 Nov 2023 3839407 Linen Items Deadline27 Nov 2023 3839410 Gauge Bandage Cotton Deadline27 Nov 2023 3839411 Surgical Equipment Deadline27 Nov 2023 3839413 Medicine (Non EDCL) Deadline27 Nov 2023 3839415 Construction of Semi Pacca Building for Ghatkhali Amin Uddin Mohila Alim Madrasha under UGDP Chawra Union ,Amtali Upazila, Dist.Barguna. Deadline27 Nov 2023 3839416 Construction of Semi Pacca Building for Kalagasia Dakhil Madrasha under UGDP Gulishakhali Union ,Amtali Upazila, Dist.Barguna. Deadline27 Nov 2023 3839419 Construction of Semi Pacca Building for Taktabunia Nesaria Dakhil Madrasha under UGDP Amtali Upazila,Dist.Barguna. Deadline27 Nov 2023 3839420 Procurement of Stationary Items (Offset Paper, Register, Calculator, Stapler, Ball Pen, etc) for NOCS Satmosjid, DPDC. Deadline26 Nov 2023 3839421 Procurement of Stationary Items (Offset Paper, Register, Calculator, Stapler, Ball Pen, etc) for NOCS Sher-E-Bangla Nagar, DPDC. Deadline26 Nov 2023 3839422 Emergency repair and maintenance works including re-stretching of loose cables, straightening of poles of 11 and 11/0.4 KV lines and cutting of tree branches on both sides of the l Deadline26 Nov 2023 3839423 EDC/NATO/SAD/2023-2024/W1.276 Vertical Extension of 4th Floor at Natore Sadar Upazila Complex Administrative Extension Building Under EDC Project, Upazila: Natore Sadar, Dist: Nato Deadline27 Nov 2023 3839426 Construction of RCC connecting Road for Chikasi Technical College and BM Institute, Upazila: Dhunot, District: Bogura. Deadline26 Nov 2023 3839427 Supply of Desktop Computer sets among Five(05) Educational Institutions,under UGDP(Phase-06), Upazila: Dhunot, District: Bogura. Deadline26 Nov 2023 3839429 Supply of High and Low Bench at Nine(09) nos. Educational Institutions under UGDP(Phase-06), Upazila: Dhunot, District: Bogura. Deadline26 Nov 2023 3839431 Construction of additional class room Shaktala GPS under PEDP4 Deadline04 Dec 2023 3839432 Construction of additional class room Paduar Bazar Model GPS under PEDP4 Deadline04 Dec 2023 3839433 Vertical Extension of 4th floor at Paba Upazila Complex Administrative Extension Building under EDC project, Upazila: Paba, Dist: Rajshahi Deadline27 Nov 2023 3839438 Emergency repair and maintenance work including change/replacement of damaged/defective 11/0.4kV distribution transformer, maintenance & load balancing of 11/0.4KV transformer and Deadline27 Nov 2023 3839439 Emergency repair and maintenance work including change/replacement of damaged/defective 11/0.4kV distribution transformer, maintenance & load balancing of 11/0.4KV transformer and Deadline27 Nov 2023 3839441 Emergency repair and maintenance work including change/replacement of damaged/defective 11/0.4kV distribution transformer, maintenance & load balancing of 11/0.4KV transformer and Deadline27 Nov 2023 3839443 Relevant emergency repair and maintenance work including change of jumpers, retention of guy and wire, change of conductor, pole straighten, replacement of pin/post insulator, cutt Deadline27 Nov 2023 3839445 1) Development Work Of Narikelbaria Union Parishad Jame Mosque At Narikelbaria Union, Under Bagherpara Upazila, Dist.- Jashore. (2) Development Work of Raypara Raja Borodha Kanto R Deadline28 Nov 2023 3839447 Part-1: Improvment of BC road on Singachura Ozabari- Kanar Bazar Road at Ch: 00-1000.00m Under Bhedarganj Upazila Dist: Shariatpur. (Road ID: 386145077). Part-2: Improvment of BC Deadline04 Dec 2023 3839449 Installation of Solar Street Light from Saudagorpara Volo Saudagor House to Bakshigonj Porshimpara road Forhad Mia House Via Shug Store & Alal Mia house, Under Bakshiganj Pourashav Deadline04 Dec 2023 3839451 Vertical Extension of 4th Floor at Dimla Upazila Complex Administrative Extension Building under EDC, Upazila: Dimla, District: Nilphamari. Deadline04 Dec 2023 3839478 Development of Riazuddin road with drain, Repairing road around Jubilee road Rani dighi , Shahid Abdur Rob colony road lane by lane drain with road, Rafiq uddin siddique by lane ro Deadline11 Dec 2023 3839480 Purchasing of Sundarban Fire Fighting Pump (2), Suction Hose Pipe (3), Branch Pipe (3), Delivery Pipe (200 sets), Suction Key, Connecting Head and Accessories Deadline27 Nov 2023 3839483 Supply of Fish bolts of 75Ibs A Rail for regular maintenance of Railway Track under DEN- 2/DA Jurisdictions. Deadline29 Nov 2023 3839484 Supply of DIGITAL SMART BOARD TOUCH SCREEN DISPLAY at different primary School Deadline30 Nov 2023 3839485 Supply of Polypropylene High & Low Benches at different educational institutions Deadline30 Nov 2023 3839486 Supply of Cowdung & Bio-Pesticide for Mangrove Nursery Raising. (Additional) Deadline27 Nov 2023 3839487 providing installation testing commissioning of fire suppression system for main power house sub-station and electrical distribution board at jashore airport Deadline27 Nov 2023 3839488 Construction of Internal Road (Lot 1) in East and West Campus of BUP Deadline26 Nov 2023 3839489 Construction of Lake side Retaining wall ( Lot -01) at East and West Campus of BUP Deadline26 Nov 2023 3839491 Repair, Maintenance of Officer's Quarters (03 Units) & Construction of Approach Road for TBS of�  Sreemongol RDO at Sreemongol, Moulvibazar. Deadline28 Nov 2023 3839492 Construction of Boundary wall & Gate of BHUKSHIMALI, TILA Gaon, MUHIBUR RAHMAN PRIMARY SCHOOL, LALPUR PRIMARY SCHOOL under Kulaura Upazila Dist. Moulvibazar Deadline11 Dec 2023 3839493 Construction of Boundary wall & Gate of HUSENPUR BALIKA, HOSHENPUR, NAZRUL ISLAM, RAILWAY under Kulaura Upazila Dist. Moulvibazar Deadline11 Dec 2023 3839495 Construction of Boundary wall & Gate of SHAHADAT ALI, SHASHAR KANDI, TATRIULY under Kulaura Upazila Dist. Moulvibazar Deadline11 Dec 2023 3839496 Through Sleeper Renewal (TSR) by BG Pre-Stressed Concrete Sleeper 90 lb 'A' New at Level Crossing Gate No-E/40 (Length =80'-0") , E/57 (Length = 70'-0") and E/59 (Lentgh =70'-0") T Deadline06 Dec 2023 3839497 Procurement of Aluminium Sulphate Deadline30 Nov 2023 3839501 Construction of Additional Class Room Dakur Bunia GPS Under PEDP4 Deadline27 Nov 2023 3839502 Shallow screening, ballasting at km 3/4 - 4/0=0.6 Km and km 6/0 - 7/2=1.2 Km in between Khulna Junction-Dolatpur station, Total=1.8 km with other ancillary works under Divisional E Deadline06 Dec 2023 3839503 Development of a) O.R nizam R/A road , b) Amirbag R/A road and c) SS khaled road ( kazir dewri to Ispahani mor) at 15 no Bagmoniram ward Deadline11 Dec 2023 3839504 Supply of Furniture (Full Secretariat Table, Half Secretariat Table, sofa Set, Revolving Chair, Visitor Executive Chair) (in the Framework Method). Deadline27 Nov 2023 3839505 Implementation & supply 194 nos Waste Basket (120 ltr) & 45 nos Non-motorized vehicle (van) under Gopalganj Pourashava, District: Gopalganj. Deadline30 Nov 2023 3839506 Procurement of Copper Made HT & LT Terminal Rod/Lead Deadline28 Nov 2023 3839507 Supply Network equipment & installation Local Area Network ( LAN) for Secondary and Higher Education Division, MoE. Deadline27 Nov 2023 3839508 Supply of Stationary equipment, Printer Toner & Computer Accessories (in the Framework Method). Deadline27 Nov 2023 3839510 (Development of 4 nos. roads at 5 no ward) Lot Description: Development of Hasem Mollah firm to world vision, Fulchori para to Potenga hotel, Fulchori para anju mia road and by lan Deadline11 Dec 2023 3839511 Washing and Ironing of bedding for one year used by upper class passengers of night trains running in Dhaka Division. Deadline26 Nov 2023 3839512 Pavement Repairing and Single Bituminous Surface Treatment (SBST) work at Ch.00+000 to 00+650, Ch.00+915 to 2+500 and Ch.3+500 to 3+965 km of Ramchandrapur Rail gate -Bhangura (Jog Deadline27 Nov 2023 3839513 Pavement Repairing and Single Bituminous Surface Treatment (SBST) Work at Ch. 5+830 to 7+630 of Pabna Town Road (Bus-Terminal to Gaspara) Road Under Pabna Road Division, During the Deadline27 Nov 2023 3839514 Repair of damaged pavement by Premix Bituminous Carpeting and Single Bituminous Surface Treatment (SBST) work at Ch. 0+000 to 2+750 of Bhangura Upazilla Connecting Road (Z-6033) un Deadline27 Nov 2023 3839516 Pavement Repairing by Premix Bituminous Carpeting and Single Bituminous surface treatment (SBST) work at Ch.43+352 to 45+052 of Singra-Gurdaspur-Chatmohor Road (Z-5209) under Pabna Deadline27 Nov 2023 3839517 Pre-Work Survey of Sub-Mersible Embankment of 144.00 KM in different Haor in different upazila (Khaliajuri, Mohanganj, Kalmakanda, Madan, Purbadhala, Atpara, Barhatta) in C/W Kabit Deadline27 Nov 2023 3839520 Supply Bench to High schools and Madrasha under Pekua Upazila Deadline28 Nov 2023 3839523 Supply of Refrigerator, Television, Microwave oven & other accessories for General Manager/West office, Rajshahi. Deadline27 Nov 2023 3839524 Wash Block Construction at Shilkhali High School Station Under Pekua Upazila Deadline28 Nov 2023 3839525 Construction of 35.00m long RCC Gurder Bridge on Dhipur Monir Sarder House-Madul Sarder House Road at Ch: 1000m Under Upazila: Goshairhat, Dist: Shariatpur. (Road ID: 386365094). Deadline04 Dec 2023 3839527 Supply of Laptop, Computer, Printer, Scanner, UPS & other accessories for General Manager/West office, Rajshahi. Deadline27 Nov 2023
API Integration — seamlessly integrate global tender data into your systems
AI-Powered Tender Intelligence for smarter bidding decisions
Publish Your Tenders — reach a global network of suppliers
Source Tenders Faster — discover verified tenders from across the globe
Chat with us